HomeMy WebLinkAboutMIRAMONT OFFICE PARK - Filed CS-COMMENT SHEETS - 2005-04-25PROJECT
COMMENT SHEET
City of Fort Coffins
DATE: 14 October, 1997 DEPT: Engineering
PROJECT: Miramont Office Park
ENGINEER: Tim Blandford
All comments must be received by: November 5, 1997
No Problems
Problems or Concerns (see below or attached)
GENERAL COMMENTS:
Sheet 1 of 1: Final Plat
Please explain why this project is dedicating 4 feet of additional R.O.W. and the
project to the immediate south is dedicating 4.5 feet of additional R.O.W.
Sheet 5 of 8: Utility Plan
Please provide a typical cross-section of Boardwalk and include the appropriate
dimensions, i.e. parkway, sidewalk, R.O.W. limits, centerline, etc.
Additional Comments
Please refer to the utility plans for additional comments and concerns.
Make sure that the Site and Landscape Plans match the Utility Plans.
Please remove the copyright on the Utility Plan,, —
Date: t1 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ® PLA
® SITE
® UTILITY
® LANDSCAPE
COMMENTREVISION
L�
DATE: August 5, 1997 DEPT: Engineering
PROJECT: #54-87AN Miramont Office Park P.U.D. (Parcel
of Oak/Cottonwood Farm ODP) - Preliminary/Final (LDGS)
PLANNER: Steve Olt
All comments must be recieved no later than the staff review meeting:
Wednesday, August 20, 1997
GENERAL COMMENTS:
Preliminary & Final Site Plan
Instead of dedicating 4 feet of additional R.O.W., please show 4.5 feet of additional
R.O.W. being dedicated.
Sheet 1 of 8: Coven Sheet
Check the "Black Bolt Survey" manual for acceptable bench marks to use. Right now the
bench marks shown on the Cover Sheet are not listed in the "Black Bolt Survey" manual.
Add a graphic scale to the Vicinity Map.
Comments continued on the next page Ew
Date: 8/
CIIECK HERE IF YOU NMI] TO RECEIVE COPIES OF REVISIONS
x PW �c Sit _ Drainage Report _ Other
x Utility Zc Redline Utility Lands*
Comments continued from the previous page...
Sheet 1 of 1: Plat
• The legal description still does not match what is shown on the drawing. Please adjust.
• Label all easements
• You will need to dedicate an additional 4.5 feet of R.O.W. along the west side of
Boardwalk Drive to meet the current street standards.
• See Sheet No. I of 1 for additional comments and concerns.
Sheet 4 of 8: Grading Plan
• For the detail of the swale along the west property line, you are showing that the
easement varies. According to the plat, this easement is 20 feet in width and doesn't
vary. Please make the appropriate corrections.
Sheet 5 of 8: Utility Plan
• You will need to dedicate an additional 4.5 feet of R.O.W. along the west side of
Boardwalk Drive to meet the current street standards.
• Need to pave each access with concrete to the R.O.W. line per the street standards.
Please label on the plans.
• Provide a typical cross-section of Boardwalk Drive.
• Provide more detail of each access into the site. We need to know how the water is
draining, etc. Include appropriate details, spot elevations, pans, etc.
• See Sheet No. 5 of 8 for additional comments and concerns.
Sheet 7 of 8: Horizontal Control Plan
• Add some extra dimensions.
Sheet 8 of 8: Details
• Include details:
1. D-18
2. D-19
3. D-25
• Replace street intersection detail with the detail showing the vertical curb.
REVISION
^COMMENT SHEET
� 5
i
3
DATE: August 5, 1997 DEPT: Eng Pvmnt
PROJECT: #54-87AN Miramont Office Park P.U.D. (Parcel
of Oak/Cottonwood Farm ODP) - Preliminary/Final (LDGS)
PLANNER„ Steve Olt
All comments must be recieved no later than the staff review meeting:
Wednesday, August 20, 1997
Date: �� 4
CHECK HERE IF YOU WISH TO RECEIVE
_ Pik _ Site
Utility _ P ine Utility
Signature: v
COPIES OF REVISIONS
_ Dra Wage Report
Landscape
_ fter 66&
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannina
DATE: March 28, 1997 DEPT: Engineering
PROJECT: #54-87AN Miramont Office Park P.U.D. (Parcel
of Oak/Cottonwood Farm ODP) - Preliminary (LDGS)
PLANNER: Steve Olt
All comments must be received by: Wednesday, April 23, 1997
GENERAL COMMENTS:
Preliminary Site Plan
Provide "No parking" signs along the west side of Boardwalk at the developers expense
per the street standards.
The sidewalks adjacent to the parking stalls that are 17' in length need to be 2' wider to
accommodate the overhang from vehicles per the street standards.
Add handicap ramps on the sidewalk along the south property access.
Sheet 1 of 7: Cover Sheet
Add a few more general notes. They are attached to the plan set.
Sheet 2 of 7: Plat
• The legal description does not match what is shown on the drawing. Please adjust.
Comments continued on the next page cw
r
Date: q/Zy19-7 Signature _
CHECK IF YOU WISH TO RECEIVE PLAT
COPIES OF REVISIONS SITE
❑ LANDSCAPE
UTILITY
Add a north arrow and a few descriptions to the vicinity map.
9' utility easements are required along collector streets.
Need to label what property is to the south of the site.
Sheet 4 of 7: Grading Plan
It appears that you are showing grading outside of the property boundary. If so, you will
need to acquire construction easements at all of the locations that this is occurring.
Sheet 5 of 7: Utility Plan
• Provide handicap access ramps at all intersections and locations of pedestrian crossings.
• Does the shared access along the south side of the property connect to anything to the
west of the site?
• Reference all details used throughout the plan set.
• The sidewalk along Boardwalk needs to shown within the R.O.W. per the street
standards.
• Provide complete horizontal alignment including, but not limited to, centerline of streets,
curve information, Street, sidewalk, and R.O.W. dimensions, crosspans, access ramps,
etc.
• Show all utility and drainage easements and dimensions.
• Show the existing features outside of the project site for 150'.
• Need to pave each access with concrete to the R.O.W. line per the street standards.
Sheet 6 of 7: Sanitary Sewer/Storm Drain Plan and Profiles
Show all utility crossings in the profiles.
Sheet 7 of 7: Details
Make sure that all of the details have been referenced throughout the plan set.
• Refer to the redlined utility plans and the site plan for additional comments.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 28, 1997 DEPT: Engineering
PROJECT: #54-87AN Miramont Office Park P.U.D. (Parcel
of Oak/Cottonwood Farm ODP) - Preliminary (LDGS)
PLANNER: Steve Olt
All comments must be received by: Wednesday, April 23, 1997
GENERAL COMMENTS:
Preliminary Site Plan
• Provide "No parking" signs along the west side of Boardwalk at the developers expense
per the street standards.
• The sidewalks adjacent to the parking stalls that are 17' in length need to be 2' wider to
accommodate the overhang from vehicles per the street standards.
• Add handicap ramps on the sidewalk along the south property access.
Sheet 1 of 7: Cover Sheet
Add a few more general notes. They are attached to the plan set.
Sheet 2 of 7: Plat
• The legal description does not match what is shown on the drawing. Please adjust.
Comments continued on the next page Ew
Date: ylzyl97 Signature
CHECK I1F YOU WISH TO RECEIVE ® PLAT
COPIES OF REVISIONS ® SITE
❑ LANDSCAPE
® UTILITY
• Add a north arrow and a few descriptions to the vicinity map.
• 9' utility easements are required along collector streets.
• Need to label what property is to the south of the site.
Sheet 4 of 7: Grading Plan
• It appears that you are showing grading outside of the property boundary. If so, you will
need to acquire construction easements at all of the locations that this is occurring.
Sheet 5 of 7: Utility Plan
• Provide handicap access ramps at all intersections and locations of pedestrian crossings.
• Does the shared access along the south side of the property connect to anything to the
west of the site?
• Reference all details used throughout the plan set.
• The sidewalk along Boardwalk needs to shown within the R.O.W. per the street
standards.
• Provide complete horizontal alignment including, but not limited to, centerline of streets,
curve information, Street, sidewalk, and R.O.W. dimensions, crosspans, access ramps,
etc.
• Show all utility and drainage easements and dimensions.
• Show the existing features outside of the project site for 150'.
• Need to pave each access with concrete to the R.O.W. line per the street standards.
Sheet 6 of 7: Sanitary Sewer/Storm Drain Plan and Profiles
• Show all utility crossings in the profiles.
Sheet 7 of 7: Details
• Make sure that all of the details have been referenced throughout the plan set.
• Refer to the redlined utility plans and the site plan for additional comments.