HomeMy WebLinkAboutMIRAMONT VALLEY PUD REPLAT OF LOTS 47, 53 AND TRACT E - Filed DA-DEVELOPMENT AGREEMENT - 2005-04-22DEVELOPMENT AGREEMENT
THIS AGREEMENT, is made and entered into this Z(�-, day of 1-%i4 �/
2000, by and between the CITY OF FORT COLLINS, COLORADO, a Municipal
Corporation, hereinafter referred to as the "City'; Miramont Associates LLC, a Colorado
limited liability company hereinafter referred to as the "Developer."
WITNESSETH:
WHEREAS, the Developer is the owner of certain real property situated in the
County of Larimer, State of Colorado, (hereafter sometimes referred to as the "Property"
or "Development") and legally described as follows, to wit:
A Replat of a Portion of Roma Valley Drive, Lots 47-53, and a Portion of Tract E,
Miramont Valley P.U.D., located in the southeast quarter of Section 1, Township 6
North, Range 68 West of the 6th P.M., City of Fort Collins, County of Larimer, State
of Colorado.
WHEREAS the Developer desires to develop the Property and has submitted to the
City all plats, plans (including utility plans), reports and other documents required for the
approval of a final plan according to the City's development application submittal
requirements master list (the final development plan documents) copies of which are on
file in the office of the City Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of the Property
will require increased municipal services from the City in order to serve such area and will
further require the installation of certain improvements primarily of benefit to the lands to
be developed and not to the City of Fort Collins as a whole; and
WHEREAS, the City has approved the final development plan documents submitted
by the Developer subject to certain requirements and conditions, which involve the
installation of and construction of utilities and other municipal improvements in connection
with the Property.
NOW, THEREFORE, in consideration of the promises of the parties hereto and
other good and valuable consideration, the receipt and adequacy of which are hereby
acknowledged, it is agreed as follows:
General Conditions
A. The terms of this Agreement shall govern all development activities of the
1
F. In the event the City waives any breach of this Agreement, no such waiver
shall be held or construed to be a waiver of any subsequent breach hereof.
G. Financial obligations of the City of Fort Collins payable after the current fiscal
year and/or not appropriated or budgeted are contingent upon funds for that purpose being
appropriated, budgeted and otherwise made available by the Fort Collins City Council.
H. This .Agreement shall run with the Property and shall be binding upon and
inure to the benefit of the parties hereto, their respective personal representatives, heirs,
successors, grantees and assigns. It is agreed that all improvements required pursuant
to this Agreement touch and concern the Property regardless of whether such
improvements are located on the Property. Assignment of interest within the meaning of
this paragraph shall specifically include, but not be limited to, a conveyance or assignment
of any portion of the Developer's legal or equitable interest in the Property, as well as any
assignment of the Developer's rights to develop the Property under the terms and
conditions of this Agreement.
I. In the event the Developer transfers title to the Property and is thereby
divested of all equitable and legal interest in the Property, the Developer shall be released
from liability under this Agreement with respect to any breach of the terms and conditions
of this Agreement occurring after the date of any such transfer of interest. In such event,
the succeeding property owner shall be bound by the terms of this Agreement.
J. Each and every term of this Agreement shall be deemed to be a material
element hereof. In the event that either party shall fail to perform according to the terms
of this Agreement, such party may be declared in default. In the event that a party has
been declared in default hereof, such defaulting party shall be given written notice
specifying such default and shall be allowed a period of ten (10) days within which to cure
said default. In the event the default remains uncorrected, the party declaring default may
elect to: (a) terminate the Agreement and seek damages; (b) treat the Agreement as
continuing and require specific performance or; (c) avail itself of any other remedy at law
or equity.
K. In the event of the default of any of the provisions hereof by either party
which shall require the party not in default to commence legal or equitable action against
said defaulting party, the defaulting parry shall be liable to the non -defaulting party for the
non -defaulting party's reasonable attorney's fees and costs incurred by reason of the
default. Nothing herein shall be construed to prevent or interfere with the City's rights and
remedies specified in Paragraph III.D of this Agreement.
L. Except as may be otherwise expressly provided herein, this Agreement shall
not be construed as or deemed to be an agreement for the benefit of any third party or
parties, and no third party or parties shall have any right of action hereunder for any cause
whatsoever.
10
M. It is expressly understood and agreed by and between the parties hereto that
this Agreement shall be governed by and its terms construed under the laws of the State
of Colorado and the City of Fort Collins, Colorado.
N. Any notice or other communication given by any party hereto to any other
party relating to this Agreement shall be hand -delivered or sent by certified mail, return
receipt requested, addressed to such other party at their respective addresses as set forth
below; and such notice or other communication shall be deemed given when so hand -
delivered or three (3) days after so mailed:
If to the City: Engineering Development Review
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
With a copy to: City Attorney's Office
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
If to the Owner: Gary E. Nordic
Miramont Associates, LLC
P.O. Box 271970
309 West Harmony Road
Fort Collins, CO 80526
Notwithstanding the foregoing, if any party to this Agreement, or their successors, grantees
or assigns, wishes to change the person, entity or address to which notices under this
Agreement are to be sent as provided above, such party shall do so by giving the other
parties to this Agreement written notice of such change.
O. When used in this Agreement, words of the masculine gender shall include
the feminine and neuter gender, and when the sentence so indicates, words of the neuter
gender shall refer to any gender; and words in the singular shall include the plural and vice
versa. This Agreement shall be construed according to its fair meaning, and as if prepared
by all parties hereto, and shall be deemed to be and contain the entire understanding and
agreement between the parties hereto pertaining to the matters addressed in this
Agreement. There shall be deemed to be no other terms, conditions, promises,
understandings, statements, representations, expressed or implied, concerning this
Agreement, unless set forth in writing signed by all of the parties hereto. Further,
paragraph headings used herein are for convenience of reference and shall in no way
define, limit, or prescribe the scope or intent of any provision under this Agreement.
11
THE CITY OF FORT COLLINS, COLORADO,
a Municipal Corporation
By:=�'-
City Maneber
ATTEST:
, ti �l
City Clerk
APPROVED AS TO ONTENT:
City Enginee
APPR D AS TO FORM:
Deputy City Attorney
DEVELOPER:
Miramont Associates LLC, a Colorado
12
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
Not Applicable.
2. Schedule of sanitary sewer lines to be installed out of sequence.
Not Applicable.
3. Schedule of street improvements to be installed out of sequence.
Not Applicable
4. Schedule of storm drainage improvements to be installed out of sequence.
Not Applicable.
13
EXHIBIT "B"
Not Applicable
14
EXHIBIT "C"
Not Applicable
Ip
Developer pertaining to the Property. For the purposes of this Agreement, "development
activities" shall include, but not be limited to, the following: (1) the actual construction of
improvements, (2) obtaining a permit therefor, or (3) any change in grade, contour or
appearance of the Property caused by, or on behalf of, the Developer with the intent to
construct improvements thereon.
B. All water lines, sanitary sewer collection lines, storm sewer lines and
facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on
the approved utility plans and in full compliance with the standards and specifications of
the City on file in the office of the City Engineer at the time of approval of the utility plans
relating to the specific utility, subject to a three (3) year time limitation from the date of
execution of this Agreement. In the event that the Developer commences or performs any
construction pursuant hereto after the passage of three (3) years from the date of
execution of this agreement, the Developer shall resubmit the utility plans to the City
Engineer for reexamination. The City may then require the Developer to comply with the
approved standards and specifications of the City on file in the office of the City Engineer
at the time of the resubmittal.
C. No building permit for the construction of any structure within the Property
shall be issued by the City until the public water lines and stubs to each lot, fire hydrants,
sanitary sewer lines and stubs to each lot, and public streets (including curb, gutter, and
pavement with at 'least the base course completed) serving such structure have been
completed and accepted by the City. No building permits shall be issued for any structure
located in excess of six hundred and sixty feet (660') from a single point of access, unless
the structures contain sprinkler systems that are approved by the Poudre Fire Authority.
D. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets
described on Exhibit 'A," attached hereto, shall be installed within the time and/or
sequence required on Exhibit "A." If the City Engineer has determined that any water lines,
sanitary sewer lines, storm drainage facilities and/or streets are required to provide service
or access to other areas of the City, those facilities shall be shown on the utility plans and
shall be installed by the Developer within the time as established under "Special
Conditions" in this document.
E. Except as otherwise herein specifically agreed, the Developer agrees to
install and pay for all water, sanitary sewer, and storm drainage facilities and
appurtenances, and all streets, curbs, gutters, sidewalks, bikeways and other public
improvements required by this Development as shown on the approved final development
plan documents and other approved documents pertaining to this Development on file with
the City.
F. Street improvements shall not be installed until all utility lines to be placed
therein have been completely installed, including all individual lot service lines leading in
and from the main to the property line.
K
G. The installation of all utilities shown on the final development plan documents
shall be inspected by the Engineering Department of the City and shall be subject to such
department's approval. The Developer agrees to correct any deficiencies in such
installations in order to meet the requirements of the plans and/or specifications applicable
to such installation. In case of conflict, the final development plan documents shall
supersede the standard specifications.
H. All storm drainage facilities shall be so designed and constructed by the
Developer as to protect downstream and adjacent properties against injury and to
adequately serve the Property (and other lands as may be required, if any). The Developer
shall meet or exceed the minimum requirements for storm drainage facilities as have been
established by the City in its Drainage Master Plans and Design Criteria. The Developer,
for itself and its successor(s) in interest, does hereby indemnify and hold harmless the City
from any and all claims that might arise, directly or indirectly, as a result of the discharge
of injurious storm drainage or seepage waters from the Property in a manner or quantity
different from that which was historically discharged and caused by the design or
construction of the storm drainage facilities, except for (1) such claims and damages as
are caused by the acts or omissions of the City in maintenance of such facilities as have
been accepted by the City for maintenance; (2) errors, if any, in the general concept of the
City's master plans (but not to include any details of such plans, which details shall be the
responsibility of the Developer); and (3) specific written or otherwise documented directives
that may be given to the Developer by the City. The City agrees to give notice to the
Developer of any claim made against it to which this indemnity and hold harmless
agreement by the Developer could apply, and the Developer shall have the right to defend
any lawsuit based on such claim and to settle any such claim provided Developer must
obtain a complete discharge of all City liability through such settlement. Failure of the City
to give notice of any such claim to the Developer within ninety (90) days after the City first
receives a notice of such claim under the Colorado Governmental Immunity Act for the
same, shall cause this indemnity and hold harmless agreement by the Developer to not
apply to such claim and such failure shall constitute a release of this indemnity and hold
harmless agreement as to such claim. Approval of and acceptance by the City of any
storm drainage facility design or construction shall in no manner be deemed to constitute
a waiver or relinquishment by the City of the aforesaid indemnification. The Developer
shall engage a Colorado licensed professional engineer to design the storm drainage
facilities as aforesaid and it is expressly affirmed hereby that such engagement shall be
intended for the benefit of the City, and subsequent purchasers of property in the
Development.
I. The (Developer shall pay storm drainage basin fees in accordance with
Chapter 26, Article VII of the City Code. Storm drainage improvements eligible for credit
or City repayment under the provisions of Chapter 26 are described together with the
estimated cost of the improvements on the attached Exhibit "B," which improvements, if
applicable, shall include right-of-way, design and construction costs. See Section II.C,
Special Conditions, Storm Drainage Lines and Appurtenances, for specific instructions.
3
J. The Developer shall provide the City Engineer with certified Record Plan
Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of
the construction. Utilities will not be initially accepted prior to as -built drawings being
submitted to and approved by the City of Fort Collins.
K. The Developer specifically represents that to the best of its knowledge all
portions of the Property dedicated (both in fee simple and as easements) to the City
associated with this Development are in compliance with all environmental protection and
anti -pollution laws, rules, regulations, orders or requirements, including solid waste
requirements, as defined by the U. S. Environmental Protection Agency Regulations at 40
C.F.R., Part 261, .and that such portions of the Property as are dedicated to the City
pursuant to this Development, are in compliance with all such requirements pertaining to
the disposal or existence in or on such dedicated property of any hazardous substances,
pollutants or contaminants, as defined by the Comprehensive Environmental Response
Compensation and Liability Act of 1980, as amended, and regulations promulgated
thereunder. The Developer, for itself and its successor(s) in interest, does hereby
indemnify and hold harmless the City from any liability whatsoever that may be imposed
upon the City by any governmental authority or any third party, pertaining to the disposal
of hazardous substances, pollutants or contaminants, and cleanup necessitated by leaking
underground storage tanks, excavation and/or backfill of hazardous substances, pollutants
or contaminants, or environmental cleanup responsibilities of any nature whatsoever on,
of, or related to any property dedicated to the City in connection with this Development,
provided that such damages or liability are not caused by circumstances arising entirely
after the date of acceptance by the City of the public improvements constructed on the
dedicated property, except to the extent that such circumstances are the result of acts or
omissions of the Developer. Said indemnification shall not extend to claims, actions or
other liability arising as a result of any hazardous substance, pollutant or contaminant
generated or deposited by the City, its agents or representatives, upon portions of the
Property dedicated to the City in connection with this Development. The City agrees to give
notice to the Developer of any claim made against it to which this indemnity and hold
harmless agreement by the Developer could apply, and the Developer shall have the right
to defend any lawsuit based on such claim and to settle any such claim provided Developer
must obtain a complete discharge of all City liability through such settlement. Failure of the
City to give notice of any such claim to the Developer within ninety (90) days after the City
first receives a notice of such claim under the Colorado Governmental Immunity Act for the
same, shall cause this indemnity and hold harmless agreement by the Developer to not
apply to such claim and such failure shall constitute a release of this indemnity and hold
harmless agreement as to such claim.
II. Special Conditions
A. Water Lines
Not Applicable
0
B. Sewer Lines
Not Applicable
C. Storm Drainage Lines and Appurtenances
1. The Developer and the City agree that all on -site and off -site storm
drainage improvements, as shown on the approved final development plan documents,
shall be completed by the Developer in accordance with said final development plan
documents prior to the issuance of more than 1 building permit in this Development.
Completion of improvements shall include the certification by a professional engineer
licensed in Colorado that the drainage facilities which serve this Development have been
constructed in conformance with said final development plan documents. Said certification
shall be submitted to the City at least two weeks prior to the date of issuance of any more
than 1 building permit in the Development.
2. The Developer shall be responsible for maintaining the structural
integrity and operational functions of all drainage facilities throughout the build -out of this
Development. If at any time following certification (as required pursuant to paragraph one
(1) above) of said drainage facilities and during the construction of structures and /or lots
within this Development the City deems that said drainage facilities no longer comply with
the approved plans, the developer shall bring such facilities back up to the standards and
specifications as shown on the approved plans. Failure to maintain the structural integrity
and operational function of said drainage facilities following certification shall result in the
withholding of the issuance of additional building permits and/ or certificates of occupancy
until such drainage facilities are repaired to the operational function and structural integrity
which was approved by the City.
3. The Developer agrees to provide and maintain erosion control
improvements as shown on the approved final development plan documents to stabilize
all over -lot grading in and adjacent to this Development. The Developer shall also be
required to post a security deposit in the amount of $3,047.00 prior to beginning
construction to guarantee the proper installation and maintenance of the erosion control
measures shown on the approved final development plan documents. Said security
deposit(s) shall be made in accordance with the criteria set forth in the City's Storm
Drainage Design Criteria and Construction Standards (Criteria). If, at any time, the
Developer fails to abide by the provisions of the approved final development plan
documents or the Criteria, notwithstanding any provisions contained in paragraph III(J) to
the contrary, the City may enter upon the Property for the purpose of making such
improvements and undertaking such activities as may be necessary to ensure that the
provisions of said plans and the Criteria are properly enforced. The City may apply such
portion of the security deposit(s) as may be necessary to pay all costs incurred by the City
in undertaking the administration, construction, and/or installation of the erosion control
4�
measures required by said plans and the Criteria. In addition, the City shall have the
option to withhold building permits and certificates of occupancy, as stated in Paragraph
III.D of this Agreement, as it deems necessary in order to ensure that the Developer installs
and maintains the erosion control measures throughout the build -out of this Development.
4. The Developer and the City agree that it is important that all lots be
graded to drain in the configuration shown on the approved final development plan
documents. For this reason the following additional requirements shall be followed for
building on all lots:
a. Prior to the issuance of a certificate of occupancy for any lots,
the Developer shall provide the City with certification that the lot has been graded correctly
(including the grading of any minor swales, if applicable); the lot corner elevations specified
on the approved final development plan documents are correct and in accordance with the
approved final development plan documents; and the minimum floor elevation for all
buildings constructed on said lot has been completed in accordance with the approved final
development plan documents. Said certification shall be completed by a Colorado licensed
professional engineer and shall be submitted to the City at least two weeks prior to the date
of issuance of the desired certificate of occupancy.
5. The Developer shall obtain the City's prior approval of any changes
from the approved final development plan documents in grade elevations and/or storm
drainage facility configuration that occur as a result of the construction of houses and/or
development of lots, whether by the Developer or other parties. The City reserves the right
to withhold the issuance of building permits and certificates of occupancy for this
Development until the City has approved such changes as being acceptable for the safe
and efficient delivery of storm drainage water.
6. The Developer and the City agree that the Developer is obligated to
maintain all on -site storm drainage facilities not accepted for maintenance by the City and
all off -site storm drainage facilities not accepted for maintenance by the City serving this
Development and outside of the public rights -of -way.
D. Streets.
1. The Developer and the City agree that no street oversizing
reimbursement from the City is due the Developer for this Development.
2. The Developer and the City agree that the Developer is responsible
for all costs for the initial installation of traffic signing and striping for this Development
related to the Development's local street operations. In addition the Developer is
responsible for all costs for traffic signing and striping related to directing traffic access to
and from the Development (e.g., all signing and striping for a right turn lane into the
Development site).
U.
3. The Developer shall be responsible for all costs related to the
installation of a 10-foot wide sidewalk and the curb and gutter on the east side of Mail
Creek Lane for the length that the roadway fronts the Miramont Valley P.U.D.
(approximately 300 feet in length.) No more than two building (2) building permits shall be
issued until the Developer provides a cash deposit to the City for reimbursement to the
party that construct the portion of said sidewalk and curb and gutter. The amount of the
cash deposit shall Ibe the estimated cost to construct said improvements, which estimate
shall be prepared by the Developer and approved by the City, plus an additional 15% of
the estimate to cover any contingencies and unexpected costs. Any interest earned by the
City as a result of said deposit shall be the property of the City to cover administration and
inflation in order to better assist the City in making reimbursement to the party who
constructs said improvements. Said deposit, once accepted by the City, shall release the
Developer from all future financial and construction responsibilities related to this 10-foot
wide sidewalk and the curb and gutter on the east side of Mail Creek Lane for the length
that fronts the Miramont Valley P.U.D.
4. The Developer shall be responsible for the construction of the offsite
bicycle/pedestrian path adjacent to lots 62 and 63 of the Miramont Valley P.U.D. The
responsibility for construction shall extend from the intersection of said path with Roma
Valley Drive, south to connect to the proposed bridge over Mail Creek. The construction
of said path shall occur no later than 30 days after the completion and acceptance of the
bicycle/pedestrian bridge over Mail Creek Lane by the City, and said path shall be
constructed in accordance with a City approved revision to the engineering design of the
Miramont Valley P.U.D.
No more than two building permits shall be issued until the Developer provides an escrow
for the cost of said improvements. The escrow of funds shall be deposited with the City
in the form of cash, bond, non -expiring letter of credit or other form of City approved
security sufficient to guarantee completion of the construction. The amount of the
escrowed funds shall be the estimated cost to construct said improvements, which
estimate shall be prepared by the Developer and approved by the City, plus an additional
25% of the estimate to cover any contingencies and unexpected costs. Any interest
earned by the City as a result of said deposit shall be the property of the City to cover
administration and inflation in order to better assist the City in making reimbursement to
the party who constructs said improvements.
At such time that the bicycle/pedestrian path is completed by the Developer and accepted
by the City, the City shall return to the Developer the amount deposited plus any interest
earned by the City as a result of said deposit, less 3% of the total amount, (which includes
said amount deposited plus the interest earned by the City) to be kept by the City to cover
its costs for administration of said deposit.
E. Ground Water, Subdrains and Water Rights
1. The City shall not be responsible for, and the Developer, for itself and its
7
successor(s) in interest, hereby agrees to indemnify and hold harmless the City against any
damages or injuries sustained in the Development as a result of ground water seepage or
flooding, structural damage, or other damage unless such damages or injuries are
sustained as a result of the City's failure to properly maintain its storm drainage facilities
in the Development.
2. If the development includes a subdrain system, any such subdrain
system, whether located within private property or within public property such as street
rights -of -way or utility or other easements, shall not be owned, operated, maintained,
repaired or reconstructed by the City and it is agreed that all ownership, operation,
maintenance, repair and reconstruction obligations shall be those of the Developer or the
Developer's successor(s) in interest. Such subdrain system is likely to be located both
upon private and public property and, to the extent that it is located on public property, all
maintenance, operation, repair or reconstruction shall be conducted in such a manner that
such public property shall not be damaged, or if damaged, shall, upon completion of any
such project, be repaired in accordance with then existing City standards. The City shall
not be responsible for, and the Developer, for itself and its successor(s) in interest, hereby
agrees to indemnify and hold harmless the City against any damages or injuries sustained
in the development as the result of groundwater seepage or flooding, structural damage
or other damage resulting from failure of any such subdrain system.
3. Without admitting or denying any duty to protect water rights, the
Developer, for itself and its successor(s) in interest, hereby agrees to indemnify and hold
harmless the City against any damages or injuries to water rights caused, directly or
indirectly by the construction, establishment, maintenance or operation of the
Development.
4. The City agrees to give notice to the Developer of any claim made
against it to which the foregoing indemnities and hold harmless agreements by the
Developer could apply, and the Developer shall have the right to defend any lawsuit based
on such claim and to settle any such claim provided the Developer must obtain a complete
discharge of all City liability through such settlement. Failure of the City to give notice of
any such claim to the Developer within ninety (90) days after the City first receives notice
of such claim under the Colorado Governmental Immunity Act for the same, shall cause
the forgoing indemnities and hold harmless agreements by the Developer to not apply to
such claim and such failure shall constitute a release of the foregoing indemnities and hold
harmless agreements as to such claim.
F. Hazards and Emergency Access
1. No combustible material will be allowed on the site until a permanent
water system is installed by the Developer and approved by the City.
III. Miscellaneous
9
A. The Developer agrees to provide and install, at its expense, adequate
barricades, warning signs and similar safety devices at all construction sites within the
public right-of-way and/or other areas as deemed necessary by the City Engineer and
Traffic Engineer in accordance with the City's "Work Area Traffic Control Handbook" and
shall not remove said safety devices until the construction has been completed.
B. As required pursuant to Chapter 20, Article IV of the City Code, the
Developer shall, at all times, keep the public right-of-way free from accumulation of waste
material, rubbish, or building materials caused by the Developer's operation, or the
activities of individual builders and/or subcontractors; shall remove such rubbish as often
as necessary, but no less than daily and; at the completion of the work, shall remove all
such waste materials, rubbish, tools, construction equipment, machinery, and surplus
materials from the public right-of-way. The Developer further agrees to maintain the
finished street surfaces so that they are free from dirt caused by the Developer's operation
or as a result of building activity. Any excessive accumulation of dirt and/or construction
materials shall be considered sufficient cause for the City to withhold building permits
and/or certificates of occupancy until the problem is corrected to the satisfaction of the City
Engineer. If the Developer fails to adequately clean such streets within two (2) days after
receipt of written notice, the City may have the streets cleaned at the Developer's expense
and the Developer shall be responsible for prompt payment of all such costs. The
Developer also agrees to require all contractors within the Development to keep the public
right-of-way clean and free from accumulation of dirt, rubbish, and building materials.
C. The Developer hereby agrees that it will require its contractors and
subcontractors to cooperate with the City's construction inspectors by ceasing operations
when winds are of sufficient velocity to create blowing dust which, in the inspector's
opinion, is hazardous to the public health and welfare.
D. The Developer shall, pursuant to the terms of this Agreement, complete all
improvements and perform all other obligations required herein, as such improvements or
obligations may be shown on the final development plan documents, or any documents
executed in the future that are required by the City for the approval of an amendment to
a development plan, and the City may withhold or revoke such building permits and
certificates of occupancy as it deems necessary to ensure performance in accordance with
the terms of this Development Agreement. The processing and "routing for approval" of
the various development plan documents may result in certain of said documents carrying
dates of approval and/or execution that are later than the date of execution of this
Development Agreement or the Memorandum Of Agreement (if any) recorded to give
record notice of this Agreement. The developer hereby waives any right to object to any
such discrepancy in dates.
E. Nothing herein contained shall be construed as a waiver of any requirements
of the City Code, Land Use Code, or Transitional Land Use Regulations (as applicable)
and the Developer agrees to comply with all requirements of the same.
P.