Loading...
HomeMy WebLinkAboutMEADOWS AT FOX CREEK PUD REPLAT LOTS 2, 9, 10, 11, AND 23 - Filed CS-COMMENT SHEETS - 2005-04-22PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: July 19, 2000 DEPT: ENGINEERING PROJECT: #21-00 Meadows @ Fox Creek Replat — Type 1 (LUC) PLANNER: Troy Jones ENGINEER: Tim Blandford All comments must be received by: August 9, 2000 ❑ No Problems 0 Problems or Concerns (see below or attached) Comments: • Please modify the Maintenance and repair guarantee notes as indicated on the plat. • Please add dme note about easement vacations. See plat for correct language. • There is a possible conflict with a 30" storm sewer pipe. Please consult with the Stormwater Department to see if there needs to be any separation between the storm sewer and the property line. You may want to have that pipe surveyed to make sure it was installed in the location indicated on the utility plans. • According to the original plat, Lots 10 and 1 1 are located in a temporary drainage easement and building permits were not going to be issued for these sites until the temporary detention pond is removed and the drainage easement is vacated. What is the status on this? Date: August 10, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS M Plat 0 Site ❑ Utility 11 Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS PROJECT (im .. COMMENT SHEET City of Fort Collins Current Planning DATE: July 19, 2000 TO: Mapping/Drafting PROJECT: #21-00 Meadows @ Fox Creek Replat — Type 1 (LUC) All comments must be received by Troy Jones no later than the staff review meeting: Wednesday, August 9, 2000 Note- Please identify your redlines for fitture reference iVtV/ LOY FAI/ni��F J I1 —� — I 21 C' w e 1� � C� I'c-' -LJ t� Cv� Ci (' � t C --- —__ -- Si, n — CHFfiK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site _Drainage Report Other I!tility Redline Utility _Landscape