HomeMy WebLinkAboutMEADOWS AT FOX CREEK PUD REPLAT LOTS 2, 9, 10, 11, AND 23 - Filed CS-COMMENT SHEETS - 2005-04-22PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 19, 2000 DEPT: ENGINEERING
PROJECT: #21-00 Meadows @ Fox Creek Replat — Type 1
(LUC)
PLANNER: Troy Jones
ENGINEER: Tim Blandford
All comments must be received by: August 9, 2000
❑ No Problems
0 Problems or Concerns (see below or attached)
Comments:
• Please modify the Maintenance and repair guarantee notes as indicated on the plat.
• Please add dme note about easement vacations. See plat for correct language.
• There is a possible conflict with a 30" storm sewer pipe. Please consult with the
Stormwater Department to see if there needs to be any separation between the storm
sewer and the property line. You may want to have that pipe surveyed to make sure it
was installed in the location indicated on the utility plans.
• According to the original plat, Lots 10 and 1 1 are located in a temporary drainage
easement and building permits were not going to be issued for these sites until the
temporary detention pond is removed and the drainage easement is vacated. What is
the status on this?
Date: August 10, 2000 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS
M Plat 0 Site ❑ Utility 11 Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS
PROJECT
(im .. COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 19, 2000 TO: Mapping/Drafting
PROJECT: #21-00 Meadows @ Fox Creek Replat — Type 1
(LUC)
All comments must be received by Troy Jones no later than the staff
review meeting:
Wednesday, August 9, 2000
Note- Please identify your redlines for fitture reference
iVtV/ LOY
FAI/ni��F
J
I1
—� — I 21 C' w e
1� � C�
I'c-' -LJ t�
Cv� Ci (' � t C
--- —__ --
Si, n —
CHFfiK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat Site _Drainage Report Other
I!tility Redline Utility _Landscape