Loading...
HomeMy WebLinkAboutTIMNATH TAP TRI STATE GENERATION AND TRANSMISSION - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-04-11Permit Number: Project Name: Project A.K.A.: DEVELOPMENT CONSTRUCTION PERMIT aJf _A04-36 Issuance Date: T, Project Location: _ SE corner of 1-25 and Mountain Vista Drive. Take the fronta-,e road south, then private drive approximately I mile east. Permittee: City and developer contacts: See attached Exhibit "A" for names and phone numbers of fill contact persons for this proiect. Fees: Permit Application hee (paid at the time of application) $ NA Construction Inspection Fee (paid prior to issuance of this permit) $ __ Total $ Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. S NA Form of security deposited with the City: PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permitice shall he responsible to require their Project Engineer to incorporate into all design drawings and spccitcat ions the certification ofatI materials testing by an Engineer. The Permittee hall have an Gnginccr prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related doCWllents. 'I he Permittceshall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permitice shall proeidc 'as-00n5nUCled" plans prepared by an Lin,ineer prior to the CitY's acceptance of the consuuciecl public improvements. (All references above to the terms "Project In(ineer' and " lingincer" shall mean a Professional Engineer licensed in Colorado.) ?. AII contractors wfio perform work on this project must be bonded and licensed in conformance with City requirements. Paving contractor: Individual Name: NOTE No p ving Company Name : — Address: Phone number(s): Office: _ Cellphone: Fax number: Ismail: Landscape contractor: IndlVldual Name: NO "I E No landscaping Company Name : — Address: _ Phone nLn11be1(5): Office: _ C'ellphone Fax number: Finail: Other contractors and parties involved in the project: SUBMIT TIIE FOLLOWING ITEMS (Required for all projects): • 81/2"xI I" copy ofthe Site Plan Proposed Project Schedule Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that arc required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): u Trat lic control plants) for the project u Proposed haul routes shown on a City map u Shop drawings u Other CONSTRUCTION ('OORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people requircCI to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and t ieneral Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: pro%ide the estimated value of all public inhastructurc improvements that will he constructed and accepted by the City to omi and maintain In addition prov-ide the value of all private infiastructurc improvements that the City will nspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project (Zuantities and Cost Estimate Sheet." Public infrastructure, estimated cost: S 0.00 Private infrastructure, estimated cost: $See Building Permit Applicat on I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or cquitahle interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City ofllcials to enter upon the property to[- purposes of inspection and, it necessarv, to enter up:m such property to perform work required of the applicant if the applicant were to Dail to pci lbnn the iequirCd vv01It Applicant Sign uwq: Date: November 3, 2004 Mark M/�cray l� DS m ;D > 0 Z W It V MAP F IT .7. 0 Em 5 e�f --------- - -------------------- -------------- I L ---------------- -- --- ---- - -- - ------ - --- ---- ---- -------- oil a lop r 1 .�� ar MUM TAP TRI-STATE "M Development Construclion Permit, Page 2;'S 3. COnslrnCtiOn lrmC restrictions: 4. I'hc applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, with plan, development agreement, soils report, pavcmcntdesign, uafFic study, drainage report, plat casements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 ofthe Transitional Land Use Regulations or Section 2.6.3(K) of -the Land (Jse Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of' tills permit. this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. h. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration dale. Such application shall contain information sufficient to justifythe granting ofthe extension. An extension may be granted for up to six months. 7. Building permitsrindcertificatesofoccupancywillonlybcissuedwhenallconditionscontained in the Development Agreement and Sections 3.3.2(C) and (D) ofthc Land Use Code or Sections 29- 078 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agrccmcnt does not spcci fy times for completion ofpublic improvcmcnts, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that Construction ofall improvcmcnts shall be required prior to the time of issuance of the First building permit. S. Acceptance by the City of the public improvements shall be after (I) Final inspection has been conducted by the City; (2) punch list items from the final inspection arc completed and accepted by the Cilv: and (3) required certifications from the licensed professional engineer that improvements arc completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. 'file warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvcmcnts, in accordance with Sections 29-13 and 29-14 of the Transitional I .and t !se Regulations and/or Sections 2 2 3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use COLIC, as applicable. 10. 1he City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. I I . No wort: (including grading) shall be started in State Highway right-of=way until a permit is issue(] by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: I3y signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of' the ownets of the properly (including all owners having legal or equitable interest in the real property, as defined in Scclion 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the rcqucstcd action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also ❑cknowlcdge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. /) /Y Applicant/Project Manager's Signature: Date Approval for issuance: City Engineer Approval: 0jz-- 4� (Permit issuance Date) Development Construction Permit_ Pagc 4/5 EXHIBIT "A" DEVELOPMENT PRO.IECT CONTACT PERSONS Name, address and numbers Project Name: Timnath Tap Project A.K.A.: NA Cite Staff Contact Persons: Development Engineer: Susan Joy, 281 N. College Ave., Fort Collins, CO 80521 Office 970-2,.1-6605 Fax 970-221-6378 Email: sjoOi Icgo%.conl Construction Inspector: .Joe Crabill, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-0605 Cell 970-222-1134 Fax 970-221-6378 Lmail: jcmbill'u IcvoN cone Current Planner: Steve Olt, 281 N. College Ave., Fort Collins, CO 80521 Office 970-22 1 -6750 Fax970-416-2020 Email: tshelmid(a fc-m.cotn Water Utilities Engineer: Frosion Control Inspector: Bob Zakely, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6063 Fax 970-221-6619 Finail: hrakely'i-fcgop.com Natural Resources: Doug Moore, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6750 Fax 970-416-2020 Email dmoorc(a fcgo%.a:m Traffic Operations: Street closures: Syl Mireles, 626 Linden Street, Fort Collins, CO Office 970-221-6815 Fax 970-6282 Email smn'cics(c: fcgm.com Transportation Planning: David Averill, 215 N. Mason, Fort Collins, CO 80521 Office 970-416-2643 Fax 221-6239 Finail da\c dI(a Ic ov.com Devefoptnent Construction Permit, Pagc 5!5 Forestry: Ralph Zcntz, 215 N. Mason, Fort Collins, CO 80521 Office970-224-6302 Fax 970-221-6586 Email: rrcnV rlcgo_.com Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6152 Fax 970-221-6619 Email dmaiullc'u Ccgoc,cgm Developer's Contact Persons: Project Manager: William Cowan, Tri-State Generation and Transmission Association, Inc. , 1100 W 1 16°' Avc, PO Box 33695, Deriver, Colorado 80233-0695 Office 303-452-61 11 x3141 Fax 303-254-6068 Finail: wcowan(cctristategt.org Developer: William Cowan, Tri-State Generation and Transmission Association, Inc. , 1 100 W 1 16°i Ave, PO Box 33695, Denver, Colorado 80233-0695 Office 303-452-6111 x3141 Fax 303-254-6068 Email: wcowan(u)tristategt.org Owner: Tri-State Generation and Transmission Association, Inc. , 1 100 W 1 16°i Avc, PO Box 33695, Denver, Colorado 80233-0695 Office 303-452-611 1 Fax 303-254-6068 Architect/Planner: William Cowan, Tri-State Generation and Transmission Association, Inc. , 1100 W 1 16"' Avc, PO Box 33695, Denver, Colorado 80233-0695 Oflice 303-452-611 I x3141 Fax 303-254-6068 Email: wcowan((Jtristatcgt.org Project Engineer: William Cowan, Tri-State Generation and Transmission Association, Inc. , 1100 W 1 16°i Ave, PO Box 33695, Denver, Colorado 80233-0695 Office 303-452-0111 x3141 Fax 303-254-6068 Email: wcowan(i>,tristatcgt.org Grading Contractor: Dale Lyle, Left Hand Excavating, 3756 Eureka Way, Frederick, Colorado 80516 Office 303-833-3326 Concrete Contractor for Flat Work: Glen TCondt, 16 Sunset Circle, Longmont, CO 80501 Office 303-776-6195 Concrete Contractor for Structures: Glen Troudt, 16 Sunset Circle, Longmont, CO 80501 Office 303-776-6195 DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/ 16/99) For City use only: Application Number: '� ' , Application Date:. Permit application fee: S 150.00 :=4!%i . -�6 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, Susan Joy , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PRO.IECT INFORMATION: Project Name (as approved by the City): Timnath Tap Project A.K.A. (Marketing name if different from Project Name): Project Location: Situated in West One -Half of Section 3 Township 7 North, Range 68 West of the Sixth Princi an 1 Meridian City of Fort Collins, County of Latimer State of Colorado. Property Owner(At the time of this permit issuance): Individual Name: N/A Company Name : Tri-State Generation and Transmission Association, Inc. Address: _ 1 100 W. 1 161' Ave P.O. Box 33695. Denver, Colorado 80233-0695 Phone number(s): Office:303-452-6111 Cel 1phone: Fax number: Email Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "thc Developer" in the Development Agreement for this project): Individual Name: William C. Cowan Company Name: Tri-State Generation and Transmission Association, Inc. Address: _ 1100 W. 116°i Ave.. P.O. Box 33695. Denver, Colorado 80233-0695 Phone number(s): Office: 303-452-611 1 extension 3141 Cellphone: N/A Fax number: 303-254-6068 Email: wcowan(attristateet.org DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/ 16/99) 1'or City use only: Application Number: Application Date: Permit application fee: $ 150.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Frigincering Section of the City. 2. 1 f you have any questions contact the Development )engineer, _Susan Joy , at 221-6605. _ . Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. Cullcec Avenue. PROJECT INFOR MA'rION: Project Name (as approved by the Cite): I imnath Tap Project A.K.A. (Marketing name if different from Project Name): Project Location: Situated in West One -Half of Section 3 "township 7 North Ranee 68 West of the Sixth Principal Meridian, Cif of Port Collins, County of Larimer, State of Colorado. Property Owner(At the time of this permit issuance): Individual Name: N/A Company Name Tri-State -Generation and 'I ransmission Association 1� nc. Address: 1 100 W. 1 16 "' Ave., P.O. Box 33695 Denver, Colorado 80233-0695 Phone number(s): Office: 303-452-6111 C'cllphone _ Fax number: Finail: Applicant/Project Manager (The primary contact person for all matters regarding this project, and the pet son responsible Im a I I matters relclell cung "the Developer" in the Development Agreement tier this project): Individual Name William C. Cowan Company Name: Tri-State Generation and Transmission Association. Inc. Address: 1100 W. 116°i Ave.. P.O.Box 33695 Denver Colorado 80233-0695 phone number(s): Office: 303-452-6111 extension 3141 Cellphone: N/A Fax number: 303-254-6068 Ismail: wco _anrrutristale*t.or Permittee (Person who is to sign the Development Construction Permit): Individual Name: Mark Murray Company Name: "I-r Gel3critinn 1111d r-in- -..inn A �qnciqljou Inc Address: 11O0 W. 116'k Ave., P.O. Box 33695. Denver. Colorado 80233-0695 phone number(s): Office: 303-452-6111 extension 3211 Cellphone: . Fax number: 303-452-6063 lanail: mmurravgu trtstateg<_crr� Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible lot the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: William C. Cowan Company Name: Tri-State Generation and Transmission Association, Inc. Address: _ 1 100 W. 116°i Ave.. P.O. Box 33695 Denver Colorado 80233-0695 Phone number(s): Office: 303-452-61 11 extension 3141 Cellphone: I ax number: 303 254-6068 Ifniail: wcowanLy trtstate_+:t.org 1'rofcssional License Number: Colorado 16253 Architect/Planner ('I he person responsible for the site design of this project) Individual Name SAME. AS ABOVE. Company Name : — Address: _ Phone numbcr(s): Office Cellphone: Fax number: Email: Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement —add additional names below): Individual Name: SAME; AS ABOVE Company Name Address: Phonc number(s): Office: Cellphone Fax number: (:mail: General Contractor (The contractor in overall charge of the public infrastructure construction) Individual Name: NOTE No public Company Name : Address: Phone number(s): Office Ccllphone: __ - --- - Fax number: Email: If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Dale Lvle Company Name : t eft ttanri Excavating Address: 3756 Eureka Way, Frederick Colorado 80516 Phonc number(s): O ft icc: 303-833 -3 326 Cellphonc: Fax number: Email: Utility contractor: Individual Name: Company Name : — Address: Phonc numher(s): Office: Cellphonc: Fax number: Ismail: Concrete contractor for flat work: Individual Name: Glen Troudt Company Name : Glen Troudt Address: _ 16 Sunset Circle Lonq,,mont Colorado 80501 Phone number(s): Officc: 303-776-6195 CeI Iphone: hax number: Email: Concrete contractor for structures: Individual Name: SAME AS ABOVE Company Name : Address: _ Phonc numbcr(s): Office Ccllphone: - Fax number: Email: