Loading...
HomeMy WebLinkAboutINTERSTATE LAND PUD - Filed CS-COMMENT SHEETS - 2005-03-23PROJECT Arft i.... COMMENT SHEET City of Fort Collins Current Plannini� DATE: January 20, 2000 TO: Engineering PROJECT: #34-88D Interstate Land Rezone & Structure Plan Amendment All comments must be received by boy -Jens no later than the staff review meeting: February 9, 2000 Note- Please identify your redlines for future reference T t Signature/ CHECK IiERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site Drainage Report _Other _Utility _Redline utility _Landscape of Fort Collins Plannina PROJECT -_. COMMENTSHEET DATE: j� ��� ,�1� DEPARTMENT: E-AzC PROJECT:1y-�,- &Lt� PLANNER: All comments must be received by: No Problems Problems or Concerns (see below) INTERSTATE LAND PUD, I ST FILING - HARLEY DAVIDSON APRIL 3, 1996 PLAT • INDICATE WHO IS TO OWN AND MAINTAIN TRACT A UTILITY PLANS COVER SHEET • NOTE I IN THE GENERAL NOTES SHALL REFERENCE THE EXECUTION OF THE DEVELOPMENT AGREEMENT AND NOT THE APPROVAL OF PLANS. • DELETE NOTE 14 IN THE GENERAL NOTES. (CONTINUED ON NEXT PAGE) JJ Date: fl�tD Signatur/C�� CHECK IF YOU WISH TO RECEIVE ❑ PLAT y' COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.8OX 580 FORT COLLINS, COLORADO 80522-0580 PLANNING DEPARTMENT (303)221-6750 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: DEPARTMENT: PROJECT: (A�j0 PL -' - PLANNER: C'L l All comments must be received by: ❑ No Problems CA)61 Problems or Concerns (see below or attached) INTERSTATE LAND PUD - PLAN REVIEW DECEMBER 28, 1995 THE STATE HAS INDICATED THAT THEY WANT TO SEE A RURAL X-SECTION ON THE FRONTAGE ROAD. THIS WAS BROUGHT UP AS A POSSIBILITY IN THE MEETING HELD ON NOVEMBER 22, 1 995. THIS TYPE OF CONFIGURATION MIGHT REQUIRE ADDITIONAL ROW TO BE DEDICATED. THE STATE HAS INDICATED THAT THE WALK WOULD NOT HAVE TO REMAIN IN THE ROW. A PEDESTRIAN EASEMENT WOULD BE NEEDED FOR WALK PLACED OUTSIDE OF THE ROW. THE ROAD SECTION SHOULD INCLUDE A 6 FOOT PAVED SHOULDER WHICH WOULD DOUBLE AS A BIKE LANE. SITE PLAN • THE 8 FOOT SIDEWALK ON PROSPECT - ONLY A 5 FOOT REQUIRED. AN B FOOT WALK CAN BE PROVIDED BUT THE CITY WILL ONLY PAY FOR ONE FOOT. • WALK ON GATEWAY DRIVE SHOULD BE WITHIN THE ROW • THE SITE PLAN INDICATES POSSIBLE PEDESTRIAN FEATURES AT MAJOR INTERSECTIONS, DEPENDING ON WHATTHIS CONSISTS OF WE WOULD NOT WANT HIS IN THE ROW. (CONTINUED ON NEXT PAGE) Date: '/w Ac Signature - CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OI, REVISIONS ❑ SITE ❑ LANDSCAPE 0 UTILITY PROJECT COMMENTSHEET DATE: ,, _ ,,� , . 1. l , .,> DEPARTMENT: "= PROJECT: 1�[niv,ull 1C'v� Tt=�. PLANNER: All comments must be received by: ❑ No Problems Problems or Concerns (see below) site and landscape plan • correct to show new sight easement lines • sidewalk needs to be provided to property line • see notes regarding the plat for planting restrictions in the sight distance easement plat • indicate who is to own and maintain tract A • is an easement needed for the lake canal going through the northern corner of the site%' lContinueri on neyt nagel I�1 Date- Signature ~' CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 PLANNING DEPARTMENT (303)221-6750 PROJECT City of Fort Collins COMMENTSHEET Planninq DATE: y 3� i 1gq(o DEPARTMENT: FNWj PROJECT: Sti + L-W'j �aau � PLANNER: All comments must be received by: No Problems QProblems or Concerns (see below) Interstate Land PUD, first filing May 31, 1996 Additional items that are needed are: • Design of the improvements for the Frontage Road and Prospect Road intersection. To include a west bound right turn lane and a east bound left turn lane. These improvements would not need to have curb and gutter, unless they are the ultimate improvements. Please let me know if your design is for the interim conditions or for the ultimate (so I know how to comment). • A striping plan for the above design. Plat • Indicate who is own and maintain Tract A (continued on next page) Date: 6/3//90 Signature: CHECK IF YOU WISH TO RECEIVE ❑ PLA COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 PLANNING DEPARTMENT (303)221-6750 Interstate Land PUD, first filing (page 2 of 2) May 31, 1996 Utility Plans Drainage and Erosion Control Plan, sheet 3 • A concrete chase should be provided from the curb cut on the frontage road to the sidewalk culverts. Grading Plan, sheet 4 • Show the grading that is to occur on the south and the east side of the Frontage road. • Show and label the Row line on the south and east. If the grading goes outside of the row than a grading easement will be needed. Horizontal Control and Utility Plan, sheet 5 • Show the sight distance easement lines. • Provide Type III barricades at the end of the sidewalk. Proposed Frontage Road Improvements, Plan and Profile, sheet 6 • Show type III barricade at the end of the sidewalks. • A 2 Inch minimum overlay would be required and it would need to meet City of Fort Collins Standards, exact requirements will depend on the pavement design from Taracon. • See plans for additional comments. Proposed Frontage Road Striping and Signing Plan, sheet 8 • On guardrail section C show a 2 inch paved section extending one foot behind the guardrail post as indicated in the M & S Standards. • The striping plan looks okay to me, I will send a copy of this and the striping and plan for prospect and the frontage road to transportation at the next submittal. Frontage Road Cross Section, sheet 9 • In addition to what is shown as being done, show the future right turn lane and gutter and indicate it as future improvements. • Draw the overlay on the sections and adjust your flowline elevations to account for the overlay so no lip is left at the edge of gutter. • Is the edge of the gutter shown adequately? It does not appear that the 8 1 /3% fall in the gutter is accounted for in your x-slopes. • Correct the: x-sections to show the walk along the detention pond area. Details, sheet 11 • The vertical curb transition detail appears twice. • On the vertical curb transition detail - what happens with the pavement? Does the edge of pavement stay in line with the gutter edge or go back to the flowline after the gutter ends? Details, sheet 12 • Modify the access detail as indicated on the plans. • Provide a detail for the 12 foot curb opening and concrete chase. PROJECT COMMENTSHEET Plannina DATE: �` �,�t �� �c���� DEPARTMENT: 51,1(1 PROJECT: ''r /C�'G� I' `,�, PLANNER: ' ", All comments must be received by: ❑ No Problems �'roblems or Concerns (see below) Interstate Land PUD, First Filing (Harley Davidson) September 7, 1996 Plat • A note needs to be placed on the plat indicating who is to own and maintain Tact A Utility Plans Drainage and Erosion Control Plan, sheet 3 • An off site easement is needed for the detention/water quality pond. Future Frontage Road Improvements, sheet 7 • Provide the cold joint detail as referenced in note 2. • Both accesses need to have a minimum width of 25 feet exclusive of the gutter. See Section 4.4 (3) of the State Highway Access Code. (Continued on Next Page) Date: Signature Signature.— CHECK IF YOU WISH TO RECEIVE ❑ P�A 7i COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 PORT COLLINS, COLORADO 80522-0580 PLANNING DEPARTMENT (303)221-6750 Interstate Land PUD, First Filing (Harley Davidson) September 7, 1996 (page 2 of 2) Frontage Road Cross Sections, sheet 9 • The shoulder slopes at sections 17+00, 18+00, and 19+00 do not meet the State Highway Access Code requirements. See Section 4.10 (7): a minimum slope of 4:1 for 6 feet and then not steeper than 3 1 shall be provided. If this can not be accomplished in the existing ROW off site slope easements will be needed.