Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK PUD 3RD FILING - Filed CS-COMMENT SHEETS - 2005-03-18PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 26,1998 TO: Engineering PROJECT: #43-94G Horsetooth East Business Park P.U.D., Pads "B" & "C", (LDGS) Final All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, June 24, 1998 t7 "S 1P, A Ix L L -ZL 11,2 z. Date: _.Signature CBECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Dmqc R" Oler Ufiv ;- Redline Utility 4ds* Gty of Fort Collins Nov-23-98 02:24P Northern Engineering 970 221 4159 P.02 / EXISTING WATER EXISTING 4' SAN. SERVICE TO ✓ SERVICES TO BE ABANDONED REMAIN PROPOSED SAN. MANHOLE C ON '= 1 3+46.71 EXISTING 8' 40t LF 8' O.IP. SEWER WATERLINE STUB — ( EXISTING SAN. ''' \ MANHOLE TO REMAIN EXISTING 8" SAN \ SEWER TO BE ABANDONED �— — EXISTING 8" s�1 EXISTING / 1-8" 1-8'z8" 45' BEND W/T.B TEE AND W E TO REMAIN r 1-8" GY W/T.B. / \ PROPOSED RCP CLASS II / XISTIN FIRE 8° \ I YDRAN 0 RE W G. A1N / DIP WATERLINE DIP O REMOVE ALL MISTING FITTINGS ANO CONNECT TO EXISTING 8" SM. PER. /\ 99.59t I WATERINE TO WEST v PROP. SAN. { WITH 8" C.V. ` 45'18' HOLE IST AEIANWRLOINE TO SOUTHREMOVE / \ UTILITY PLAN DETAIL SCALE: 1"-20' PROJECT COMMENT SHEET City of Fort Collins Current PlanninP DATE: March 8, 1999 DEPT:Engineering PROJECT: Horsetooth East Business Park, 3`d Filing, Rite Aid PLANNER: Steve Olt ENGINEER: Sheri Wamhoff 13 No Problems Problems or Concerns (see below or attached) Horsetooth East Business Park, 3`d Filing (Rite Aid) March 8, 1999 • Provide all necessary easement documents • The plat needs to reflect the easements being dedicated with the 2nd filing. • No detention is allowed within the Row. Modify the plans so this does not occur. Date: 3/F/ 99 PLEASE SEND COPIES OF MARKED Signature: 5• lrt/ REVISIONS: ❑ PLA Eg" SITE [yam UTILITY ❑ LANDSCAPE REVISION rt COMMENT SHEET +M1W: DATE: October 15, 1998 TO: Engineering PROJECT: #43-94G Horsetooth East Business Park P.U.D., 3rd Filing (Rite Aid) Final - LDGS All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, November 4, 1998 ❑ No Comment 0 Problems or Concerns (see below or attached) Horsetooth East BP PUD, 3rd filing (Rite Aid) November 6, 1999 The retaining wall/ screen wall - what does this look like? Height of both? Distance from sidewalk? Does the area behind the wall slope toward the wall or the access drive? Place a note on the Landscape plan in regards to the tree placement on Timberline. The deciduous trees along Timberline shall be placed 12 feet east of the property line where this does not interfere with the sidewalk. Show the patterned concrete crosswalk on the Utility plans and provide a detail of these. See plans for additional comments. As noted before these plans can not be filed until the plans for Horsetooth BP, 2 filing have been filed, as the improvements necessary for this site are being shown with that plan set. Those improvements will be a requirement of both sites, as they are needed prior to either site being Date structed. �i� n/ (��/ Signature: 5 , c2-t. City of Fort Collins DATE: August 13, 1998 TO: Engineering PROJECT: #43-94G Horsetooth East Business Park, 3rd Filing, (Rite Aid) LDGS - Final All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, September 2,1998 September 9, t99s Horsetooth East Business Park, 3rd Filing (Rite Aid) P Site/ landscape Plan • The sidewalk on timberline is to be a 6 foot sidewalk with an 8 foot parkway. • Notes on the Plans indicate that the right turn lane on Timberline and the internal drive will be existing. This may be so, but if they haven't been built yet then they will need to be built with this project. So please reference the plans that this design will be approved with. Requirement of construction of these improvements will be a requirement of the development agreement for both projects. • The access out of the site on the south to the access drive closest to Timberline road needs to be narrowed to one lane going out. The narrowing should occur by moving the eastern curb line west. This will help to provide adequate separation between the drive and the ultimate right turn lane which will be 12 feet closer to the drive than shown on these plans (these plans show the interim design for Timberline Road) • There is a note indicating that the sidewalk on the north side of the access drive is being built by others. I am not sure who that is, but the god filing is not showing the walk being constructed on that side of the drive. So this plan needs to show it is being constructed here. • The site/landscape and utility plans do not reflect the latest pedestrian crossings of the access drive as being shown on the 2nd filing submittal. (Continued on next page) Date: Signatures CHECK HERE IF YOU WISH TO RECEIVE COPIFS OF REVISIONS , —Qw site _ Draainiage Report _ Oler ZGUWity _>SIc& utility �,Laodsape Jw� City of Fort Collins Horsetooth East Business Park, 3rd Filing (Rite Aid) (page 2 of 2) September 9, 1998 site/landscape (continued) • The deciduous trees along Timberline Road need to be placed with the center of the tree at 12 feet east of the eastern property line. This will insure that the trees will be in the future parkway strip and will not require relocation or removal at the time of the ultimate improvements. Ornamental trees may be place in the parkway area being provided with this plan. Plat • It is not a private drive it is Elk Road - it is being vacated by ordinance and I can provide the ordinance number upon final approval of the vacation by City Council for you to include on the plat. • In the area where Elk Road and Otter Drive are being vacated the area is being retained as utility, drainage and emergency access easement. • Indicate that the off -site easements are to be provided by separate document. • indicate the width of Row being dedicated. Utility Plans • Revise the general notes as shown on the cover sheet and add the additional general notes as indicated in order to provide City of Fort Collins General notes. • Add ` )" filing' to the title. The access out of the site on the south to the access drive closest to Timberline road needs to be narrowed to one lane going out. The narrowing should occur by moving the eastern curb line west. This will help to provide adequate separation between the drive and the ultimate right turn lane which will be 12 feet closer to the drive than shown on these plans (these plans show the interim design for Timberline Road) • Show the ribbon median in Timberline that will extend to Horsetooth. • Reference the Horsetooth East Business Park, 2' filing plans for the design of the access drive and the Timberline improvements. This will have to be constructed prior to this project being built. Note also this plan set can not be approved until those plans are approved unless the design for the access drive and Timberline Road is included in these plans. • Provide the following details: additions to existing sidewalk D-20, curb and gutter detail D-11, Patching detail. • see plans for additional comments REVISION COMMENT SHEET DATE: August 13, 1998 TO: Engineering PROJECT: #43-94G Horsetooth East Business Park, 3rd Filing, (Rite Aid) LDGS - Final All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, September 2,1998 Horsetooth East Business Park, 3rd Filing (Rite Aid) September 9, 1998 Site/ landscape Plan • The sidewalk on timberline is to be a 6 foot sidewalk with an 8 foot parkway. • Notes on the Plans indicate that the right turn lane on Timberline and the internal drive will be existing. This may be so, but if they haven't been built yet then they will need to be built with this project. So please reference the plans that this design will be approved with. Requirement of construction of these improvements will be a requirement of the development agreement for both projects. • The access out of the site on the south to the access drive closest to Timberline road needs to be narrowed to one lane going out. The narrowing should occur by moving the eastern curb line west. This will help to provide adequate separation between the drive and the ultimate right turn lane which will be 12 feet closer to the drive than shown on these plans (these plans show the interim design for Timberline Road) • There is a note indicating that the sidewalk on the north side of the access drive is being built by others. I am not sure who that is, but the 2"d filing is not showing the walk being constructed on that side of the drive. So this plan needs to show it is being constructed here. • The site/landscape and utility plans do not reflect the latest pedestrian crossings of the access drive as being shown on the 2"d filing submittal. (Continued on next page) Date: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS .k<Tw Site _ Drainage Report _Offer ,Z fifiv ->5� Utility x Horsetooth East Business Park, 3rd Filing (Rite Aid) (page 2 of 2 ) September 9, 1998 site/landscape (continued) The deciduous trees along Timberline Road need to be placed with the center of the tree at 12 feet east of the eastern property line. This will insure that the trees will be in the future parkway strip and will not require relocation or removal at the time of the ultimate mprovements. Ornamental trees may be place in the parkway area being provided with this plan. Plat It is not a private dr ve it is Elk Road - it is being vacated by ordinance and I can provide the ordinance number upon final approval of the vacation by City Council for you to include on the plat. In the area where Elk Road and Otter Drive are being vacated the area is being retained as utility, drainage and emergency access easement. Indicate that the off -site easements are to be provided by separate document. indicate the width of Row being dedicated. Utility Plans Revise the general notes as shown on the cover sheet and add the additional general notes as indicated in order to provide City of Fort Collins General notes. • Add `3rd filing' to the title. The access out of the site on the south to the access drive closest to Timberline road needs to be narrowed to one lane going out. The narrowing should occur by moving the to provide adequate separation between the drive eastern curb Line west. This will help and the ultimate right turn lane which will be 12 feet closer to the drive than shown on these plans (these plans show the interim design for Timberline Road) Show the ribbon median in Timberline that will extend to Horsetooth. Reference the Horsetooth East Business Park. 2"d filing plans for the design of the access drive and the Timberline improvements. This will have to be constructed prior to this project being built. Note also this plan set can not be approved until those plans are approved unless the design for the access drive and Timberline Road is included in these plans. Provide the following details: additions to existing sidewalk D-20, curb and gutter detail D-11, Patching detail. • see plans for additional comments -1N 0 PROJECT COMMENT SHEET Citv of Fort Collins Current Planning DATE: May 26, 1998 TO: Engineering PROJECT: #43-94G Horsetooth East Business Park P.U.D., Pads "B" & "C", (LDGS) Final All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, June 24,1998 �,PJ�.0 �iD ro /-��"�n°�)c��t � l �/Iv�.c.�-Cc-•--/e � o,� , Date: Signature: i CHECK HERE T YOU WE TO RECEIVE COPIES OF REVISIONS --6 Oler i _� Drainage Report _ L-Utility fm Utility 6dsape City of Fort Collins PROJECT ;OP`! COMMENT SHEET City of Fort Collins Current Planning DATE: May 26, 1998 TO: Engineering Pavement PROJECT: #43-94G Horsetooth East Business Park P.U.D., Pads "B" & "C", (LDGS) Final All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, June 24,1998 A pavement design and final soils report will need to be submitted when the street improvements are completed. Date: CHECK HERE IP YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ Site _ — Other _ Unity _ Redline Utility _ Lands* aAMR PROJECT IWAO COMMENT SHEET City of Fort Collins Current PlanninE DATE: April 26, 1999 TO: Engineering PROJECT: #43-94G Horsetooth East Business Park PUD, 3rd Filing Final (LDGS) All comments must be received by Sheri Wamhoff no later than the staff review meeting: Wednesday, May 17, 1999 - YLL C�i in� DATE: November 24, 1998 TO: Engineering PROJECT: #43-94G Horsetooth East Business Park, 3rd Filing (Rite Aid) - Final P.U.D. (LDGS) All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, December 9, 1998 ❑ No Comment Problems or Concerns (see below or attached) Horsetooth East Business Park, 3rd Filing December 17. 1998 • A sketch and a legal description for one of the easements was received, nothing more was received. • Prior to this project being scheduled for a hearing cither 1) letters of intent for all off -site easements must be received or 2) Signcd easements for all off -site easements must be received. An compete casement document consists of a Deed of dedication with proper language and all signatures (original. no copies), legal description, attorney certification and sketch. Plat The amount of Row to be dedicated on Horsetooth Road is to be 57.50 feet • The ordinance in which Elk Road and Otter Drive were vacated by is No. 213, 1998. The areas that were vacated were retained as emergency access, utility and drainage easements. Need to show this area as being Sneh or show that it is being vacated. • Need to make sure that the off -site easements being dedicated by the second filing are reflected on this plat if they are within the platted area. Depending on timing they may or may not be recorded prior to this plat being filed. Utility plans • Section A on Sheet C4.10 shows the retaining wall to be located 25 feet behind the sidewalk. Scaling off of the plan this distance is only approx. 10 feet. Which is correct? Date: I Z/ u F5 Signature: d• tocxA a fl CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ to _ Site _ Drainage Rqoft vltility _ Redline Utility _ Landscape — Outerkmm Citv of Fort Collins DATE: November 24, 1998 TO: Engineering PROJECT: #43-94G Horsetooth East Business Park, 3rd Filing (Rite Aid) - Final P.U.D. (LDGS) All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, December 9, 1998 ❑ No Comment Problems or Concerns (see below or attached) Horsetooth East Business Park. 3rd Him-, December 17, 1999 A sketch and a legal description for one of the easements was received, nothing more was received. Prior to this project being scheduled for a hearing either 1) letters of intent for all off -site easements must be received or'-) Signed easements for all off -site easements must be received. An compete easement document consists of a Deed of dedication with proper language and all si-matures (original, no copies), legal description_ attorney certification and sketch. Plat • The amount of Row to be dedicated on Horsetooth Road is to be 57.50 feet • The ordinance in which Elk Road and Otter Drive were vacated by is No. 213, 1998. The areas that were vacated were retained as emergency access, utility and draimuze easements. Need to show this area as being such or show that it is bein_ vacated. • Need to make sure that the off -site easements bein, dedicated'ov the second tiling are reelected on this plat if they are within the platted area. Depending on timing, they may or may not be recorded prior to this plat bein, filed. Utility plans • Section A on Sheet Cd. 10 shows the retaining wall to be located 25 feet behind the sidewalk. Scaling off of the plan this distance is only approx. 10 feet. Which is correct? Date: 12/� LO I i�$ Signature: CHECK MERE IF YOU WISH TO RECEIVE COPIES OF REV51ONS ✓PHt _ Site _ Dmilige Repoli vmfi _ Redline Utility _ Landscape City of Fort Collins REVISION COMMENT SHEET DATE: Novernber 24, 1998 TO: Stormwater PROJECT: #43-94G Horsetooth East Business Park, 3rd Filing (Rite Aid) - Final P.U.D. (LDGS) All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, December 9, 1998 ❑ No Comment Problems or Concerns (see below or attached) 1. The plat which is included in the Final Utility Plans does not have all the necessary drainage easements shown; however, the plat which was included separately does so. Please include the updated plat in the Final Utility Plans. RESPONSE: 2. The outlet of storm line B is shown to have an invert elevation of 47.48. However, the plan view shows the outlet between contours 49 and 50. Please change plan view of storm sewer to clarify this discrepancy. RESPONSE: (continued on Date: l z V Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS XP19 _Site XDrainage Report x Odler us ndlity Ix- Redline Utility _ Lads* a.= C-.'. E.6. -es Citv of Fort Collins �. On the grading plan, please indicate invert elevations at the ends of storm sewer pipes and provide spot elevations for the spilhvay/top ofberm. RESPONSE: 4. Please provide a detail of the 1 S" concrete channels. RESPONSE: 5. For the storm sewer profiles, please indicate the pond 100-year WSEL only where it is applicable — it's currently a bit misleading. In addition, the profile for storm line D does not appear to show the retaining wall correctly — please revise to match actual conditions. RESPONSE: Erosion/Sediment Control Comments 1. The erosion control plan is ok. Please refer to the redlined plans and report for additional review comments ikk HrsethEBp-b&c4.doc ED f DATE: November 24, 1998 DEPT: Water/Wastewater PROJECT: #43-94G Horsetooth East Business Park, 3rd Filing, (Rite Aid) LDGS — Final P.U.D. All comments must be received by Mike Ludwig no later than the staff review meeting: Wednesday, December 9, 1998 Coordinate proposed water and sewer layout in shared private drive with Northern Enaineerimg. Show coordinated layout for both project in this area. Coordinate landscape design with civil design and provide required landscape/utility separation distances. Provide 10 feet of separation between water'sewer lines and light poles. Clearly define area of concrete encasement of sewer line in plan and profile Views. Realign water service and fire line to avoid service line being place in thnist block. No connection may be made to water service between main and a point 5 feet downstream of the meter pit. Relocate proposed irrigation tap on water service to provide j feet of separation. See site. landscape and utility plans for other comments. Sienature: CHECK HERE IF 1'OI' wlSil TO RECEIVE COPIES OF REVISIONS Plat X Site Drainage Report _Other X Otility X Redline Utility X Landscape