DATE: July 22, 1998 TO:
PROJECT: #43-94C Horsetooth East Business Park, 2nd
Filing - LDGS Final
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, August 12,1998
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ PW _ Site _ Drainage Rep ft _ Olher
_ Utility _ R.efte Utility _ Landscape
Horsetooth East Business Park PUD, Second Filing (page 2 of 2) August 13, 1998
• Provide concrete to the property line on what is Elk Road.
• The entry radii off of Automation Way should be 15 feet.
• The site plan indicates that the sidewalk is to be built all along the southern edge of the
internal drive going out to Horsetooth. Please indicate what is to be built now and if curb
and gutter is to be installed along both sides.
• The stormdrain manhole on the southern property edge appears to be in a location that
conflicts with a handicap ramp.
• Indicate that the sidewalk along Timberline is to be a 6 foot sidewalk (we agreed that is
could be 6 in lieu of a 7 foot walk) Also make the parkway 8 feet. This is less than standard,
but the reduction of the parkway allows for trees to be placed to be within the center of the
future major arterial parkway and keep an adequate separation from the walk. The future
street trees should be placed 18.5 feet from the flowline of Timberline as designed with this
project.
• Plan and Profile sheet
• Need to show the grade that is being tied into on the south side.
• Why is the median being shown with different distances off of the section line. Does the
street move around a bit?
• Need to provide a note and a detail on how you plan to provide drainage through the
median. Are chases going to be used, PVC pipe,... and how often?
• Need to note on the cross sections that there needs to be a 12" area behind the walk that is at
a less than 2% slope.
• Provide cross sections for the remaining portion of the road where the median is to be placed
16+00 to 19+00
• Provide a detail for the glue down median.
• The street intersection detail needs to be modified fro use as a driveway detail.
• The handicap ramp detail provided is not really applicable as the site is designed. Detail D-
12.1 would be more appropriate for the Automation/ access drive situation. A detail for the
Timberline Road/ access drive needs to be created, as there is no standard detail for the
design shown. We do not want the standard comer walk here as that would direct pedestrian
traffic out into the street.
• See additional comments on the plans.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 29, 1997 TO: Engineering
PROJECT: #43-94E Horsetooth Business Park, Lot 2, Big
Horn Office Building - Type I (LUC) PDP
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, *November 12,1997
*Note 2-week review schedule requested by the Planning Director.
Horsetooth East Business Park, Lot 2 November 28, 1997
Site Plan
1. The layout on the site plan and the utility plans do not match.
2. All walk within the Row needs to be concrete. The brick walk should not start until after
the property line.
3. Label the retaining walls.
Utility Plans
4. Provide the General Notes on the Utility Plans. See attached for a list.
5. Provide an index of sheets.
6. A 3.5" X 4.5" space is needed on every sheet for the signature block or put the signature
block on the sheets.
7. Current standards require detached sidewalk. A letter requesting a variance should be
submitted from a licenced engineer. As part of the letter need to provide justification as
to why the sidewalk should be attached.
8. The layout on the site plan and the utility plans do not match.
9. The handicap ramps in the parking lot should be per the detail on the site plan.
10. The corner ramp detail is for a detached walk. If an attached walk is to be provided than
the ramp detail for attached walk needs to be provided.
(Continued o next age)
Date: ��
CHECK HERE )F YOU WISH TO RECEIVE COPIES OF REVISIONS
X pw _\"SSit,1el _ Drainage Report _ Oler `ice
�UW1ty �Redhoe U@4 Yv . dscape Cify of Fort Collins
Horsetooth East Business Park, Lot 2 (page 2 of 2) November 28, 1997
11. Provide vertical curb detail D-11.
12. See plans for additional comments.
REVISION
COMMENT SHEET
DATE: December 31 1998 TO: Engineering
PROJECT: #43-94C Horsetooth East Business Park, 2nd
Filing
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, December 23, 1998
❑ No Comment
i
[� Problems or Concerns (see below or attached)
Horsetooth East Business Park PUD, Second Filing
Plat
January 7, 1999
• Provide a note indicating that Elk Road and Otter Drive were vacated by Ordinance No.
213,1998
• The area that had been Elk Road and Otter Drive were retained as utility, drainage and
emergency access easement. That needs to be shown on the plat and if changes are
desired to that than the vacations need to be shown on the plat for the areas within the
platted boundaries where the easements are desired to be vacated.
Utility Plans
• On sheets 8 and 12 indicate that the islands are to be filled with exposed concrete
aggregate. color San Diego Buff
• The rounded hardscape median should have a height of 8 inches and not a 2% slope.
If comments from all departments are addressed and completed off -site easement documents are
provided than mylars can be submitted in for signature after the hearing for this project.
Date: / -' _ Signature: c�
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site _ Drainage Report _ Olher �-
Utpity _ Redline Utility _ Landscape
City of Fort Collins
i
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: <, / ` ) DEPT: ENGINEERING
PROJECT: T-:) A Lt
I lorsetooth East BP, 2nd Filing November 19, 1998
Landscape Plan
• Label the retaining wall and handrail areas on the plan
• The utility plans show the walk being built on the north side of the internal drive as do
the plans for the rite aid site Q d filing). What is to be built'?
Plat
• Show the off -site easements that are needed for this project. Label and indicate they are
to be by separate document.
• Upon Vacation of the Row for Elk Road and Otter Drive the area is being retained as
utility, drainage and emergency access easements. If you wish to eliminate any of these
designations, you will need to show the vacation of the easements on this plat.
• Appear to have a slight arrow problem
• make sure it is clear what the limits of the access easement that is being vacated are.
Utility Plans
• The portionof the Sewer that is under Timberline road that is to be abandoned will need
to be done al. the time the Timberline work is being done - please show this.
• Provide a detail of the enhanced sidewalks on the utility plans.
• We are sorry about this one, but the glue down median on Timberline needs to be 4 feet
wide with a 10 foot travel lane. We will no longer be putting 2 foot medians in. The
existing ones are not working well with the main problem being that the signs that need
to be placed on the medians are all wider than 2 feet thus resulting in damage to vehicles
and signs. Please make the changes shown to the medians.
See additional comments on sheets
Date: `\l?', % 'l , Signature: 6'�
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS: �
Plat `Site Drainage Report _ Other
Utility v Redline Utility LLandscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 15, 1998 TO: Engineering
a PROJECT: #43-94C Horsetooth East Business Park P.U.D.,
Filing, (LDGS) Final
lAll comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, June 17,1998
0 Horsetooth East Business Park, 2nd Filing, Pad G June 30, 1998
An update to the traffic study is needed. This project (32,000 sq ft office building) is accounted
for as two buildings, but the 13,800 sq ft retail store is not accounted for. Only 7,200 sq ft of
3 retail is shown and even if the sq footage for the bank is combined (4,500 sq feet) it does not
meeting the proposed 13,800 sq feet. And there are still two remaining parcels to be developed.
As 1 said the 32,000 sq foot office building is accounted for, but the site plan indicates that this
building could also be retail, resterant or other services. The highest trip generator needs to be
accounted for in the traffic study to show the site can accomidate all the potential uses. One
update can de done for this site and the prposed retail.
Site Plan
*Access points must align (southern access off of Automation)
*Provide a 5 foot sidewalk and 6 foot parkway along automation way.
*The sidewalk along Timberline needs to be a 7 foot walk not 6 foot.
*Show all improvements that are to be done
Plat
*Can not vacate ROW by plat - it has to go to City Council for vacation. Submit plans for
routing of the vacation request. The vacation will need to occur prior to the filing of the plat.
*Upon vacation of the roads these access drives will no longer have names.
*Provide additional 3 feet of ROW along Automation Way.
*Use the current attorney certification statement.
(Continued on next page) •-
Date: Signature.
CHECK HERE LF YOU WISH TO RECEIVE COPIES OF REVISIONS
PUt Sike _ Dramgc Report _ Other
Utility Rdme UWq - Landscape
Horsetooth East Business Park, 2nd Filing, Pad G (page 2 of 2) June 30, 1998
Utility Plans
**The centerline of the southern access drive needs to line up with the centerline of the drive
across the street.
*Provide a 5 foot sidewalk and 6 foot parkway along automation way.
4** asements will be needed for all work outside of the plated boundaries.
rovide ROW for the ultimate x-section and the right turn lane along Timberline (70.5 + 12
from centerline)
*The sidewalk along Timberline needs to be a 7 foot walk not 6 foot. Transition it out to its
ultimate location at the edge of the ROW (new).
Qhe median needs to be built to each intersection - it will be built now and not later.
*Provide concrete to the property line at all access drives.
*An inlet needs to be provided at the southern side of the access drive off of Timberline - not just
a sidewalk culvert.
*Tie the proposed profile into the design that was done for the corner project, their design ended
at their property line. Shown tieing into .3% slope. A portion of this area had temp curb placed
in without a final design - I think this is a part of that. Tie in at the property line - that is all that
would probably been built to standards.
*Provide access entrance details
*Provide handicap Ramp detail for the ramps being built within the ROW.
*See additional comments on plans
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 15, 1998 TO: Engineering Pavement
PROJECT: #43-94C Horsetooth East Business Park P.U.D.,
3rd Filing, (LDGS) Final
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, June 17,1998
(,tre pljb1� ��/e � 11 �d
Date: W `� 7-
CHECK IRE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Pit _ Site _ Drainage Report _ 06er
_ Utility _ Reline Utility — Landscape
6 1 am
010%
City of Fort Collins
Ak
y
DATE: July 22, 1998 TO: Engineering
PROJECT: #43-94C Horsetooth East Business Park, 2nd
Filing - LDGS Final
All comments lnust be received by Steve Olt no later than the staff
review meeting:
Wednesday, August 12,1998
Horsetooth East Business Park PUD, Second Filing (page 1 of 2) August 13, 1998
Site Plan
• It was agreed that the walk on Automation could be attached, but would need to be a
minimum of 4.5 feet wide.
• There is a sidewalk being shown connecting the Carriage Wash PUD to this site - there is a
manhole shown in this walk where the ramp would need to be. That appears to cause a
conflict.
• Show all the improvements that are going to be built with this project.
• Indicate the walk on Timberline is to be a 6 foot walk with an 8 foot parkway.
• No landscaping has been shown on the plans for the median in Timberline. Landscaping
Plat
should be provided here.
Use the current Attorney Certification paragraph.
Utility Plans
• Letters of intent or the easements for all work outside of the platted boundaries is needed
prior to this project being schedule for a hearing.
• Indicate what is existing and what is new walk on Automation Way. The new sidewalk is to
be 4.5 feet in width.
• Indicate the widths of the access drives and there location in relation to the property line.
(Continued on next page)