Loading...
HomeMy WebLinkAboutHORSETOOTH EAST BUSINESS PARK PUD SECOND - Filed GC-GENERAL CORRESPONDENCE - 2005-03-17Transpc tion Services Engineering Department Ciiv of Fo,'T Collins November 28, 1995 FACSIMILE TO: Lynn Green (303)695-1338 Re: Carriage Wash PUD Dear Lynn: During this past construction season, the City completed a portion of Timberline Road adjacent to the above-relerenced development. In accordance with the City Code, if the City constructs such improvements, it may collect the property owners share of the costs prior to the issuance of any building permit. Because the final closeout of this project is not yet complete, I have assessed the estimated cost of these improvements at $12,229.00 with the building permit for 2000 Bighorn Drive. When the closeout of this project has been completed. I will notify you of the actual amount owed for this work. I expect that the actual cost will be slightly less than the estimated cost and any refund will be remitted with the notification. 1 f you have any questions or if 1 can be of further assistance, please don't hesitate to call. Sincerely, Matt Baker SID Coordinator P.O F.n -,81, • Voi Collins, l h 80 72 O:1K! • (9 01 22.1-h005 m�ffSCOTT, COX&ASSOCIATES, INC. M11. [(Marl Clas>gum, IV, P.I. December 18, 1997 Mr. Sheri Wamhoff Engineering Department City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Ms. Wamhoff: consulting engineers • surveyors William I L htltnd(old, P.F. Ref: SCA Project #96534 Horsetooth East Business Park Minor Subdivision, Lot 2 This letter is to serve as a request for a variance from construction of the standard detached sidewalk to the construction of an attached sidewalk on the north and west sides of the subject project. An attached sidewalk has been proposed as part of this project to be consistent with adjacent streets in this development which also utilize attached sidewalks. In our design, we have used the appropriate handicap ramp construction details for the proposed sidewalk with the existing curb configuration. These details are consistent with City of Fort Collins Design and Construction Standards. Should you have any questions regarding this request, please do not hesitate to contact us at the address and phone herein. Sincerely, SCOTT, COX & ASSOCIATES, INC. Brad E. Eaton, .E. 'ywu, Reviewed William H. 15 M 55111 Strert • Boulder, Colorado 80303 • (303) 444-3051 • Fax: (303) 444-3387 FROM : MIKE BLRNK PHONE NO. : 970 484 0472 May. 06 1999 02:50PM P2 May 6, 1999 Sheri Wamhoff Civil Engineer Transportation Services Engineering Department 281 North College Ave. Fort Collins, Colorado 80522 Dear Sheri; Enclosed is the cost estimate for street and sidewalk improvements for Timberline Road along our site. The cost estimate reflects what the City of Fort Collins will be responsible for as we understand it from our previous discussions_ It includes the following. All of Epoxy Down Curb and Island Half of Landscaped Median (Total Median Length = 274 L.F., Half of Median Length = 137 L.F.) Half of Irrigation Tap for Landscaped Median • Subgrade preparation for sidewalk oversizing from 4' walk to 6' and 7' walk. Sidewalk oversizing from 4' walk to 6' and 7' walk. If you have any questions or comments, please feel free to call me at 221-4158 Sincerely, 420 SOUTH HOWES, SUITE 202. FORT COLLINS, COLORADO Ea521, (970)221.4158, FAX (M)221-4159 FKOM : MIKE BLANK PHONE 110. : 970 484 0472 COST ESTIMATE HORSETOOTH EAST BUSINESS PARK, 2nd FILING 9805.00 PAG May. 06 1999 02:51PM P3 5/5/1999 W CHALONA Unit Estimated Total Description unit Price Quantity Price Epoxy DDwn Curb and Island L.F. $6.00 1142 $9,136.00 $9.500.00 Landscape Median L.S. L.S. $9,500.00 $1,000.00 1 1 $1,000.00 irrigation Tap Subgrade Preparation - Walk Oversizing 8F $1.00 359 $Z$359.00 SldeWalK Oversizing 00 .00 $22,230.00 SUB -TOTAL L.S. 10.0% $2,223.00 Contingency Construction Survey and Staking L.S. 1.0% $272.30 Constructon Management L.S. 6.0% 6.50/0 $1,333.80 $1444.95 Engineering L.S. L.S. 150/0 $333.45 Traffic Control $27,767.50 TOTAL VENTEX LLC 1055 AURARIA PARKWAY DENVER, COLORADO 80204 April 6, 1999 The City of Fort Collins Timberline Partners, Limited, LLLP Engineering Department Suite 300 281 North College Avenue 4875 Pearl East Circle Fort Collins, Colorado 80521 Boulder, Colorado 80301 Re: Horsetooth East Business Park P.U.D., Second Filine Gentlemen: This letter will confirm that the undersigned as Owner of Lot 1, Carriage Wash P.U.D., Horsetooth East Business Park, is aware that Timberline Partners, Limited, LLLP and/or the City of Fort Collins will be constructing new drainage facilities principally consisting of installation of a 15" underground drainage pipe within an existing drainage easement, along Timberline Road, located on the Lot owned by the undersigned as shown on the attached site plan. The undersigned has no objection to such construction activities within such easement, provided the easement area is restored to its present condition after construction is completed. The w� F.ioo acknowledges tl.at flie existir� Sign un i'le c,01ilel Ul Big " H, D[1VC and Timberline Road may be temporarily removed for a period not to exceed thirty (30) days for purposes of construction and then replaced, at no expense to the undersigned. Its. i 4 r �f . VENTEX LLC 1055 AURARIA PARKWAY DENVER, COLORADO 80204 April 6, 1999 The City of Fort Collins Timberline Partners, Limited, LLLP Engineering Department Suite 300 281 North College Avenue 4875 Pearl East Circle Fort Collins, Colorado 80521 Boulder, Colorado 80301 Re: Horsetooth East Business Park P.U.D., Second Filing Gentlemen: This letter will confirm that the undersigned as Owner of Lot 1, Carriage Wash P.U.D., Horsetooth East Business Park, is aware that Timberline Partners, Limited, LLLP and/or the City of Fort Collins will be constructing new drainage facilities principally consisting of installation of a 15" underground drainage pipe within an existing drainage easement, along Timberline Road, located on the Lot owned by the undersigned as shown on the attached site plan. The undersigned has no objection to such construction activities within such easement, provided the easement area is restored to its present condition after construction is completed. The undersigned also acknowledges that the existing sign on the corner of Big Horn Drive and Timberline Road may be temporarily removed for a period not to exceed thirty (30) days for purposes of construction and then replaced, at no expense to the undersigned. �a Its: ar 44i�✓4 Transportation Services Engineering Department Citv of Fort Collins March 11, 1999 Northern Engineering Services, Inc. Jade Miller 420 South Howes, Suite 202 Fort Collins, Co 80521 Re: Horsetooth East Business Park PUD, Second Filing Easement Dedication Dear Jade: I have reviewed the easement dedication documents that you sent to me in and some additional information is needed in order to finish processing the documents. The following information/ documents are needed: 1. The dedication document for each easement needs to be modified. The maintenance statement on each document states "... maintenance of such right-of-way ..." and as it is easement and not right-of-way being dedicated. the statement needs to be changed to state 11 . such easement... 2. An additional construction easement is needed for the installation of the stormsewer line on the Carriage Wash site (per stormwater). Please provide this additional easement. 3. A check for $130 made out to the Larimer County Clerk and Recorder is needed for the filing fees for the easement dedications already received. This does not include item #above, the et tional for the should be added to construction to the t tal forr the A ng offlthe construction easement nt and $5 p 4. An additional item to note is that the legal description for the access, utility and drainage easement for the internal drive does not match what is being shown on the Horsetooth East Business Park PUD, Third Filing plat. The above items are needed prior to the City signing the Utility Plans for this project. I have also attached an Information for Development Agreement sheet. I need this information in order to complete the Development Agreement for this project. If you have any questions in regards to this matter, please contact me at 221-6750. Sincerely, Sheri Wamhoff Civil Engineer II Attachment cc: Steve Olt, City of Ft Collins 28t Xorth College venue • P.O. Box 580 • Fort Collins, CO 80S22-0580 • (970) 321-6605 NORTHERN MEMORANDUM Date: December 9, 1998 To: Sheri Wamhoff City of Fort Collins Engineering Department 281 North College Avenue Fort Collins, CO 80522-0580 From: Jade P. Miller Northern Engineering Project: Horsetooth East Business Park PUD, Second Filing Project No. 9805.06 PAG This letter serves to address any concern you may have for offsite easements for the Horsetooth East Business Park PUD, 2n1 Filing. As of the date of this letter, all offsite easements related to this project have been granted with the exception of the Grading Easement on Lot 2, Carriage Wash PUD. This easement is currently in negotiation, however, due to the timing of events for the submittal of the Horsetooth East Business Park PUD, Second Filing, the easement is not ready to be recorded. If you have any concern that this easement may not be granted, please be assured that we still have a viable project. You still retain the option of making the easement a requirement in the development agreement. Also be aware of the fact that this easement is a matter of convenience for construction and cost. If we have any unforseen difficulties in obtaining this grading easement, our plans can be easily modified so that no grading easement will be required. We will keep you informed on the status of this pending easement. Please give me a call at 221-4158 if you still have any questions or concerns regarding this project. I appreciate your assistance in reviewing our project in a timely manner which will allow it to be placed on the January 1999 Agenda for Planning and Zoning. 420 SOUTH HOWES. SUITE 202, FORT COLLINS, COLORADO 80521, 1970)221-4158, FAX (970)221-4159