Loading...
HomeMy WebLinkAboutHICKORY HILL VILLAGE AT CUNNINGHAM CORNER PUD - Filed GC-GENERAL CORRESPONDENCE - 2005-03-17Comm ity Planning and En- ironmentai rvices Engineering Department City of Fort Collins October 19, 1992 Tom Sibbald Shields Street Corporation 2301 Research Boulevard Fort Collins, CO 80526 RE: Hickory Hill Village at Cunningham Corner, P.U.D. Dear Mr. Sibbald: Per your request a walk through inspection of the public improvements installed as a part of the Hickory Hill development was performed. The following is a list of those items which need to be corrected prior to the City's acceptance of these improvements. 1. Fire hydrant at southwest side of parking lot adjacent to Building F needs to be raised so break away flange is 0.1 to 0.2 above finished landscaping. Fire hydrants are to be given a fresh coat of DeVoe Safety Yellow paint #58158 - 01 as per Water Department Specifications. 2. Manholes A-2 and C-2 rings and covers appeared to have been displaced during the asphalt pavement installation and will need to be recentered over manhole barrel section. These and all other manholes need to be grouted inside as per Water Department Specifications. If you have any questions regarding these items, please call me at 221-6605. Sincerely, David Stringer Chief Construction Inspector cc: Tom Chapel