HomeMy WebLinkAboutHEART OF THE ROCKIES SECOND - Filed CS-COMMENT SHEETS - 2005-03-16REVISION COMMENT SHEET DATE: January 28, 1999 TO: Engineering PROJECT: #21-83L Heart of the Rockies Christian Church, Phase 1 — PDP - Final Compliance (LUC) All comments must be received by Ted Shepard no later than the staff review meeting,: Wednesday, February 24, 1999 [3''No Comment Problems or Concerns (see below or attached) Date: signature:° - CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site _ Drainage Report _ Other _ Utility _ Redline Utility _ landscape Brittany Knolls, Hear of the Rockies Christian Church, Phase 1 May 27, 1998\ (page 2 of 2) • Add the following note to the General Notes: The developer is responsible for all costs for the initial instillation of traffic signing and striping for this development related to the development local street operations. In addition the developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the development (e.g. All signing and striping for a right turn lane into the development site). PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: April 29, 1998 TO: Streets PROJECT: #21-83L Brittany Knolls O.D.P., Heart of the Rockies Christian Church, Phase I - Type I (LUC) PDP All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, May 27,1998 Date: LkLLq CHECK 10 IF yOU WISH TO RECEIVE COPIES OF REVISIONS PIS Site — Rqt _ Offer _ Utility _ IE& Utility — lame PROJECT COMMENT SHEET Citv of Fort Collins Current Planning DATE: April 29, 1998 TO: Engineering Pvmnt PROJECT: #21-83L Brittany Knolls O.D.P., Heart of the Rockies Christian Church, Phase I - Type I (LUC) PDP All comments must be received by Leanne Harter no later than the staff review meeting;: Wednesday, May 27,1998 tFes.- r- i='-�... _- �' tc'7 P e i o,,J- xtj fie' N��,��; _�-e f1 Date: CHECK HERE IF YOU PUSH TO RECEIVE COPIES OF REVISIONS _ Pit -Site _ lhaiW Report _ Oler UOV — R&C Utility — Landscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 29, 1997 DEPT: Stormwater PROJECT: #25-97 Fossil Creek Commercial Plaza, Heart of the Rockies Christian Church Type I (LUC) PDP/FC PLANNER: Leanne Harter All comments must be received no later than the staff review meeting: Wednesday, October 15, 1997* *4-week review period waived by the planning director. Date: cc No Ftvj C 0 a tLea �i;e 10-"�- r �C�A e D/ i w Q-V To P( r CHECK HERE T YOU WISH TO RECEIVE COPIES OF REVISIONS Pit _ Site; _ Dramage W _ Other _ Utility _ Alone Utility — Lands* `�o 6 LAW—kmml NZ^061KA-M City of Fort Collins REVISION COMMENT SHEET DATE: November 9, 1998 TO: Engineering PROJECT: #21-83L Heart of the Rockies Church - Type 11 (LUC) - PDP All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, November 18, 1998 ❑ No Comment IJ Problems or Concerns (see below or attached) f�m�� CtRcT � Lyc � c\�I�zn Date: I/Z4 1 Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Lqlat '�p$ite �v �_/ Draro�agaee Report _ Oler �yUfi 2gedhe UfiV `- < Lm"'"�" Citv of Foct Cullins REVISION COMMENT SHEET P DATE: November 9, 1998 TO: Engineering PROJECT: #21-83M Heart of the Rockies Church/Brittany Knolls - Type II (LUC) - ODP All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, November 18, 1998 [9/No Comment ❑ Problems or Concerns (see below or attached) Date: 1 Sigaa=e: V CE ECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Pit _ Site _ Drainage Report _ Mer �— _ Utility _Redline Utility _Landscape Citv of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: August 19, 1998 TO: Engineering PROJECT: #21-83M Heart of the Rockies Christian Church (Disciples of Christ) - ODP - Type II All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, September 16,1998 NOTE: UTILITY/DRAINAGE PLANS AND DRAINAGE REPORT WERE SUBMITTED WITH PDP SUBMITTAL 4/2 7198 c f3Yl 4AA,9. 0 i y1I1 CYigjl C>k Date: CHECK HERE IF YOU `MH TO RECEIVE COPIES OF REVISIONS _ pit '�fle _ OraiW R" _Offer _ ubhv — Redline Utility _landscape REVISION COMMENT SHEET DATE: August 21, 1998 TO: Engineering PROJECT: #21-83L Brittany Knolls - Heart of the Rockies Christian Church - Type 1 - PDP All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, September 16,1998 Brittany Knolls - Heart of the Rockies Christian Church - Type 1, PDP September 16, 1998 Site/Landscape • The sidewalk along the North needs to be extended east to the property line. • The interior parking stalls need to be 19 feet in width. As these parking spaces are head to head the stall length can not be reduced as there is no overhang. The exterior parking stall can be reduced to 17 feet as they overhang the sidewalk and landscaping. • The section cut on the Landscape Plan shows the walk along Brittany as being attached. Please show this correctly. • Label what is to be an enhanced cross walk and what is to be raised cross walk. Utility • Show the needed drainage easements on the plat. • Indicate the driveway widths. • Provide details for and label the enhanced cross walks and the raised pedestrian crossing. • Provide a striping plan for Brittany Street. • Provide driveway (access drives) detail Date: 9 �G FK Signature: •w CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS AM tote _ Drainage Report _ Oflter rUnntj' '4fte Utll4 —A-L®ldsape City of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: l 29, 1998 TO: Engineering PROJECT: #21-83L Brittany Knolls O.D.P., Heart of the Rockies Christian Church, Phase I - Type I (LUC) PDP All comments must be received by Leanne Harter no later than the staff review meeting;: Wednesday, May 27,1998 Brittany Knolls, Hear of the Rockies Christian Church, Phase 1 May 27, 1998\ With the ODP to be submitted a traffic study including the entire site shall be submitted. Site Plan • Provide a 6 foot parkway and a 5 foot sidewalk along Brittany Drive. • Provide Sidewalk on Brittany with this phase along the frontage of lot 1 and from Westbourn Cir. To Trilby Rd. • Showing an access onto Trilby with a future phase. This will be reviewed as part of the ODP Plat • Provide additional 1.5 feet of ROW along Brittany and an additional 7.5 feet of ROW along Trilby Rd and Lemay Ave. • Provide a 9 foot utility easement behind the new ROW on Brittany and provide a 15 foot utility easement behind the new ROW on Lemay Ave and Trilby Rd. • Provide necessary easements for drainage and detention. Utility Plans • Provide a 6 foot parkway and a 5 foot sidewalk along Brittany Drive. • Provide Sidewalk on Brittany with this phase along the frontage of lot 1 and from Westbourn Cir. To Trilby Rd. (Continued on next page) Date: r? / d Signature: CHECK HERE IF YOU IFSH TO RECEIVE COPIES OF REVISIONS VP(at Site Drainage Repoli _ Otber 8filiity �K&e Utility _�Cands* City of Fort Collins Brittany Knolls, Hear of the Rockies Christian Church, Phase 1 May 27, 1998\ (page 2 of 2) • Add the following note to the General Notes: The developer is responsible for all costs for the initial instillation of traffic signing and striping for this development related to the development local street operations. In addition the developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the development (e.g. All signing and striping for a right turn lane into the development site). PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: Aprils 29, 1998 TO: Mapping/Drafting PROJECT: #21-83L Brittany Knolls O.D.P., Heart of the Rockies Christian Church, Phase I - Type I (LUC) PDP All comments must be received by Leanne Harter no later than the staff review meeting:. Wednesday, May 27,1998 � d /�J /n/0441 4��� C,./2v6 C � or �fh3 qyL %�fT a/ �u z oF Dur�/z ���NaA�j MuN✓M�N7� NdT J lta�,/Id /} j �r /,-� c`"r'� ju'cSE ✓J 7Z) /�� 9 GU / Oe� ? Do U T/ (-17� Lam. Date: b CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ Sk —hww Utility _ Rapine Utility _ Ian6* cats of F PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: April 29, 1998 TO: Engineering PROJECT: #21-83L Brittany Knolls O.D.P., Heart of the Rockies Christian Church, Phase I - Type I (LUC) PDP All comments must be received by Leanne Harter no later than the staff review meeting: Wednesday, May 27,1998 Brittany Knolls, Hear of the Rockies Christian Church, Phase 1 May 27, 1998\ With the ODP to be submitted a traffic study including the entire site shall be submitted. Site Plan • Provide a 6 foot parkway and a 5 foot sidewalk along Brittany Drive. • Provide Sidewalk on Brittany with this phase along the frontage of lot 1 and from Westboum Cir. To Trilby Rd. • Showing an access onto Trilby with a future phase. This will be reviewed as part of the ODP Plat • Provide additional 1.5 feet of ROW along Brittany and an additional 7.5 feet of ROW along Trilby Rd and Lemay Ave. • Provide a 9 foot utility easement behind the new ROW on Brittany and provide a 15 foot utility easement behind the new ROW on Lemay Ave and Trilby Rd. • Provide necessary easements for drainage and detention. Utility Plans • Provide a 6 foot parkway and a 5 foot sidewalk along Brittany Drive. • Provide Sidewalk on Brittany with this phase along the frontage of lot 1 and from Westboum Cir. To Trilby Rd. (Continued on next page) �j Date: / Signature: r, / / a'L�C - J CHECK ME IF YOU WSII TO RECEIVE COPIES OF REVISIONS VP a _mite Drainage Report _ Offer a ily dine Utility v�ndsape �� City of Fort Collins