Loading...
HomeMy WebLinkAboutHARMONY VILLAGE PUD THIRD REPLAT - Filed CS-COMMENT SHEETS - 2005-03-15REVISION COMMENT SHEET DATE: 3.19.01 DEPT: ENGINEERING PROJECT: ga>' Filing, Replat and Minor Amendments PLANNER: Ted Shepard `f ENGINEER: Katie Moore All comments must be received by: ❑ No Problems 0 Problems or Concems (see below or attached) Comments: • Please correct typo (sight distance, not site distance) on plat. • Please dedicate additional right-of-way to standards along Timberline (10' parkway, 6' sidewalk, 15' utility easement). (Unfortunately I didn't notice the need for this earlier.) • On final site plan, please remove building envelope from easement area. Also, please match site and landscape plans to utility plans. • Please show new sanitary sewer lines as solid lines. • Please see plan sheets for more comments. Date: March 19, 2001 Signaturel� PLEASE SEND COPIES OF MARKED REVISK T,, S 0 Plat 0 Site 10 Utility 21 Landscape 13 Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS PROJECT COMMENT SHEET Current Planning DATE: 2.13.01 DEPT: ENGINEERING PROJECT: #65-93G HARMONY VILLAGE REPLAT #3 — TYPE I (LUC) PLANNER: Ted Shepard ENGINEER: Katie Moore All comments must be received by: 2.21.01 ❑ No Problems ,i�JProblems or Concems (see below or attached) Comments: • Please correct first sentence of legal description. • On the note below the vicinity map, please include the title of the item that corresponds with the reception number. • If any easements are or were dedicated to anyone other than the City of Fort Collins, those entities need to sign the plans. (Is the Electrical easement meant to be dedicated to the City or to REA or someone else?) Was the Spring Canyon Ditch Co. easement vacated previously? If so, please provide the reception number/title of the document. If it is being vacated with this replat, their approval is required. • A sight distance easement to the north of the western access point is needed. • Structures are not allowed within easements. Please adjust easements or buildings to correct this. • Please correct curve tables. .J r3 - t 1 Date: February 13,2001 Signature. LEASE SEND COPIES OF MARKED REVISIONS Al Plat 0 Site 0 Utility 0 Landscape 0 Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: December 20, 2000 DEPT:ENGINEERING PROJECT: #65-93G HARMONY VILLAGE REPLAT #3 — TYPE I (LUC) PLANNER: TED SHEPARD ENGINEER: KATIE MOORE All comments must be received by December 27, 2000 ❑ No Problems ❑ Problems or Concems (see below or attached) Comments: • Please correct typos and plat wording.; ; I • Please reconcile easement notes on cover page. They ate currently conflicting. • Please complete the easement curve table. • Please show widths of rights -of -way of Timberline and Harmony. • Please show which easements are being vacated as referred to in the notes. • Please include a site plan. Date: December 20, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS 0 Plat ❑ Site ❑ Utility ❑ Landscape 0 Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS lArWU PROJECT 1119waal COMMENT SHEET City of Foil Collins Current Planninu DATE: November 30, 2000 TO: Engineering PROJECT: #65-93G HARMONY VILLAGE REPLAT #31 — TYPE I (LUC) All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: December 27, 2000 Note- Please identify your redlines for future reference Signature Cl IECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility _Redline Utility Landscape 6a City of Foct Collins PROJECT COMMENT SHEET City of Fort Collins Current PlanninE DATE: November 30, 2000 TO: Technical Services PROJECT: #65-93G HARMONY VILLAGE REPLAT #39 —TYPE I (LUC) All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: December 27, 2000 Note- Please identify your redlines for future reference 1 L1 �cvvtE �l�CFS he re Lt/� ,.�. aY�'� t-hCt�z c�'� St= GCYv7P+' '� �11'(' �r�l 46,C5 176+ Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS lSPlat _Site _Drainage Report _Other _Utility Redline Utility _Landscape (=� dm) City of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: December 20, 2000 DEPT:ENGINEERING PROJECT: #65-93G HARMONY VILLAGE REPLAT #3 — TYPE I (LUC) PLANNER: TED SHEPARD ENGINEER: KATIE MOORE All comments must be received by: December 27, 2000 ❑ No Problems �EUroblems or Concerns (see below or attached) Comments: • Please correct typos and plat wording (see attached pages). • Please reconcile easement notes on cover page. They are currently conflicting. • Please complete the easement curve table. • Please show widths of rights -of -way of Timberline and Harmony. • Please show which easements are being vacated as referred to in the notes. • Please include a site plan. • Replat approval needs to be approved concurrently with corresponding minor amendments. Date: December 28, 2000 Signature: T L C' PLEASE SEND COPIES OF MARKED REVISIONS )ATlat O'Site ❑ Utility ❑ Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS