HomeMy WebLinkAboutHARMONY VILLAGE PUD - Filed CS-COMMENT SHEETS - 2005-03-15Transpor+ation Services Engineen.,g Department City of Fort Collins October 23, 1998 Mr. Dave Klockeman JR Engineering, Ltd 2620 E. Prospect Rd., Suite 190 Fort Collins, CO 80525 RE: Harmony Road Horizontal Alignment Dear Dave: Attached you will find an AutoCAD r14 file containing the City's desired horizontal alignment for Harmony Road from Lemay Avenue to I-25. The centerline shown in the drawing is described with bearings and offsets from both the section and quarter corners along the alignment. The drawing is on the City's coordinate base for Harmony Road, therefore you may have to move and rotate the drawing to fit your development plans. You will find that all of the intersection geometries are shown for the major intersections along the alignment. However, they shall be considered accurate only in concept. Existing structures, topography and monuments were not obtained in developing the alignments of the intersecting streets such as Lemay Ave., Timberline Road and County Road No. 9. Therefore, it will be your responsibility to design the proper setbacks for your developments along these roadways as they would relate to the existing conditions keeping the proper geometries in mind as shown the drawing. Also all turning movements and radii should be designed for each intersection layout. The following is a list of the file information as well as layer names that will assist you in manipulating the file. Filename: harmrdcon.dwg Layer names: PR-CL Proposed Centerline PR-EOA Proposed Edge of Asphalt PR -FL Proposed Flowline PR -LANES Proposed Lane Lines PR -ROW Proposed right of way PR-CL-LBL Proposed centerline labels Note: Harmony Road setbacks shall be measured from the proposed future edge of asphalt. If you have any questions please do not hesitate to can me at (970)221-6605. Sincerely, Keith Meyer, P.E. Civil Engineer 281 North College ,Avenue • P.O. Box 380 • Fort Collins, CO 80522-0580 • (970) 221-6605 Tim Blandfotd - Concerns regarding Harr 'y From: Kathleen Reavis To: DevelopmentReview Date: 6/5/98 10:42am Subject: Concerns regarding Harmony Road design Dave, As we discussed at yesterday's meeting, here are my concerns/issues regarding the design of Harmony Road- I agree with the group that these issues are pressing due to the recent development surge along the corridor, so hopefully we can get some direction in how to proceed to resolve these issues as soon as possible. 1) Design of medians ` want to make sure that they are wide enough at the'noses" to serve as practical pedestrian refuge areas. concern with how snow removal/storage will be done to make sure that snow is not piled in the bikelanes according to CDOT they prefer to store snow in the medians rather than to the outside. concern that with the needed taper and storage lengths for left turn access points, that the median will only be a very narrow "ribbon" and actually look like College Ave or worse (defeats any hope of having a boulevard type concept for Harmony - it will just look like any other urban arterial.) ` maintenance issues are complex - policy level implications between the City and CDOT. Now may be the time to push for a "trade" between the City/CDOT - for CR32 being the state hwy and Harmony becoming a local roadway. 2) Work that we're trying to start on revising the access control plan - I should have a draft RFP out to you all by today or Monday. 3) When/if the speed limits change on Harmony - how will this impact the needs for design? Who will make this call - the City or CDOT? 4) Need to better define where current and future bus stop locations need to be in regards to bus pull outs and pedestrian access. 5) Major reconstruction is needed along Harmony east of Cambridge to CR7 due to sub -standard conditions with existing vertical and horizontal design - this could dramatically impact ROW needs in this area. 6) How will double lefts at several of the intersections along Harmony be accommodated? Need to incorporate through bikelanes at the intersections and provide for as many ped-related improvements as possible (not just at these intersections, but others as well) 7) For the very long range - I think it wouldn't hurt to look at potential sites for a pedestrian overpass along Harmony Road. As an FYI, the new portion of Harmony Road from CR7 to the interchange will include the full six lane cross-section, with bikelanes and sidewalks - so this design should be used to set the alignment of Harmony Road west of CR7. The City has submitted a project to the North Front Range Council (MPO) to find funding for a design project for Harmony - but who knows when or if this project will actually be funded so it may not be able to solve the immediate pressing need for answers but it could help with longer term improvements. I can imagine that there are many other concerns from a Traffic and Engineering perspective - these are -- Tim Bla_ndfdrd -Concerns regarduig W - _y Road design just my thoughts. Hopefully, you can incorporate these into your list for the upcoming Growth Management Lead Team meeting. Please let me know if you have any questions/concerns regarding this list. Thank you. KR REVISION COMMENT SHEET DATE: July 16, 1998 TO: Engineering PROJECT: #65-93C Harmony Village PUD - LDGS Prelim. All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday,August 5,1998 Note: Comments were made from reviewing the Site and Landscape Plans. The utility plans should reflect the necessary modifications based on these comments. GENERAL COMMENTS FOR UTILITY PLANS AND SITE & LANDSCAPE PLANS: U As stated in the letter sent to you dated August 5, 1998, because the City has not yet determined the datum/centerline along Harmony Road, this Development is proceeding at some risk in the fact that the determination of the datum line may adversely affect the location of buildings, setbacks, and landscaping. Once the datum line has been determined, more formal and accurate comments will be made. J The 3/4 access along Harmony Road has been approved by the State. Therefore, you may proceed with the design of that access. Please see sheet Z for additional comments i+ Date: Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS /Plat Asite _ Drainage Report Ulility ✓Redline Utility ✓Landscape REVISION COMMENT SHEET DATE: July 16, 1998 TO: CDOT PROJECT: #65-93C Harmony Village PUD - LDGS Prelim. All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday,August 5,1998 a��e.ss I�SNb$.rt g AA r��-• �� �1,;fi�eY,Lebl� gzt�J„� � C1i� 0.r`r�tG 1.1 A.,-t9cSx' i V eq t-��sLei'c, �''\\ c�ee.e-.Ss e�exi-+�; Jir�or� -�,r �n--u sc%u�, � U�aF�'���,`ao-2-"• `t11 o Date: HERE IFWISH TO RECEIVE aREVISIONS7St iRepOtherty _Redline Utility D[�C�[��L�C� D , . 7 s9s ID aR� Yid®j � • F DATE: July 16, 1998 TO: Trans. Planning PROJECT: #65-93C Harmony Village PUD - LDGS Prelim. All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday,August 5, 1998 ui. � U ; vt LJ` L ll� L' cJ � -�- l: �� 7��-�L.�•'�v2 ii}�. _ �/y1 �,S ±,� U_: � �L=; t�tZ C �t--K V f . s Vv�i�-' C'✓tip VL% S_�L v\ s,��—f Date: CHECK HERE IF YOU,W[SH TO RECEIVE COPIES OF REVISIONS PHt Site e Rep ft _ Olher _ Utility _Redline Utility Iandsape 4t VK Y� City of Fort Collins I,vcf _ . .. Tim Blandford -Concerns regarding Harm �y Road design Page 1 From: Kathleen Reavis To: DevelopmentReview Date: 6/5/98 10:42am Subject: Concerns regarding Harmony Road design Dave, As we discussed at yesterday's meeting, here are my concerns/issues regarding the design of Harmony Road. I agree with the group that these issues are pressing due to the recent development surge along the corridor, so hopefully we can get some direction in how to proceed to resolve these issues as soon as possible. 1) Design of medians . want to make sure that they are wide enough at the 'noses" to serve as practical pedestrian refuge areas. concern with how snow removal/storage will be done to make sure that snow is not piled in the bikelanes according to CDOT they prefer to store snow in the medians rather than to the outside. concern that with the needed taper and storage lengths for left turn access points, that the median will only be a very narrow "ribbon" and actually look like College Ave or worse (defeats any hope of having a boulevard type concept for Harmony - it will just look like any other urban arterial ) ' maintenance issues are complex - policy level implications between the City and CDOT. Now may be the time to push for a "trade" between the City/CDOT - for CR32 being the state hwy and Harmony becoming a local roadway. 2) Work that we're trying to start on revising the access control plan - I should have a draft RFP out to you all by today or Monday. 3) When/if the speed limits change on Harmony - how will this impact the needs for design? Who will make this call - the City or CDOT? 4) Need to better define where current and future bus stop locations need to be in regards to bus pull outs and pedestrian access. 5) Major reconstruction is needed along Harmony east of Cambridge to CR7 due to sub -standard conditions with existing vertical and horizontal design - this could dramatically impact ROW needs in this area. 6) How will double lefts at several of the intersections along Harmony be accommodated? Need to incorporate through bikelanes at the intersections and provide for as many ped-related improvements as possible (not just at these intersections, but others as well) 7) For the very long range - I think it wouldn't hurt to look at potential sites for a pedestrian overpass along Harmony Road. As an FYI, the new portion of Harmony Road from CR7 to the interchange will include the full six lane cross-section, with bikelanes and sidewalks - so this design should be used to set the alignment of Harmony Road west of CR7. The City has submitted a project to the North Front Range Council (MPO) to find funding for a design project for Harmony - but who knows when or if this project will actually be funded so it may not be able to solve the immediate pressing need for answers but it could help with longer term improvements. I can imagine that there are many other concerns from a Traffic and Engineering perspective - these are Tim Blandford Concerns regarding Harr y Road design Page 2 ` just my thoughts. Hopefully, you can incorporate these into your list for the upcoming Growth Management Lead Team meeting. Please let me know if you have any questions/concerns regarding this list. Thank you. KR PROJECT i� COMMENT SHEET Citv of Fort Collins Current Planning DATE: May 1, 1998 TO: Traffic Operations PROJECT: #65-93C Harmony Village PUD - (LDGS) Preliminary PUD All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, May 27,1998 Date: Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ Si"te'" �II'' _ Drainage Report U9V R_ Ofher `i efine UOV _ Landscape City of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 1, 1998 TO: Mapping/Drafting PROJECT: #65-93C Harmony Village PUD - (LDGS) Preliminary PUD All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, May 27,1998 Vj f-- h C e- Date: See. �)V- �IvI0.f 'FLCA. CHECK HERE IF YOU WISH TO RECM COPIES OF REVISIONS Plat _ Site _ Drainage Report _ Oler _ Utility _ Redline Udi _ Lads* City of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 1, 1998 TO: Trans. Ping. n, PROJECT: #65-93C Harmony Village PUD - (LDGS) Preliminary PUD u All comments must be received by Ted Shepard no later than the staff review meeting:k. Q Wednesday, y-2f� rx V L i J r c+ 7,L11_ CI�Gti S�Jc v'GL E I�fJ d Lkj t Date % Signature: 7 CHECK HERE T YOU WISH TO RECEIVE COPIES OF RE IONS J Plat etc Damage Report — Offer - Utility — Redline Utility viAds* City of Fort Collins i 1 Ted Shepard - Harmony Village From: Eric Bracke To: Dave Stringer, Tim Blandford q Date: Harm 8 Village Subject: Harmony Village Please have the developer remove the "enhanced " crosswalks along Harmony Road at Timberline. The W� enhanced x-walk can remain along Timberline. / The construction of the x-walk requires they be built one lane at a time. This type of construction lends itself to differential settlements/heaving, water infiltration, etc..... On a high speed facility such as Harmony Road, these types of x-walks are not considered safe. Painted x-walks are the preferred alternative. This logic was also used with Celestica. I have discussed this issue lwith / Kathleen. Eric CC: Ted Shepard PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 1, 1998 TO: Engineering PROJECT: #65-93C Harmony Village PUD - (LDGS) Preliminary PUD All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, May-47,1998 3UNE 3 Note: Comments were made from reviewing the Site and Landscape Plans. The utility plans should reflect the necessary modifications based on these comments. GENERAL COMMENTS: Sheet 2 of 10: Preliminary Site Plan The access off of Harmony Road has not been approved by the Colorado Department of Transportation (CDOT). The access points along Harmony Road need to comply with the Harmony Road Access Control Plan. J If the access on Harmony Road is approved, you will need to provide a right -turn lane with the appropriate amount of lane length, storage length, and taper length as stated in the State Highway Access Code (SHAC). Please see sheet 2 for additional comments 6w Date: 4-17 1 CHECK HQIE IF YOU WISH TO RECEIVE COPIES OF REVISIONS �� ✓ Plat ✓ Sik _ Dram* Report _ ✓ Ubh y ✓ Rdme lltl 4 ✓ I.aads* City of Fort Collins NOV 2 708 PROJECT COMMENT SHEET City of Fort Collins Current Planning TRANSPORTATION PLANNING KATHLEEN REAVIS DATE: November 9, 1998 TO: PROJECT: #65-93D Harmony Village P.U.D. - Final - LDGS All comments must be received by Ted Shepard no later than the staff review meeting: December 9, 1998 s lle-c�-�-c �J�;1nvac�i l�i�°`�ivtaccr.� Kos � ���� � C'tl�L%l-'��`�'� 6�L� SL-v�- d ✓I�QG'tG�GGc,�GG Y�'�9?N� � v UUU w c4-4,A,"'�lt Lw � ,�2iG -Izl�Gzd o✓v/�' dP/l �o D tijv Date: �� k v�C Signature: r tL l Ply vv�e-ta_ cl CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat �_ k _ Drainage Rgod _Offer NIfilaM _ U# _ Rebe U9V �116ds* City of Fort Collins ^',�,� )16 J� C1kx L!/� C 4'iAi , l'I a, Cc f17 AnAbiGt-iy 1 / �cp PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 9, 1998 TO: Engineering PROJECT: #65-93D Harmony Village P.U.D. - Final - LDGS All comments must be received by Ted Shepard no later than the staff review meeting: December 9, 1998 COMMENTS FROM THE UTILITY PLANS: z;x The access off of Harmony Road has not been approved by the Colorado Department of Transportation (COOT). The access points along Harmony Road need to comply with the Harmony Road Access Control Plan. xs Please provide a preliminary design of Harmony Road and Timberline Road 1000 feet beyond the construction limits. You will need to show the interim and ultimate improvements. zR You will need to revise the A -Line agreement with COOT. You will need to apply for a State Highway Access Permit for the access on Harmony Road as well as for Timberline Road. You will need to do intersection improvements to the intersection of Harmony Road and Timberline Road. -I-, The sidewalk along Harmony Road will need to connect to the nearest improved sidewalk network as per the Transportation Planning standards. Continue t Date: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ Plat ✓Si4 _ Drainage Repod _ Other ✓ Utility / Redline Utility / Lands* jalmAMN\ City of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 9, 1998 TO: Engineering Pavement PROJECT: #65-93D Harmony Village P.U.D. -Final - LDGS All comments must be received by Ted Shepard no later han the staff review meeting: December 9, 1998 Date: Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ Site _ Drainage Report _ Olher U6V _ Redline Utility _ IankpE City of Fort Cullin. REVISION COMMENT SHEET DATE: January 6, 1999 TO: Engineering PROJECT: #65-93D Harmony Village PUD — Final — LDGS All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, January 27,1998 No Comment 0 Problems or Concerns (see below or attached) MAJOR COMMENTS FROM THE UTILITY PLANS: The access off of Harmony Road has not been approved by the Colorado Department of Transportation (CDOT). The access points along Harmony Road need to comply with the Harmony Road Access Control Plan. Please provide a preliminary design of Harmony Road and Timberline Road 1000 feet beyond the construction limits. Yd'u will need to show the interim and ultimate improvements. You will need to revise the A -Line agreement with CDOT. You will need to apply for a State Highway Access Permit for the access on Harmony Road as well as for Timberline Road. You will need to do intersection improvements to the intersection of Harmony Road and Timberline Road. The sidewalk along Harmony Road needs to connect to the nearest improved sidewalk network as per the Transportation Planning standards. The bike lanes will also need to e constructed on Harmony Road. .+ Remove designations to a 'common drive". This is a drive isle for a parking lot, not a private drive or a private road. The P&Z Board will question this at the hearing. continue to the next page Date: 1 Signature: — CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS '} Plat site _ Dminage Report —Other Utility _ Redline Utility Landscape City of Fart Collins REVISION COMMENT SHEET DATE: January 6, 1999 TO: TRAN5FORTATIC KATHLEEN PROJECT: #65-93D Harmony Village PUD — Final — LDGS All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, January 27, 1998 No Comment Problems or Concerns (see below or attached) tC7 Date: CHECK HERE IF YOU FISH TO RECEIVE COPIES OF REVISIONS �P,�la.t� rte D� uage Repod _ Odff E� ty _Redline Utility man PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 23, 1999 DEPT: ENGINEERING PROJECT: Harmony Village PUD — Harmony Road Improvements ENGINEER: Tim Blandford All comments must be received by: July 12, 1999 ❑ No Problems 0 Problems or Concerns (see below or attached) OUTSTANDING ISSUES NEEDING TO BE ADDRESSED: 0 Please modify the City's signature blocks. This is the latest version, which needs to be incorporated on all plan sets. 0 Please make sure that the sidewalk along Harmony Road is contained within a pedestrian access easement, 0 Are the turning movements going to be okay at the Harmony/Timberline intersection? Please check and respond. 0 1 don't think that the State will allow a concrete in Harmony Road at the west entrance. In fad, I don't think the City will allow that either. Please eliminate the cross -pan and sheet flow the water. See the approved utility plans for Harmony Centre PUD (the development on the comer of Harmony and College). 0 Please modify the cross section of the median. We can install landscaping in a 4-foot median. 0 Please explain what is happening where the transitions are in the flowline profiles. 0 The cross section sheets are out of order. Please change. 0 Please label all of the catch slopes with the grade(s) being used. 0 The left turn lanes adjacent to the median need to be 12' exclusive of the gutter pan. Please make sure this is the case. 0 The variance request that you supplied regarding the lane tapers, storage lengths, etc. will need to be approved by the State. You will have to complete the State forms and include them in the State Highway Access Permit package. Date: 1 1'I,19 PLEASE SEND COPIES ❑ PLAT OF MARKED REVISIONS: ❑ SITE Cd UTILITY Signature: 0 LANDSCAPE ❑ SUBMIT MYLARS PROJECT COMMENT SHEET Citv of Fort Collins Current DATE: May 23, 1999 DEPT: ENGINEERING PROJECT: Harmony Village PUD — Harmony Road Improvements ENGINEER: Tim Blandford All comments must be received by: July 12, 1999 ❑ No Problems 0 Problems or Concerns (see below or attached) OUTSTANDING ISSUES NEEDING TO BE ADDRESSED: e Please modify the City's signature blocks. This is the latest version, which needs to be ,:.. incorporated on all plan sets. ;; c5 •� Please make sure that the sidewalk along Harmony Road is contained within a pedestrian access easement, o F Are the turning movements going to be okay at the Harmony/Timberline intersection? Please check and respond. o I don't think that the State will allow a concrete in Harmony Road at the west entrance. In r fact, I don't think the City will allow that either. Please eliminate the cross -pan and sheet Flow the water. See the approved utility plans for Harmony Centre PUD (the development on the corner of Harmony and College). o- —Please modify the cross section of the median. We can install landscaping in a 4-foot F' c'1median. 0 -,N Please explain what is happening where the transitions are in the flowline profiles. o- The cross section sheets are out of order. Please change. o- Please label all of the catch slopes with the grade(s) being used. o- The left turn lanes adjacent to the median need to be 12' exclusive of the gutter pan. Please make sure this is the case. o The variance request that you supplied regarding the lane tapers, storage lengths, etc. will need to be approved by the State. You will have to complete the State forms and include them in the State Highway Access Permit package. Date: 1,14.99 Signature: PLEASE SEND COPIES ❑ PLAT OF MARKED REVISIONS: ❑ SITE I ❑ SUBMIT MYLARS Gib UTILITY 0 LANDSCAPE 0*1 PROJECT 11m,"I COMMENT SHEET City of Fort Collins Current Planninii DATE: April 28, 2000 TO: Mapping/Drafting PROJECT: #65-93E Harmony Village PUD, Replat No. 1 — PDP - Type I (LUC) A11 comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, May 17, 2000 Note- Please identify your redlines for facture reference Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS flat Site _DrunageReport _Other c;ry of Fort Collins Utility _Redline Utility _Landscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: April 28, 2000 DEPT: ENGINEERING PROJECT: #63-93E Harmony Village PUD, Replat No. 1 — PDP — Type 1 (LUC) PLANNER: Ted Shepard ENGINEER: Tim Blandford All comments must be received by: May 17, 2000 ❑ No Problems 0 Problems or Concerns (see below or attached) Comments: See the Plat for comments and concerns. Please address the commenu prior to resubmitting. Date: May 22, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS ❑ Plat ❑ Site 0 Utility ❑ Landscape 0 Drainage Report M 3UDI-111 1.1 1 Lr IN. Transpor ion Services Engineering Department City of Fort Collins June 29, 1998 Mr. David Klockeman, P.E. JR Engineering, Ltd. 2620 East Prospect Road Fort Collins, CO 80525 Re: Harmony Village Roadway Improvements Dear David: This letter is in response to the meeting City of Fort Collins' staff had with Tess Jones from the Colorado Department of Transportation (CDOT) Thursday, June 25, 1998. The items that we discussed were the necessary roadway improvements required of this development along Harmony Road and Timberline Road. Please be aware that the items listed below are preliminary concerns based on the conceptual drawings your office submitted for the Harmony Road/Timberline Road intersection. We will make more formal comments once your office officially submits the utility plans for review again. The following is a list of comments and concerns made by City staff: 1. After reviewing the preliminary design of Harmony Road, i.e., the ultimate lane configurations atthe intersection of Harmony Road and Timberline Road, it appears that beginning your improvements from the north edge of the existing median will suffice. 2. The City requires intersection improvements at the intersection of Harmony Road and Timberline Road. Both developments (Harmony Village and PVH) are responsible for these improvements. Therefore, it is the recommendation of City staff that you coordinate your design with The Sear -Brown Group and include the design in the set of utility plans for each development. We would like to see the design of the intersection cover the following area: a. east leg - 1000 feet b. north leg - to Milestone Drive C. west leg - 1000 feet d. south leg - to the main entrance to both projects 3. Please design the medians in both Harmony Road and Timberline Road so that they provide pedestrian refuge for those who wish to cross the street. Account for vehicle turning movements your design. 4. The placement of the proposed bike lanes on Harmony Road will need to comply with the bike lane work currently underway by the City. Please contact Kathleen Reavis regarding the alignment and any other details you might need for your design. 5. At this time, City staff is not in favor of the main entrance to the site. If this street is going to function as a public street, you must design it like a public street. The ^_81 North College Avenue • P.O. B(ox 58) • Fort Collins, CO 80522-U580 • (970) 221-6605 public/private street connection from the Harmony Crossing subdivision needs redesigning. We may want to coordinate a time to where you can sit in on our Transportation Coordination meeting to discuss different design options. 5. Please be aware that the State is currently in the process of adopting a new State Highway Access Code (SHAC). They anticipate they will approve and adopt the new code at the end of August. Once that happens you will need to meet the requirements listed in that document. It looks as though Harmony Road is going to be classified as an NR-B road. For an NR-B > 40 mph, use the following criteria (these figures are subject to change at the time the State adopts the new (SHAG)): a. Both right turn and left turn deceleration lane lengths are 500 feet (including the taper length) b. Acceleration lane length is 760 feet (including the taper length) C. Transition taper ratio is 15:1 7. At the time I wrote this letter, I still had not heard from Tess Jones regarding the west access off Harmony Road. During the Transportation Coordination meeting she expressed that she still was not comfortable with the location. Her intentions were to review the Traffic Impact Study and get back to me by Tuesday, June 30. When I hear her decision, I will contact you. Again, the above comments are currently the main issues City staff recognizes from the conceptual drawings at this time. City staff will make more formal and detailed comments once you submit the utility plans for review. I hope this letter addresses the issues you had and assists in your design. If you need clarification on anything, or have any additional questions or concerns, please do not hesitate to contact me at 221-6605. Tim R. Blandford Engineering Department City of Fort Collins cc: Ted Shepard, Senior City Planner Eric Bracke, Traffic Systems Technician Kathleen Reavis, Transportation Planner II Tess Jones, CDOT Matt Baker, SID Coordinator Transpo. ion Services Engineering Department City of Fort Collins June 12, 1998 Mr. David W. Klockeman 2620 East Prospect Road, Suite 190 Fort Collins, CO 80525 Re: Harmony Village - Harmony Road Alignment Dear David: Thank you for meeting with City staff on Wednesday June 10, 1998 to discuss the Harmony Road alignment and the proposed lane configuration. As you know there are still a number of issues that need to be resolved before the City can agree on a final design. City staff did discuss your preliminary design at our Transportation Coordination Meeting on Thursday June 11, 1998. City staff would like to offeryou the following comments to helpfacilitate your effort in the design of Harmony Road: 1. Please provide City staff with the existing lane configurations as well as the ultimate lane configurations for 1000 feet beyond the construction limits. This will need to be prepared for both Harmony Road and Timberline Road. 2. The design of Harmony Road will need to be in conformance with the Harmony Road Bicycle Plan and the design that is currently underway. 3. You will need to be in contact with BHA Designs, who is designing the Poudre Valley Hospital site, to coordinate both designs so that they will work with each other. 4. Kathleen Reavis does want the bike lanes along Harmony Road to be along the edge of the road. At locations where Harmony Road is intersected with either a collector street or arterial street, the bike lane will shift so as to be between the right turn lane and the through lane. If you have questions or concerns with this arrangement, please contact her at 224-6140. 5. The design of Harmony Road will need to be designed with the median in the ultimate location. 6. You will need to accommodate a transit stop on Harmony Road, east of the private drive access. Please contact Gaylene Rossiter at 221-6195 for the design standards for such bus stops. 7. Since Harmony Road is a State Highway, your design must incorporate the State Access Code requirements for taper lengths, storage lengths, lane lengths, variance requests, etc. 8. It should be noted that with this project, the A -line will need to be amended. This is done by the Developer, who deals directly with CDOT. 9. Any utility work within the Harmony Road ROW will need to be approved through a utility construction permit. The Developer is responsible for acquiring this from CDOT. '�,1 North ('0IIC"C AN CniC • CO. Box 580 • Fort Collins, CO 50522-OnSO • (970) 221-6605 10. State Highway Access Permits will need to be acquired for the two accesses along Harmony Road, the private drive and Timberline Road, prior to any construction within the ROW. It is currently being negotiated with the CDOT on whether the City processes the applications or the State. More information will be provided at a future date. The above comments are preliminary at this time. There will be additional comments from both City and State staff once utility plans are submitted for review. If you should have any questions or concerns regarding this matter, please do not hesitate to contact this office at 221-6605. Sincer_ Tim R. Blandford Engineering Department City of Fort Collins CC' Dave Stringer, Dev. Review Manager Matt Baker, Street Oversizing Eric Bracke, City Traffic Engineer Ted Shepard, Senior City Planner Kathleen Reavis, Transportation Planning Gaylene Rossiter, Transfort PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 1, 1998 TO: Engineering Pvmt. PROJECT: #65-93C Harmony Village PUD - (LDGS) Preliminary PUD All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, May 27,1998 Date: ! /,-( - q r' Signature:T i Z'( A «t CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Flat _ Site _ Drainage Report _ Wec _ Utility _ Red me Utility _ Landscape REVISION ar; COMMENT SHEET DATE: September 28, 1998 DEPT: Engineering PROJECT: #65-93C Harmony Village Preliminary P.U.D. (LDGS) All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, October 21,1998 Note: Comments were made from reviewing the Site and Landscape Plans. The utility plans should reflect the necessary modifications based on these comments. GENERAL COMMENTS FOR THE SITE & LANDSCAPE PLANS: ✓ You will need to submit offsite easements prior to go to the Planning and Zoning Board Hearing. ✓ Please relocate the "neck -downs" to the locations shown. ✓ At both the Timberline Road/Hormony Road and Timberline Road/Timberwood Drive intersections, please use the style of access ramp that you see in the downtown area. These types of ramps provide a more direct connection with the crosswalks and they direct pedestrians to the other side of the street more effectively (if they can be designed to fit). ✓ The nose of the median at the intersection of Timberline Road and Timberwood Drive needs to be pulled back from the flowline a minimum of 20 feet. note: more detailed comments will be made at the time of the final submittal Date: a/za/es Signature: Please send copies of marked revisions _Plat _ Site _Utility _Landscape Fort REVISION COMMENT SHEET DATE: September 28, 1998 TO: Transp. Planning PROJECT: #65-93C Harmony Village Preliminary P.U.D. (LDGS) All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, October 21,1998 ❑ No Problems 0 Problems or Concerns (see below or attached) au� iU-CR.I/-+ wt-ue ( IG/9 ) u,�- 46ad— 131fh 1n AVW, -vim 4 q � nrw javKL� 3�'bo�f/�q��{ T�Q (1�nn¢� d .� V�%� "/ YUS�1 s�✓ C�iG+ ��- � e� t uro {NGV f i � . Uv`k 6Lcl Q 5+tp <'4� 4a v l6 T�d11�2�e,lLw�t- � Date: /U Signature: }�}� Citv of Fort Collins � ��,.