October 23, 1998
Mr. Dave Klockeman
JR Engineering, Ltd
2620 E. Prospect Rd., Suite 190
Fort Collins, CO 80525
RE: Harmony Road Horizontal Alignment
Dear Dave:
Attached you will find an AutoCAD r14 file containing the City's desired horizontal alignment for
Harmony Road from Lemay Avenue to I-25. The centerline shown in the drawing is described with
bearings and offsets from both the section and quarter corners along the alignment. The drawing is on the
City's coordinate base for Harmony Road, therefore you may have to move and rotate the drawing to fit
your development plans. You will find that all of the intersection geometries are shown for the major
intersections along the alignment. However, they shall be considered accurate only in concept. Existing
structures, topography and monuments were not obtained in developing the alignments of the intersecting
streets such as Lemay Ave., Timberline Road and County Road No. 9. Therefore, it will be your
responsibility to design the proper setbacks for your developments along these roadways as they would
relate to the existing conditions keeping the proper geometries in mind as shown the drawing. Also all
turning movements and radii should be designed for each intersection layout. The following is a list of the
file information as well as layer names that will assist you in manipulating the file.
Filename: harmrdcon.dwg
Layer names: PR-CL
Proposed Centerline
PR-EOA
Proposed Edge of Asphalt
PR -FL
Proposed Flowline
PR -LANES
Proposed Lane Lines
PR -ROW
Proposed right of way
PR-CL-LBL
Proposed centerline labels
Note: Harmony Road setbacks shall be measured from the proposed future edge of asphalt.
If you have any questions please do not hesitate to can me at (970)221-6605.
Sincerely,
Keith Meyer, P.E.
Civil Engineer
281 North College ,Avenue • P.O. Box 380 • Fort Collins, CO 80522-0580 • (970) 221-6605
Tim Blandfotd - Concerns regarding Harr 'y
From: Kathleen Reavis
To: DevelopmentReview
Date: 6/5/98 10:42am
Subject: Concerns regarding Harmony Road design
Dave,
As we discussed at yesterday's meeting, here are my concerns/issues regarding the design of Harmony
Road- I agree with the group that these issues are pressing due to the recent development surge along
the corridor, so hopefully we can get some direction in how to proceed to resolve these issues as soon as
possible.
1) Design of medians
` want to make sure that they are wide enough at the'noses" to serve as practical pedestrian refuge
areas.
concern with how snow removal/storage will be done to make sure that snow is not piled in the bikelanes
according to CDOT they prefer to store snow in the medians rather than to the outside.
concern that with the needed taper and storage lengths for left turn access points, that the median will
only be a very narrow "ribbon" and actually look like College Ave or worse (defeats any hope of having a
boulevard type concept for Harmony - it will just look like any other urban arterial.)
` maintenance issues are complex - policy level implications between the City and CDOT. Now may be
the time to push for a "trade" between the City/CDOT - for CR32 being the state hwy and Harmony
becoming a local roadway.
2) Work that we're trying to start on revising the access control plan - I should have a draft RFP out to you
all by today or Monday.
3) When/if the speed limits change on Harmony - how will this impact the needs for design? Who will
make this call - the City or CDOT?
4) Need to better define where current and future bus stop locations need to be in regards to bus pull outs
and pedestrian access.
5) Major reconstruction is needed along Harmony east of Cambridge to CR7 due to sub -standard
conditions with existing vertical and horizontal design - this could dramatically impact ROW needs in this
area.
6) How will double lefts at several of the intersections along Harmony be accommodated? Need to
incorporate through bikelanes at the intersections and provide for as many ped-related improvements as
possible (not just at these intersections, but others as well)
7) For the very long range - I think it wouldn't hurt to look at potential sites for a pedestrian overpass along
Harmony Road.
As an FYI, the new portion of Harmony Road from CR7 to the interchange will include the full six lane
cross-section, with bikelanes and sidewalks - so this design should be used to set the alignment of
Harmony Road west of CR7.
The City has submitted a project to the North Front Range Council (MPO) to find funding for a design
project for Harmony - but who knows when or if this project will actually be funded so it may not be able to
solve the immediate pressing need for answers but it could help with longer term improvements.
I can imagine that there are many other concerns from a Traffic and Engineering perspective - these are
--
Tim Bla_ndfdrd -Concerns regarduig W - _y Road design
just my thoughts.
Hopefully, you can incorporate these into your list for the upcoming Growth Management Lead Team
meeting.
Please let me know if you have any questions/concerns regarding this list.
Thank you.
KR
REVISION
COMMENT SHEET
DATE: July 16, 1998 TO: Engineering
PROJECT: #65-93C Harmony Village PUD - LDGS Prelim.
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday,August 5,1998
Note: Comments were made from reviewing the Site and Landscape Plans. The utility plans should
reflect the necessary modifications based on these comments.
GENERAL COMMENTS FOR UTILITY PLANS AND SITE & LANDSCAPE PLANS:
U As stated in the letter sent to you dated August 5, 1998, because the City has not yet
determined the datum/centerline along Harmony Road, this Development is proceeding
at some risk in the fact that the determination of the datum line may adversely affect
the location of buildings, setbacks, and landscaping. Once the datum line has been
determined, more formal and accurate comments will be made.
J The 3/4 access along Harmony Road has been approved by the State. Therefore, you may
proceed with the design of that access.
Please see sheet Z for additional comments i+
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
/Plat Asite _ Drainage Report
Ulility ✓Redline Utility ✓Landscape
REVISION
COMMENT SHEET
DATE: July 16, 1998 TO: CDOT
PROJECT: #65-93C Harmony Village PUD - LDGS Prelim.
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday,August 5,1998
a��e.ss I�SNb$.rt g AA r��-• �� �1,;fi�eY,Lebl� gzt�J„� �
C1i� 0.r`r�tG 1.1 A.,-t9cSx'
i V
eq
t-��sLei'c, �''\\ c�ee.e-.Ss e�exi-+�; Jir�or� -�,r �n--u sc%u�, � U�aF�'���,`ao-2-"•
`t11
o
Date:
HERE IFWISH TO RECEIVE aREVISIONS7St
iRepOtherty _Redline Utility
D[�C�[��L�C�
D , . 7 s9s ID
aR� Yid®j � •
F
DATE: July 16, 1998 TO: Trans. Planning
PROJECT: #65-93C Harmony Village PUD - LDGS Prelim.
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday,August 5, 1998
ui.
� U ; vt LJ` L ll� L' cJ � -�- l: �� 7��-�L.�•'�v2 ii}�. _ �/y1 �,S ±,� U_: � �L=; t�tZ
C �t--K V
f . s Vv�i�-' C'✓tip VL% S_�L v\ s,��—f
Date:
CHECK HERE IF YOU,W[SH TO RECEIVE COPIES OF REVISIONS
PHt Site e Rep ft _ Olher
_ Utility _Redline Utility Iandsape
4t VK
Y�
City of Fort Collins
I,vcf
_ . ..
Tim Blandford -Concerns regarding Harm �y Road design Page 1
From: Kathleen Reavis
To: DevelopmentReview
Date: 6/5/98 10:42am
Subject: Concerns regarding Harmony Road design
Dave,
As we discussed at yesterday's meeting, here are my concerns/issues regarding the design of Harmony
Road. I agree with the group that these issues are pressing due to the recent development surge along
the corridor, so hopefully we can get some direction in how to proceed to resolve these issues as soon as
possible.
1) Design of medians
. want to make sure that they are wide enough at the 'noses" to serve as practical pedestrian refuge
areas.
concern with how snow removal/storage will be done to make sure that snow is not piled in the bikelanes
according to CDOT they prefer to store snow in the medians rather than to the outside.
concern that with the needed taper and storage lengths for left turn access points, that the median will
only be a very narrow "ribbon" and actually look like College Ave or worse (defeats any hope of having a
boulevard type concept for Harmony - it will just look like any other urban arterial )
' maintenance issues are complex - policy level implications between the City and CDOT. Now may be
the time to push for a "trade" between the City/CDOT - for CR32 being the state hwy and Harmony
becoming a local roadway.
2) Work that we're trying to start on revising the access control plan - I should have a draft RFP out to you
all by today or Monday.
3) When/if the speed limits change on Harmony - how will this impact the needs for design? Who will
make this call - the City or CDOT?
4) Need to better define where current and future bus stop locations need to be in regards to bus pull outs
and pedestrian access.
5) Major reconstruction is needed along Harmony east of Cambridge to CR7 due to sub -standard
conditions with existing vertical and horizontal design - this could dramatically impact ROW needs in this
area.
6) How will double lefts at several of the intersections along Harmony be accommodated? Need to
incorporate through bikelanes at the intersections and provide for as many ped-related improvements as
possible (not just at these intersections, but others as well)
7) For the very long range - I think it wouldn't hurt to look at potential sites for a pedestrian overpass along
Harmony Road.
As an FYI, the new portion of Harmony Road from CR7 to the interchange will include the full six lane
cross-section, with bikelanes and sidewalks - so this design should be used to set the alignment of
Harmony Road west of CR7.
The City has submitted a project to the North Front Range Council (MPO) to find funding for a design
project for Harmony - but who knows when or if this project will actually be funded so it may not be able to
solve the immediate pressing need for answers but it could help with longer term improvements.
I can imagine that there are many other concerns from a Traffic and Engineering perspective - these are
Tim Blandford Concerns regarding Harr y Road design Page 2 `
just my thoughts.
Hopefully, you can incorporate these into your list for the upcoming Growth Management Lead Team
meeting.
Please let me know if you have any questions/concerns regarding this list.
Thank you.
KR
PROJECT
i�
COMMENT SHEET
Citv of Fort Collins
Current Planning
DATE: May 1, 1998 TO: Traffic Operations
PROJECT: #65-93C Harmony Village PUD - (LDGS)
Preliminary PUD
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, May 27,1998
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ Si"te'" �II'' _ Drainage Report
U9V R_ Ofher `i
efine UOV _ Landscape City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 1, 1998 TO: Mapping/Drafting
PROJECT: #65-93C Harmony Village PUD - (LDGS)
Preliminary PUD
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, May 27,1998
Vj f-- h C e-
Date:
See. �)V- �IvI0.f 'FLCA.
CHECK HERE IF YOU WISH TO RECM COPIES OF REVISIONS
Plat _ Site _ Drainage Report _ Oler
_ Utility _ Redline Udi _ Lads*
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 1, 1998 TO: Trans. Ping.
n,
PROJECT: #65-93C Harmony Village PUD - (LDGS)
Preliminary PUD
u
All comments must be received by Ted Shepard no later than the staff
review meeting:k.
Q
Wednesday,
y-2f�
rx
V
L i
J r
c+
7,L11_ CI�Gti S�Jc v'GL E I�fJ d
Lkj t
Date % Signature: 7
CHECK HERE T YOU WISH TO RECEIVE COPIES OF RE IONS
J Plat etc Damage Report — Offer
-
Utility — Redline Utility viAds* City of Fort Collins
i
1
Ted Shepard - Harmony Village
From: Eric Bracke
To: Dave Stringer, Tim Blandford q
Date: Harm 8 Village
Subject: Harmony Village
Please have the developer remove the "enhanced " crosswalks along Harmony Road at Timberline. The W�
enhanced x-walk can remain along Timberline. /
The construction of the x-walk requires they be built one lane at a time. This type of construction lends
itself to differential settlements/heaving, water infiltration, etc.....
On a high speed facility such as Harmony Road, these types of x-walks are not considered safe. Painted
x-walks are the preferred alternative. This logic was also used with Celestica.
I have discussed this issue
lwith
/ Kathleen.
Eric
CC: Ted Shepard
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 1, 1998 TO: Engineering
PROJECT: #65-93C Harmony Village PUD - (LDGS)
Preliminary PUD
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, May-47,1998
3UNE 3
Note: Comments were made from reviewing the Site and Landscape Plans. The utility plans
should reflect the necessary modifications based on these comments.
GENERAL COMMENTS:
Sheet 2 of 10: Preliminary Site Plan
The access off of Harmony Road has not been approved by the Colorado
Department of Transportation (CDOT). The access points along Harmony Road
need to comply with the Harmony Road Access Control Plan.
J If the access on Harmony Road is approved, you will need to provide a right -turn
lane with the appropriate amount of lane length, storage length, and taper length as
stated in the State Highway Access Code (SHAC).
Please see sheet 2 for additional comments 6w
Date: 4-17 1
CHECK HQIE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ��
✓ Plat ✓ Sik _ Dram* Report _
✓ Ubh y ✓ Rdme lltl 4 ✓ I.aads* City of Fort Collins
NOV 2 708
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning TRANSPORTATION PLANNING
KATHLEEN REAVIS
DATE: November 9, 1998 TO:
PROJECT: #65-93D Harmony Village P.U.D. - Final -
LDGS
All comments must be received by Ted Shepard no later than the staff
review meeting:
December 9, 1998
s
lle-c�-�-c �J�;1nvac�i l�i�°`�ivtaccr.� Kos
� ���� � C'tl�L%l-'��`�'� 6�L� SL-v�- d ✓I�QG'tG�GGc,�GG Y�'�9?N�
� v UUU
w
c4-4,A,"'�lt Lw � ,�2iG
-Izl�Gzd o✓v/�' dP/l �o D tijv
Date: �� k v�C Signature: r tL l
Ply vv�e-ta_ cl
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat �_ k _ Drainage Rgod _Offer NIfilaM
_ U# _ Rebe U9V �116ds* City of Fort Collins ^',�,�
)16 J� C1kx L!/� C 4'iAi , l'I a, Cc f17 AnAbiGt-iy 1 /
�cp
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: November 9, 1998 TO: Engineering
PROJECT: #65-93D Harmony Village P.U.D. - Final -
LDGS
All comments must be received by Ted Shepard no later than the staff
review meeting:
December 9, 1998
COMMENTS FROM THE UTILITY PLANS:
z;x The access off of Harmony Road has not been approved by the Colorado Department of
Transportation (COOT). The access points along Harmony Road need to comply with the
Harmony Road Access Control Plan.
xs Please provide a preliminary design of Harmony Road and Timberline Road 1000 feet beyond
the construction limits. You will need to show the interim and ultimate improvements.
zR You will need to revise the A -Line agreement with COOT.
You will need to apply for a State Highway Access Permit for the access on Harmony Road
as well as for Timberline Road.
You will need to do intersection improvements to the intersection of Harmony Road and
Timberline Road.
-I-, The sidewalk along Harmony Road will need to connect to the nearest improved sidewalk
network as per the Transportation Planning standards.
Continue t
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat ✓Si4 _ Drainage Repod _ Other
✓ Utility / Redline Utility / Lands*
jalmAMN\
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: November 9, 1998 TO: Engineering Pavement
PROJECT: #65-93D Harmony Village P.U.D. -Final -
LDGS
All comments must be received by Ted Shepard no later han the staff
review meeting:
December 9, 1998
Date: Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ Site _ Drainage Report _ Olher
U6V _ Redline Utility _ IankpE City of Fort Cullin.
REVISION
COMMENT SHEET
DATE: January 6, 1999 TO: Engineering
PROJECT: #65-93D Harmony Village PUD — Final — LDGS
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, January 27,1998
No Comment
0 Problems or Concerns (see below or attached)
MAJOR COMMENTS FROM THE UTILITY PLANS:
The access off of Harmony Road has not been approved by the Colorado Department of
Transportation (CDOT). The access points along Harmony Road need to comply with the
Harmony Road Access Control Plan.
Please provide a preliminary design of Harmony Road and Timberline Road 1000 feet
beyond the construction limits. Yd'u will need to show the interim and ultimate
improvements.
You will need to revise the A -Line agreement with CDOT.
You will need to apply for a State Highway Access Permit for the access on Harmony Road
as well as for Timberline Road.
You will need to do intersection improvements to the intersection of Harmony Road and
Timberline Road.
The sidewalk along Harmony Road needs to connect to the nearest improved sidewalk
network as per the Transportation Planning standards. The bike lanes will also need to e
constructed on Harmony Road.
.+ Remove designations to a 'common drive". This is a drive isle for a parking lot, not a private
drive or a private road. The P&Z Board will question this at the hearing.
continue to the next page
Date: 1 Signature: —
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS '}
Plat site _ Dminage Report —Other
Utility _ Redline Utility Landscape
City of Fart Collins
REVISION
COMMENT SHEET
DATE: January 6, 1999 TO:
TRAN5FORTATIC
KATHLEEN
PROJECT: #65-93D Harmony Village PUD — Final — LDGS
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, January 27, 1998
No Comment
Problems or Concerns (see below or attached)
tC7
Date:
CHECK HERE IF YOU FISH TO RECEIVE COPIES OF REVISIONS
�P,�la.t� rte D� uage Repod _ Odff
E� ty _Redline Utility man
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 23, 1999 DEPT: ENGINEERING
PROJECT: Harmony Village PUD — Harmony Road Improvements
ENGINEER: Tim Blandford
All comments must be received by: July 12, 1999
❑ No Problems
0 Problems or Concerns (see below or attached)
OUTSTANDING ISSUES NEEDING TO BE ADDRESSED:
0 Please modify the City's signature blocks. This is the latest version, which needs to be
incorporated on all plan sets.
0 Please make sure that the sidewalk along Harmony Road is contained within a
pedestrian access easement,
0 Are the turning movements going to be okay at the Harmony/Timberline intersection?
Please check and respond.
0 1 don't think that the State will allow a concrete in Harmony Road at the west entrance. In
fad, I don't think the City will allow that either. Please eliminate the cross -pan and sheet
flow the water. See the approved utility plans for Harmony Centre PUD (the development
on the comer of Harmony and College).
0 Please modify the cross section of the median. We can install landscaping in a 4-foot
median.
0 Please explain what is happening where the transitions are in the flowline profiles.
0 The cross section sheets are out of order. Please change.
0 Please label all of the catch slopes with the grade(s) being used.
0 The left turn lanes adjacent to the median need to be 12' exclusive of the gutter pan.
Please make sure this is the case.
0 The variance request that you supplied regarding the lane tapers, storage lengths, etc.
will need to be approved by the State. You will have to complete the State forms and
include them in the State Highway Access Permit package.
Date: 1 1'I,19
PLEASE SEND COPIES ❑ PLAT
OF MARKED REVISIONS: ❑ SITE
Cd UTILITY
Signature:
0 LANDSCAPE
❑ SUBMIT MYLARS
PROJECT
COMMENT SHEET
Citv of Fort Collins
Current
DATE: May 23, 1999 DEPT: ENGINEERING
PROJECT: Harmony Village PUD — Harmony Road Improvements
ENGINEER: Tim Blandford
All comments must be received by: July 12, 1999
❑ No Problems
0 Problems or Concerns (see below or attached)
OUTSTANDING ISSUES NEEDING TO BE ADDRESSED:
e Please modify the City's signature blocks. This is the latest version, which needs to be
,:..
incorporated on all plan sets.
;;
c5 •� Please make sure that the sidewalk along Harmony Road is contained within a
pedestrian access easement,
o F Are the turning movements going to be okay at the Harmony/Timberline intersection?
Please check and respond.
o I don't think that the State will allow a concrete in Harmony Road at the west entrance. In
r fact, I don't think the City will allow that either. Please eliminate the cross -pan and sheet
Flow the water. See the approved utility plans for Harmony Centre PUD (the development
on the corner of Harmony and College).
o- —Please modify the cross section of the median. We can install landscaping in a 4-foot
F' c'1median.
0 -,N Please explain what is happening where the transitions are in the flowline profiles.
o- The cross section sheets are out of order. Please change.
o- Please label all of the catch slopes with the grade(s) being used.
o- The left turn lanes adjacent to the median need to be 12' exclusive of the gutter pan.
Please make sure this is the case.
o The variance request that you supplied regarding the lane tapers, storage lengths, etc.
will need to be approved by the State. You will have to complete the State forms and
include them in the State Highway Access Permit package.
Date: 1,14.99 Signature:
PLEASE SEND COPIES ❑ PLAT
OF MARKED REVISIONS: ❑ SITE I ❑ SUBMIT MYLARS
Gib UTILITY
0 LANDSCAPE
0*1
PROJECT
11m,"I COMMENT SHEET
City of Fort Collins
Current Planninii
DATE: April 28, 2000 TO: Mapping/Drafting
PROJECT: #65-93E Harmony Village PUD, Replat No. 1 —
PDP - Type I (LUC)
A11 comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, May 17, 2000
Note- Please identify your redlines for facture reference
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
flat Site _DrunageReport _Other
c;ry of Fort Collins
Utility _Redline Utility _Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 28, 2000 DEPT: ENGINEERING
PROJECT: #63-93E Harmony Village PUD, Replat No. 1 —
PDP — Type 1 (LUC)
PLANNER: Ted Shepard
ENGINEER: Tim Blandford
All comments must be received by: May 17, 2000
❑ No Problems
0 Problems or Concerns (see below or attached)
Comments:
See the Plat for comments and concerns. Please address the commenu prior to resubmitting.
Date: May 22, 2000 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS
❑ Plat ❑ Site 0 Utility ❑ Landscape 0 Drainage Report M 3UDI-111 1.1 1 Lr IN.
Transpor ion Services
Engineering Department
City of Fort Collins
June 29, 1998
Mr. David Klockeman, P.E.
JR Engineering, Ltd.
2620 East Prospect Road
Fort Collins, CO 80525
Re: Harmony Village Roadway Improvements
Dear David:
This letter is in response to the meeting City of Fort Collins' staff had with Tess Jones from the
Colorado Department of Transportation (CDOT) Thursday, June 25, 1998. The items that we
discussed were the necessary roadway improvements required of this development along Harmony
Road and Timberline Road. Please be aware that the items listed below are preliminary concerns
based on the conceptual drawings your office submitted for the Harmony Road/Timberline Road
intersection. We will make more formal comments once your office officially submits the utility
plans for review again.
The following is a list of comments and concerns made by City staff:
1. After reviewing the preliminary design of Harmony Road, i.e., the ultimate lane
configurations atthe intersection of Harmony Road and Timberline Road, it appears
that beginning your improvements from the north edge of the existing median will
suffice.
2. The City requires intersection improvements at the intersection of Harmony Road
and Timberline Road. Both developments (Harmony Village and PVH) are
responsible for these improvements. Therefore, it is the recommendation of City
staff that you coordinate your design with The Sear -Brown Group and include the
design in the set of utility plans for each development. We would like to see the
design of the intersection cover the following area:
a. east leg - 1000 feet
b. north leg - to Milestone Drive
C. west leg - 1000 feet
d. south leg - to the main entrance to both projects
3. Please design the medians in both Harmony Road and Timberline Road so that
they provide pedestrian refuge for those who wish to cross the street. Account for
vehicle turning movements your design.
4. The placement of the proposed bike lanes on Harmony Road will need to comply
with the bike lane work currently underway by the City. Please contact Kathleen
Reavis regarding the alignment and any other details you might need for your
design.
5. At this time, City staff is not in favor of the main entrance to the site. If this street
is going to function as a public street, you must design it like a public street. The
^_81 North College Avenue • P.O. B(ox 58) • Fort Collins, CO 80522-U580 • (970) 221-6605
public/private street connection from the Harmony Crossing subdivision needs
redesigning. We may want to coordinate a time to where you can sit in on our
Transportation Coordination meeting to discuss different design options.
5. Please be aware that the State is currently in the process of adopting a new State
Highway Access Code (SHAC). They anticipate they will approve and adopt the
new code at the end of August. Once that happens you will need to meet the
requirements listed in that document. It looks as though Harmony Road is going to
be classified as an NR-B road. For an NR-B > 40 mph, use the following criteria
(these figures are subject to change at the time the State adopts the new (SHAG)):
a. Both right turn and left turn deceleration lane lengths are 500 feet
(including the taper length)
b. Acceleration lane length is 760 feet (including the taper length)
C. Transition taper ratio is 15:1
7. At the time I wrote this letter, I still had not heard from Tess Jones regarding the
west access off Harmony Road. During the Transportation Coordination meeting
she expressed that she still was not comfortable with the location. Her intentions
were to review the Traffic Impact Study and get back to me by Tuesday, June 30.
When I hear her decision, I will contact you.
Again, the above comments are currently the main issues City staff recognizes from the conceptual
drawings at this time. City staff will make more formal and detailed comments once you submit the
utility plans for review. I hope this letter addresses the issues you had and assists in your design.
If you need clarification on anything, or have any additional questions or concerns, please do not
hesitate to contact me at 221-6605.
Tim R. Blandford
Engineering Department
City of Fort Collins
cc: Ted Shepard, Senior City Planner
Eric Bracke, Traffic Systems Technician
Kathleen Reavis, Transportation Planner II
Tess Jones, CDOT
Matt Baker, SID Coordinator
Transpo. ion Services
Engineering Department
City of Fort Collins
June 12, 1998
Mr. David W. Klockeman
2620 East Prospect Road, Suite 190
Fort Collins, CO 80525
Re: Harmony Village - Harmony Road Alignment
Dear David:
Thank you for meeting with City staff on Wednesday June 10, 1998 to discuss the Harmony Road
alignment and the proposed lane configuration. As you know there are still a number of issues
that need to be resolved before the City can agree on a final design.
City staff did discuss your preliminary design at our Transportation Coordination Meeting on
Thursday June 11, 1998. City staff would like to offeryou the following comments to helpfacilitate
your effort in the design of Harmony Road:
1. Please provide City staff with the existing lane configurations as well as the ultimate
lane configurations for 1000 feet beyond the construction limits. This will need to
be prepared for both Harmony Road and Timberline Road.
2. The design of Harmony Road will need to be in conformance with the Harmony
Road Bicycle Plan and the design that is currently underway.
3. You will need to be in contact with BHA Designs, who is designing the Poudre
Valley Hospital site, to coordinate both designs so that they will work with each
other.
4. Kathleen Reavis does want the bike lanes along Harmony Road to be along the
edge of the road. At locations where Harmony Road is intersected with either a
collector street or arterial street, the bike lane will shift so as to be between the right
turn lane and the through lane. If you have questions or concerns with this
arrangement, please contact her at 224-6140.
5. The design of Harmony Road will need to be designed with the median in the
ultimate location.
6. You will need to accommodate a transit stop on Harmony Road, east of the private
drive access. Please contact Gaylene Rossiter at 221-6195 for the design
standards for such bus stops.
7. Since Harmony Road is a State Highway, your design must incorporate the State
Access Code requirements for taper lengths, storage lengths, lane lengths, variance
requests, etc.
8. It should be noted that with this project, the A -line will need to be amended. This
is done by the Developer, who deals directly with CDOT.
9. Any utility work within the Harmony Road ROW will need to be approved through
a utility construction permit. The Developer is responsible for acquiring this from
CDOT.
'�,1 North ('0IIC"C AN CniC • CO. Box 580 • Fort Collins, CO 50522-OnSO • (970) 221-6605
10. State Highway Access Permits will need to be acquired for the two accesses along
Harmony Road, the private drive and Timberline Road, prior to any construction
within the ROW. It is currently being negotiated with the CDOT on whether the City
processes the applications or the State. More information will be provided at a
future date.
The above comments are preliminary at this time. There will be additional comments from both
City and State staff once utility plans are submitted for review.
If you should have any questions or concerns regarding this matter, please do not hesitate to
contact this office at 221-6605.
Sincer_
Tim R. Blandford
Engineering Department
City of Fort Collins
CC' Dave Stringer, Dev. Review Manager
Matt Baker, Street Oversizing
Eric Bracke, City Traffic Engineer
Ted Shepard, Senior City Planner
Kathleen Reavis, Transportation Planning
Gaylene Rossiter, Transfort
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 1, 1998 TO: Engineering Pvmt.
PROJECT: #65-93C Harmony Village PUD - (LDGS)
Preliminary PUD
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, May 27,1998
Date: ! /,-( - q r' Signature:T i Z'( A «t
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Flat _ Site _ Drainage Report _ Wec
_ Utility _ Red me Utility _ Landscape
REVISION
ar; COMMENT SHEET
DATE: September 28, 1998
DEPT: Engineering
PROJECT: #65-93C Harmony Village Preliminary P.U.D.
(LDGS)
All comments must be received by Ted Shepard no later than the staff
review meeting: Wednesday, October 21,1998
Note: Comments were made from reviewing the Site and Landscape Plans. The utility plans should
reflect the necessary modifications based on these comments.
GENERAL COMMENTS FOR THE SITE & LANDSCAPE PLANS:
✓ You will need to submit offsite easements prior to go to the Planning and Zoning Board
Hearing.
✓ Please relocate the "neck -downs" to the locations shown.
✓ At both the Timberline Road/Hormony Road and Timberline Road/Timberwood Drive
intersections, please use the style of access ramp that you see in the downtown area. These
types of ramps provide a more direct connection with the crosswalks and they direct
pedestrians to the other side of the street more effectively (if they can be designed to fit).
✓ The nose of the median at the intersection of Timberline Road and Timberwood Drive needs
to be pulled back from the flowline a minimum of 20 feet.
note: more detailed comments will be made at the time of the final submittal
Date: a/za/es Signature:
Please send copies of marked revisions _Plat _ Site
_Utility _Landscape
Fort
REVISION
COMMENT SHEET
DATE: September 28, 1998 TO: Transp. Planning
PROJECT: #65-93C Harmony Village Preliminary P.U.D.
(LDGS)
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, October 21,1998
❑ No Problems
0 Problems or Concerns (see below or attached)
au� iU-CR.I/-+ wt-ue ( IG/9 ) u,�- 46ad— 131fh
1n AVW, -vim 4 q � nrw javKL� 3�'bo�f/�q��{
T�Q (1�nn¢� d .� V�%� "/
YUS�1 s�✓ C�iG+ ��- � e� t uro {NGV f i � . Uv`k 6Lcl
Q 5+tp <'4�
4a v l6
T�d11�2�e,lLw�t- �
Date: /U Signature: }�}�
Citv of Fort Collins � ��,.