Loading...
HomeMy WebLinkAboutSPRING CREEK BIKE PATH CROSSING SHERWOOD DITCH - Filed LSP-LAND SURVEY PLATS - 2010-02-22SPRING CREEK BIKE PATH CROSSING OF THE SHERWOOD DITCH II I t REMOVE TREE PROPOSED CONCRETE BIKE PATH r• -, �: / 37 I \ \ ` 9 ` V N 5932.37 E 9981.16 32 FT BRIDGE ► / / 1 61 1 1 !- 'rdl . m t I „ EXISTING SPRING CREEK TRAIL SCALE 1"=10' 0 10 20 30 I LEGEND EXISTING CONCRETE BIKE PATH _____________ EXISTING DIRT ROAD CONCRETE Q SANITARY MANHOLE gc}c}0 EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 4950 PROPOSED CONTOUR PROPOSED CONRETE BIKE PATH PROPOSED BRIDGE - - - - - - - - PROPOSED BRIDGE ABUTMENT I Topsoi 5" -11 I I I I t I I I � I IN 5932.i7 IE 10013.3p I II a -- III II II III ill Notes: 1, 3,500 P,S.I. Concrete 2, Fiber flesh 3. Control joints: 10'C-C; expansion joint every 90' and control joint continuosly along trail centerline. All control joints to be saw cut. 4, 1% outslope on trail surface. 5. Recondition, level base under trail. 6. Backfill shall allow water to drain away from trail. 7, Surface finish shall be 'rough broom'. 8. Concrete color, 2 (bs per sack, Yosemite Brown J I —z- -- e5 I L— a -P U n N 0 d 7F GRADE SIDE SLOPES AT 3:1 PROPOSED CONCRETE BIKE PATH /i i 1 END BIKE PATH 50 FT EAST 0 r BRIDGE w/ BRIDGE CONSTRUCTION (FINAL BIKE PATH ALIGNMENT AST OF BRIDGE TO BE DETERMINED AT A LATER DATE) I 1% 0 4999 4998 4997 / 4996 i i NOTE: BRIDGE LENGTH = 32'-0" BACK OF FACE TO BACK OF FACE DISTANCE BETWEEN ABUTMENTS = 32'-2" / Trail 6'3 i �1'=• ' Exisitng GrounjW�, I 4 : y 4� i 9 9 m 1 #4 BARS #4 BARS @ 1'-6' C-C 3' I-0' L#4 BARS #4 BARS @ 1' 6' C-C #4 BAR 1 112' Gravel, 1' Thick TRAIL BRIDGE ABUTMENT TYPICAL SECTI❑N LENGTH IS 14 FEET Sherwood Ditch PROJECT L❑CATI❑N Spring Creek SheAds St. THESE PLANS HAVE BEEN REVIEWED ACCEPTED BY THE SHERWOOD DITCH COMPANY BY AND EONSIBLE PARTY DATE City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: Director of Engineering Date CHECKED BY: later & Wastewater Utility Date CHECKED BY: Stormwater Utility Date CHECKED BY: Parks &Recreation Date CHECKED BY: Date CHECKED BY: Date 6' 14'-0' Q) O 75 75 O O 0) 0) O L� —J J L� v d L Note: Verify ledge and backwall height with bridge manufacturer. Ira ma W mr 0°�E�aN �a " 32WSH ! iHlifi W 0 o QO OQ V) 1 om 0M oM � V ^ Q^ Q 1 Q a o� o 0 Z K U q U w < > m W W a (L oN o� aim ma W mr 0°�E�aN �a " 32WSH ! iHlifi W 0 o QO OQ V) 1 om 0M oM � V ^ Q^ Q 1 Q a o� o 0 Z K U q U w < > m W W a (L oN o� aim C ca a rn c 'v �o Z Z c tC O O O U OC U- O U = F— d z a o U Cc c O U Y W 00 a LLI Y U F O PROJECT NO. 020-169 DRAWING NO. 1 0f 1