September 24, 2003
Steve Ott, Project Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, Co 80522-0580
Re: Holiday Inn Express and Suites
Fort Collins, Colorado
L,iA Project No. 03030
Bear Mr. Olt,
Regarding the conceptual review staff comni.ents for the proposed Holiday Inn
Express, dated .April 18, 200we offer the following responses.
ZONING
a. No response required.
b. No response required.
C. The Harmony COLridOr Standards and Us,-J in the
revised site design.
d. The total unit count is 89 rooms. A total of 8'9 parki:r; starts is
provided.
ENGINEERING
a. The utility plan and requirements for utility plaits c'neckiist are
enclosed with this submiaal.
b. Street oversi ping fees will be. paid by the o-a:ner.
C. Latimer County Rnad Impact Fees rroill be paid by the ov.-ner.
Cl. A Transportation Impact Study has been enclosed with this
submittal.
e. The sidewalk along 'Wheaton Drive has been placed within a 15'
access and utility easement. The proposed detached sidewalk is
now located 8' from the face ofexisting curb.
f. No response required.
g. A 9' utility easement along Oak Ridge Drive and a 15' access and
Utility easement alone w'hcaton Drive are pio`.;dcd. An 80' access
and utility easement are provided along Hnnnony Road. All
Easements are labeled on the site plan and the plat.
700 MAIN AVENUE (701) 293-1350 (ND) FAX (701) 293-1353
POST OFFICE BOX 2464 (218) 233-3512 (MN) EMAIL- IjaZ lightowlerjohnson-com
FARGO, NORTH DAKOTA 58108-2464 WEBSITE. www.lightowlerjohnson.corn
allowed. Wheaton Drive has a stormsewer in it so that would be the
best outfall. Oakridge Drive is an option and runoff could be
discharged into the curb and gutter since there is no stormsewer.
e. Water quality extended detention is required to treat the runoff.
f. The applicant's design engineer should refer to the overall Oakridge
drainage report for the detention requirements. In any case, there
would be some detention since rainfall requirements have increased
since the original report and there is the water quality extended
detention requirement, as mentioned above.
Please contact Glen, at (970)224-6065, if you have questions about these
comments.
5. Alan Rutz of the Light & Power Department offered the following
comments:
a. Please coordinate the transformer location with Light & Power.
b. The standard electric development charges will apply to this
development request.
C. A C-1 Commercial Form must be filled out to help determine the
power needs for this development.
Please contact Alan, at (970)224-6153, if you have questions about these
comments.
6. Doug Moore of the Natural Resources Department offered the following
comments:
a. Native plant materials and grasses should be incorporated in the
Landscape Plan for the development. The use of bluegrass should be
minimized.
b. If prairie dogs exist on this property they must be relocated or
humanely eradicated prior to any construction occurring on -site,
including overlot grading. This is set forth in Section 3.4.1(N)(5) of
the LUC.
C. 'The trash enclosure should be designed to be large enough to provide
for a recycling container.
d. A single trash hauler for this property and adjacent properties
should be used to minimize truck traffic in the area. Please
coordinate this with existing and proposed development.
e. Provisions for bicycle/pedestrian connections to surrounding
properties is very important.
f. A Fugitive Dust Control Permit will be required and this permit is
issued by the Lorimer County Environmental Health Department.
Please contact them directly to discuss this requirement.
Please contact Doug, at (970)224-6143, if you have questions about these
comments.
7. Tom Reiff of the Transportation Planning Department offered the
following comments:
a. A Transportation Impact Study (TI5), addressing all modes of
transportation, will be required with your Project Development Plan
(PDP) submittal. Please contact Eric Brocke of the Traffic
Operations Department, at (970)224-6062 and Tom Reiff of the
Transportation Planning Department, at (970)416-2040 to determine
what information may be needed in the TI5 pertaining to Level of
Service (1-O5) for vehicle, pedestrian, bicycle, and transit modes of
transportation.
b. Crass -access for vehicular and pedestrian movement between the
Holiday Inn Express Hotel and the !HOP Restaurant is recommended.
C. 5idewalks must be a minimum of 6- wide in locations where
automobiles will overhang them.
Please contact Tom, at (970)416-2040, if you have questions about these
comments.
Current Planning has 4 more significant comments regarding this proposed
development:
Please be aware of the requirements set forth in Section 3.5.1 -
]Building and Project Compatibility in the LUC. Also, if the 4-story
hotel building is to be more than 40' in height then the development
request is subject to a Building Height Reviewas set forth in
:Section 3.5.1(6) of the LUC.
The concept plan does not comply with the Orientation to a
Connecting Waikwaystandard set forth in Section 3.5.3(8)(1) of the
LUC.
The concept plan does not comply with the Orientation to guild -to
Lines for Streetfront Buildings standards set forth in Section
3.5.3(13)(2) of the LUC.
The development request will be subject to the standards and
guidelines set forth in the Harmony Corridor Plan and Harmony
Corridor Standards and Guidelines, both adopted by City Council.
The request will have to comply. with all the applicable regulations and
standards set forth in Article 3 - General Development Standards and the
Permitted Uses, Land use Standards and Development Standards in
Division 4.21 - Harmony Corridor District of the LUC.
9. This development request will be subject to the Development Review Fee
Schedule that is available in the Current Planning Department office. The
fees are due at the time of submittal of the required documents for the
appropriate development review process (overall development plan, project
development plan, final compliance) by City staff and affected outside
reviewing agencies.
10. This development proposal is subject to the requirements as set forth in the
City's LUC, specifically Articles 2. Administration (Development Review
Procedures), Article 3. General Development Standards, and Division 4.21 -
Harmony Corridor Zoning District. Copies of Article 3 and Division 4.21 are
available in the Current Planning Department or on the City of Fort Collins
website G) wwti fcoov com. Go to Departments, then the Current Planning
Department.
11. The City's Current Planning Department will coordinate the development
review process. The required submittal package will be submitted to this
department and distributed accordingly to other City departments and
outside reviewing agencies involved in development review.
12. The proposed hotel (lodging establishment) project is permitted in the HC
District as a Type II, Planning and Zoning Board review and public hearing.
The developer/applicant for this development request must hold a
neighborhood information meeting prior to formal submittal of the project.
This is set forth in Section 2.2.2 of the LUC. The required notification area
is set forth in Section 2.2.6 of the LUC. Please contact Steve Olt, at
(970)221-6341, to assist you in setting a date, time, and location for the
meeting.
PROJECT
I COMMENT SHEET
City of Fort Collins
Current Planning REMI
DATE: October 9, 2003 TO: Engineering Pavement
PROJECT: 413-82CR OAKRIDGE BUSINESS PARK, 36'"
]FILING, HOLIDAY INN EXPRESS PDP — TYPE II
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
November 5, 2003
Note - PJ.FASI identify your redlines for future reference
19)
7
Nanle (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report Other
_Utility Redline Utility _Landscape
4koft
City of Fort Collins
c �" .. TT".'a....,•-•ate • 'i.'�. ''��`�
PROJECT
(a 6�� COMMENT SHEET
City of Fort Collins REC.D
no
Current Planning
DATE: October 9, 2003 TO: Technical Services
PROJECT: #13-82CR OAKRIDGE BUSINESS PARK, 36T"
FILING, HOLIDAY INN ExPREss PDP — TYPE II
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
November 5, 2003
Note - PLEASE identify your redlines for future reference
/. t3e-zwvgize *i' 64taSE
�EGAI �MNP.
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
S4/7 A%fITCN YcF
City of Fort Collins
° Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: November 5, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE: II
All comments must: be received by Steve Olt in Current Planning, no later than the
staff review meeting:
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11/4/2003
[11/4/03] Please revise the approval block on the construction set as shown on the redlines. The approval block
should be on all sheets.
Number: 11 Created: 11/4/2003
[11/4/031 The grading and erosion control plan sets are not readable, please revise. Because of the information
presented, it is difficult to determine if the permissive amount of sheetflow drainage for a driveway across a
sidewalk is being exceeded. Please ensure that the maximum amount of parking lot area crossing over a public
walk does not exceed 750 square feet.
Topic: General
Number: 9 Created: 11/4/2003
[1 1 /4/03] The existing bricks along Wheaton which act as a sidewalk are not considered an approved sidewalk system and
needs to be removed and replaced in accordance with City standards.
Number: 15 Created: 11/4/2003
[11/4/03] Please separate the site and landscape plans from the construction drawing set (and not name them
C-2 and C-6 respectively). These are items that will be filed separate from the construction drawing set. The
construction drawing set should have all remaining sheets assembled together within the plan set (ensure that
the grading plan sheet included within the drainage report is also included in the construction drawing set). The
plat, while also filed separately, should also be included in the construction drawing set as a sheet for reference,
placed immeadiately after the cover sheet. The cover sheet index should note that the second sheet in the plan
set is a plat for reference.
Number: 16 Created: 11/4/2003
[11/4/03] There appears to be some discrepancy as to where the modular block pavement is to be installed.
Sheet C-2 shows that this will only be used for the internal parking lot areas while Sheet C-9 shows based upon
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility __ Redline Utility Landscape
Page 1
the note on the lower right-hand corner of the page that the entire area noted as "F" will used this pavement,
which includes the drive aisles noted as concrete on C-2. Please clarify.
Number. 21 Created: 11/4/2003
[ 11 /4/031 Per LCUASS standard 19-6, the two parking stalls along the north side of the drive aisles that intersects with
Wheaton Drive need to be eliminated, a 50' setback from the flowline of Wheaton Drive (a collector) is required.
Number: 24 Created: 11/4/2003
[ 1 1 /4/031 Please revise the title on all the documents to read "Oakridge Business Park 36th Filing, Holiday Inn Express".
Number: 25 Created: 11/4/2003
[ 1 1 /4/03] It appears that. PFA needs the drive aisle connecting the two driveways to be dedicated as an emergency access
easement. Please indicate such dedication on the plat.
Number: 26 Created: 11/4/2003
[ 1 1 /4/03] The plans conflict with regards to the type of driveway proposed out to Oakridge Drive.
Number: 27 Created: 11/4/2003
[ 1 1 /4/03] The new access ramp at the southeast corner of Harmony Road and Wheaton Drive should be constructed as a
directional ramp, not a corner ramp.
Topic: Plat
Number: 22 Created: 11/4/2003
[1 1 /4/031 The plat needs to dedicate additional right-of-way for Harmony Road and additional access and landscape
easement behind the right-of-way as reflected on the 33rd fling. 9' of utility easement behind the right-of-way on
Oakridge Drive is also required to be dedicated. The site plan appears to dimension these items (but not call this out)
correctly but it is not reflected on the plat.
Number: 23 Created: 11/4/2003
[1 1 /4/031 There appears to be a portion of sidewalk along Oakridge Drive approaching Wheaton that is on private
property. It would make sense to dedicate this as right-of-way to provide a continuous property line along Oakridge.
Page 2
?roject Comments Sheet
y Selected Departments
Cill of fort Collins
Department: Water Wastewater
Date: November 6, 2003
Project:
OAKRIDGIE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
November 05, 2003
!dote - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 34 Created: 11 /5/2003
[11/5/03] Show and label the location of the proposed meter vault. Is a 4-inch water services truly
needed? Show and label all water line connection appurtenances (i.e. tapping saddles, thrust blocks,
valves, etc.). Include all appropriate current City of Fort Collins Utilities standard details (i.e. meter
vault, thrust block, typical water/sewer service, bedding, etc.). PVC pipe is not permitted with in the
City of Fort Collins service area. Label all water lines as D.I.P. and include a note to polywrap all
D.I.P.
Number: 35 Created: 11 /5/2003
[11/5/03] Provide 0.2 feet of fall through existing sanitary sewer manhole. Include a note to core drill
all openings into the existing manhole and to reshape the bench to direct flow through manhole.
Topic: Utility Plans
Number: 39 Created: 11 /6/2003
[11/6/03]lnclude the :standard general note to the landscape plans pertaining to shrub/utility
separation distance. Maintain the required landscape/utility separation distances on the landscape
plans.
See site, landscape and utility plans for other comments.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility _ Redline Utility _ Landscape
Page 1
Project'omments Sheet
Cityof Fort Collins
Selected Departments
Department: Transportation Planning
Date: November 6, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 28 Created: 11 /4/2003
[11/4/031 Please relabel the "15' utility and access easement" along Wheaton Drive
to read " 15' utility and public sidewalk easement". Also the "80' Access & Landscape
Easement" along Harmony needs to be relabeled as "80' Public sidewalk &
Landscape Easement."
Number: 29 Created: 11 /4/2003
[11/4/031 Why does the dedicated right of way (ROW) along Oak Ridge Drive dip
down at the NE corner of the Wheaton intersection? Please correct and continue th--
ROW dedication along the back of the Oak Ridge sidewalk to the easement along
Wheaton.
Number: 30 Created: 11 /4/2003
[11/4/03] Trees proposed along Wheaton need to be planted within the 8' parkway.
The submitted landscape plan depicts the tree trunks in the sidewalk.
Number: 31 Created: 11 /4/2003
[11/4/03] The landscape plans shows the proposed evergreens along Harmony
growing into the sidewalk / trail. Please be aware that there is a required 8'
clearance from the walk to the first branch. A better option would be to relocate the
proposed trees to a location that does not grow into the walk now or into the future.
a- (-0 3
Date
CHECK HER
F IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat .4 Site Drainage Report Other
Utility _ Redline Utility � Landscape
Page 1
Number: 32 Created: 11/4/2003
[11/4/031 Please be sure that when the large hedge along Harmony is trimmed for
the nc ev sidewalk. / trail that ;here is a minimum 2' distance from the hedge to the
walk.
Number. 33 Created: 11/4/2003
[11/4/03] Are the proposed shade trees along Harmony satisfying CDOT's setback
standards from the edge of the roadway?
Paee 2
C. The trash enclosure should be designed to be large enough to provide
for a recycling container.
d. A single trash hauler for this property and adjacent properties
should be used to minimize truck traffic in the area. Please
coordinate this with existing and proposed development.
e. Provisions for bicycle/pedestrian connections to surrounding
properties is very important,
f. A Fugitive Dust Control Permit will be required and this permit is
issued by the Lorimer County Environmental Health Department.
Please contact them directly to discuss this requirement.
Please contact Doug, at (970)224-6143, if you have questions about these
comments.
7. Tom Reiff of the Transportation Planning Department offered the
following comments:
a. A Transportation Impact Study (TIS), addressing all modes of
transportation, will be required with your Project Development Plan
(PDP) submittal. Please contact Eric Bracke of the Traffic
Operations Department, at (970)224-6062 and Tom Reiff of the
Transportation Planning Department, at (970)416-2040 to determine
what information may be needed in the TIS pertaining to Level of
Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of
transportation.
b. Cross -access for vehicular and pedestrian movement between the
Holiday Inn Express Hctel and the !HOP Restaurant is recommended.
C. Sidewalks must be a minimum of 6' wide in locations where
automobiles will overhang them.
Please contact Tom, at (970)416-2040, if you have questions about these
comments.
00
Project Comments Sheet
LW Selected Departments
C ih of Fort Collin
��
Department: Stormwater Utility
Date: November 7, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 17 Created: 11/4/2003
Quantity detention is required for this site in its entirety, not just for the difference
between the old and present rainfall standards. Per the Oakridge B.P. master plan, this
basin (230) requires detention. Detention can be provided in the parking lot of
commercial properties with a maximum 100-year water surface elevation of 1 foot over
the parking lot.
Number: 18 Created: 11 /4/2003
For water quality mitigation, 40-hour extended detention is required. This is one of the
methods presented in the Urban Storm Drainage Criteria Manual out of Denver.
Number: 19 Created: 11 /4/2003
Per the Oakridge B.P. master plan, the basin the site is located in is supposed to drain
to the east and into another storm sewer network than the one proposed. Due to this
site proposing to change drainage patterns, an analysis is required to determine
whether or not the storm sewer network has enough additional capacity for the
proposed release rate of the site.
Number: 44 Created: 11 /7/2003
Please revise the elevation for benchmark #9-94 on the cover sheet. See redlined plan.
C OL'—. )
Signature
-7-0S
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat Site t/ Drainage Report Other_
✓ Utility _ ✓ Redline Utility ✓ Landscape
Page I
C_c. S�cc OL� II
µ'I.a..rc' t%ir..
Number: 45 Created: 11 /7/2003
A drainage easement is required for the 100-year water surface limits of the detention
pond as well as the outfall storm sewer. These easements need to be dedicated to the
City of Fort Collins.
Number: 46 Created: 11/7/2003
The outlet structure for the detention pond needs to be the City's standard. Please see
attached exhibit,
Topic: Erosion/Sediment Control
Number: 20 Created: 11 /4/2003
1. Please remove: the "Soil Erosion and Sediment Control Notes" on plan sheets C-9 and C-
10 and replace: with City of Fort Collins standard erosion control notes (new version,
September, 2003). Please add to these any specific notes you have pertaining to the
sediment/eros:ion control plan for this site (e.g. revegetation).
2. Please prepare: and submit an erosion control report with calculations per City of Fort
Collins specifications.
Page 2
rrc r project Comments Sheet
Selected Departments
Citvot Fort Collins
Department: Engineering
Date: November 7, 2003
Project:
OAKRIDGE 3USINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
POP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff rev, w meeting:
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11/4/2003
[11/4/031 Please revise the approval block on the construction set as shown on the redlines. The approval block
should be on all sheets.
Number: 11 Created: 11/4/2003
111/4/03] -he grading and erosion control plan sets are not readable, please revise. Because of the informa@,
presented. t is difficult to determine if the permissive amount of sheetflow drainage for a driveway across a
sidewalk is being exceeded. Please ensure that the maximum amount of parking lot area crossing over a public
walk does not exceed 750 square feet.
Number: 40 Created: 11/7/2003
[ 11 /7/03] Show street patching for the proposed street cuts onto public right-of-way. Please note that due to the Iles=
distance between street cuts on Wheaton, a mill and inlay may instead be required for the entire length between stn.
The new driveways will require a street patch that is the entire width of the existing bikelane(s). Add a note refere, _..
these street curs indicating the following: "Limits of street repair are approximate. Final limits to be determined in the field
by the City Engineering Inspector at the time the cuts are made."
Number: 41 Created: 11/7/2003
[1 1 /7/031 Please replace details on the details sheet with City standard details as reclined (such as access ramps,
driveways, etc.)
Number: 42 Created: 11/7/2003
[ 1 1 /71031 Please revise the ramp proposed at the Harmony/Wheaton intersection to direct peds across Wheaton (not
lead to the corner). Because this is along CDOT right-of-way, the ramp will need to be constructed to CDOT standards.
Please ensure CDOT's details (with truncated domes) are included.
Number: 43 Created: 11/7/2003
[ 1 1 /7/031 The sidewalk along Harmony should remain detached approaching the intersection because there isn't curb
and gutter along this section of Harmony., ;
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat -,--`Site Drainage Report Other_
Utilitv --Redline Utility ✓Landscape
Page I
Topic: ,3eneral
Number: 9 Created: 11/4/2003
[ 1 1 /4/03] The existing bricks along Wheaton which act as a sidewalk are not considered an approved sidewalk system and
should be removed and replaced in accordance with City standards.
Number: ' 5 Created: 11/4/2003
[11/4103] P'.,ase separate the site and landscape plans from the construction drawing set (and not name them
C-2 and G6 respectively). These are items that will be fled separate from the construction drawing set. The
construction drawing set shoved have all remaining sheets assembled together within the plan set (eneure •t
the grading plan sheet included within the drainage report is also included in the construction drawing set). Elie
plat, while also filed separately, should also be included in the construction drawing set as a sheet for reference,
placed immediately after the cover sheet. The cover sheet index should note that the second sheet in the plan
set is a plat for reference.
Number: '6 Created: 11/4/2003
[11/4/03] There appears to be some discrepancy as to where the modular block pavement is to be installed.
Sheet C-2 _rows that this will only be used for the internal parking lot areas while Sheet C-9 shows base a upon
the note on the lower right-hand corner of the pace that the entire area noted as " F' will used this pavement,
which inciuees the drive aisles noted as concrete on C-2. Please clarify.
Number: 21 Created: 11/4/2003
[ 1 1/4/031 Per LCUASS standard 19-6, the two parking stalls along the north side of the drive aisles that intersects with
Wheaton Drive need to be eliminated, a 50' setback from the flowline of Wheaton Drive (a collector) is required.
Number: 24 Created: 11/4/2003
[ 1 1 /4/03] Please revise the title on all the documents to read "Oakridge Business Park 36th Filing, Holiday Inn Express".
Number: 25 Created: 11/4/2003
[ 1 1 /4/03] it appears that PFA needs the drive aisle connecting the two driveways to be dedicated as an emergency
easement. Please indicate such dedication on the plat.
Number: 26 Created: 11/4/2003
[ 1 1 /4/03] The plans conflict with regards to the type of driveway proposed out to Oakridge Drive.
Number: 27 Created: 11/4/2003
[ 1 1/4/031 The new access ramp at the southeast corner of Harmony Road and Wheaton Drive should be construe_,
directional ramp, not a corner ramp.
Topic: Plat
Number: 22 Created: 11/4/2003
[ 1 1 /4/03] The plat needs to dedicate additional right-of-way for Harmony Road and additional access and landscape
easement behind the right-of-way as reflected on the 33rd filing. 9' of utility easement behind the right-of-way on
Oakridge Drive is also required to be dedicated. The site plan appears to dimension these items (but not call this out)
correctly but it is not reflected on the plat.
Number: 23 Created: 11/4/2003
[ 1 1 /4/03] There appears to be a portion of sidewalk along Oakridge Drive approaching Wheaton that Is on private
property. It would make sense to dedicate this as right-of-way to provide a continuous property line along Oakridge.
Number: 47 Created: 11 /7/2003
[ 11 /7/031 Issue #22 will need to be investigated further internally in the City with regards to the right-of-way dedication
on Harmony as it appears the Spring Canyon Lateral may complicate such a right-of-way dedication.
Number: 48 Created: 11 /7/2003
[ 11/7/03] On the plat,. Item N7 mentions a right-of-way ditch but does not indicate on the plat where this might be. Is
this note pertinent to the plat?
Page 2
( 0�
STAFF PROJECT REVIEW
C'iKut Dart thliin.
Lightowler Johnson Associates Date: 11/18/2003
C/o Andrew Wei -der
700 Main Avenue
Fargo. ND. 58103
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK, 36TH FILING (HOLIDAY
INN EXPRESS), PDP - "TYPE II. and we offer the following comments:
ISSUES
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Plans
Number: 51 Created: 1 1/13/2001
[1 1/11/03] Rick Lee of the City's Building Department indicated that he is attaching a copy of the
various codes that the City kill enforce.
Number: 59 Created: 11 / 18/2003
[1 1/18/03] There are discrepancies between the Site Plan and the Building Elevations regarding the
north elevation. where the walls and patios are. The north elevation does not appear to show these
areas.
Number: 61 Created: 1 1 / 18/2003
[1 1/18/03] Elevations and details are needed for the maintenance building, trash enclosure, and walls
on the north side of the building.
Number: 62 Created: I 1 / 18/2003
[ 1 1 / 18/03 ] Why is there no physical connection behceen the entry canopy and the front of the
buildin¢. for weather protection for the guests? The Site Plan and Landscape Plan would appear to
show a connection but the Building Elevations do not.
Number: 63
Created: I 1 / 18/2003
[1 1/18/03] "File east and west elevations of the building, appear to need more detailing to meet Section
3.5.3(D)f3) ofthe LUC.
N u nt ber: 64 Created: 1 1 / 18/2003
[1 1/18/03] The north elevation, facing Harmony road. should include brick columns at the break in
the middle of the building to reflect the south side at the front entry.
Topic: Landscaping
Number: 52 Created: 1 1 / 13/2003
[1 1 / 13/03 ] Laurie D'A.udney of the City's Water Conservation Department is forwarding copies of
the Water Conservation Standards for Landscapes COMMENT SI IEET and Water Conservation
Standard, for LANDSCAPING and IRRIGATION SYSTEMS General Information.
Number: 53 Created: 1 1 / 13 /2003
1 1/13/031 Is this climate appropriate for the proposed Pervious Paver Blocks? How will the grass be
established and maintained if water is not applied?
Paec I
Number: 54 Created: 11/13/2003
[11/13/03] The proposed Austrian Pines and Colorado Blue Spruce at the northeast corner of the site,
in the required landscape setback, are nice but will they encumber pedestrian and bicycle movement
on the sidewalk? Also, Blue Spruce are not in the Harmony Road Plant Palette (or the Local/Collector
Street Palette).
Number: 55 Created: 11/13/2003
[ 11/ 13/031 Some of the landscaping along the east property line interferes with the logical sidewalk
connection to the IHOP Restaurant to the east.
Number: 56 Created: 11/13/2003
[11/13/03] Please see the red -lined Landscape Plan for Planning's comments. It appears as though the
Harmony Corridor Standards and Guidelines, relating to the Plant Palettes, is not being satisfied with
the plan.
Number: 58 Created: 11/18/2003
[11/18/031 It is difficult to read the shrubs symbols on the west and south side of the parking lot to
determine if the screening requirements are being met.
Topic: Signage
Number: 57
Created: 11/17/2003
[11/17/031 Remove all signage from the Building Elevations. This development is subject to the City
of Fort Collins Sign Code that is administered by the Zoning Department. The allowable signage will
be determined outside of this Project Development Plan review.
Topic: Site Plan
Number: 60 Created: 11/18/2003
[11/18/03] The building setback from Wheaton Drive does not satisfy either the LUC requirement of
no more than 15' from the street right-of-way or the Harmony Corridor suggested setback of 40' from
the "future edge of pavement".
Topic: Utility Plans
Number: 49 Created: 11/13/2003
[1 1/13/031 Len Hilderbrand of Xcel Energy (Public Service) offered the following comments:
a. Public Service has an existing 3" ped. gas main located along the west and south edge of Lot
1 of the 36th Filing.
b. The subdivision plat shows a 15' utility easement along the west boundary of the lot. A 9'
wide utility easement must be shown on the plat along the north edge of the Oakridge Drive
right-of-way.
C. No trees may planted within 4' of gas lines.
Number: 50 Created: 11/13/2003
[11/13/03] Dennis Greenwalt ofComcast Cable (cable TV) offered the following comments:
a. Comcast Cable would like to see continuous utility easements along Oakridge Drive. Also,
they would like to see a utility easement along East Harmony Road.
Page 2
b. No plans will be made to serve this project until a Broadband Utility Easement, also called a
service agreement, is completed with their Commercial Accounts Executive, Reneta Santro.
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11/4/2003
[I 1/4/03 J Please revise the approval block on the construction set as shown on the redlines. The
approval block should be on all sheets.
Number: I 1
Created: 1 1 /4/2003
[1 1,4'031 The grading and erosion control plan sets are not readable, please revise. Because of the
information presented. it is difficult to determine if the permissive amount of sheet flow drainage for
a driveway across a sidewalk is bcim- exceeded. Please ensure that the maximum amount of parking
lot area crossing over a public walk does not exceed 750 square feet.
Number: 40 Created: 1 1 /7/2003
[ 1 1 /7/03 1 Show street patching for the proposed street cuts onto public right-of-way. Please note that
due to the close distance between street cuts on Wheaton, a mill and inlay may instead be required for
the entire length between street cuts. The new driveways will require a street patch that is the entire
�s idth of the existing hikelane(s). Add a note referencing these street cuts indicating the following:
"Limits of street repair are approximate. Final limits to be determined in the field by the City
Engineering Inspector at the time the cuts are made."
Number: 41 Created: 11 /7/2003
[11/7/03] Please replace details on the details sheet with City standard details as redlined (such as
access ramps, driveways, etc.)
Number: 42 Created: I 1 /7/2003
[l I /7/03] Please revise the ramp proposed at the Hamiony,Wheaton intersection to direct peds across
Wheaton (not lead to the comer). Because this is along CDOT right-of-way, the ramp will need to be
constructed to CDOT standards. Please ensure CDOT's details (with truncated domes) are included.
Number 43 Created: 1 1 /7/2003
[11/7/03] The sidewalk along Harmony should remain detached approaching the intersection because
there isn't curb and gutter along this section of Harmony.
Topic: General
Number: 9 Created: 11/4, 2003
[1 1/4/03 1 The existing bricks along Wheaton which act as a sidewalk are not considered an approved
sidewalk system and should be removed and replaced in accordance with City standards.
Number: 15 Created: 1 1 /4/2003
[1 114/03] Please separate the site and landscape plans from the construction drawing set (and not
name them C 2 and C-6 respectively). These are items that will be tiled separate from the
construction drawing set. The construction drawing set should have all remaining sheets assembled
together within the plan set (ensure that the grading plan sheet included within the drainage report is
also included in the construction drawing set). The plat, while also filed separately, should also be
included in the construction drawing set as a sheet for reference. placed immediately after the cover
sheet. '['he cover sheet index should note that the second sheet in the plan set is a plat for reference.
Page 3
Number: 16 Created: 11/4/2003
[ 11/4/031 There appears to be some discrepancy as to where the modular block pavement is to be
installed. Sheet C-2 shows that this will only be used for the internal parking lot areas while Sheet C-
9 shows based upon the note on the lower right-hand corner of the page that the entire area noted as
"P" will used this pavement, which includes the drive aisles noted as concrete on C-2. Please clanfy.
Number: 21 Created: 11/4/2003
[11/4/03] Per LCUAS'S standard 19-6, the two parking stalls along the north side of the drive aisles
that intersects with Wheaton Drive need to be eliminated, a 50' setback from the flowline of Wheaton
Drive (a collector) is required.
Number: 24
Created: 11/4/2003
[11/4/03] Please revise the title on all the documents to read "Oakridge Business Park 36th Filing,
Holiday Inn Express".
Number: 25 Created: 11/4/2003
[11/4/031 It appears that PFA needs the drive aisle connecting the two driveways to be dedicated as
an emergency access easement. Please indicate such dedication on the plat.
Number: 26 Created: 11/4/2003
[11/4/03] The plans conflict with regards to the type of driveway proposed out to Oakridge Drive.
Number: 27 Created: 11/4/2003
[11/4/031 The new access ramp at the southeast comer of Harmony Road and Wheaton Drive should
be constructed as a divectional ramp, not a comer ramp.
Topic: Plat
Number: 22 Created: 11/4/2003
[11/4/03] The plat needs to dedicate additional right-of-way for Harmony Road and additional access
and landscape easement behind the right-of-way as reflected on the 33rd filing. 9' of utility easement
behind the right-of-way on Oakridge Drive is also required to be dedicated. The site plan appears to
dimension these items (but not call this out) correctly but it is not reflected on the plat.
Number: 23 Created: 11/4/2003
[11/4/03] There appears to be a portion of sidewalk along Oakridge Drive approaching Wheaton that
is on private property. It would make sense to dedicate this as right-of-way to provide a continuous
property line along Oakridge.
Number: 47 Created: 11/7/2003
[1 1/7/031 Issue #22 will need to be investigated further internally in the City with regards to the
right-of-way dedication on Harmony as it appears the Spring Canyon Lateral may complicate such a
right-of-way dedication.
Number: 48 Created: 11 /7/2003
[11/7/031 On the plat. Item #7 mentions a right-of-way ditch but does not indicate on the plat where
this might be. Is this note pertinent to the plat?
Department: Light & Power Issue Contact: Alan Rutz
Topic: General
Number: 12 Created: 11/4/2003
[11/4/03] Standard electric development charges will apply to this development request.
Page 4
Number: 13 Created: 1 1 /4/2003
[11/4/03] A C-1 Commercial Service Form must be filled out to help determine the power needs for
this development.
Number: 14 Created: 1 1 /4/2003
[11/4/03] Power for this development may come from the existing transformer at the east edge of this
site. This will require an outage to the IHOP building at the time the transformer is changed out to a
larger transformer.
Department: Natural Resources Issue Contact: Doug Moore
"Topic: General/Utilh), Plans
Number: 37 Created: 11/6/2003
[11/6/031 If Prairie Dogs are currently located on the site they will need to be removed prior to any
construction activity occurring including overlot grading. Currently the federal government is not
allowing Prairie Dogs to be relocated due to the threat of the Monkey Pox Virus. Due this current
ban on relocation if Prairie Doe are located or relocate to the property during construction (including
oxerlot grading) they ,vill need be humanly eradicated in accordance to Chapter 4 of the City Code.
At any time if Iivc Prairie Dogs are found on site during grading or other construction activities the
construction site will be closed until the Prairie Does have been removed. Please add a note
explaining this to your general notes on the utility plan set. Natural Resources will also add a
provision to the development agreement for this project explaining this.
Prairie Dog Removal. Before the commencement of grading or other construction on the development
site, any prairie dogs inhabiting portions of the site within the Limits of Development (LOD) shall be
relocated or eradicated by the developer using, city -approved methods as set forth in Chapter 4 of the
City Code and, when applicable, using methods reviewed and approved by the Colorado Division of
Wildlife. LU('3.4.1(N)(i)
Sec. 4-119. Use of poison restricted.
No person shall poison any animal or distribute poison in any manner with the intent to poison any
animal, except that mice, rats or any rodents other than hamsters, guinea pigs and squirrels may be
poisoned by the use of a poisonous substance approved for such use by the United States
Fnvironmental Protection Agency. This prohibition shall not apply to persons regularly engaged in
the business of fumigation or pest extermination and licensed by the state of Colorado: provided,
however, that such persons may use only fumigants to destroy prairie does or other burrowing
rodents.
(Ord No. 160, 1986, $ 1(35-26), 11-4-86: Ord. No. 60, 1995, $ 9, 5-16-95) Forr Collins Cal Code
Topic: Utility Maim
Number: 38 Created: 1 1/6/2003
[ 1 1 /6/03 1 Limits of Development (LOD) need to he labeled on Utility Plans NRD will not require
fencing of these limits but may require the installation of a Prairie Dog bander fencing during
construction ifPranie Dogs relocate to the construction site while construction activity are underway.
Limits of Development. The applicant shall propose, and the Director shall establish on the project
development plan, it "limits of development" ("LOD") linc(s) to establish the boundary of the project
outside of which no land disturbance activities will occur during the construction of the project. The
purpose of the LOD lines shall be to protect natural habitats and features and their associated butler
Page 5
zones from inadvertent damage during site construction activities. The location of the LOD shall be
designed to preserve si;,mificant ecological characteristics of the affected natural habitat or feature that
could not reasonably be restored if disturbed by construction activities associated with the project.
The LOD shall also be designed to accommodate the practical needs of approved construction activity
in terns of ingress and egress to the developed project and necessary staging and operational areas.
L UC 3.4.1(N) (1)
Designation. LODs, as approved by the Director, shall be shown on the final plan for development.
LODs shall be designated in the field prior to commencement of excavation, grading or construction
with fencing or other methods approved by the Director. L UC 3.4.1(N)(2)
Department: Police
Topic: Genera!
Issue Contact: Joseph Gerdom
Number: 36 Created: 11/5/2003
[11/5/03] Employee/delivery access doors should have small, shatter resistant view ports to allow
surveillance.
Department: Stormwater Utility
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 17 Created: 11/4/2003
Quantity detention is required for this site in its entirety, not just for the difference between the old
and present rainfall standards. Per the Oakridge B.P. master plan, this basin (230) requires detention.
Detention can be provided in the parking lot of commercial properties with a maximum 100-year
water surface elevation of 1 foot over the parking lot.
Number: 18 Created: 11/4/2003
For water quality mitigation. 40-hour extended detention is required. This is one of the methods
presented in the Urban Storm Drainage Criteria Manual out of Denver.
Number: 19
Created: 11/4/2003
Per the Oakridge B.P. master plan, the basin the site is located in is supposed to drain to the east and
into another storm sewer network than the one proposed. Due to this site proposing to change
drainage patterns, an analysis is required to determine whether or not the storm sewer network has
enough additional capacity for the proposed release rate of the site.
Number: 44 Created: 11 /7/2003
Please revise the elevation for benchmark #9-94 on the cover sheet. See redlined plan.
Number: 45
Created: 11/7/2003
A drainage easement is required for the 100-year water surface limits of the detention pond as well as
the outfall storm sewer. These easements need to be dedicated to the City of Fort Collins.
Number: 46 Created: 11 /7/2003
The outlet structure for the detention pond needs to be the City's standard. Please see attached
exhibit.
Page 6
B. Current Planning has 4 more significant comments regarding this proposed
development:
Please be aware of the requirements set forth in Section 3.5.1 -
Building and Project Compatibility in the LUC. Also, if the 4-story
hotel building is to be more than 40' in height then the development
request is subject to a Building Height Reviewas set forth in
Section 3.5.1(G) of the LUC.
The concept plan does not comply with the Orientation to a
Connecting Waikwaystandard set forth in Section 3.5.3(B)(1) of the
LUC.
The concept plan does not comply with the Orientation to Build -to
Lines for Streetfront Buildings standards set forth in Section
3.5.3(B)(2) of the LUC.
The development request will be subject to the standards and
guidelines set forth in the Harmony Corridor Plan and Harmony
Corridor Standards and Guidelines, both adopted by City Council.
The request will have to comply. with all the applicable regulations and
standards set forth in Article 3 - General Development Standards and the
Permitted Uses, Land Use Standards and Development Standards in
Division 4.21 - Harmony Corridor District of the LUC.
9. This development request will be subject to the Development Review Fee
Schedule that is available in the Current Planning Department office. The
fees are due at the time of submittal of the required documents for the
appropriate development review process (overall development plan, project
development plan, final compliance) by City staff and affected outside
reviewing agencies.
10. This development proposal is subject to the requirements as set forth in the
City's LUC, specifically Articles 2. Administration (Development Review
Procedures), Article 3. General Development Standards, and Division 4.21 -
Harmony Corridor Zoning District. Copies of Article 3 and Division 4.21 are
available in the Current Planning Department or on the City of Fort Collins
website @ www.fceov.com. Go to Departments, then the Current Planning
Department.
Topic: Erosion/Sediment Control
Number: 20 Created: 11/4/2003
1. Please remove the "Soil Erosion and Sediment Control Notes" on plan sheets C-9 and C-10
and replace with City of Fort Collins standard erosion control notes (new version, September,
2003). Please add to these any specific notes you have pertaining to the sediment/erosion
control plan for this site (e.g. revegetation).
2. Please prepares and submit an erosion control report with calculations per City of Fort Collins
specifications.
Department: Traffic Operations
Topic: Traffic
Number: 7
No issues from Traffic Operations.
Department: Transfort
Topic: Traffic
Number: 8
[10/27/03] No comments from Transfort
Department: Transportation Planning
Issue Contact: Eric Bracke
Created: 10/ 15/2003
Issue Contact: Garold Smith
Created: 10/27/2003
Issue Contact: Tom Reiff
Topic: Transportation
Number: 28 Created: 11/4/2003
[1 1/4/03] Please relabel the "15' utility and access easement" along Wheaton Drive to read "15' utility
and public sidewalk easement". Also the "80' Access & Landscape Easement" along Harmony needs
to be relabeled as "80' Public sidewalk & Landscape Easement."
Number: 29 Created: 11/4/2003
f l I /4/03] Why does the dedicated right of way (ROW) along Oak Ridge Drive dip down at the NE
corner of the Wheaton intersection? Please correct and continue the ROW dedication along the back
of the Oak Ridge sidewalk to the easement along Wheaton.
Number: 30
Created: 11/4/2003
[1 1/4/03] Trees proposed along Wheaton need to be planted within the 8' parkway. The submitted
landscape plan depicts the tree trunks in the sidewalk.
Number: 31 Created: 11 /4/2003
[11/4/03] The landscape plans shows the proposed evergreens along Harmony growing into the
sidewalk / trail. Please be aware that there is a required 8' clearance from the walk to the first branch.
A better option would be to relocate the proposed trees to a location that does not grow into the walk
now or into the future.
Number: 32 Created: 11 /4, 2003
[11/4/031 Please be sure that when the large hedge along Harmony is trimmed for the new sidewalk/
trail that there is a minimum 2' distance from the hedge to the walk.
Number: 33 Created: 11/4/2003
[1 1/4/03] Are the proposed shade trees along Harmony satisfying CDOT's setback standards from the
edge of the roadway'?
Page 7
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 34 Created: 11/5/2003
[11/5/03] Show and label location of the proposed meter vault. Is a 4-inch water services truly
needed? Show and label all water line connection appurtenances (i.e. tapping saddles, thrust blocks,
valves, etc_). Include all appropriate current City of Fort Collins Utilities standard details (i.e. meter
vault, thrust block, typical water/sewer service, bedding, etc.). PVC pipe is not permitted with in the
City of Fort Collins service area. Label all water lines as D.I.P. and include a note to polywrap all
D.I.P.
Number: 35 Created: 11/5/2003
[11/5/03] Provide 0.2 feet of fall through existing sanitary sewer manhole. Include a note to core
drill all openings into the existing manhole and to reshape the bench to direct flow through manhole.
Topic: Utility Plans
Number: 39 Created: 11/6/2003
[11/6/03]lnclude the standard general note to the landscape plans pertaining to shrub/utility separation
distance. Maintain the required landscape/utility separation distances on the landscape plans.
Department: Zoning;
Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 1 Created: 10/13/2003
Bicycle parking should be located near main building entrances
Number: 2
Created: 10/13/2003
Please show and label building footprint, envelope, dimensions and distance to property lines on the
site plan
Number: 3 Created: 10/13/2003
Do not show signage on the elevations. Sign will be reviewed and permitted separately
Number: 4 Created: 10/13/2003
Why isn't the drive -under pone attached to the building? From a customer standpoint, it would be
nice to be able to get out of their vehicle and into the building without getting rained/snowed on in the
cold months.
Number: 5
Created: 10/13/2003
Please provide elevations for the maintenance building and trash -recycle enclosure
Number: 6 Created: 10/13/2003
On the landscape plan, please provide counts for the groupings of plants, trees etc.
The following comments were expressed at City staff review of the project:
Engineering:
Please separate the Site Plan and the Landscape Plan from the utility plans.
Page 8
2. An easement is needed for the sidewalk connection to Wheaton Drive in the Harmony Road 80'
setback area. Please contact Everitt Companies to acquire the easement.
3. Are the proposed Pervious Paver Blocks the best parking space solution in this area?
4. There are several parking spaces that do not meet the setback requirements from the street.
5. The subdivision plat needs to dedicate street right-of-way, easements, emergency access
easement, public access easement, and landscape S access easement along Harmony Road.
Stormwater:
This development plan is not providing the required storm water detention. This site needs 5
times as much as is shown. This is a major issue.
The water quality as shown is not to the City's recommended standard.
The storm sewer system needs to be re -analyzed. There is a capacity question.
Water/Wastewater:
No meter is shown for water.
PVC pipe is not allowed.
Show the meter vault.
Light & Power:
The City cannot get poker to the west side of this site. Power will have to be shared with the
IHOP Restaurant to the east.
This completes staff (and outside reviewing agencies) review and comments at this time. Additional
comments and red -lined plans may be forthcomine. This proposal is subject to the 90-day revision
re -submittal requirement (from the date of this comment letter, being November 18, 2003) as
set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of vour red -lined plans
when you re -submit. The number of copies of each document to re -submit is shown on the attached
Revisions Routing Sheet.
II' you have any questions regarding these issues or any other issues related to this project, please feel
free to call me at (9701) 221-6341.
Yours 11, ru ly,
Steve Olt
City Planner
Page 9
LIGHTOWLER JOHNSON ASSOCIATES
INCORPORATED
ARCHITECTS ENGINEERS
November 27. 2003
Steve Olt, Project: Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, Co 80522-0580
Re: Oakridge Business Park 36`h Filiing
Holiday Inn Express and Suites
Fort Collins, Colorado
LJA Project No. 03030
Dear Mr. Olt,
Regarding the staff review comments for the proposed Holiday Inn Express, dated
1 1/18/03, we offer the following responses. We are resubmitting with intention to have a
public hearing in January. We understand there will likely be more revisions requested,
we feel that all the major issues have been resolN ed and that these plans are at least 50%
complete.
Issues:
Department: Current Planning
Topic: Building Plan
51 Comment has been noted.
59 Sheet A-4.1 has been revised and coordinated with Site Plan.
61 Elevations of the Trash -Recycle enclosure and the Maintenance building have
been included in this submittal. Refer to Sheet A-0.
62 The building overhang and drive under porte overlap, providing protection from
weather as provided by the Holiday Inn Express Hotel and Suites prototype.
63 Please indicate specific required revisions.
64 The North elevation on sheet A-4.1 has been revised to include the brick fagade as
requested.
Topic: Landscape Plan
52 An independent irrigation installer is to be contracted by the owner. A note on the
landscape plan has been added to direct the irrigation contractor to the CFC Water
Conservation Standards.
700 MAIN AVENUE (701) 293-1350 (No) FAX (701) 293-1353
POST OFFICE BOX 2464 (218) 233-3512 (MN) EMAIL' lia@lightowlerjohnson.com
FARGO, NORTH DAKOTA 58108-2464 VVEBSITE: www. lightowlerjohnson.com
53 The paver blocks specified are not intended to allow vegetative growth. The
pavers to be used are approximately 6 inches square with the corners cut. This
allows an opening at every corner joint. An 18" sand cushion below the pavers is
to be used. for filtration of stormwater and the only reason incorporated into this
design. These blocks are used extensively in Canada, where freeze thaw
conditions are severe. They are also used frequently in extreme desert conditions
to allow infiltration into water starved soils.
54 The blue spruce along Harmony road have been removed from the plan. The
potentially protrusive trees have been replaced with smaller plantings.
55 A sidewalk connection to the IHOP has been added. Landscape plantings have
been revised accordingly.
56 The drawings have been revised per the red lined drawings. Blue spruce has been
removed from the North side of the Property
58 The shrubbery has been revised for better display.
Topic: Signage
57 The exterior signage has been removed from the building elevations on Sheet A-4
and A-4.1.
Topic: Site Plan
60 The proximity of the West building wall to the Wheaton Drive right of way was
located as shown due to several site limitations.
1. The existing landscape wall at the Northwest corner is only 2.5 feet across
the property line. In order to maintain the integrity of the wall, and not
add additional bearing pressure to the hotel footings, the distance between
these strictures should be kept to a minimum. During construction, some
shoring might be required for the existing wall. The proposed building
location requires minimal amount of shoring.
2. Electrical service lines, Data service lines and telephone service lines will
enter the building at this corner. Installation and maintenance of these
lines would be more challenging if the building were further West.
3. The required water meter vault is to be located on the Hotel side of the
property line. The dimension of the water meter vault is 8 feet. The
distance between the meter vault and the building is 13 feet. Between the
meter vault and the building, a proposed sewer lateral and drainage pipe
are to be installed. Moving the building closer to the property line would
require rerouting of these pipes. The site does not have the required slope
to reroute the drainage pipe.
4. Should the building ever set on fire and collapse, at the proposed setback
from Wheaton Drive, emergency personnel would have a safe distance to
work between the crash zone and oncoming street traffic.
5. A. four-story building looming over the sidewalk might not maintain the
exceptionally aesthetic neighborhood the City of Fort Collins is trying to
create. From a guest's perspective, some separation from they're sleeping
room to the street might be more desirable.
6. The required space for large landscape plantings would not be available if
the building were closer to the street.
7. Some of the first floor guest -room windows would look directly at the
back of the existing wall if the building were closer to the street.
Topic: Utility Plan
49
a) The existing gas pedestal has been located on the utility plans.
b) A 9-foot utility easement has been shown on the plat along the North side
of Oakridge Drive.
c) All trees have been located at a minimum distance of 4-feet away from gas
lines.
50
a) The requested easements have been included on the Plat and site plan.
b) Request for service shall be made by the owner. The requested conduits
for service line entry into the building have been included on the electrical
plans.
Department: Engineering
Topic: Construction Drawings
10 The required approval block has been added to every sheet.
1 1 The grading and E&S plans have been revised for clarity. The surface area of
parking lot draining over the public walk has been minimized to 750 SF Max.
40 Street patching information has been specified on the plans as requested.
41 The details have been updated to CFC standards as requested.
42 The ramp detail has been updated to CDOT standards as requested.
43 The sidewalk along Harmony road has been revised to be detached as requested.
Topic: General
9 The existing bricks along Wheaton Drive will be removed. A new detached
sidewalk will be installed. A CDOT approved directional ramp will be aligned
with the cramp across Wheaton Drive. A ramp will not be installed on the South
side of Harmony Road.
15 The site and landscape plans have been removed from the construction drawing
set. The sheet arrangement has been revised as requested.
16 The modular paver blocks are to be installed in the parking stall area only as
shown on sheet C-2. The calculations on sheet C-9 reflect the
impervious/pervious ratio corrections for stormwater calculations in Area F.
According to the UDFCD, for areas covered with pervious pavers, the ratio of
impervious to pervious surface is 50:50.
21 The plan has been modified to comply with the 50' setback from Wheaton Drive.
24 The title block has been revised as requested.
25 The requested Emergency Access Easement has been specified on the Plat and
site plan.
26 The driveway onto Oakridge Drive shall be the same style used on Wheaton.
Radial curves are NOT to be used as per CFC code.
27 The access ramp at the Harmony / Wheaton intersection shall be directional as
requested.
Topic: Plat
22 It appears that additional right of way cannot be dedicated due to the existing
Irrigation. easement. The requested easements have been included in the revisions
to the plat.
23 The property line bump out at the Wheaton and Oakridge intersection has been
dedicated as street right of way.
47 Please inform us of the resolution regarding the Spring Canyon lateral.
48 The note on the plat refers to the Spring Canyon Lateral Easement and has been
corrected accordingly.
Department: Light & Power
Topic: General
12 Please contact the owner for all required development fees.
13 A C-1 commercial form has been completed and included with this submittal.
14 The proposed transformer has been removed from the utility plans. A note has
been added that the existing IHOP transformer will be replaced and shared
between the two facilities.
Department: Natural Resources
Topic: General/Utility Plans
37 The notes regarding prairie dogs have been updated as requested.
Topic: Utility Plans
38 LOD lines have been proposed on the plan revisions.
Department: Police
Topic: General
36 All exterior doors to the hotel will have windows. Employee access and
deliveries shall be through public access locations.
Department: Stormwater Utility
Topic: Drainage
17 The required stormwater detention volume has been recalculated for full detention
of the 100-year storm at the new rainfall intensities. The maximum ponding
depth of 1-foot has not been exceeded.
18 The 40-hour extended extended detention criteria for water quality mitigation was
used in the Sand filter basin design and located in the Water Quality Volume
Calculation section of the Stormwater Management & Erosion and Sediment
Control Report.
19 The prorated release rate of 1.2 CFS for this site is proposed to drain into
coneyence element 34, which is a 24-inch RCP. This element directs water to the
drainage channel, conveyance element 22. According to the Overall Master
drainage plan, the current contributing [lows in element 34 is 6 CFS. At the
minimum allowable slope of 0.5%, this pipe is capable of transporting up to 16
CFS. An additional 1.2 CFS should not exceed the capacity of the pipe.
Calculations have been included in the Report.
44 Benchmark 99-44 has been corrected as requested.
45 The limits of the 100 year water surface and the outfall storm sewer have
dedicated as a drainage easement on the plat and the site plan.
46 The outlet structure has been revised to the CFC standard.
Topic: Erosion!SedimentControl
20
1 Please indicate the location of the current Notes so we may make the
required corrections.
2 The Erosion Control Report is included at the back of the Stormwater
Management & Erosion Control Report. Please indicate any specific
changes required to this report.
Department: Transportation Planning
Topic: Transportation
28 The easement labels have been corrected as requested.
29 The burnp out of the property line has been removed and the area has been
dedicated as right of way as requested.
30 The trees have been relocated as required.
31 The evergreens adjacent to the Sidewalk along Harmony have been replaced with
less obtrusive species.
32 A not stating that "Two feet of clearance from the sidewalk to the existing hedge
shall be :maintained." Has been added to the landscape plan and the demolition
plan.
33 The shade trees along Harmony have been removed. The existing shade trees
shall be preserved as extensively as possible.
Department: Water Wastewater
Topic: General
34 The internal water meter has been removed. The required meter vault has been
located on the utility plan to the specified dimensions. Details for the meter vault
have been added.
35 The utility plan has been revised to display 0.2 feet of drop through the manhole.
The note to reshape the bench has been added as well.
Topic: Utility Plans
39 A note stating "No landscape plantings shall be within 4-feet of any utility line."
Has been added to the landscape plan and the utility plan.
Department: Zoning
Topic: Zoning
I A total of six inverted u type bicycle parking stalls are included on the site plan.
Three stalls are located by the North door which is adjacent to the bicycle path
along Harmony Road. The other three are located as close to the front door as
possible.
2 The building footprint as shown displays the outermost edge of the proposed
structure. Dimensions have been added as requested.
3 The exterior signage has been removed from the building elevations on Sheet A-4
and A-4.1 as requested.
4 The building overhang and drive under porte overlap providing protection from
weather as provided by the Holiday Inn Express Hotel and Suites prototype.
5 Elevations for the maintenance building and trash -recycle enclosure have been
added to the submittal. Refer to Sheet A-0.
6 Counts for planting groupings have been added as requested.
For your convenience, we have attached a copy of the comments from
which these responses originated. All of the redlined drawings are included with
this submittal as instructed. Please contact us with any comments or concerns.
Sincerely,
LIGHTOWLER JOHNSON ASSOCIATES, FNC.
Andrew Werder
REM '83DEC
REVISION
COMMENT SHEET
DATE: November 28, 2003 TO: Technical Services
PROJECT: #13-82CR OAKRIDGE BUSINESS PARK, 36TH
FILING, HOLIDAY INN EXPRESS — TYPE II
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
December 17, 2003
No Continent
MProblems or Concerns (see below or attached)
*"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
I, Ltc=fIL L�LO.`'E ��C/vI�GC 1; i,. l�/7 rC-�( /✓ /V115 �(/l/�i Ste`/(✓.Q%+L �EP, k`:; �✓"GS/�DiSTi.
Z. IF TN f s Pc. a•r 15 ( G� rt.,v on,
D tG.¢i/Nh R� AT ilk �S�% 1
Tl4a Q UTe 2 f3.Nol �YlusT g° AAo0,o TNT 1�L�0iGRTtro �1
3. 47bICATIafv
q, AaCAS 01= &)T- � P47- wttc- LH1g1%Se �.,jt 0/c.3>'/dn/ IZ4T
Name (please print)
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report Other
-
Utility Redline Utility
A
City of Fort Collins
11. The City's Current Planning Department will coordinate the development
review process. The required submittal package will be submitted to this
department and distributed accordingly to other City departments and
outside reviewing agencies involved in development review.
12. The proposed hotel (lodging establishment) project is permitted in the HC
District as a Type II, Planning and Zoning Board review and public hearing.
The developer/applicant for this development request must hold a
neighborhood information meeting prior to formal submittal of the project.
This is set forth in Section 2.2.2 of the LUC. The required notification area
is set forth in Section 2.2.6 of the LUC. Please contact Steve Olt, at
(970)221-6341, to assist you in setting a date, time, and location for the
meeting.
Ak Project Comments Sheet
Selected Departments
City of Fort Collins
M
Department: Transportation Planning
Date: December 16, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE: II
All comments mustt be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 30 Created: 11/4/2003
[12/16/031 The trees along Wheaton are still shown behind the sidewalk. According
to the City's street standards the trees need to be planted between the
sidewalk and the street. Is there a reason to locate the trees behind the
sidewalk?
[11/4/031 Trees proposed along Wheaton need to be planted within the 8' parkway.
The submitted landscape plan depicts the tree trunks in the sidewalk.
Number: 31 Created: 11/4/2003
[12/16/031 There are still a few evergreen trees shown growing over the proposed
sidewalks/trail on the landscape plans. Please consider relocating these to an area
that doesn't impact the sidewalk & trail or change the tree species.
[11/4/031 The landscape plans shows the proposed evergreens along Harmony
growing into the sidewalk / trail. Please be aware that there is a required 8'
clearance from the walk to the first branch. A better option would be to relocate the
proposed trees to a location that does not grow into the walk now or into the future.
Signature
1,1-14 3
Date
CHECK H> $E IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat TE Site Drainage Report Other
Utility _ Redline Utility Landscape
Page 1
Project Comments Sheet
/MM;MW�' Selected Departments
Citv of Fort Collins
���
Department: Water Wastewater
Date: December 17,1003
Project:
OAKRIDGE! BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 77 Created: 12/17/2003
[12/17/031 Minimum slope for a 6-inch sanitary sewer is 1 %. Please reflect this on all
appropriate sheets of the utility plans.
Number: 78 Created: 12/17/2003
[12/17/03] Fire line may not pass thru proposed water meter vault. Provide a lfoot
minimum separation between meter vault and fire line.
Number: 79 Created: 12/17/2003
[12/17/03] Show and label 4"x3" reducer in water service profile. Will a dielectric coupling
be required between the ductile iron pipe and the copper? If so show and label the location
on the profile view.
See site, landscape and utility plans for other comments.
Signature Q i
CHECK HERE IF YOU WISH TO RECEIVE COPIES
Plat "Site Drainage Report
Utility Redline Utility %Landscape
Page 1
Date
OF REVISIONS
Other
Project Comments Sheet
Selected Departments
City ollins
Department: Stormwater Utility
Date: December 19, 2003
Project:
OAKRIDGE: BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 89 Created: 12/19/2003
The detention calculation can be reduced with using .64 as the C-factor in the spread
sheet, which automatically adds the multiplier of 1.25.
Number: 90 Created: 12/19/2003
Please revise spillway elevation in the report to 4978.75 instead of 4978, which is
required due to the: high water surface elevation being at 4978.75. The grading plan
shows the HWL to be at 4978.75 already.
Number: 91 Created: 12/19/2003
Please add a detention pond summary table to the drainage and erosion control plan
including volume required, volume provided, 100-year HWL, and water quality volume
required and provided.
Number: 92 Created: 12/19/2003
Please provide a detail for the new inlet , ST-7, in the detention pond. This does not
have to be our standard water quality outlet structure detail, due to a different water
quality mitigation being used for this project.
12-(9 -o j
Date
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat Site �� /Drainage Report Other
Utility �_�/ Redline ✓ Landscape
Page I
GG 't4L'0c Out
Topic: Erosion/Sediment Control
Number: 20 Created: 11 /4/2003
[12/16/03]
1. Please remove the "Soil Erosion and Sediment Control Notes" on plan sheets C-9 and C-
10 and replace with City of Fort Collins standard erosion control notes (new version,
September, 2.003). Please add to these any specific notes you have pertaining to the
sediment/erosion control plan for this site (e.g. revegetation).
1 2. Please prepare and submit an erosion control report with calculations per City of Fort
Collins specifications.
Issue Contact: Basil Harridan
Topic: Plat
Number: 74 Created: 12/16/2003
[12/16/03] Please provide a signature block on the plat for the Spring Canyon Lateral
owners.
Page 2
STAFF PROJECT REVIEW
Lightowler Johnsen Associates, Inc. Date: 12/19/2003
c/o Andrew Werder
700 Main Avenue
Fargo, ND. 58108-2464
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK, 36TH FILING,
HOLIDAY INN EXPRESS PDP - TYPE II, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Plans
Number: 63 Created: 11/18/2003
[12/22/03] There should be building bays of no more than 30' in width. Also, the 50%
rule for features such as windows, entrances, arcades, arbors, awnings, treillage with
vines details is not being represented.
[11/18/03] The east and west elevations of the building appear to need more detailing
to meet Section 3.5.3(D)(3) of the LUC.
Number: 95 Created: 12/22/2003
[12122103] This building appears to be 52' to 57' in height. Section 3.5.1(G) of the
LUC sets forth the. requirement that all buildings or structures in excess of 40' in
height shall be subject to special review. The review criteria is set forth in Sections
3.5.1(G)(1)(a) Review Standards and (b) Submittal Requirements.
Number:96 Created: 12/22/2003
[12122103] Please review Sections 3.5.3(D)(2), (3) & (4) of the LUC regarding building
Character and Image, specifically Fagade Treatment (all sides), Facades, and
Entrances. The building does not appear to satisfy, as a minimum, the building bay
requirements and the street facing building articulation requirements.
Number: 97 Created: 12/22/2003
[12122103] There is still signage shown on the West Building Elevation that must be
removed from the Building Elevations plan.
Page 1
r
Topic: Landscaping
Number: 52 Created: 11/13/2003
[12/19/03] Repeat Comment.
[11/13/03] Laurie D'Audney of the City's Water Conservation Department is
forwarding copies of the Water Conservation Standards for Landscapes COMMENT
SHEET and Water Conservation Standards for LANDSCAPING and IRRIGATION
SYSTEMS General Information.
Number: 86 Created: 12/19/2003
[12/19/03] Remove the UTILITY PLAN APPROVAL block from the Landscape Plan. No
signature blocks are needed on this plan.
Number: 87 Created: 12/19/2003
(12/19/03] The street trees along Wheaton Drive must be in the parkway strip
between back of curb and the sidewalk, per Section 3.2.1(D)(2)(a) of the Land Use
Code.
Number: 88 Created: 12/19/2003
[12/19/03] There are a number of existing trees at the northwest corner of this site
that have not been and are not shown on the Landscape Plan.
* 3 Cottonwood - south of existing wall
* 4 Austrian Pine - south of existing wall
* 2 Chokecherry - north of existing wall
A utility plan sheet shows these trees to be removed. After a site visit, City staff
(City Forester and Planning) is of the opinion that several of these trees can be
retained and protected. The western -most Austrian Pine should not be in jeopardy with
the construction of the hotel building. One, and maybe two, of the Cottonwood may e
able to be retained. Please see the colored drawing attached to this comment letter.
The trees that may, be removed will have to be mitigated for, in the form of the
following:
* Cottonwood trees ...... 4 trees per each tree to be removed.
* Austrian Pines ........... 3 trees per each tree to be removed.
* Chokecherry trees ..... 2 trees per each tree to be removed.
There are probably enough new trees on the Landscape Plan to provide mitigation;
however, enough of them must be upsized to provide the required mitigation.
Depending on how many trees are to be removed the number of mitigation trees ranges
from 17 to 28. The mitigation standards are set forth in Section 3.2.1(F)(1) of the LUC
and are as follows:
* Canopy shade trees ..... minimum 3" caliper, balled and burlap
* Ornamental trees ......... minimum 2.5" caliper, balled and burlap
* Evergreen trees ........... minimum 8' height, balled and burlap
Page 2
Number: 94 Created: 12/22/2003
[12/22/03] There were 4 Bur Oak trees shown along East Harmony Road, in the 80'
setback area, on the previous Landscape Plan. They are in the Harmony Corridor
Standards & Guidelines Oak Palette and it is unclear as to why they have been removed
from the Landscape Plan.
Number: 98 Created: 12/22/2003
[12/22/03] There are a number of shrubs on the Plant List that do not appear in
either of the plant palettes in the Harmony Corridor Standards & Guidelines. See the
red -lined Landscape Plan reviewed by Current Planning. Please understand that the
plant materials to be used in the "setback zone" along Harmony Road and in the
"setback areas" along local and collector streets are guidelines, not standards. These
palettes are; however, strongly recommended.
Topic: Signage
Number: 57 Created: 11/17/2003
[12/22/03] There is still signage being shown on the West Building Elevation on Sheet
A-4 of the Building Elevations. This signage must be removed from the plan.
[11/17/03] Remove all signage from the Building Elevations. This development is
subject to the City of Fort Collins Sign Code that is administered by the Zoning
Department. The allowable signage will be determined outside of this Project
Development Plan review.
Topic: Site Plan
Number: 83 Created: 12/19/2003
[12/19/03] The Expansion Joints (EJ) should not be shown on the Site Plan. This is a
Site Plan, not a utility plan. The symbol just clutters the drawing.
Number: 84 Created: 12/19/2003
[12/19/03] Please see the attached example of the approval and signature blocks that
are required on a .Site Plan. The UTILITY PLAN APPROVAL block should not be on the
Site Plan. This is a Site Plan, not a utility plan.
Number: 85 Created: 12/19/2003
[12/19/03] The Drainage Easement Boundary that was added to the Site Plan with this
second round of review should be removed. This is a Site Plan, not a drainage plan.
Page 3
Topic: Utility Plans
Number: 81 Created: 12/19/2003
[12/19/03] Len Hilderbrand of Xcel Energy offered the following comments:
a. They have a 3" gas main located in the easements on the west and south edges
of the site.
b. Please contact Connie Woodward for installation of gas service. 5he can be
contacted at(970)225-7843.
Number: 82 Created: 12/19/2003
[12/19/03] Dennis Greenwalt of Comcast Cable (TV) indicated that they would like to
see the 80' Access and Landscape Easement along East Harmony Road changed to
Access, Utility and Landscape Easement.
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11/4/2003
[12/8/03] When noting previously that the approval block should be on all sheets, it
wasn't intended to be on the site and landscape plans, as these are not typically
part of a construction drawing set. Please have the approval block removed
from the site and landscape plans.
[11/4/03] Please revise the approval block on the construction set as shown on the
redlines. The approval block should be on all sheets.
Number: 41 Created: 11/7/2003
[12/16/03] This item wasn't addressed, however it is not required to be addressed
until the submittal after a public hearing. At that time, please ensure that LCUA55
details 706 and 1602 are added (and replace previous details reflecting driveway
approach and sidewalk installation). (In conjunction with a previous comment, ensure
the CDOT detail for access ramps is also included).
[11/7/03] Please replace details on the details sheet with City standard details as
redlined (such as access ramps, driveways, etc.)
Topic: General
Number: 15 Created: 11/4/2003
[12/8/03] The construction drawing set does not have the plat reference sheets in it.
This is fine for purposes of review, however the reference plat must be included in this
construction set at the time of signature of the plans.
[11/4/03] Please separate the site and landscape plans from the construction drawing
set (and not name them C-2 and C-6 respectively). These are items that will be filed
separate from the construction drawing set. The construction drawing set should have
Page 4
all remaining sheets assembled together within the plan set (ensure that the grading
plan sheet included within the drainage report is also included in the construction
drawing set). The plat, while also filed separately, should also be included in the
construction drawing set as a sheet for reference, placed immediately after the cover
sheet. The cover sheet index should note that the second sheet in the plan set is a
plat for reference.
Number: 24 Created: 11/4/2003
[12/8/03] While this appears correctly on the title block of the construction plan set
and the site plan, the title blocks on the top part of the sheets should also be revised
to reflect this.
[11/4/03] Please revise the title on all the documents to read "Oakridge Business Park
36th Filing, Holiday Inn Express".
Number: 25 Created: 11/4/2003
[12/8/03] My apologies, the comment was not clear and misinterpreted. PFA requires
the emergency access easement to connect the two driveways internal to the property
(from Oakridge Drive north and then west out to Wheaton Drive). At the same time,
the area now shown on the plat as dedicated as an emergency access easement should
be changed to a public access easement to ensure a public access easement is
maintained throughout the connection of the two driveways onto Oakridge Drive.
[11/4/03] It appears that PFA needs the drive aisle connecting the two driveways to
be dedicated as an emergency access easement. Please indicate such dedication on the
plat.
Number: 27 Created: 11/4/2003
[12/8/03] Please ensure that the CDOT construction detail for this ramp is provided.
An image of this was emailed on 11/21, and can be resent if not received.
[11/4/03] The new access ramp at the southeast corner of Harmony Road and
Wheaton Drive should be constructed as a directional ramp, not a corner ramp.
Number: 71 Created: 12/11/2003
[12/11/03] There is conflicting information between the site plan and utility plans.
The site plan calls out curb openings in the middle parking island median which are not
called out in the utility plan. Also, the survey overlay sheet on the utility plan sheet
shows the existing brick along Wheaton Drive is to be removed, but on the site plan it
states it is to remain (the brick needs to be removed).
Page 5
Number: 72 Created: 12/12/2003
[12/12/03] The landscaping plan does not illustrate that trees are being removed
which is only shown on the survey overlay sheet (C-3) of the utility plan set. The
landscaping plan needs to illustrate vegetation to be removed, which may be of concern
to Planning and/or Forestry.
Number: 73 Created: 12/16/2003
(12/16/03] Please realign the sidewalk along Harmony Road to ensure that the
sidewalk is separated two feet from the existing landscape wall structure.
Number: 75 Created: 12/16/2003
[12/16/03] Prior to a hearing, a letter of intent from the property owner of the outlot
at Harmony and Wheaton as well as the ditch company are required to verify that they
do not object to the work within their property.
Number: 76 Created: 12/16/2003
[12/16/03] At time of final compliance approval, the ditch company will need to be a
signatory to the plat and off -site access easements are required from the outlot for
the construction of the sidewalk.
Topic: Landscaping
Number: 80 Created: 12/17/2003
(12/17/03] Please situate the street trees along Wheaton Drive between the curb and
sidewalk (parkway :strip), not behind the sidewalk.
Topic: Plat
Number: 22 Created: 11/4/2003
[12/8/03] After internal discussion it was concluded that, the developer is required to
obtain the additional right-of-way along Harmony Road (as was done on the project
east) which would presumably overlap a portion of the ditch. The 9' of utility
easement along Oakridge Drive does not appear properly approaching Wheaton Drive,
9' of offset should follow around the property line curve up to the point where it
intersects the existing 15' easement along Wheaton Drive.
[11/4/03] The plat needs to dedicate additional right-of-way for Harmony Road and
additional access and landscape easement behind the right-of-way as reflected on the
33rd filing. 9' of utility easement behind the right-of-way on Oakridge Drive is also
required to be dedicated. The site plan appears to dimension these items (but not call
this out) correctly but it is not reflected on the plat.
Page 6
/ArOU
PROJECT
110SOK'Aal COMMENT SHEET
City of Fort Collins
REM,Current PlanninE 'A30C
DATE: October 9, 2003 TO: Engineering Pavement
PROJECT: #13-82CR OAKRIDGE BUSINESS PARK, 36'11
FILING, HOLIDAY INN EXPRESS PDP — TYPE II
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
November 5, 2003
Note - PLEASE identify your redlines for future reference
t
Name (please print)
CI IECK 1 iERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report Other
Utility _Redline Utility Landscape
Number: 48 Created: 11/7/2003
[12/16/03] The response letter indicates that this notes refers to the Spring Canyon
Lateral and that it has been revised; I'm still not seeing an Item #7 labeled on the
plat, just referenced in the notes.
[11/7/03] On the plat, Item #7 mentions a right-of-way ditch but does not indicate on
the plat where this might be. Is this note pertinent to the plat?
Number: 93 Created: 12/22/2003
(12/22/03] Technical Services offered the following comments:
1. Legal closes. Plait boundary is missing several bearings/distances.
2. The outer boundary of the plat must go around the area to be dedicated on the
southwest corner of the site.
3. Dedication statement is missing the "name" of the plat.
4. Areas of lot and plat will change with dedication of tract.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General/Utility Plans
Number: 37 Created: 11/6/2003
[12/18/03] Please add a note explaining this to your general notes on the utility
plan set. The federal government has made changes to their policy related to Prairie
Dog relocation. Contact the Colorado Division of Wildlife for more information.
[11/6/03] If Prairie Dogs are currently located on the site they will need to be
removed prior to any construction activity occurring including overlot grading.
Currently the federal government is not allowing Prairie Dogs to be relocated due to
the threat of the Monkey Pox Virus. Due this current ban on relocation if Prairie Dog
are located or relocate to the property during construction (including overlot grading)
they will need be humanly eradicated in accordance to Chapter 4 of the City Code. At
any time if live Prairie Dogs are found on site during grading or other construction
activities the construction site will be closed until the Prairie Dogs have been removed.
Please add a note explaining this to your general notes on the utility plan set. Natural
Resources will also add a provision to the development agreement for this project
explaining this.
Prairie Dog Removal. Before the commencement of grading or other
construction on the development site, any prairie dogs inhabiting portions of the
site within the Limits of Development (LOD) shall be relocated or eradicated by
the developer using city -approved methods as set forth in Chapter 4 of the City
Code and, when applicable, using methods reviewed and approved by the
Colorado Division of Wildlife. LUC34.1(N)(5)
Page 7
Sec. 4-119. Use of poison restricted.
No person shall poison any animal or distribute poison in any manner with the intent to
poison any animal, except that mice, rats or any rodents other than hamsters, guinea
pigs and squirrels may be poisoned by the use of a poisonous substance approved for
such use by the United States Environmental Protection Agency. This prohibition shall
not apply to persons regularly engaged in the business of fumigation or pest
extermination and licensed by the state of Colorado; provided, however, that such
persons may use only fumigants to destroy prairie dogs or other burrowing rodents.
(Ord. No. 160, 1986, 9 1(35-26), 11-4-86; Ord. No. 60, 1995, 5 9, 5-16-95) Fort Collins
City Code
Department: PFA Issue Contact: Michael Chavez
Topic: Genera/
Number: 65 Created: 12/9/2003
REQUIRED ACCESS:
A fire lane is required. The fire lane shall be visible by painting and signage, and
maintained unobstructed.
The criteria for a required fire lane contain several conditions that must be met.
1. The minimum width shall be 20 feet.
2. Inside turning radius shall be 25 feet and outside turning radius shall be 50
feet.
3. Compacted road base shall be used during the construction phase only. The
permanent fire lane shall consist of asphalt or concrete and shall be required to
support 40 tons
4. The fire lane shall be platted as an "Emergency Access Easement" on the final
plat.
Buildings three stories or more in height must have access to a 30 foot
unobstructed access roadway on at least (1) one side for aerial operations. PFA
Policy 85-5' (B)199T UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
Number: 66 Created: 12/9/2003
[12/9/03] ADDRESS NUMERALS:
Address numerals shall be visible from the street fronting the property, and posted
with a minimum of 6 inch numerals on a contrasting background. (Bronze numerals on
brown brick are not acceptable).
1997 UFC 901.4.4
An addressing scheme shall be submitted to the fire department for approval prior to
being posted on the building.
Page 8
Number: 67 Created: 12/9/2003
[12/9/03] WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute
at a residual pressure of 20 psi. 1997 UFC 901.2.2.2
Number: 68 Created: 12/9/2003
[12/9/03] SPRINKLER REQUIREMENTS:
These proposed buildings shall be fire sprinklered.
1997 UFC 1003.2.9
Number: 69 Created: 12/9/2003
[12/9/03] FIRE ALARM REQUIREMENTS:
A fire alarm system is required for this proposed project.
Number: 70 Created: 12/9/2003
[12/9/03] KNOX BOX:
Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new
building equipped with a required fire sprinkler system or fire alarm system.
1997 LIFC 902.4, PFA POLICY 88-20
Department: Stormwater Utility Issue Contact: Wes Lamorque
Topic: Drainage
Number: 89 Created: 12/19/2003
The detention calculation can be reduced with using .64 as the C-factor in the spread
sheet, which automatically adds the multiplier of 1.25.
Number: 90 Created: 12/19/2003
Please revise spillway elevation in the report to 4978.75 instead of 4978, which is
required due to the high water surface elevation being at 4978.75. The grading plan
shows the HWL to be at 4978.75 already.
Number: 91 Created: 12/19/2003
Please add a detention pond summary table to the drainage and erosion control plan
including volume required, volume provided, 100-year HWL, and water quality volume
required and provided.
Number: 92 Created: 12/19/2003
Please provide a detail for the new inlet ,ST-7, in the detention pond. This does not
have to be our standard water quality outlet structure detail, due to a different water
quality mitigation being used for this project.
Page 9
Topic: Erosion/Sediment Control
Number: 20 Created: 11/4/2003
(12/16/031
1. Please remove the "Soil Erosion and Sediment Control Notes" on plan sheets C-9
and C-10 and replace with City of Fort Collins standard erosion control notes
(new version, September, 2003). Please add to these any specific notes you
have pertaining to the sediment/erosion control plan for this site (e.g.
revegetation).
2. Please prepare and submit an erosion control report with calculations per City of
Fort Collins specifications.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Plot
Number: 74 Created: 12/16/2003
[12/16/031 Please provide a signature block on the plat for the Spring Canyon Lateral
owners.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 30 Created: 11/4/2003
[12/16/03] The trees along Wheaton are still shown behind the sidewalk. According to
the City's street standards the trees need to be planted between the sidewalk and the
street. Is there a reason to locate the trees behind the sidewalk?
[11/4/03] Trees proposed along Wheaton need to be planted within the 8' parkway.
The submitted landscape plan depicts the tree trunks in the sidewalk.
Number: 31 Created: 11/4/2003
(12/16/03] There: are still a few evergreen trees shown growing over the proposed
sidewalks/trail on the landscape plans. Please consider relocating these to an area that
doesn't impact the; sidewalk & trail or change the tree species.
[11/4/03] The landscape plans shows the proposed evergreens along Harmony growing
into the sidewalk / trail. Please be aware that there is a required 8' clearance from the
walk to the first branch. A better option would be to relocate the proposed trees to a
location that does not grow into the walk now or into the future.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Genera/
Number: 77 Created: 12/17/2003
[12/17/03] Minimum slope for a 6-inch sanitary sewer is 1%. Please reflect this on all
appropriate sheets of the utility plans.
Page 10
Number: 78 Created: 12/17/2003
[12/17/03] Fire line may not pass-thru proposed water meter vault. Provide a 1foot
minimum separation between meter vault and fire line.
Number: 79 Created: 12/17/2003
[12/17/03] Show and label 4"A" reducer in water service profile. Will a dielectric
coupling be required between the ductile iron pipe and the copper? If so show and label
the location on the profile view.
See site, landscape and utility plans for other comments.
This completes staff (and outside reviewing agencies) review and comments at this
time. It is possible; that this item could be placed on the February 19, 2004 Planning
and Zoning Board public hearing agenda if these comments and concerns are addressed
in a timely fashion. City staff will be setting the February agenda on January 21'. This
proposal is subject to the 90-day revision re -submittal requirement (from the
date of this comment letter, being December 19, 2003) as set forth in Section
2.2.11(A) of the Land Use Code. Be sure and return all of your red -lined plans when
you re -submit. The number of copies of each document to re -submit is shown on the
attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970)221-6341.
Yours Truly,
Steve Olt,
City Planner
cc: Marc Virata, Engineering
Wes Lamarque, 5tormwater
Current Planning File #13-82CR
Page 11
Project Comments Sheet
--ow'' Selected Departments
City of Fort Collins
Department: Engineering
Date: December 22, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11/4/2003
[12/8/03] When noting previously that the approval block should be on all sheets, it wasn't intended to be on the
site and landscape plans, as these are not typically part of a construction drawing set. Please have the
approval block removed from the site and landscape plans.
[11/4/031 Please revise the approval block on the construction set as shown on the redlines. The approval block
should be on all sheets.
Number: 41 Created: 11 /7/2003
[12116/03] This item wasn't addressed, however it is not required to be addressed until the submittal after a public hearing. At
that time, please ensure that LCUASS details 706 and 1602 are added (and replace previous details reflecting driveway
approach and sidewalk installation). (In conjunction with a previous comment, ensure the CDOT detail for access ramps is
also included).
[ 11 /7/03] Please replace details on the details sheet with City standard details as reclined (such as access ramps,
driveways, etc.)
Topic: General
Number: 15 Created: 11/4/2003
[12/8/03] The construction drawing set does not have the plat reference sheets in it. This is fine for purposes of review.
however the reference plzit must be included in this construction set at the time of signature of the plans.
[11/4/03] Please separate the site and landscape plans from the construction drawing set (and not name them
C-2 and C-6 respectively). These are items that will be fled separate from the construction drawing set. The
construction drawing set should have all remaining sheets assembled together within the plan set (ensure that
the grading plan sheet included within the drainage report is also included in the construction drawing set). The
Signature
z 2 X+-
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
� Utility ��Redline Utility � Landscape
Page I
plat, while also filed separately, should also be included in the construction drawing set as a sheet for reference,
placed immediately after the cover sheet. The cover sheet index should note that the second sheet in the plan
set is a plat for reference.
Number: 24 Created: 11/4/2003
[12/8/031 While this appears correctly on the title block of the construction plan set and the site plan, the title blocks on the top
part of the sheets should also be revised to reflect this.
[ 1 1 /4/031 Please revise the title on all the documents to read "Oakridge Business Park 36th Filing, Holiday Inn Express".
Number: 25 Created: 11/4/2003
If 2181031 My apologies, the comment was not clear and misinterpreted. PFA requires the emergency access easement to
connect the two driveways internal to the property (from Oakridge Drive north and then west out to Wheaton Drive). At the
same time, the area now shown on the plat as dedicated as an emergency access easement should be changed to a public
access easement to ensure a public access easement is maintained throughout the connection of the two driveways onto
Oakridge Drive.
[ 11 /4/031 It appears that PFA needs the drive aisle connecting the two driveways to be dedicated as an emergency access
easement. Please indicate such dedication on the plat.
Number: 27 Created: 11/4/2003
[1218/031 Please ensure that the CDOT construction detail for this ramp is provided. An image of this was emailed on 11/21,
and can be resent if not received.
[ 1 1 /4/03] The new access ramp at the southeast corner of Harmony Road and Wheaton Drive should be constructed as a
directional ramp, not a corner ramp.
Number: 71 Created: 12/11/2003
112/11/031 There is conflicting information between the site plan and utility plans. The site plan calls out curb openings
in the middle parking island median which are not called out in the utility plan. Also, the survey overlay sheet on the utility
plan sheet shows the existing brick along Wheaton Drive is to be removed, but on the site plan it states it is to remain (the
brick needs to be removed).
Number: 72 Created: 12/12/2003
[12/12/031 The landscaping plan does not illustrate that trees are being removed which is only shown on the
survey overlay sheet (C:-3) of the utility plan set. The landscaping plan needs to illustrate vegetation to be
removed, which may be of concern to Planning and/or Forestry.
Number: 73 Created: 12/16/2003
[ 12/ 16/031 Please realign the sidewalk along Harmony Road to ensure that the sidewalk is separated two feet from the
existing landscape wall structure.
Number. 75 Created: 12/16/2003
[ 12/ 16/03] Prior to a hearing, a letter of Intent from the property owner of the outlot at Harmony and Wheaton as well
as the ditch company are required to verify that they do not object to the work within their property.
Number: 76 Created: 12/16/2003
[12/16/031 At time of final compliance approval, the ditch company will need to be a signatory to the plat and offsite
access easements are required from the outlot for the construction of the sidewalk.
Topic: Landscaping
Number: 80 Created: 12/17/2003
[ 12/ 17/031 Please situate the street trees along Wheaton Drive between the curb and sidewalk (parkway strip), not
behind the sidewalk.
Page 2
Topic: Plat
Number: 22 Created: 11 /4/2003
[1218/031 After internal discussion it was concluded that, the developer is required to obtain the additional right-of-way along
Harmony Road (as was done on the project east) which would presumably overlap a portion of the ditch. The 9' of utility
easement along Oakridge Drive does not appear properly approaching Wheaton Drive, 9' of offset should follow around the
property line curve up to the point where it intersects the existing 15' easement along Wheaton Drive.
[ 1 1 /4/031 The plat needs to dedicate additional right-of-way for Harmony Road and additional access and landscape
easement behind the right; -of -way as reflected on the 33rd filing. 9' of utility easement behind the right-of-way on
Oakridge Drive is also required to be dedicated. The site plan appears to dimension these items (but not call this out)
correctly but it is not reflected on the plat.
Number: 48 Created: 11 /7/2003
[ 12/ 16/031 The response letter indicates that this notes refers to the Spring Canyon Lateral and that it has been revised;
I'm still not seeing an Item #7 labeled on the plat, just referenced in the notes.
[ 1 1 /7/031 On the plat, Item #7 mentions a right-of-way ditch but does not indicate on the plat where this might be. Is
this note pertinent to the plat?
Page 3
LIGHTOWLER JOHNSON ASSOCIATES
INCORPORA -D
ARCHITECTS ENGINEERS
February 6, 2004
Steve Olt, Project Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, Co 80522-0580
Re: Oakridge Business Park 16`h Filling
Holiday Inn Express and Suites
Fort Collins. Colorado
IJA Project No. 03030
Dear Mr. Olt.
Regarding the staff review comments for the proposed Holiday Inn Express, dated
12/17,103, we offer the following responses.
Issues:
Department: Current Planning
Topic: Building Plan
63 We will be requesting a Modification of Standards concerning this issue. Also,
the Last and West Elevations have been revised with more detail as shown on
Sheets A-4 and A-4.1.
95 We will comply with the review criteria as stated in the LUC.
96 We will be requesting a Modification of Standards concerning this issue.
97 The signage has been removed. as requested, from the West Building Elevation
on Shect A-4.
'I opic: Landscape Plan
52 Note 16 was added to the landscape plan as requested.
86 The approval block has been removed from the landscape plan.
87 The street trees have been relocated between the sidewalk and the street curb.
88 The existing trees have been identified on the landscape plan and the survey
overlay. Previous submittals displayed the water service lines in the wrong
location. The mechanical room is on the north side of the hotel and the water
lines were moved accordingly. The Austrian pines identified as savable b} the
city Rirestry department and the City planner will need to be removed for
installation of water services. Only one Cottonwood will need to be removed. A
700 MAIN AVENUE (701) 293-1350 (ND) FAX (701) 293-1353
POST OFFICE BOX 2464 (218) 233'512 (MN) EMAIL: Ija(n lightowlerjohnson.com
FARGO, NORTH DAKOTA 58108 2464 WEBSITE: www lightowlerjohnson.c,rn
tree mitigation schedule was added to the landscape plan and the required size of
mitigated trees adjusted as required.
94 The 4 Bur Oak trees were inadvertently left off the previous submittal. They have
been returned to the landscape plan.
98 The shrubs within the "setback zone" have been revised with the species chosen
from the recommended palette.
Topic: Signage
57 The signage has been removed, as requested, from the West Building Elevation
on Sheet A-4.
Topic: Site Plan
83 The expansion joint locations have been removed from the site plan and added to
the utility plan.
84 The site plan signature block has been revised as requested.
85 The drainage easement has been removed from the site plan and added to the
utility plan and the drainage plan.
Topic: Utility Plan
81
a. The existing gas lines along the South and West property lines have been
added as requested.
b. We have been in contact with Connie Woodward of Xcel energy. The
owner will contact her for service.
82 The wording of the 80' Easement has been revised as requested.
Department: Engineering
Topic: Construction Drawings
10 Approval blocks have been revised as redlined by the review staff.
41 LCUASS details 706 and 1602 have been added to the plans. CDOT access ramp
detail has been added as well.
Topic: General
15 Revised plat reference sheets have been included with this submittal.
24 The project titles at the top of the sheets have been revised to match the project
name in the title block.
25 A 30' wide emergency access easement has been added to the plat and the site
plan as requested. The area previously labeled as Emergency access easement has
been relabeled as a public access easement.
27 The CDOT access ramp detail has been added as requested.
71 Curb opening labels have been removed from the site plan and added to both the
utility and the grading plan. Reference to existing brick has been removed from
the site plan, it is now labeled as new concrete sidewalk.
72 The landscape plan has been revised to show existing trees to remain or be
removed.
PROJECT
(06�1 COMMENT SHEET
City of Fort Collins REf,,p
Current Planning
DATE: October 9, 2003 TO: Technical Services
PROJECT: #13-82CR OAKRIDGE BUSINESS PARK, 36T11
FILING, HOLIDAY INN EXPRESS PDP — TYPE II
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
November 5, 2003
Note - PLEASE identify your redlines for future reference
l . Ue trn/DAiLY C�bpL G�LOSE . $ER2iNC� e�77L n/ED t7ec TI3cTiJEra.'
GEGA! $x),wP.
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
73 The sidewalk along Harmony Road has been realigned as to maintain a minimum
distance of two feet from the existing landscape wall.
75 Letters of intent from the Everitt companies and the ditch company will be
provided prior to the public hearing.
76 The signature block on the site plan has been revised and includes a location for
the ditch company to sign. The revised plat provides the same.
Topic: Landscape Plan
80 Street trees have been relocated between the sidewalk and the street curb.
Topic: Plat
22 Additional right of way will be dedicated as requested. The 9' Utility easement
boundary along Oakridge Drive has been extended to the property line
48 Item # 7 has been located on the plat.
Department: Natural Resources
Topic: General/Utility Plans
37 A note has been added to sheets C-I and C-4 as requested.
Department: PFA
Topic: General
65 No parking -Fire lane signs are located on the site plan. Signs shall be per
LCUASS detail 1418.
a. A 30' wide fire lane is provided from Oakridge Drive to Wheaton
drive.
b. Internal turning radius of 25' and external radius of 55'are
provided.
C. Proposed fire lane is specified as reinforced concrete on the site
plan. A pavement detail is located on sheet C-6. The section to be
used accounts for heavy truck traffic and turning operations. The
pavement design is based on the Geo-technical engineering study
and pavement thickness design report provided by Kumar &
Associates dated May 21, 2003.
d. The fire lane is labeled as emergency access easement on the plat.
Topic: Address labels
66 A comment has been added to Sheet A-4 requiring "address numerals to be
visible from the street fronting the property, and posted with a minimum of 6 inch
numerals on a contrasting background" and "an addressing scheme shall be
submitted to the fire department for approval prior to being posted on the
building" as required.
Topic: Water Supply: Commercial
67 Existing public fire hydrants exist at the following locations:
1. Between the existing IHOP driveway and the proposed Holiday
Inn Express driveway, approximately 200 feet from the Southeast
building comer.
2. Across Wheaton Drive, approximately 135 feet from the
Northwest building corner.
3. Across Oakridge Drive, approximately 275 feet from the
Southwest building corner.
At no point does the proposed building exceed a distance of 300 feet from a
public fire hydrant.
Topic: Water Supply: Commercial
68 The proposed structure shall be sprinkled.
Topic: Fire Alarm system
69 A fire alarm system shall be installed and designed by a fire system contractor.
Topic: Knox Box
70 The Knox Box location has been specified on the Site plan, Sheet A-2, and Sheet
A-4.
Department: Stormwater Utility
Topic: Drainage
89 The detention requirement calculations have been revised as recommended. A
weighted coefficient of .68 was calculated and used in the drainage calculations.
90 The spillway elevation has been revised to an elevation of 4978.55 The drainage
report was adjusted as required and requested
91 A Detention pond summary table has been added to the drainage and erosion
control plan.
92 A detail for the inlet ST-7 has been added to the plan.
Topic: Erosion /Sediment Control
20
The Erosion Control notes has been revised as requested.
The Stormwater Management report and Erosion Control report has been
revised for clarity and as requested by staff review. We are submitting the
Erosion Control report separate from the Stormwater Management Report
for Review Purposes. We have also submitted the Reports under one
cover as in the previous submittals.
Department: Stormwater Utility
Topic: Plat
74 According to Kathy Parynik of Everitt Companies, all water and ditch rights were
purchased by Oakridge Business Park Association and the ditch no longer
delivers water. We have received a letter of intent from Everitt Companies and
have included a copy with this submittal.
Department: Transportation Planning
Topic: Transportation
30 The street trees have been relocated between the sidewalk and the street curb.
31 Several evergreen trees have been removed from the plan as to maintain 8 feet of
clearance from the walk and the first branch of the tree based on the expected size
of the trees. We have replaced some of the evergreen trees with alternate species.
Department: Water Wastewater
Topic: General
77 The slope of the 6" sanitary sewer has been revised to 1 %.
78 The fire line has been revised as requested.
79 A 4" x 3" reducer has been added to the eater service profile. A dielectric
connection will be installed and also added to the profile.
We have also revised the plans per redlined drawings. The utility plan
sheet previously labeled as Erosion and Sediment control details has been
renamed Miscellaneous Details. The Stormwater Management and Erosion and
Sediment Control report has been revised for clarity. in addition to submitting the
SWM and E&S Report. a separate Erosion Control report has been submitted.
For your convenience, we have attached a copy of the comments from
which these responses originated. All of the redlined drawings are included with
this submittal as instructed. Please contact us with any comments or concerns.
Sincerely,
LIGHTOWL.ER JOHNSON ASSOCIATES. INC.
Andrew Werder
REVISION
REC. D
COMMENT SHEET
DATE: February 9, 2004 TO: Technical Services
PROJECT: 913-82CR Oakridge Business Park, 361h Filing,
Holiday Inn Express PDP — Type lI (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
2 S
jaw"xy�, 2004
I I (< l?a r 6-t4 ,
Fly-- Co rtar16tiH--nor ��u#r,J- I-C. 7
1-1 No Comment
[D' Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
t pUu.✓+�P'2Y � Lr= GeA-G l�d.SE ,
(I1i1� IS i Ne ia23.q o� r(f� LET I N� SAtnc
4 n TI'+3 CAT ? - /I�iJi
/i
R�� u r
r r Ik— m/
?r-1Or UT'Y / Sr /Jc, w-�
xw,1.gG0 j� SNo✓ cg�7tuti �'
�Qi_RcAO/ ��
LssInr 50 7v 147- %N� Sr
�T
Name (please print) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
&Plat _Site _Drainage Report —Other- 6a
Utility Redline Utility Landscape city of eort couins
Project Comments Sheet
Selected Departments
Department: Transportation Planning
Date: February 17, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP -TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
February 25, 2004
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: General
Number: 101 Created: 2/17/2004
[2/17/04] No further comments.
REM '84FEROpn 2:2`
,7
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page 1
Project Comments Sheet
Selected Departments
Citv of Fort Collins
Department: Water Wastewater
Date: February 25, 2004
Project:
OAKRIDGE? BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPIE 11
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
February 25, 2004
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 105 Created: 2/25/2004
[2/25/04] See site, landscape and utility plans for comments.
Signatures Date
CHECK HERE_ IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility v' Landscape
Page 1
Project Comments Sheet
Selected Departments
Department: Sturmwater Utility
Date: February 27, 2004
Project:
OAKRIDGE: BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
February 25, 2004
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 107 Created: 2/27/2004
Please see minor comments on reclined plans regarding revising elevations.
Topic: G�t"� era/C
` , Number: 106 Created: 2/27/2004
1. Please provide a report, calculations, and plan per City of Fort Collins specifications for
erosion/sediment control.
2. You include three sets of notes on plan sheets C-8 and C-9. Some are no longer in use,
many are redundant, some are contradictory to City of Fort Collins specifications. Please
make sure all notes comply with City specifications, and are not redundant or
contradictory.
3. Please make sure all the BMP's you indicate in your report are clearly indicated on the
plans.
If you have any questions regarding erosion control, please call Bob Zakely at (970) 221-
6700.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site ✓ Drainage Report Other_
f Utility _�/ Redline Utility Landscape
Page I
oLt
�r Project Comments Sheet
Selected Departments
Citv of Fort Collins
���
Department: Engineering
Date: N[arch 1, 2004
Project:
OAKRIDGE BUSINESS
PDP - TYPE 11
Issue Contact: (Marc Virata
PARK 36TH FILING, HOLIDAY INN EXPRESS
Topic: General
Number: 100 Created: 2/16/2004
12/16/041 Why doesn't the sidewalk along Harmony Road heading west not curve south to tie directly with the access
ramp?
Number: 102 Created: 2/23/2004
(2/23/041 The access ramp detail originally provided was not the latest CDOT drawing. These are now provided
with the Engineering comments.
Number: 109 Created: 3/1 /2004
[3/1/04] Just as an FYI, CDOT will require a warranty deed for the right-of-way dedication along Harmony Road. This
is not required at this time.
Topic: Landscaping
Number: 103 Created: 2/23/2004
[2/23/04] CDOT requires that the trees along Harmony Road be set back 35' from the edge of the existing
southernmost through lane. With about 10 feet of pavement for the bike lane and runoff, the trees need to be set
back about 25' from the existing edge of pavement. All four burr oaks will need to be moved back.
Topic: Plat
Number: 104 Created: 2/23/2004
[2/23/041 Based upon information provided by Everitt Companies to the consultant, there doesn't appear to be any
ditch right-of-way on the site. The plat should be revised accordingly to reflect this information.
Number: 110 Created: 3/1/2004
[3/11041 Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of the plat? (Additional right-of-way?)
3. Provide reception number on the plat for the offsite sidewalk and utility easement when recorded.
4. Where does the 30' public access easement go to, at the southeast corner? (Arrow goes to the 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where #101 #15, etc?
Signature
�Zz`
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat -Site Drainage Report Other_
Utility Redline Utility Landscape
Page I
STAFF PROJECT REVIEW
Cilyof fort Collins
Lightowler Johnson Associates Date: 03/10/2004
c/o Andrew Werder
700 Main Avenue
Fargo, ND. 58103
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK 36TH FILING,
HOLIDAY INN EXPRESS PDP - TYPE II, and we offer the following comments:
ISSUES:
Department: Advance Planning Issue Contact: Clark Mapes
Topic: Building Plans
Number: 108 Created: 3/1/2004
The building design would benefit from stronger horizontal detailing to mark the
stories. For example, on the brick end elements it could be done with courses; and
on the main faces of the building, with brick courses or EIFS details. In particular,
the multi -story area contained under the hoop or arch line does not express human
scale or building stories, nor any reason for the hoop. IF there is a strong desire for
such a tall element, it should be given a reason for being, with something different
happening within it -- e.g. different fenestration.
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 100 Created: 2/16/2004
[2/16/04] Why doesn't the sidewalk along Harmony Road heading west not curve
south to tie directly with the access ramp?
Number: 102 Created: 2/23/2004
[2/23/04] The access ramp detail originally provided was not the latest CDOT
drawing. These are now provided with the Engineering comments.
Number: 109 Created: 3/1/2004
[3/1/04] Just as an FYI, CDOT will require a warranty deed for the right-of-way
dedication along Harmony Road. This is not required at this time.
Topic: Landscaping
Number: 103 Created: 2/23/2004
[2/23/041 CDOT requires that the trees along Harmony Road be set back 35' from
the edge of the existing southernmost through lane. With about 10 feet of pavement
for the bikelane and runoff, the trees need to be set back about 25' from the existing
edge of pavement. All four Bur Oaks will need to be moved back.
Page I
Topic: Plat
Number: 104 Created: 2/23/2004
[2/23/04] Based upon information provided by Everitt Companies to the consultant,
there doesn't appear to be any ditch right-of-way on the site. The plat should be
revised accordingly to reflect this information.
Number: 110 Created: 3/1/2004
[3/1/04] Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of the plat? (Additional right-
of-way?)
3. Provide reception number on the plat for the offsite sidewalk and utility easement
when recorded.
4. Where does the 30' public access easement go to, at the southeast corner?
(Arrow goes to the! 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where #10, #15, etc?
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 107 Created: 2/27/2004
Please see minor comments on redlined plans regarding revising elevations.
Topic: Erosion/Sediment Control
Number: 106 Created: 2/27/2004
1. Please provide a report, calculations, and plan per City of Fort Collins
specifications for erosion/sediment control.
2. You include three sets of notes on plan sheets C-8 and C-9. Some are no
longer in use, many are redundant, some are contradictory to City of Fort
Collins specifications. Please make sure all notes comply with City
specifications, and are not redundant or contradictory.
3. Please make sure all the BMP's you indicate in your report are clearly
indicated on the plans.
If you have any questions regarding erosion control, please call Bob Zakely at
970-221-6700.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 101 Created: 2/17/2004
[2/17/04] No further comments.
Page 2
` Project Comments Sheet
Selected Departments
Citlof Dort Collins
Department: Engineering
Date: November 5, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting.
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11 /4/2003
[11/4/03] Please revise the approval block on the construction set as shown on the redlines. The approval block
should be on all sheets.
Number: 11 Created: 11 /4/2003
111/4/031 The grading and erosion control plan sets are not readable, please revise. Because of the information
presented, it is difficult to determine if the permissive amount of sheetflow drainage for a driveway across a
sidewalk is being exceeded. Please ensure that the maximum amount of parking lot area crossing over a public
walk does not exceed 750 square feet.
Topic: General
Number: 9 Created: 11 /4/2003
[ 1 1 /4/031 The existing bricks along Wheaton which act as a sidewalk are not considered an approved sidewalk system and
needs to be removed and replaced in accordance with City standards.
Number: 15 Created: 11 /4/2003
[11/4/031 Please separate the site and landscape plans from the construction drawing set (and not name them
C-2 and C-6 respectively). These are items that will be filed separate from the construction drawing set. The
construction drawing set should have all remaining sheets assembled together within the plan set (ensure that
the grading plan sheet included within the drainage report is also included in the construction drawing set). The
plat, while also filed separately, should also be included in the construction drawing set as a sheet for reference,
placed immeadiately after the cover sheet. The cover sheet index should note that the second sheet in the plan
set is a plat for reference.
Number: 16 Created: 11/4/2003
[1114/03] There appears to be some discrepancy as to where the modular block pavement is to be installed.
Sheet C-2 shows that this will only be used for the internal parking lot areas while Sheet C-9 shows based upon
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page l
Department: Walter Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 77 Created: 12/17/2003
[2/25/04]
[12/17/03] Minimum slope for a 6-inch sanitary sewer is 1 %. Please reflect this on
all appropriate sheets of the utility plans.
Number: 78
[2/25/04]
Created: 12/17/2003
[12/17/03] Fire line may not pass through the proposed water meter vault. Provide
a one (1) foot minimum separation between meter vault and fire line.
Number: 79
[2/25/04]
Created: 12/17/2003
[12/17/03] Show and label 4"xY reducer in water service profile. Will a dielectric
coupling be required between the ductile iron pipe and the copper? If so show and
label the location on the profile view.
See site, landscape and utility plans for other comments.
Number: 105 Created: 2/25/2004
[2/25/04] See site, landscape and utility plans for comments.
Additional comments:
A. A copy of corments received from QWEST (telephone) is attached to this
letter.
B. Len Hilderbrand of Xcel Energy (gas) indicated that the developer must contact
Connie Woodard to schedule installation of gas service to this site. Connie can
be reached at 970-225-7843.
C. A copy of the comments received from the City's Technical Services
Department (mapping / surveying) is attached to this letter.
D. Marc Virata of the Engineering Department indicated that some of the Bur
Oaks in the East Harmony Road setback area are too close to the street. They
must be at least 35' from the closest drive lane.
Page 3
E. Marc Virata of the Engineering Department indicated that the sidewalk
connection at East Harmony Road and Wheaton Drive must be somewhat
realigned to provide straight, continuous pedestrian movement. The sidewalk
must be aligned with the handicapped ramp.
This development proposal is in a condition that is sufficient to be scheduled for a
Planning and Zoning Board public hearing. The Holiday Inn Express item is being
placed on the April 15, 2004, P & Z Board public hearing agenda. The issues
and concerns expressed in this letter and on the enclosed red -lined plans will need
to be addressed with your Final Compliance review, which is the next step (after the
public hearing for the Project Development Plan) in the City's development review
process. Before submitting Final Compliance documentation please contact me for
the submittal requirements (fee, plans, reports, etc.)
Please be sure and return all of the red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 970-221-6341.
Yours Truly,
Steve Olt,
City Planner
Page 4
00 00 00
LIGHTOWLER JOHNSON ASSOCIATES
INCORPORATED
ARCHITECTS ENGINEERS
June 8, 2004
Steve Olt, Project Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins. Co 80522-0580
Re: Oakridge Business Park 36th Filling
Holiday Inn Express and Suites
Fort Collins, Colorado
LJA Project No. 03030
Dear Mr. Olt,
Regarding the staff review comments for the proposed Holiday Inn Express, dated
3/10/2004, we offer the follo%Ning responses.
Issues:
Department: Advance Planning
Topic: Building Plans
108 NR
Department: Engineering
Topic: General
100 The sidewalk along harmony road has been realigned with the access ramp.
102 The current CDOT ramp detail has been added to the plans.
109 NA
Topic: Landscaping
103 All four bur oaks have been relocated 25' from existing edge of pavement.
Topic: Plat
110 Items 10 and 15 are not applicable and have been removed.
Department: Stormwater Utility
Topic: Drainage
107 Redlined grade changes have been made as requested.
Topic: Erosion /Sediment Control
700 MAIN AVENUE (701) 293-13501ND) FAX (701) 293-1353
POST OFFICE BOX 2464 1218) 233-3512 (MN) EMAIL: Ija0lightowlerjohnson.com
FARGO, NORTH DAKOTA 58108-2464 WEBSITE: www.hghtowlerjohnson.com
106 1. BMP efficiency, performance and surety calculations have been added to
the erosion and sediment control plan.
2. Redundant and non -compliant notes have been removed.
3. BMP's indicated in the report are located on plans.
Department: Transportation Planning
Topic: General
101 NA
Department: Water Wastewater
Topic: General
77 All sanitary sewer lines are labeled to have 1% slope. PVC downspout leaders
are specified to have 0.5% slope. Both plan and profile for sanitary sewer have
pipe slopes labeled at 1 %.
78 A note was added to sheet C-4 stating contractor shall provide 3-foot separation
between fire and domestic lines and contractor shall provide 1-foot separation
between fire line and meter box.
79 A 4" x 3" reducer is shown on both plan and profile views. A dielectric
connection for copper domestic line is specified on both plan and profile views.
105 Plan redlines have been corrected or clarified as requested.
The pervious paver stones specified on previous site plan submittals have
been removed. Additional detention was required and obtained by raising the
high water level by 0.15 foot. The high water level does not exceed 12 inches in
any parking location. The required water quality mitigation volume and required
sand filter basin surface area also increased. The required area and volume for
water quality were previously provided.
The Qwest telephone Pedestals along Wheaton Drive will not be
relocated. The public sidewalk will be placed to the East of the pedestals, within
the utility and public sidewalk easement.
We have also revised the plans per redlined drawings. For your
convenience, we have attached a copy of the comments from which these
responses originated. All of the redlined drawings are included H ith this
submittal as instructed. Please contact us with any comments or concerns.
Sincerely,
LIGIITOWIARJOHNSO 4ASSCIATES,INC.
StCV ewald, P.E.
STAFF PROJECT REVIEW
Lightowler Johnson Associates
c/o Andrew Wender
700 Main Avenue:
Fargo, ND. 58103
i
Date: 03/10/2004 MAR f 2004 j
F f,•11
_r
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK 36TH FILING,
HOLIDAY INN EXPRESS PDP - TYPE II, and we offer the following comments:
ISSUES:
Department: Advance Planning Issue Contact: Clark Mapes
Topic: Building Plans
Number: 108 Created: 3/1/2004
The building design would benefit from stronger horizontal detailing to mark the
stories. For example, on the brick end elements it could be done with courses; and
on the main faces of the building, with brick courses or EIFS details. In particular,
the multi -story area contained under the hoop or arch line does not express human
scale or building stories, nor any reason for the hoop. IF there is a strong desire for
such a tall element, it should be given a reason for being, with something different
happening within it -- e.g. different fenestration.
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 100 Created: 2/16/2004
[2/16/04] Why doesn't the sidewalk along Harmony Road heading west not curve
south to tie directly with the access ramp?
Number: 102 Created: 2/23/2004
[2/23/04] The access ramp detail originally provided was not the latest CDOT
drawing. These are now provided with the Engineering comments.
Number: 109 Created: 3/1/2004
[3/1/04] Just as an FYI, CDOT will require a warranty deed for the right-of-way
dedication along Harmony Road. This is not required at this time.
Topic: Landscaping
Number: 103 Created: 2/23/2004
[2/23/04] CDOT requires that the trees along Harmony Road be set back 35' from
the edge of the existing southernmost through lane. With about 10 feet of pavement
for the bikelane and runoff, the trees need to be set back about 25' from the existing
edge of pavement. All four Bur Oaks will need to be moved back.
Page 1
Topic: Plat
Number: 104 Created: 2/2?'2004
[2/23/041 Based upon information provided by Everitt Companies to the consultant,
there doesn't appear to be any ditch right-of-way on the site. The plat should be
revised accordingly to reflect this information.
Number: 110 Created: 3/1/2004
[3/1/04] Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of the plat? (Additional right-
of-way?)
3. Provide reception number on the plat for the offsite sidewalk and utility easement
when recorded.
4. Where does the 30' public access easement go to, at the southeast corner?
(Arrow goes to the 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where #10, #15, etc?
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 107 Created: 2/27/2004
Please see minor comments on reclined plans regarding revising elevations.
Topic: Erosion/Sediment Control
Number: 106 Created: 2/27/2004
1. Please provide a report, calculations, and plan per City of Fort Collins
specifications for erosion/sediment control.
2. You include three sets of notes on plan sheets C-8 and C-9. Some are no
longer in use, many are redundant, some are contradictory to City of Fort
Collins specifications. Please make sure all notes comply with City
specifications, and are not redundant or contradictory.
3. Please make sure all the BMP's you indicate in your report are clearly
indicated on the plans.
If you have any questions regarding erosion control, please call Bob Zakely at
970-221-6700. ) q7a-L2y 60E3
,. .
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 101 Created: 2/17/2004
[2/17/04] No further comments.
Pa,�c 2
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 77 Created: 12/17/2003
[2/25/041
[12/17/03] Minimum slope for a 6-inch sanitary sewer is 1 %. Please reflect this on
all appropriate sheets of the utility plans.
Number: 78
[2/25/041
Created: 12/17/2003
[12/17/03] Fire line may not pass through the proposed water meter vault. Provide
a one (1) foot minimum separation between meter vault and fire line.
Number: 79
[2/25/04]
Created: 12/17/2003
[12/17/03] Show and label 4"XY reducer in water service profile. Will a dielectric
coupling be required between the ductile iron pipe and the copper? If so show and
label the location on the profile view.
See site, landscape and utility plans for other comments.
Number: 105 Created: 2/25/2004
[2/25/04] See site, landscape and utility plans for comments.
Additional comments:
A. A copy of comments received from QWEST (telephone) is attached to this
letter.
B. Len Hilderbrand of Xcel Energy (gas) indicated that the developer must contact
Connie Woodard) to schedule installation of gas service to this site. Connie can
be reached at 970-225-7843.
C. A copy of the comments received from the City's Technical Services
Department (mapping / surveying) is attached to this letter.
D. Marc Virata of the Engineering Department indicated that some of the Bur
Oaks in the East: Harmony Road setback area are too close to the street. They
must be at least 35' from the closest drive lane.
Page 3
E. Marc Virata of the Engineering Department indicated that the sidewalk
connection at East Harmony Road and Wheaton Drive must be somewhat
realigned to provide straight, continuous pedestrian movement. The sidewalk
must be aligned with the handicapped ramp.
}}#Y****#}}*##***tk+#***##*******+**}+4*}**++ttt#*****+x*YY#}**}tt+*4+*****+ttt###*#***#********
This development proposal is in a condition that is sufficient to be scheduled for a
Planning and Zoning Board public hearing. The Holiday Inn Express item is being
placed on the April 15, 2004, P & Z Board public hearing agenda. The issues
and concerns expressed in this letter and on the enclosed red -lined plans will need
to be addressed with your Final Compliance review, which is the next step (after the
public hearing for the Project Development Plan) in the City's development review
process. Before submitting Final Compliance documentation please contact me for
the submittal requirements (fee, plans, reports, etc.)
Please be sure and return all of the red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 970-221-6341.
Yours Truly,
Steve Olt,
City Planner
Palle 4
.%
FINAL PLAN
,.
COMMENT SHEET
City of Fort Collins
REC.D
Current Planning;
DATE: June'), 2004 TO: Tech Services
PROJECT: #13-87CU Oakridge Business Park, 36th Filing,
Holiday Inn Express — Final Plan
All comments must be received by Steve Olt no later than the staff
review meeting:
July 7, 2004 M `/
Note - Please identify your redlines for future reference
1. F&.i.✓D19',¢y � I. GAG ea0s�.
4 T (ocY S i4,4DE D A 12.c: A a r-- 'r-C-f Acc.Lrs1 ES/hT 7-
T —'—� 77 Q6 (-EiTLHcJ-O IT
I ('f � S L Cu 12. /v �T Yl �./ C: C. .� S
%t)tIOor Sc:AN' Tc--z�- G,jA (T t S .
3 Tl I s P:� Oi A �eA jz tlJr, AT TNs ecJ
7a 3, wT r o i7-
(
r <��.�q,,.i L'VCtt � t-f� T0� or' c�iHetZ tNES,
4, fN t4A I S 7HT /a Dp Tt(2tjA,- LtAJ it
)ici�T i� A) ROW 4c)iic5S il-l-6 (J& H
Name (please print)
ZPECK
HERE IF YOTJ WISH TO RECEIVE COPIES OF REVISIONS
lat Site Drainage Report Other
Utility _Redline Utility _Landscape City of Fort Collim
lAtqm
FINAL PLAN
i COMMENT SHEET
City of Fort Collins
Current Planning
DATE: June 91 2004 TO: Engineering — Dave S.
PROJECT: #13-87CU Oakridge Business Park, 36th Filing,
Holiday Inn Express — Final Plan
All comments must be received by Steve Olt no later than the staff
review meeting:
July 7, 2004
Note - Please identify your redlines for future reference
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat —Site Drainage Report Other
Utility Redline Utility Landscape
4in
City of Port Collins
the note on the lower right-hand corner of the page that the entire area noted as " P' will used this pavement,
which includes the drive aisles noted as concrete on C-2. Please clarify.
Number: 21 Created: 11/4/2003
[ 1 1 /4/031 Per LCUASS standard 19-6, the two parking stalls along the north side of the drive aisles that intersects with
Wheaton Drive need to be eliminated, a 50' setback from the flowline of Wheaton Drive (a collector) is required.
Number: 24 Created: 11 /4/2003
[ 1 1 /4/031 Please revise the title on all the documents to read "Oakridge Business Park 36th Filing, Holiday Inn Express".
Number. 25 Created. 11 /4/2003
[ 1 1 /4/031 It appears that PFA needs the drive aisle connecting the two driveways to be dedicated as an emergency access
easement. Please indicate such dedication on the plat.
Number. 26 Created: 11 /4/2003
[ 1 1 /4/031 The plans conflict with regards to the type of driveway proposed out to Oakridge Drive.
Number. 27 Created. 11 /4/2003
[1 1 /4/03] The new access ramp at the southeast corner of Harmony Road and Wheaton Drive should be constructed as a
directional ramp, not a corner ramp.
Topic: Plat
Number. 22 Created: 11 /4/2003
[ 1 1 /4/031 The plat needs to dedicate additional right-of-way for Harmony Road and additional access and landscape
easement behind the right of -way as reflected on the 33rd fling. 9' of utility easement behind the right-of-way on
Oakridge Drive is also required to be dedicated. The site plan appears to dimension these items (but not call this out)
correctly but it is not reflected on the plat.
Number: 23 Created: 11 /4/2003
[ 1 1 /4/031 There appears to be a portion of sidewalk along Oakridge Drive approaching Wheaton that is on private
property. It would make sense to dedicate this as right-of-way to provide a continuous property line along Oakridge.
Page 2
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Water Wastewater
Date: July 7, 2004
Project:
OAKRIDGE: BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II AND FINAL PLAN
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Roger Buffington
Topic: Utility Plans
Number: 113 Created: 7/7/2004
[7/7/041 The 3-inch water service must be ductile iron pipe from the water main in
the street to a point 5 feet downstream of the meter vault.
Issue Contact: Jeff Hill
Topic: Utility Plans
Number: 111
[7/6/04] No comments
Created: 7/6/2004
-71-77
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility '4 Landscape
Page L
Project Comments Sheet
Selected Departments
City of Fort Coll ins
Department: Engineering
Date: July 9, 2004
Project:
OAKRIDGE: BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II AND FINAL PLAN
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 109 Created: 3/1/2004
[7/9/04] Carried over for reference.
[311/041 Just as an FYI, CDOT will require a warranty deed for the right-of-way dedication
along Harmony Road. This is not required at this time.
Number: 116 Created: 7/9/2004
[7/9/04] The obtaining of the offsite easement on the corner parcel northwest of the site is I
still believe unresolved. Mylars cannot be signed off until this is obtained (and the few
remaining comments from other departments are addressed).
Number: 117 Created: 7/9/2004
[7/9/04] Attached is an "information for development agreements" sheet that should be filled
out to start the development agreement process.
Number: 118 Created: 7/9/2004
[7/9/04] Coordinate: between the site and construction plan as to whether pervious paver
blocks are still intended on the easternmost row of parking, which is shown on the site plan.
Topic: Plat
Number: 110 Created: 3/1/2004
[7/9/04] In response to the previous submittal, Technical Services offers the following
comments:
1. Boundary and
-
Dat
HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other,
Utility _ Redline Utility Landscape
Page I
2. The shaded area of the access easement at the SE comer needs to be "hatched", it will
not scan the way it is.
3. The radial bearing at the sw corner of the plat needs to be replotted, it will not scan over
the top of other lines.
4. What is the additional line in the area dedicated as right-of-way, across the north side of
the plat?
[3/1/04] Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of the plat? (Additional right-of-way?)
3. Provide reception number on the plat for the offsite sidewalk and utility easement when
recorded.
4. Where does the 30' public access easement go to, at the southeast corner? (Arrow goes
to the 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where #10, #15, etc?
Page 2
Project Comments Sheet
Lwtm�) Selected Departments
Cii� of I uri ColliW
Department: Stormwater Utility
Date: July 9, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
POP - TYPE: II AND FINAL PLAN
All comments must: be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 115 Created: 7/9/2004
Please see minor comments on redlined plans.
Topic: Erosion/Sediment Control
Number: 114 Created: 7/9/2004
1. Please remove notes #17, 18, and 19 on plan sheet C-9.
2. On your surety cost estimate, the costs you use for temporary seed and mulch
(BMP costs) appear way too high.
3. What is to protect downstream areas from the utilities installations in Wheaton
Drive?
4. Why is the curb opening on Wheaton left unprotected?
If you have any questions regarding erosion control, please contact Bob Zakely at (970)
224-6063.
Signature
7 R7
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage, Report- Other
✓'� Utility _ ' Redline Utility Landsc�rpet��L'_
.< - Li
Page 1
T
Citv of Gott Collins
Lightowler Johnson
c/o Andrew Werder
700 Main Avenue
Fargo, ND. 58103
STAFF PROJECT REVIEW
Associates Date: 07/12/2004
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK
36TH FILING (H:OLIDAY INN EXPRESS), PDP - FINAL PLAN (TYPE II -
LUC), and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 119 Created: 7/9/2004
[7/9/04] Light & Power has indicated that the existing
electric transformer on the IHOP property, proposed to be
replaced and shared with the Holiday Inn Express, must be in a
utility easement. The location of the existing transformer,
assumed to be the location for the replacement, is not in a
utility easement on the IHOP subdivision plat. This issue must
be resolved prior to issuance of building permit or
certificate of occupancy, whichever Light & Power requires.
Number: 120 Created: 7/9/2004
[7/9/04] The Current Planning Department has no further
comments. We Eire ready for mylars of the Site Plan, Landscape
Plan, Building Elevations, and subdivision plat to be
submitted to Current Planning. Please submit 1 mylar each of
the Site, Landscape, and Building Elevations Plans; and, 3
mylars of the subdivision plat. At least 1 plat mylar must
have original signatures of the Owner, Attorney, and Surveyor.
Department: ]Engineering Issue Contact: Marc Virata
Topic: General
Number: 109 Created: 3/1/2004
[7/9/04] Carried over for reference.
[3/1/04] Jus:� as an FYI, CDOT will require a warranty deed
for the right-of-way dedication along Harmony Road. This is
not required at this time.
Page 1
Number: 116 Created: 7/9/2004
[7/9/04] The obtaining of the off -site easement on the corner
parcel northwest of the site is I still believe unresolved.
Mylars cannot be signed off until this is obtained (and the
few remaining comments from other departments are addressed).
Number: 117 Created: 7/9/2004
[7/9/04] Attached is an "information for development
agreements" sheet that should be filled out to start the
development agreement process.
Number: 118 Created: 7/9/2004
[7/9/04] Coordinate between the site and construction plan as
to whether pervious paver blocks are still intended on the
easternmost row of parking, which is shown on the Site Plan.
Topic: Plat
Number: 110 Created: 3/l/2004
[7/9/04] In response to the previous submittal, Technical
Services offers the following comments:
1. Boundary and legal close.
2. The shaded area of the access easement at the SE corner
needs to be "hatched", it will not scan the way it is.
3. The radial bearing at the sw corner of the plat needs to be
replotted, it will not scan over the top of other lines.
4. What is the additional line in the area dedicated as right-
of-way, across the north side of the plat?
[3/1/041 Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of
the plat? (Additional right-of-way?)
3. Provide reception number on the plat for the offsite
sidewalk and utility easement when recorded.
4. Where does the 30' public access easement go to, at the
southeast corner? (Arrow goes to the 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where
#10, #15, etc?
Department: Light & Power Issue Contact: Alan Rutz
Topic: Utility Plans
Number: 112 Created: 7/7/2004
[7/7/04] An easement will be required for the existing
transformer and electric line that is on the IHOP property.
Page 2
Department: Stormwater Utility Issue Contact: Wes
Lamarque
Topic: Drainage
Number: 115 Created: 7/9/2004
Please see minor comments on redlined plans.
Topic: Erosion/Sediment Control
Number: 114 Created: 7/9/2004
1. Please remove notes 417, 18, and 19 on plan sheet C-9.
2. On your surety cost estimate, the costs you use for
temporary seed and mulch (BMP costs) appear way too high.
3. What is to protect downstream areas from the utilities
installations in Wheaton Drive?
4. Why is the curb opening on Wheaton left unprotected?
If you have any questions regarding erosion control, please
contact Bob Za.kely at (970) 224-6063.
Department: Water Wastewater Issue Contact: Roger
Buffington
Topic: Utility Plans
Number: 113 Created: 7/7/2004
[7/7/04] The 3-inch water service must be ductile iron pipe
from the water main in the street to a point 5 feet downstream
of the meter vault.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility Plans
Number: Ill Created: 7/6/2004
[7/6/04] No comments.
Be sure and return all redlined plans if/when you re -submit.
If you have any questions regarding these issues or any other
issues related to this project, please feel free to call me at
(970)221-6341.
Yo rs Truly,
Steve Olt
City Planner
Page 3
LIGHTOWLER JOHNSON ASSOCIATES
INCORPORATED
ARCHITECTS ENGINEERS
July 26, 2004
Steve Olt, Project Manager
City of Fort Collins
291 North College Avenue
P.O. Box 580
Fort Collins, Co 80522-0580
Re: Oakridge Business Park 36th Filling
Holiday Inn Express and Suites
Fort Collins. Colorado
LJA Project No. 03030
Dear Mr. Olt,
Regarding the staff review comments for the proposed Holiday Inn Express, dated
7/12/04, we offer the following responses.
Issues:
Department: Current Planning
Topic: General
119: The existing transformer will not be shared. A new transformer located along
Wheaton Drive is proposed 10-feet south of the proposed water meter vault.
Coordination with light and power has been made to determine a suitable
location.
120: The requested mylars have been enclosed with this submittal.
Department: Engineering
Topic: General
109 NR
116 A deed of dedication of easement has been sent to Oakridge Business Park
Association for signing. An exhibit drawing and legal description have been
submitted, to Marc Virata for review. The reception number of the off -site
easement will be added to the plat before recording.
117 The information for development agreements form has been completed and sent
to Marc Virata via email.
118 Notation for pervious paver blocks have been removed from the site plan. Paver
blocks are not intended to be used in any parking areas.
700 MAIN AVENUE (701) 293-1350 (ND) FAX (701) 293-1353
POST OFFICE BOX 2464 (218) 233-3512 (MN) EMAIL: Ija@lightowlerjohnson.com
FARGO, NORTH DAKOTA 58108-2464 WEBSITE: www.lightowlerjohnson.com
Topic: Plat
110 1. NR
2. The access easement at the Southeast has been hatched as requested.
3. A reception Number for the offsite easement has been provided.
4. The additional line does not apply to this plat and has been removed.
Department: Light & Power
Topic: Utility Plans
The existing transformer will not be shared. A new transformer located along
Wheaton Drive is proposed 10-feet south of the proposed water meter vault.
Department: Stormwater Utility
Topic: Drainage
115 Minor redlines have corrected as requested. The elevation of the control structure
rim was revised as requested. Rip -rap shall be 6" to 12" in diameter and placed in
6' wide by 5' long pads.
Topic: Erosion/Sediment Control
114 1. Notes have been removed as requested.
2 Surety cost estimate has been revised.
3. A note has been added advising contractors to complete utility installatio.n
in streets within a timely fashion and to provide downstream inlet
protection within 300 feet of project site.
4. The curb opening along Wheaton Drive has been closed with silt fence.
Department: Water Wastewater
Topic: General
j 13 The 3-inch copper has been replaced with ductile iron.
Feel free to contact us with any questions or concerns.
Sincerely,
LiGJP� ER :f?FON ASSOCIATES, INC.
y
Stevan G. Dewa7d, P.E.
Enclosures
13roject Comments Sheet
Selected Departments
City of Fort Collins
Department: Water WwJewater
Date: November 6, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP-TYPEII
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 34 Created: 11 /5/2003
[11/5/031 Show and label the location of the proposed meter vault. Is a 4-inch water services truly
needed? Show and label all water line connection appurtenances (i.e. tapping saddles, thrust blocks,
valves, etc.). Include all appropriate current City of Fort Collins Utilities standard details (i.e. meter
vault, thrust block, typical water/sewer service, bedding, etc.). PVC pipe is not permitted with in the
City of Fort Collins service area. Label all water lines as D.I.P. and include a note to polywrap ail
D.I.P.
Number: 35 Created: 11 /5/2003
[11/5/031 Provide 0.2 feet of fall through existing sanitary sewer manhole. Include a note to core drill
all openings into the existing manhole and to reshape the bench to direct flow through manhole.
Topic: Utility Plans
Number: 39 Created: 11 /6/2003
[11/6/03]lnclude the standard general note to the landscape plans pertaining to shrub/utility
separation distance. Maintain the required landscape/utility separation distances on the landscape
plans.
See site, landscape and utility plans for other comments
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1
Project f7omments Sheet
Selected Departments
Department: Transportation Planning
Date: November 6, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP-TYPEII
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 28 Created: 11 /4/2003
[11/4/03] Please relabel the "l5' utility and access easement" along Wheaton Drive
to read "15' utility and public sidewalk easement". Also the "80' Access & Landscape
Easement" along Harmony needs to be relabeled as "80' Public sidewalk &
Landscape Easement."
Number: 29 Created: 11/4/2003
[11/4/03] Why does the dedicated right of way (ROW) along Oak Ridge Drive dip
down at the NE corner of the Wheaton intersection? Please correct and continue the
ROW dedication along the back of the Oak Ridge sidewalk to the easement along
Wheaton.
OR IT *74 Will
Created: 11 /4/2003
[11/4/031 Trees proposed along Wheaton need to be planted within the 8' parkway.
The submitted landscape plan depicts the tree trunks in the sidewalk.
Number: 31 Created: 11 /4/2003
[11/4/03] The landscape plans shows the proposed evergreens along Harmony
growing into the sidewalk / trail. Please be aware that there is a required 8'
clearance from the walk to the first branch. A better option would be to relocate the
proposed trees to a location that does not grow into the walk now or into the future.
/(- (-0 3
bare
CHECK HER IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility � Landscape
Pagc I
h. Owner will be responsible for any street improvements required by
the City of Fort Collins.
i. LCUASS were used in the site design for drives and ramps.
j. Appendix E-4 has been completed and submitted for review.
k. According to the Harmony Corridor plan, the recommended
parking setback is 30' along collector streets. A setback of 20' is
required to obtain the area necessary for the water quality pond.
1. The existing public access easement on the IHOP property has
been incorporated into the Holiday Inn Express site plan. A
driveway is to connect the two properties providing an off street
vehicular connection.
WATER/WASTEWATER.
a. New water service connections will be made at the 8" water main
in Wheaton Drive.
b. No response required.
C. No existing services are stubbed onto the property.
d. Separate domestic and fire flow lines will be installed.
e. Owncr shall be responsible for all fees associated with this
development.
f. A private irrigation designer is to be contracted by the owner.
STOW",4WATER
a. The owner shall be responsible for all development fees. Extended
detention is provided for runoff reduction.
b. No response required.
C. A Storm Water Management & Erosion and Sediment Control
Report is included with this submittal. This report has been
prepared by Stevan G. Dewald, Colorado license 433672.
d. The existing storm inlet located on Wheaton will be used as the
discharge location. A release rate of 1.2 CFS through a control
orifice will be maintained.
e. A sand filter basin will provide extended water quality detention.
f. The UDFCD drainage criteria manual (volume 3) was used during
design. Detention capacity has been designed per the overall
Oakridge drainage report.
LIGHT AND POWER
a. Transformer location will be coordinated with the Light and Power
Department.
b. Owner shall be responsible for electric development charges.
C. A C-1 Commercial form has will be submitted.
Number:
[11 /4/03
the nL:^r
walk.
32 Created: 11 /4/2003
Please be sure that when the large hedge along Harmony is trimmed for
sidewalk / trail that ;here is a minimum 2' distance from the hedge to the
Number 33 Created: 11/4/2003
[11/4/031 Are the proposed shade trees along Harmony satisfying CDOT's setback
standards from the edge of the roadway?
Pau 2
Project Comments Sheet
Selected Departments
CitN u1 1-ori lulling
Department: Stormwater Utility
Date: November 7, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 17 Created: 11/4/2003
Quantity detention is required for this site in its entirety, not just for the difference
between the old and present rainfall standards. Per the Oakridge B.P. master plan, this
basin (230) requires detention. Detention can be provided in the parking lot of
commercial properties with a maximum 100-year water surface elevation of 1 foot over
the parking lot.
Number: 18 Created: 11/4/2003
For water quality mitigation, 40-hour extended detention is required. This is one of the
methods presented in the Urban Storm Drainage Criteria Manual out of Denver.
Number: 19 Created: 11/4/2003
Per the Oakridge B.P. master plan, the basin the site is located in is supposed to drain
to the east and into another storm sewer network than the one proposed. Due to this
site proposing to change drainage patterns, an analysis is required to determine
whether or not the storm sewer network has enough additional capacity for the
proposed release rate of the site.
Number: 44 Created: 11/7/2003
Please revise the elevation for benchmark #9-94 on the cover sheet. See redlined plan.
C0<e i
Signature
Date
-03
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site ✓ Drainage Report Other
✓ Utility ✓ Redline Utility ✓ Landscape C.c_ -.4 . ou-
Page I /ire vo.11
C. -s,L4� nL
Number: 45 Created: 11 /7/2003
A drainage easement is required for the 100-year water surface limits of the detention
pond as well as the outfall storm sewer. These easements need to be dedicated to the
City of Fort Collins.
Number: 46 Created: 11/7/2003
The outlet structure for the detention pond needs to be the City's standard. Please see
attached exhibit.
Topic: Erosion/Sediment Control
Number: 20 Created: 11 /4/2003
1. Please remove the "Soil Erosion and Sediment Control Notes" on plan sheets C-9 and C-
10 and replace with City of Fort Collins standard erosion control notes (new version,
September, 2003). Please add to these any specific notes you have pertaining to the
sediment/erosion control plan for this site (e.g. revegetation).
2. Please prepare and submit an erosion control report with calculations per City of Fort
Collins specifications.
Page 2
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: November 7, 2003
Project:
OAKRIDGE SUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff resew meeting:
November 05, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11/4/2003
[t 1/41031 Please revise the approval block on the construction set as shown on the redlines. The approval block
should be on all sheets.
Number: 11 Created: 11/4/2003
[11/4/031 The grading and erosion control plan sets are not readable, please revise. Because of the informal;-
presented, t is difficult to determine if the permissive amount of sheetFlow drainage for a driveway across a
sidewalk is being exceeded. Please ensure that the maximum amount of parking lot area crossing over a public
walk does not exceed 750 square feet.
Number: 40 Created: 11/7/2003
[ 11 /7/03] Show street patching for the proposed street cuts onto public right-of-way. Please note that due to the des -
distance between street cuts on Wheaton, a mill and inlay may instead be required for the entire length between str.
The new driveways will reouire a street patch that is the entire width of the existing bikelane(s). Add a note refere, ...
these street cim indicating the following: "Limits of street repair are approximate. Final limits to be determined in the fieid
by the City Engineering Inspector at the time the cuts are made."
Number: 41 Created: 11/7/2003
[ 1 1 /7/031 Please replace details on the details sheet with City standard details as redlined (such as access ramps,
driveways, etc.)
Number: 42 Created: 11/7/2003
[ 1 1 /7/031 Please revise the ramp proposed at the Harmony/Wheaton intersection to direct peds across Wheaton (not
lead to the corner). Because this is along CDOT right-of-way, the ramp will need to be constructed to CDOT standards.
Please ensure CDOT's details (with truncated domes) are included.
Number: 43 Created: 11/7/2003
[ 1 1 /7/03] The sidewalk along Harmony should remain detached approaching the intersection because there isn't curb
and gutter along this section of Harmony., /
i
Signature
Plat
Utility
Date
HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
/Site Drainage Report Other
iRcdline Utility /Landscape
Page 1
Topic: 3eneral
Number: 9 Created: 11/4/2003
[ 1 1 /4/03] The existing bricks along Wheaton which act as a sidewalk are not considered an approved sidewalk system and
should be removed and replaced in accordance with City standards.
Number. ' 5 Created: 11/4/2003
[11/4/031 P',,ase separate the site and landscape plans from the construction drawing set (and not name them
C-2 and C respectively). These are items that will be filed separate from the construction drawing set. The
construction drawing set shoved have all remaining sheets assembled together within the plan set (ensure
the grading plan sheet included within the drainage report is also included in the construction drawing set). -ire
plat, while also filed separately, should also be included in the construction drawing set as a sheet for reference,
placed immediately after the cover sheet. The cover sheet index should note that the second sheet in the plan
set is a plat for reference.
Number. 16 Created: 11/4/2003
f11/4/03] There appears to be some discrepancy as to where the modular block pavement is to be installed.
c3heet C rows that this will only be used for the internal parking lot areas while Sheet C-9 shows basr 2 upon
the note on me lower right-hand corner of the pace that the entire area noted as "F" will used this pavement,
which inciuces the drive aisles noted as concrete on C-2. Please clarify.
Number: 21 Created: 11/4/2003
[ 1 1/4/03] Per LCUASS standard 19-6, the two parking stalls along the north side of the drive aisles that intersects with
Wheaton Drive need to be eliminated, a 50' setback from the flowline of Wheaton Drive (a collector) is required.
Number: 24 Created: 11/4/2003
[ 1 1 /4/03] Flease revise the title on all the documents to read "Oakridge Business Park 36th Filing, Holiday Inn Express".
Number: 25 Created: 11/4/2003
[ 1 1 /4/031 it appears that PFA needs the drive aisle connecting the two driveways to be dedicated as an emergene,' -
easement. Please indicate such dedication on the plat.
Number: 26 Created: 11/4/2003
[ 1 1 /4/03] The plans conflict with regards to the type of driveway proposed out to Oakridge Drive.
Number: 27 Created: 11/4/2003
[ 1 1/4/031 The new access ramp at the southeast corner of Harmony Road and Wheaton Drive should be construr.
directional ramp, not a corner ramp.
Topic: Plat
Number: 22 Created: 11/4/2003
[ 1 1 /4/03] The plat needs to dedicate additional right-of-way for Harmony Road and additional access and landscape
easement behind the right of -way as reflected on the 33rd filing. 9' of utility easement behind the right-of-way on
Oakridge Drive is also required to be dedicated. The site plan appears to dimension these items (but not call this ouT.t
correctly but it is not reflected on the plat.
Number: 23 Created: 11/4/2003
[ 1 1 /4/03] There appears to be a portion of sidewalk along Oakridge Drive approaching Wheaton that is on private
property. It would make sense to dedicate this as right-of-way to provide a continuous property line along Oakridge.
Number: 47 Created: 11/7/2003
[1 1 /7/03] Issue #22 will need to be investigated further internally in the City with regards to the right-of-way dedication
on Harmony as it appears the Spring Canyon Lateral may complicate such a right-of-way dedication.
Number: 48 Created: 11 /7/2003
[ 1 1 /7/03] On the plat, Item #7 mentions a right-of-way ditch but does not indicate on the plat where this might be. Is
this note pertinent to the plat?
Page 2
6zSTAFF PROJECT REVIEW
Cilpuf tort aillin+
Lightowlet Johnson Associates Date: 11/18/2003
c/o Andrew Weider
700 Main Avenue
Fargo, ND. 58103
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK, 36TH FILING (HOLIDAY
INN EXPRESS), PDP - TYPE 11. and we offer the following continents:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Plans
Numher: 51 Created: 11/] 3/2003
[I 1/11/03] Rick Lee of the Ciri%s Building Department indicated that he is attaching a copy of the
various codes that the City kill enforce.
Number: 59 Created: 1 1 / 18/2003
[ 1 1/18/03] There are discrepancies between the Site Plan and the Building Elevations regarding the
north elevation, when_ the walls and patios are. The north elevation does not appear to show these
areas.
Number: 61 Created: 1 1 / 18/2003
[1 1/18/03] Elevations and details are needed for the maintenance building, trash enclosure, and walls
on the north side of the building.
Number. 62 Created: 1 I / 18/2003
[ 1 1/18/031 Why is there no phNsical connection bethceen the entry canopy and the front of the
building, for weather protection for the guests? The Site Plan and Landscape Plan would appear to
show a connection but the Building Elevations do not.
Number: 63 Created: 1 1/18/2003
[ 1 1 / 18/03 [ The east and west elevations of the building* appear to need more detailing to meet Section
3.5.3(D)(3) of the LUC.
Number: 64 Created: 1 1 / 18/2003
[ 1 1/18/03] The north elevation, facing Harmony road. should include brick columns at the break in
the middle of the building to reflect the south side at the front entry.
Topic: Lamiscaping
Numbs 52 Created: 1I/13/2003
[ 1 1 /13/03 ] Laurie D'Audney of the Cith-'s Water Conservation Department is forwarding copies of
the Wntcr Conservation Standards for Landscapes COMMENT SHEET and Water Conservation
Standards for LANDSCAPING and IRRIGATION SYSTEMS General Information.
Number: 53 Created: I 1 / 13/2003
[ 1 1/13/031 Is this climate appropriate for the proposed Pervious Paver Blocks? How will the grass be
established and maintained if water is not applied?
Page I
Number: 54 Created: 11/13/2003
[11/ 13/031 The proposed Austrian Pines and Colorado Blue Spruce at the northeast comer of the site,
in the required landscape setback, are nice but will they encumber pedestrian and bicycle movement
on the sidewalk? Also, Blue Spruce are not in the Harmony Road Plant Palette (or the Local/Collector
Street Palette).
Number: 55 Created: 11/13/2003
[11/13/03] Some of the landscaping along the east property line interferes with the logical sidewalk
connection to the IHOP Restaurant to the east.
Number: 56 Created: 11/13/2003
[11/13/03] Please see the red -lined Landscape Plan for Planning's comments. It appears as though the
Harmony Corridor Standards and Guidelines, relating to the Plant Palettes, is not being satisfied with
the plan.
Number: 58
Created: 11/18/2003
[11/18/03] It is difficult to read the shrubs symbols on the west and south side of the parking lot to
determine if the screening requirements are being met.
Topic: Signage
Number: 57
Created: 11 / 17/2003
[11/17/031 Remove all signage from the Building Elevations. This development is subject to the City
of Fort Collins Sign Code that is administered by the Zoning Department. The allowable signage will
be determined outside of this Project Development Plan review.
Topic: Site Plan
Number: 60 Created: 11 / 18/2003
[11/18/03] The building setback from Wheaton Drive does not satisfy either the LUC requirement of
no more than 15' from the street right-of-way or the Harmony Corridor suggested setback of 40' from
the "future edge of pavement".
Topic: Utility Plans
Number: 49 Created: 11/13/2003
[1 1/13/031 Len Hilderbrand of Xcel Energy (Public Service) offered the following comments:
a. Public Service has an existing 3" ped. gas main located along the west and south edge of Lot
1 of the 36th Filing.
b. The subdivision plat shows a 15' utility easement along the west boundary of the lot. A 9'
wide utility easement must be shown on the plat along the north edge of the Oakridge Drive
right-of-way.
C. No trees may be planted within 4' of gas lines.
Number: 50 Created: 11/13/2003
[11/13/03] Dennis Greenwalt of Comcast Cable (cable TV) offered the following comments:
a. Comcast Cable would like to see continuous utility easements along Oakridge Drive. Also,
they would like to see a utility easement along East Harmony Road.
Page 2
b. No plans will be made to serve this project until a Broadband Utility Easement, also called a
service agreement, is completed with their Commercial Accounts Executive, Reneta Santro.
Department: Engineering Issue Contact: Marc Virata
Topic-: Construction Drcnriugs
Number: 10 Created: 1 1/4, 2003
[1 1/4/03] Please revise the approval block on the construction set as shown on the redlines. The
approval block should be on all sheets.
Number: 1 1
Created: 1 1 /4/2003
[11/4/03] The grading and erosion control plan sets are not readable, please revise. Because of the
information presented, it is difficult to determine if the permissive amount of sheet flow drainage for
a drk cvaay across a sidewalk is being exceeded. Please ensure that the maximum amount of parking
lot area crossing over a public walk does not exceed 750 square feet.
Number: 40 Created: 1 1 /7/2003
11 1,7/03] Show street patching for the proposed street cuts onto public right-of-way. Please note that
due to the close distance hem een street cuts on Wheaton, a mill and inlay may instead be required for
the entire length between street cuts. 7 he ne�c drivc��ays %� ill require a street patch that is the entire
width of the existing bikelane(s). Add a note referencing these street cuts- indicating the following:
"Limits of street repair are approximate. Final limits to be determined in the Field by the City
Engineering Inspector at the time the cuts are made."
Number: 41
Created: 1 1 /7/2003
[ 1 1/7,03] Please replace details on the details sheet �� ith City standard details as redlined (such as
access ramps, driveways, etc.)
Number: 42
Created: 1 1 /7/2003
[1 1 /7/03] Please revise the ramp proposed at the Harmony/Wheaton intersection to direct peds across
Wheaton (not lead to the comer). Because this is along CDOT right-of-way, the ramp will need to be
constructed to CDOT standards. Please ensure CDOT's details (with truncated domes) are included.
Number: 43 Created: 11 /7/2003
11 1, 7/03] The sidewalk alone Harmony should remain detached approaching the intersection because
there isn't curb and gutter along this section of Harmony.
Topic: General
Number: 9 Created: 1 1 /4/2003
[ 1 1/4/03] The existing bricks along Wheaton which act as a sidewalk are not considered an approved
sidewalk system and should be removed and replaced in accordance with City standards.
Number: 15 Created: 1 1 /4/2003
[11/4/03J Please separate the site and landscape plans from the construction drawing set (and not
name them C-2 and C-6 respectively). These are items that will be filed separate from the
construction drawing set The construction drawing set should have all remaining sheets assembled
together within the plan set (ensure that the grading plan sheet included within the drainage report is
also included in the construction drawing set). The plat, while also filed separately, should also be
included in the construction drawing set as a sheet for reference, placed immediately after the cover
sheet. The cover sheet index should note that the second sheet in the plan set is a plat for reference.
Pace 3
Number: 16 Created: 11/4/2003
[11/4/031 There appears to be some discrepancy as to where the modular block pavement is to be
installed. Sheet C-2 shows that this will only be used for the internal parking lot areas while Sheet C-
9 shows based upon the note on the lower right-hand comer of the page that the entire area noted as
"F" will used this pavement, which includes the drive aisles noted as concrete on C-2. Please clarify.
Number: 21 Created: 11/4/2003
[11/4/031 Per LCUASS standard 19-6, the two parking stalls along the north side of the drive aisles
that intersects with Wheaton Drive need to be eliminated, a 50' setback from the flowline of Wheaton
Drive (a collector) is required.
Number: 24 Created: 11/4/2003
[11/4/03] Please revise the title on all the documents to read "Oakridge Business Park 36th Filing,
Holiday Inn Express".
Number: 25 Created: 11/4/2003
[11/4/03] It appears that PFA needs the drive aisle connecting the two driveways to be dedicated as
an emergency access easement. Please indicate such dedication on the plat.
Number: 26
Created: 11/4/2003
[11/4/03] The plans conflict with regards to the type of driveway proposed out to Oakridge Drive.
Number: 27
Created: 11/4/2003
[11/4/031 The new access ramp at the southeast comer of Harmony Road and Wheaton Drive should
be constructed as a directional ramp, not a corner ramp.
Topic: Plat
Number: 22 Created: 11/4/2003
[11/4/031 The plat needs to dedicate additional right-of-way for Harmony Road and additional access
and landscape easement behind the right-of-way as reflected on the 33rd filing. 9' of utility easement
behind the right-of-way on Oakridge Drive is also required to be dedicated. The site plan appears to
dimension these items (but not call this out) correctly but it is not reflected on the plat.
Number: 23 Created: 11/4/2003
[11/4/03] There appears to be a portion of sidewalk along Oakridge Drive approaching Wheaton that
is on private property. It would make sense to dedicate this as right-of-way to provide a continuous
property line along Oakridge.
Number: 47 Created: 11 /7/2003
[11/7/03] Issue #22 will need to be investigated further internally in the City with regards to the
right-of-way dedication on Harmony as it appears the Spring Canyon Lateral may complicate such a
right-of-way dedication.
Number: 48 Created: 11 /7/2003
[11/7/031 On the plat. Item #7 mentions a right-of-way ditch but does not indicate on the plat where
this might be. Is this note pertinent to the plat"
Department: Light & Power
Topic: General
Number: 12
Issue Contact: Alan Rutz
Created: 11/4/2003
[ 11/4/03] Standard electric development charges will apply to this development request.
Page 4
Number: 13 Created: 1 1 /4/2003
[I 1/4/031 A C-I Commercial Service Form must be tilled out to help determine the power needs for
this development.
Number: 14 Created: 11 /4/2003
1 1/4/03] Power for this development may come from the existing transformer at the east edge of this
site. This will require an outage to the IHOP building at the time the transformer is changed out to a
larger transformer.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General/Utility Plans
Number: 37 Created: 1 1 /6/2003
If 1 /6/03] If Prairie Dogs are currently located on the site they will need to be removed prior to any
construction activity occurring including orerlot grading Currently the federal government is not
allowing Prairie Dogs to be relocated due to the threat of the Ylonkev Pox Virus. Due this canent
ban on relocation if Prairie Dog are located or relocate to the property during construction (including
overlot grading) they will need be humanly eradicated in accordance to Chapter 4 of the City Code.
At any time if live Prairie Dogs are found on site during Lading or other construction activities the
construction site will be closed until the Prairie Dogs have been removed. Please add a note
explaining this to your general notes on the utility, plan set. Natural Resources will also add a
provision to the development agreement for this project explaining this.
Prairie Dog Removal, Before the commencement of v_*rading or other construction on the development
site, any prairie dogs inhabiting portions of the site within the Limits of Development (LOD) shall be
relocated or eradicated by the developer using cityapproved methods as set forth in Chapter 4 of the
City Code and, when applicable, using methods reviewed and approved by the Colorado Division of
Wildhte. LUC'3.4.1(Id)0)
Sec. 4-1 19. Use of poison restricted.
No person shall poison any animal or distribute poison in any manner with the intent to poison any
animal, except that mice, rats or any rodents other than hamsters, guinea pigs and squirrels may be
poisoned by the use of a poisonous substance approved for such use by the United States
Environmental Protection Agency. This prohibition shall not apply to persons regularly engaged in
the business of fumigation or pest extermination and licensed by the state of Colorado: provided,
however, that such pe-sons may use only fumigants to destroy prairie dogs or other burrowing
rodents.
(Ord. No. 160, 1986, § 1(35-26), 1 1-4-86: Ord. No. 60, 1995, § 9, 5-16-95) Fort Collins Cal, Coale
Topic: Utility Plans
Number: 38 Created: 1 1/6/2003
11/6/03] Limits of Development (LOD) need to be labeled on Utility Plans NRD will not require
fencing of these limits but may require the installation of a Prairie Dog ban ier fencing during
tr consuction if Prairie Dogs relocate to the construction site while construction activity are underway.
Limits of Development. The applicant shall propose, and the Director shall establish on the project
development plan, a "limits of development" ("LOD") linc(s) to establish the boundary of the project
outside of which no land disturbance activities will occur during the construction of the project. The
purpose of the LOD lines shall be to protect natural habitats and features and their associated butter
Page 5
NATURAL RESOURCES DEPARTMENT
a. Native plant materials and grasses were integrated in the landscape
plans. Bluegrass is not to be used.
b. A note has been included on the site plans stating "If prairie dogs
exist on the site, they shall be relocated or humanely eradicated
prior to commencement of any construction activities."
c. A 12'x24'trash enclosure is provided for recycling containers and
trash receptacles.
d. The owner shall be responsible for securing trash removal services.
Stipulations, as set forth by the City of Fort Collins, should be
directed to the Owner.
Provided provisions for bicycle traffic are as follows.
1. An 8' concrete sidewalk / bicycle trail within the 80' access
and landscape easement is provided. Said path shall
connect to the existing path in front of the IHOP and the
existing attached sidewalk located at the corner of
Harmony and Wheaton. A new accessible ramp and
sidewalk will be installed at this intersection to maintain
ADA regulations and accommodate the width of the path.
2. Bicycle parking is provided as per the Harmony corridor
regulations and LCUASS.
f A Fugitive Dust Control permit will be obtained.
TRANSPORTATION PLANNING DEPARTMENT
a. A Transportation Impact Stud}' has been included with this
submittal.
b. Cross access is provided between the IHOP and the Holiday Inn
Express.
C. All sidewalks with adjacent automobile overhang have been
designed at 6' in width.
CURRENT PLANNING
a. No response at this time.
b. The revised plan provides direct connection to the bicycle trail /
sidewalk along Harmony Road.
C. The plan has been revised to comply with the orientation to build -
to lines for street front buildings. The building has been placed at
a distance of six feet from the 80' landscape and access easement
line along Harmony Road.
d. No response required.
zones from inadvertent damage during site construction activities. The location of the LOD shall be
designed to preserve significant ecological characteristics of the affected natural habitat or feature that
could not reasonably be restored if disturbed by construction activities associated with the project.
The LOD shall also be designed to accommodate the practical needs of approved construction activity
in terms of ingress and egress to the developed project and necessary staging and operational areas.
L UC 3.4.1(N) (1)
Designation. LODs, as approved by the Director, shall be shown on the final plan for development.
LODs shall be designated in the field prior to commencement of excavation, grading or construction
with fencing or other methods approved by the Director. LUC 3.4.1(N)(2)
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 36 Created: 11/5/2003
[11/5/03] Employee/delivery access doors should have small, shatter resistant view ports to allow
surveillance.
Department: Stormwater Utility
Topic: Drainage
Number: 17
Issue Contact: Wes Lamarque
Created: 11/4/2003
Quantity detention is required for this site in its entirety, not just for the difference between the old
and present rainfall standards. Per the Oakridge B.P. master plan, this basin (230) requires detention.
Detention can be provided in the parking lot of commercial properties with a maximum 100-year
water surface elevation of 1 foot over the parking lot.
Number: 18 Created: 11/4/2003
For water quality mitigation. 40-hour extended detention is required. This is one of the methods
presented in the Urban Storm Drainage Criteria Manual out of Denver.
Number: 19
Created: 11/4/2003
Per the Oakridge B.P. master plan, the basin the site is located in is supposed to drain to the east and
into another storm server network than the one proposed. Due to this site proposing to change
drainage patterns, an analysis is required to determine whether or not the storm sewer network has
enough additional capacity for the proposed release rate of the site.
Number: 44 Created: 11/7/2003
Please revise the elevation for benchmark #9-94 on the cover sheet. See redlined plan.
Number: 45
Created: 11/7/2003
A drainage easement is required for the 100-year water surface limits of the detention pond as well as
the outtall storm sewer. These easements need to be dedicated to the City of Fort Collins.
Number: 46 Created: 11/7/2003
The outlet structure for the detention pond needs to be the City's standard. Please see attached
exhibit.
Page 6
Topic-: Erosion/Sediment Control
Number: 20 Created: 11 /4/2003
1. Please remove the "Soil Erosion and Sediment Control Notes" on plan sheets C-9 and C-10
and replace with City of Fort Collins standard erosion control notes (new version, September,
2003). Please add to these any specific notes you have pertaining to the sediment/erosion
control plan for this site (e.g. revegetation).
2. Please prepare and submit an erosion control report with calculations per City of Fort Collins
specifications.
Department: Traffic Operations
Topic: Traffic
Number: 7
No issues from Traffic Operations.
Department: Transfort
Topic: Traffic
Number: 8
110/27/03] No comments from Transfort
Department: Transportation Planning
Topic: Transportation
Issue Contact: Eric Bracke
Created: 10/ 15 /2003
Issue Contact: Garold Smith
Created: 10/27/2003
Issue Contact: Tom Reiff
Number: 28 Created: 11 /4/2003
[1 1/4/03] Please relabel the "15' utility and access easement" along Wheaton Drive to read "15' utility
and public sidewalk easement". Also the "80' Access & Landscape Easement" along Harmony needs
to be relabeled as "80' Public sidewalk & Landscape Easement."
Number: 29 Created: 11 /4/2003
[1 l/4/03] Why does the dedicated right of way (ROW) along Oak Ridge Drive dip down at the NE
corner of the Wheaton intersection'? Please correct and continue the ROW dedication along the back
of the Oak Ridge sidewalk to the easement along Wheaton.
Number: 30 Created: I 1 /4/2003
[1 1/4/03] Trees proposed along Wheaton need to be planted within the S' parkway. The submitted
landscape plan depicts the tree trunks in the sidewalk.
Number: 31
Created: 1 1 /4/2003
[11/4/031 The landscape plans shows the proposed evergreens along Harmony rowing into the
sidewalk / trail. Please be aware that there is a required 8' clearance from the walk to the first branch.
A better option would be to relocate the proposed trees to a location that does not grow into the walk
now or into the future.
Number: 32 Created: 1 1 /4,2003
[ 1 1/4/031 Please be sure that when the large hedge along Harmony is trimmed for the new sidewalk /
trail that there is a minimum 2' distance from the hedge to the walk.
Number: 33 Created: 1 1 /4/2003
[11/4/03] Arc the proposed shade trees along Harmony satisfying CDOT's setback standards from the
edge of the roadway"
Page 7
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 34 Created: 11/5/2003
[ 1115103] Show and label location of the proposed meter vault. Is a 4-inch water services truly
needed'? Show and label all water line connection appurtenances (i.e. tapping saddles, thrust blocks,
valves, etc.). Include all appropriate current City of Fort Collins Utilities standard details (i.e. meter
vault, thrust block, typical water/sewer service, bedding, etc.). PVC pipe is not permitted with in the
City of Fort Collins service area. Label all water lines as D.I.P. and include a note to polywrap all
D.1. P.
Number: 35 Created: 11/5/2003
[11/5/031 Provide 0.2 feet of fall through existing sanitary sewer manhole. Include a note to core
drill all openings into the existing manhole and to reshape the bench to direct flow through manhole.
Topic: Utility Plans
Number: 39 Created: 1 1 /6/2003
[11/6/03]lnclude the standard general note to the landscape plans pertaining to shrub/utility separation
distance. Maintain the required landscape/utility separation distances on the landscape plans.
Department: Zoning
Topic: Zoning
Number: 1
Issue Contact: Jenny Nuckols
Created: 10/13/2003
Bicycle parking should be located near main building entrances
Number: 2 Created: 10/13/2003
Please show and label building footprint, envelope, dimensions and distance to property lines on the
site plan
Number: 3 Created: 10/13/2003
Do not show signage on the elevations. Sign will be reviewed and permitted separately
Number: 4 Created: 10/13/2003
Why isn't the drive -under porte attached to the building? From a customer standpoint, it would be
nice to be able to get out of their vehicle and into the building without getting rained/snowed on in the
cold months.
Number: 5 Created: 10/13/2003
Please provide elevations for the maintenance building and trash -recycle enclosure
Number: 6
Created: 10/13/2003
On the landscape plan, please provide counts for the groupings of plants, trees etc.
.r.+.,+.a**++•�+..*»:....a**++**�++»«+..•r**+*�*r+.++.+++.>r*.�>a**rwrr�a�++w*r*
The following comments were expressed at City staff review of the project:
Engineering:
Please separate the Site Plan and the Landscape Plan from the utility plans.
Page 8
2. An easement is needed for the sidewalk connection to Wheaton Drive in the Harmony Road 80'
setback area. Please contact Everitt Companies to acquire the easement.
3. Are the proposed Pervious Paver Blocks the best parking space solution in this area?
4. Thar are several parking spaces that do not meet the setback requirements from the street.
5. The subdivision plat needs to dedicate street right-of-way, easements, emergency access
easement, public access easement, and landscape & access easement along Harmony Road.
Stormwater:
This development plan is not providing the required storm water detention. This site needs 5
times as much as is shown. This is a major issue.
2. The water quality as shown is not to the City's recommended standard.
3. The storm sewer system needs to be re -analyzed. There is a capacity question.
Water/Wastewater:
No meter is shown for water.
2. PVC pipe is not allowed.
3. Show the meter vault.
Light & Power:
The City cannot get poker to the west side of this site. Power will have to be shared with the
MOP Restaurant to the east.
This completes staff (and outside reviewing agencies) review and comments at this time. Additional
comments and red -lined plans may be forthcomine. This proposal is subject to the 90-day revision
re -submittal requirement (from the date of this comment letter, being November 18, 2003) as
set tirrth in Section 2.2.1 I(A) of the Land Use Code. Be sure and return all of your red -lined plans
when You rc_submit. The number of copies of each document to re -submit is shown on the attached
Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues related to this project, please feel
free to call me at (970) 221-6341.
You s Truly,
lJ"
Steve Olt
City Planner
Paee 9
LIGHTOWLER JOHNSON ASSOCIATES
INCORPORATED
ARCHITECTS ENGINEERS
November 27. 2003
Steve Olt, Project Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, Co 80522-0580
Re: Oakridge Business Park 36th Filiing
Holiday Inn Express and Suites
Fort Collins, Colorado
L.JA Project No. 03030
Dear Mr. Olt,
Regarding the staff review comments for the proposed Holiday Inn Express, dated
I I/18/03, we offer the following responses. We are resubmitting with intention to have a
public hearing in January. We understand there will likely be more revisions requested.
we feel that all the major issues have been resolved and that these plans are at least 50%
complete.
Issues:
Department: Current Planning
Topic: Building Plan
51 Comment has been noted.
59 Sheet A-4.1 has been revised and coordinated with Site Plan.
61 Elevations of the Trash -Recycle enclosure and the Maintenance building have
been included in this submittal. Refer to Sheet A-0.
62 The building overhang and drive under forte overlap, providing protection from
weather as provided by the Holiday Inn Express Hotel and Suites prototype.
63 Please indicate specific required revisions.
64 The North elevation on sheet A-4.1 has been revised to include the brick fapade as
requested.
Topic: Landscape Plan
52 An independent irrigation installer is to be contracted by the owner. A note on the
landscape plan has been added to direct the irrigation contractor to the CFC Water
Conservation Standards.
700 MAIN AVENUE (701) 293-1350 (ND) FAX (701) 293-1353
POST OFFICE BOX 24CA (218) 233-3512 (MN) EMAIL. Ija ^ Fghtowlerjohnson.com
FARGO, NORTH DAKOTA 58108-2404 WEBSIFE. www.lightowlerjohnson com
53 The paver blocks specified are not intended to allow vegetative growth. The
pavers to be used are approximately 6 inches square with the corners cut. This
allows an opening at every cornerjoint. An 18" sand cushion below the pavers is
to be used for filtration of stormwater and the only reason incorporated into this
design. These blocks are used extensively in Canada, where freeze thaw
conditions are severe. They are also used frequently in extreme desert conditions
to allow infiltration into water starved soils.
54 The blue spruce along Harmony road have been removed from the plan. The
potentially protrusive trees have been replaced with smaller plantings.
55 A sidewalk connection to the IHOP has been added. Landscape plantings have
been revised accordingly.
56 The drawings have been revised per the red lined drawings. Blue spruce has been
removed from the North side of the Property
58 The shrubbery has been revised for better display.
Topic: Signage
57 The exterior signage has been removed from the building elevations on Sheet A-4
and A-4.1.
Topic: Site Plan
60 The proximity of the West building wall to the Wheaton Drive right of way was
located as shown due to several site limitations.
1. The existing landscape wall at the Northwest corner is only 2.5 feet across
the property line. In order to maintain the integrity of the wall, and not
add additional bearing pressure to the hotel footings, the distance between
these structures should be kept to a minimum. During construction, some
shoring might be required for the existing wall. The proposed building
location requires minimal amount of shoring.
2. Electrical service lines, Data service lines and telephone service lines will
enter the building at this corner. Installation and maintenance of these
lines would be more challenging if the building were further West.
3. The required water meter vault is to be located on the Hotel side of the
property line. The dimension of the water meter vault is 8 feet. The
distance between the meter vault and the building is 13 feet. Between the
meter vault and the building, a proposed sewer lateral and drainage pipe
are to be installed. Moving the building closer to the property line would
require rerouting of these pipes. The site does not have the required slope
to reroute the drainage pipe.
4. Should the building ever set on fire and collapse, at the proposed setback
from Wheaton Drive, emergency personnel would have a safe distance to
work between the crash zone and oncoming street traffic.
5. A four-story building looming over the sidewalk might not maintain the
exceptionally aesthetic neighborhood the City of Fort Collins is trying to
create. From a guest's perspective, some separation from they're sleeping
room to the street might be more desirable.
6. The required space for large landscape plantings would not be available if
the building were closer to the street.
7. Some of the first floor guest -room windows would look directly at the
back of the existing wall if the building were closer to the street.
Topic: Utility Plan
49
a) The existing gas pedestal has been located on the utility plans.
b) A 9-foot utility easement has been shown on the plat along the North side
of Oakridge Drive.
c) All trees have been located at a minimum distance of 4-feet away from gas
lines.
50
a) The requested easements have been included on the Plat and site plan.
b) Request for service shall be made by the owner. The requested conduits
for service line entry into the building have been included on the electrical
plans.
Department: Engineering
Topic: Construction Drawings
10 The required approval block has been added to every sheet.
11 The grading and E&S plans have been revised for clarity. The surface area of
parking lot draining over the public walk has been minimized to 750 SF Max.
40 Street patching information has been specified on the plans as requested.
41 The details have been updated to CFC standards as requested.
42 The ramp detail has been updated to CDOT standards as requested.
43 The sidewalk along Harmony road has been revised to be detached as requested.
Topic: General
9 The existing bricks along Wheaton Drive will be removed. A new detached
sidewalk will be installed. A CDOT approved directional ramp will be aligned
with the ramp across Wheaton Drive. A ramp will not be installed on the South
side of Harmony Road.
15 The site and landscape plans have been removed from the construction drawing
set. The sheet arrangement has been revised as requested.
16 The modular paver blocks are to be installed in the parking stall area only as
shown on sheet C-2. The calculations on sheet C-9 reflect the
impervious/pervious ratio corrections for stormwater calculations in Area F.
According to the UDFCD, for areas covered with pervious pavers, the ratio of
impervious to pervious surface is 50:50.
21 The plan has been modified to comply with the 50' setback from Wheaton Drive.
24 The title block has been revised as requested.
25 The requested Emergency Access Easement has been specified on the Plat and
site plan.
26 The driveway onto Oakridge Drive shall be the same style used on Wheaton.
Radial curves are NOT to be used as per CFC code.
27 The access ramp at the Harmony / Wheaton intersection shall be directional as
requested.
Topic: Plat
22 It appears that additional right of way cannot be dedicated due to the existing
Irrigation easement. The requested easements have been included in the revisions
to the plat.
23 The property line bump out at the Wheaton and Oakridge intersection has been
dedicated as street right of way.
47 Please inform us of the resolution regarding the Spring Canyon lateral.
48 The note on the plat refers to the Spring Canyon Lateral Easement and has been
corrected accordingly.
Department: Light & Power
Topic: General
12 Please contact the owner for all required development fees.
13 A C-1 commercial form has been completed and included with this submittal.
14 The proposed transformer has been removed from the utility plans. A note has
been added that the existing IHOP transformer will be replaced and shared
between the two facilities.
Department: Natural Resources
Topic: General/Utility Plans
37 The notes regarding prairie dogs have been updated as requested.
Topic: Utility Plans
38 LOD lines have been proposed on the plan revisions.
Department: Police
Topic: General
36 All exterior doors to the hotel will have windows. Employee access and
deliveries shall be through public access locations.
Department: Stormwater Utility
Topic: Drainage
17 The required stormwater detention volume has been recalculated for full detention
of the 100-year storm at the new rainfall intensities. The maximum pending
depth of I -foot has not been exceeded.
18 The 40-hour extended extended detention criteria for water quality mitigation was
used in the Sand filter basin design and located in the Water Quality Volume
Calculation section of the Stormwater Management & Erosion and Sediment
Control Report.
19 The prorated release rate of 1.2 CFS for this site is proposed to drain into
coneyence element 34, which is a 24-inch RCP. This element directs water to the
drainage channel, conveyence element 22. According to the Overall Master
drainage plan, the current contributing flows in element 34 is 6 CFS. At the
minimum allowable slope of 0.5%, this pipe is capable of transporting up to 16
CFS. An additional 1.2 CFS should not exceed the capacity of the pipe.
Calculations have been included in the Report.
44 Benchmark 99-44 has been corrected as requested.
45 The limits of the 100 year water surface and the outfall storm sewer have
dedicated as a drainage easement on the plat and the site plan.
46 The outlet structure has been revised to the CFC standard.
Topic: Erosion /Sediment Control
20
I Please indicate the location of the current Notes so we may make the
required corrections.
2 The Erosion Control Report is included at the back of the Stormwater
Management & Erosion Control Report. Please indicate any specific
changes required to this report.
Department: Transportation Planning
Topic: Transportation
28 The easement labels have been corrected as requested.
29 The bump out of the property line has been removed and the area has been
dedicated as right of way as requested.
30 The trees have been relocated as required.
3l The evergreens adjacent to the Sidewalk along Harmony have been replaced with
less obtrusive species.
32 A not stating that "Two feet of clearance from the sidewalk to the existing hedge
shall be maintained." Has been added to the landscape plan and the demolition
plan.
33 The shade trees along Harmony have been removed. The existing shade trees
shall be preserved as extensively as possible.
Department: Water Wastewater
Topic: General
34 The internal water meter has been removed. The required meter vault has been
located on the utility plan to the specified dimensions. Details for the meter vault
have been added.
35 The utility plan has been revised to display 0.2 feet of drop through the manhole.
The note to reshape the bench has been added as well.
Topic: Utility Plans
39 A note stating "No landscape plantings shall be within 4-feet of any utility line."
Has been added to the landscape plan and the utility plan.
Department: Zoning
Topic: Zoning
A total of six inverted u type bicycle parking stalls are included on the site plan.
Three stalls are located by the North door which is adjacent to the bicycle path
along Harmony Road. The other three are located as close to the front door as
possible.
The building footprint as shown displays the outermost edge of the proposed
structure. Dimensions have been added as requested.
The exterior signage has been removed from the building elevations on Sheet A-4
and A-4.1 as requested.
The building overhang and drive under porte overlap providing protection from
weather as provided by the Holiday Inn Express Hotel and Suites prototype.
Elevations for the maintenance building and trash -recycle enclosure have been
added to the submittal. Refer to Sheet A-0.
Counts for planting groupings have been added as requested.
For your convenience, we have attached a copy of the comments from
which these responses originated. All of the redlined drawings are included with
this submittal as instructed. Please contact us with any comments or concerns.
Sincerely,
LIGHTOW/LEff R JAAOHNSON ASSOCIATES, INC.
Andrew Werder
OTHERITEMS
a. Owner shall be responsible for required fee.
b. No response required.
C. No response required.
d. A neighborhood meeting was held on May 20, 2003. No
opposition or negative concerns were voiced at that time.
For your convenience, we have attached a copy of the comments from
which these responses originated. Feel free to contact us if you have any
comments or concerns.
Sincerely,
LIGHTOWLER JOHNSON ASSOCIATES, INC.
�4," U'J�"
Andrew Werder
REM '93DEC S 9
REVISION
COMMENT SHEET
DATE: November 28, 2003 TO: Technical Services
PROJECT: #13-82CR OAKRIDGE BUSINESS PARK, 36TH
FILING, HOLIDAY INN EXPRESS — TYPE II
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
December 17, 2003
No Comment
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
1 7,,_r
Z. IF 1-i,4IS pt_A-r I S ( Ar � 6eJ 61 et o /c.4r/�/h Rum I T
7-14jy Q u7�_-2 r3 ntnj i'husr `f a Agounv -rHu- Dr -Di r-4"r" {
3. bEiDrCAT16/v Sr.47amevT aF Tfftr A.47-
/1, 112EAS of LvT g tv47-
!.V/u GFfAw� WILCO/C.¢7/d/� II -
Name (please print) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other Citv of Fort Collins
Utility _Redline Utility _Landscape
00
/A4t9ftProject Comments Sheet
MM61�M Selected Departments
City of Fort Collins
Department: Transportation Planning
Date: December 16, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 30 Created: 11 /4/2003
[12/16/031 The trees along Wheaton are still shown behind the sidewalk. According
to the City's street standards the trees need to be planted between the
sidewalk and the street. Is there a reason to locate the trees behind the
sidewalk?
[11/4/031 Trees proposed along Wheaton need to be planted within the 8' parkway.
The submitted landscape plan depicts the tree trunks in the sidewalk.
Number: 31 Created: 11 /4/2003
[12/16/031 There are still a few evergreen trees shown growing over the proposed
sidewalks/trail on the landscape plans. Please consider relocating these to an area
that doesn't impact the sidewalk & trail or change the tree species.
[11/4/031 The landscape plans shows the proposed evergreens along Harmony
growing into the sidewalk / trail. Please be aware that there is a required 8'
clearance from the walk to the first branch. A better option would be to relocate the
proposed trees to a location that does not grow into the walk now or into the future.
Signature Date
CHECK HIT IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility 7"" Landscape
Page 1
Project Comments Sheet
Selected Departments
Citv of Fort Collins
Department: Water Wastewater
Date: December 17, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 77 Created: 12/17/2003
[12/17/031 Minimum slope for a 6-inch sanitary sewer is 1 %. Please reflect this on all
appropriate sheets of the utility plans.
Number: 78 Created: 12/17/2003
[12/17/031 Fire line may not pass thru proposed water meter vault. Provide a lfoot
minimum separation between meter vault and fire line.
Number: 79 Created: 12/17/2003
[12/17/03] Show and label 4"x3" reducer in water service profile. Will a dielectric coupling
be required between the ductile iron pipe and the copper? If so show and label the location
on the profile view.
See site, landscape and utility plans for other comments.
/7,-i7,y'2
Jignature i Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility ti. Redline Utility iLandscape
Page I
Project Comments Sheet
Selected Departments
City of Port Collins
Department: Stormwater Utility
Date: December 19, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 89
Created: 12/19/2003
The detention calculation can be reduced with using .64 as the C-factor in the spread
sheet, which automatically adds the multiplier of 1.25.
Number: 90 Created: 12/19/2003
Please revise spillway elevation in the report to 4978.75 instead of 4978, which is
required due to the high water surface elevation being at 4978.75. The grading plan
shows the HWL to be at 4978.75 already.
Number: 91 Created: 12/19/2003
Please add a detention pond summary table to the drainage and erosion control plan
including volume required, volume provided, 100-year HWL, and water quality volume
required and provided.
Number: 92 Created: 12/19/2003
Please provide a detail for the new inlet , ST-7, in the detention pond. This does not
have to be our standard water quality outlet structure detail, due to a different water
quality mitigation being used for this project.
couct)
Signature
�2—l4�O3
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat Site �� ✓ Drainage Report Other_
Utility _�/ Redline Wflity ✓ Landscape
Page 1
CG
jH,,,rc. lib
Topic: Erosion/Sediment Control
Number: 20 Created: 11/4/2003
[12/16/031
1. Please remove the "Soil Erosion and Sediment Control Notes" on plan sheets C-9 and C-
10 and replace with City of Fort Collins standard erosion control notes (new version,
September, 2003). Please add to these any specific notes you have pertaining to the
sediment/erosion control plan for this site (e.g. revegetation).
2. Please prepare and submit an erosion control report with calculations per City of Fort
Collins specifications.
Issue Contact: Basil Harridan
Topic: Plat
Number: 74 Created: 12/16/2003
[12/16/031 Please provide a signature block on the plat for the Spring Canyon Lateral
owners.
Page 2
STAFF PROJECT REVIEW
Citvof Fort Collin,
Lightowler Johnson Associates, Inc. Date: 12/19/2003
c/o Andrew Werder
700 Main Avenue
Fargo, ND. 58108-2464
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK, 36TH FILING,
HOLIDAY INN EXPRESS PDP - TYPE II, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Plans
Number: 63 Created: 11/18/2003
[12/22/03] There should be building bays of no more than 30' in width. Also, the 50%
rule for features such as windows, entrances, arcades, arbors, awnings, treillage with
vines details is not being represented.
[11/18/03] The east and west elevations of the building appear to need more detailing
to meet Section 3.5.3(D)(3) of the LUC.
Number:95 Created: 12/22/2003
[12122103] This building appears to be 52' to 57' in height. Section 3.5.1(G) of the
LUC sets forth the requirement that all buildings or structures in excess of 40' in
height shall be subject to special review. The review criteria is set forth in Sections
3.5.1(G)(1)(a) Review Standards and (b) Submittal Requirements.
Number: 96 Created: 12/22/2003
[12/22/03] Please review Sections 3.5.3(D)(2), (3) & (4) of the LUC regarding building
Character and Image, specifically Fagade Treatment (all sides), Facades, and
Entrances. The building does not appear to satisfy, as a minimum, the building bay
requirements and the street facing building articulation requirements.
Number: 97 Created: 12/22/2003
[12/22/03] There is still signage shown on the West Building Elevation that must be
removed from the Building Elevations plan.
Page 1
r
Topic, Landscaping
Number: 52 Created: 11/13/2003
[12/19/03] Repeat Comment.
[11/13/03] Laurie D' Audney of the City's Water Conservation Department is
forwarding copies of the Water Conservation Standards for Landscapes COMMENT
SHEET and Water Conservation Standards for LANDSCAPING and IRRIGATION
SYSTEMS General Information.
Number: 86 Created: 12/19/2003
[12/19/03] Remove the UTILITY PLAN APPROVAL block from the Landscape Plan. No
signature blocks are needed on this plan.
Number: 87 Created: 12/19/2003
[12/19/03] The street trees along Wheaton Drive must be in the parkway strip
between back of curb and the sidewalk, per Section 3.2.1(D)(2)(a) of the Land Use
Code.
Number: 88 Created: 12/19/2003
[12/19/03] There are a number of existing trees at the northwest corner of this site
that have not been and are not shown on the Landscape Plan.
* 3 Cottonwood - south of existing wall
* 4 Austrian Pine - south of existing wall
* 2 Chokecherry - north of existing wall
A utility plan sheet shows these trees to be removed. After a site visit, City staff
(City Forester and Planning) is of the opinion that several of these trees can be
retained and protected. The western -most Austrian Pine should not be in jeopardy with
the construction of the hotel building. One, and maybe two, of the Cottonwood may Ze
able to be retained. Please see the colored drawing attached to this comment letter.
The trees that may be removed will have to be mitigated for, in the form of the
following:
* Cottonwood trees ...... 4 trees per each tree to be removed.
* Austrian Pines ........... 3 trees per each tree to be removed.
* Chokecherry trees ..... 2 trees per each tree to be removed.
There are probably enough new trees on the Landscape Plan to provide mitigation;
however, enough of them must be upsized to provide the required mitigation.
Depending on how many trees are to be removed the number of mitigation trees ranges
from 17 to 28. The mitigation standards are set forth in Section 3.2.1(F)(1) of the LUC
and are as follows:
* Canopy shade trees ..... minimum 3" caliper, balled and burlap
* Ornamental trees ......... minimum 2.5" caliper, balled and burlap
* Evergreen trees ........... minimum 8' height, balled and burlap
Page 2
Number: 94 Created: 12/22/2003
[12/22/03] There were 4 Bur Oak trees shown along East Harmony Road, in the 80'
setback area, on the previous Landscape Plan. They are in the Harmony Corridor
Standards & Guidelines Oak Palette and it is unclear as to why they have been removed
from the Landscape Plan.
Number: 98 Created: 12/22/2003
[12/22/03] There are a number of shrubs on the Plant List that do not appear in
either of the plant palettes in the Harmony Corridor Standards & Guidelines. See the
red -lined Landscape Plan reviewed by Current Planning. Please understand that the
plant materials to be used in the "setback zone" along Harmony Road and in the
"setback areas" along local and collector streets are guidelines, not standards. These
palettes are; however, strongly recommended.
Topic: Signage
Number: 57 Created: 11/17/2003
[12/22/03] There is still signage being shown on the West Building Elevation on Sheet
A-4 of the Building Elevations. This signage must be removed from the plan.
[11/17/03] Remove all signage from the Building Elevations. This development is
subject to the City of Fort Collins Sign Code that is administered by the Zoning
Department. The allowable signage will be determined outside of this Project
Development Plan review.
Topic: Site Plan
Number: 83 Created: 12/19/2003
[12/19/03] The Expansion Joints (EJ) should not be shown on the Site Plan. This is a
Site Plan, not a utility plan. The symbol just clutters the drawing.
Number: 84 Created: 12/19/2003
[12/19/03] Please see the attached example of the approval and signature blocks that
are required on a Site Plan. The UTILITY PLAN APPROVAL block should not be on the
Site Plan. This is a Site Plan, not a utility plan.
Number: 85 Created: 12/19/2003
[12/19/03] The Drainage Easement Boundary that was added to the Site Plan with this
second round of review should be removed. This is a Site Plan, not a drainage plan.
Page 3
Topic: Utility Plans
Number: 81 Created: 12/19/2003
[12/19/03] Len Hilderbrand of Xcel Energy offered the following comments:
a. They have a 3" gas main located in the easements on the west and south edges
of the site.
b. Please contact Connie Woodward for installation of gas service. 5he can be
contacted at(970)225-7843.
Number: 82 Created: 12/19/2003
[12/19/03] Dennis Greenwalt of Comcast Cable (TV) indicated that they would like to
see the 80' Access and Landscape Easement along East Harmony Road changed to
Access, Utility and Landscape Easement.
Department: Engineering Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11/4/2003
[12/8/03] When noting previously that the approval block should be on all sheets, it
wasn't intended to be on the site and landscape plans, as these are not typically
part of a construction drawing set. Please have the approval block removed
from the site and landscape plans.
[11/4/03] Please revise the approval block on the construction set as shown on the
redlines. The approval block should be on all sheets.
Number: 41 Created: 11/7/2003
[12/16/03] This item wasn't addressed, however it is not required to be addressed
until the submittal after a public hearing. At that time, please ensure that LCUA55
details 706 and 1602 are added (and replace previous details reflecting driveway
approach and sidewalk installation). (In conjunction with a previous comment, ensure
the CDOT detail for access ramps is also included).
[11/7/03] Please replace details on the details sheet with City standard details as
redlined (such as access ramps, driveways, etc.)
Topic: General
Number: 15 Created: 11/4/2003
[12/8/03] The construction drawing set does not have the plat reference sheets in it.
This is fine for purposes of review, however the reference plat must be included in this
construction set at the time of signature of the plans.
[11/4/03] Please separate the site and landscape plans from the construction drawing
set (and not name them C-2 and C-6 respectively). These are items that will be filed
separate from the construction drawing set. The construction drawing set should have
Page 4
all remaining sheets assembled together within the plan set (ensure that the grading
plan sheet included within the drainage report is also included in the construction
drawing set). The plat, while also filed separately, should also be included in the
construction drawing set as a sheet for reference, placed immediately after the cover
sheet. The cover sheet index should note that the second sheet in the plan set is a
plat for reference.
Number: 24 Created: 11/4/2003
[12/8/03] While this appears correctly on the title block of the construction plan set
and the site plan, the title blocks on the top part of the sheets should also be revised
to reflect this.
[11/4/03] Please revise the title on all the documents to read "Oakridge Business Park
36th Filing, Holiday Inn Express".
Number: 25 Created: 11/4/2003
[12/8/03] My apologies, the comment was not clear and misinterpreted. PFA requires
the emergency access easement to connect the two driveways internal to the property
(from Oakridge Drive north and then west out to Wheaton Drive). At the same time,
the area now shown on the plat as dedicated as an emergency access easement should
be changed to a public access easement to ensure a public access easement is
maintained throughout the connection of the two driveways onto Oakridge Drive.
[11/4/03] It appears that PFA needs the drive aisle connecting the two driveways to
be dedicated as an emergency access easement. Please indicate such dedication on the
plat.
Number: 27 Created: 11/4/2003
[12/8/03] Please ensure that the CDOT construction detail for this ramp is provided.
An image of this was emailed on 11/21, and can be resent if not received.
[11/4/03] The new access ramp at the southeast corner of Harmony Road and
Wheaton Drive should be constructed as a directional ramp, not a corner ramp.
Number: 71 Created: 12/11/2003
[12/11/03] There is conflicting information between the site plan and utility plans.
The site plan calls out curb openings in the middle parking island median which are not
called out in the utility plan. Also, the survey overlay sheet on the utility plan sheet
shows the existing brick along Wheaton Drive is to be removed, but on the site plan it
states it is to remain (the brick needs to be removed).
Page 5
�: AI,/
Community Planning and Environmental S_. vices
Current 1'lIII Ili 11
''t�i •. �era�.'9 1
City of Fort Collins
April 18, 2003
Lightowler Johnson Associates
c/o Stevan Dewald, P.E.
700 Main Avenue
P.O. Box 2464
Fargo, ND 58108
Dear Stevan,
For your information, attached is a copy of the Staff's comments concerning the request
for a Holiday Inn Express @ Oakridge Business Park which was presented before the
Conceptual Review Team on April 7, 2003.
This is a request for a new Holiday Inn Express Hotel in the Oakridge Business Park. The
hotel would be a 4-story building containing 87 units (guest rooms). The property is 2.17
acres in size and is located at the northeast corner of Oakridge Drive and Wheaton Drive.
The existing IHOP Restaurant is directly to the east and East Harmony Road is along the
north side. The property is in the HC - Harmony Corridor Zoning District.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be
made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6341.
Sincerely,
Steve Olt, Project Planner
cc: Stormwater Utility
Streets
Steve Pfister
File
281 Noith(Akr,, \%, nur• I'OI(,It(ullim, C(1805"-fl?N.(1 (1)-0), ail I.Ah i9-;liJl6-'(',O
Number: 72 Created: 12/12/2003
[12/12/03] The landscaping plan does not illustrate that trees are being removed
which is only shown on the survey overlay sheet (C-3) of the utility plan set. The
landscaping plan needs to illustrate vegetation to be removed, which may be of concern
to Planning and/or Forestry.
Number: 73
Created: 12/16/2003
(12/16/03] Please realign the sidewalk along Harmony Road to ensure that the
sidewalk is separated two feet from the existing landscape wall structure.
Number: 75 Created: 12/16/2003
[12/16/03] Prior to a hearing, a letter of intent from the property owner of the outlot
at Harmony and Wheaton as well as the ditch company are required to verify that they
do not object to the work within their property.
Number: 76 Created: 12/16/2003
[12/16/03] At time of final compliance approval, the ditch company will need to be a
signatory to the plat and off -site access easements are required from the outlot for
the construction of the sidewalk.
Topic: Landscaping
Number: 80 Created: 12/17/2003
[12/17/03] Please situate the street trees along Wheaton Drive between the curb and
sidewalk (parkway strip), not behind the sidewalk.
Topic: Plat
Number: 22 Created: 11/4/2003
[12/8/03] After internal discussion it was concluded that, the developer is required to
obtain the additional right-of-way along Harmony Road (as was done on the project
east) which would presumably overlap a portion of the ditch. The 9' of utility
easement along Oakridge Drive does not appear properly approaching Wheaton Drive,
9' of offset should follow around the property line curve up to the point where it
intersects the existing 15' easement along Wheaton Drive.
[11/4/03] The plat needs to dedicate additional right-of-way for Harmony Road and
additional access and landscape easement behind the right-of-way as reflected on the
33rd filing. 9' of utility easement behind the right-of-way on Oakridge Drive is also
required to be dedicated. The site plan appears to dimension these items (but not call
this out) correctly but it is not reflected on the plat.
Page 6
Number: 48 Created: 11/7/2003
[12/16/03] The response letter indicates that this notes refers to the Spring Canyon
Lateral and that it has been revised; I'm still not seeing an Item #7 labeled on the
plat, just referenced in the notes.
[11/7/03] On the plat, Item #7 mentions a right-of-way ditch but does not indicate on
the plat where this might be. Is this note pertinent to the plat?
Number: 93 Created: 12/22/2003
[12/22/03] Technical Services offered the following comments:
1. Legal closes. Plat boundary is missing several bearings/distances.
2. The outer boundary of the plat must go around the area to be dedicated on the
southwest corner of the site.
3. Dedication statement is missing the "name" of the plat.
4. Areas of lot and plat will change with dedication of tract.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General/Utility Plans
Number: 37 Created: 11/6/2003
[12/18/03] Please add a note explaining this to your general notes on the utility
plan set. The federal government has made changes to their policy related to Prairie
Dog relocation. Contact the Colorado Division of Wildlife for more information.
[11/6/03] If Prairie Dogs are currently located on the site they will need to be
removed prior to any construction activity occurring including overlot grading.
Currently the federal government is not allowing Prairie Dogs to be relocated due to
the threat of the Monkey Pox Virus. Due this current ban on relocation if Prairie Dog
ore located or relocate to the property during construction (including overlot grading)
they will need be humanly eradicated in accordance to Chapter 4 of the City Code. At
any time if live Prairie Dogs are found on site during grading or other construction
activities the construction site will be closed until the Prairie Dogs have been removed.
Please add a note explaining this to your general notes on the utility plan set. Natural
Resources will also add a provision to the development agreement for this project
explaining this.
Prairie Dog Removal. Before the commencement of grading or other
construction on the development site, any prairie dogs inhabiting portions of the
site within the Limits of Development (LOD) shall be relocated or eradicated by
the developer using city -approved methods as set forth in Chapter 4 of the City
Code and, when applicable, using methods reviewed and approved by the
Colorado Division of Wildlife. LUC3.4.1(N)(5)
Page 7
Sec. 4-119. Use of poison restricted.
No person shall poison any animal or distribute poison in any manner with the intent to
poison any animal, except that mice, rats or any rodents other than hamsters, guinea
pigs and squirrels may be poisoned by the use of a poisonous substance approved for
such use by the United States Environmental Protection Agency. This prohibition shall
not apply to persons regularly engaged in the business of fumigation or pest
extermination and licensed by the state of Colorado; provided, however, that such
persons may use only fumigants to destroy prairie dogs or other burrowing rodents.
(Ord. No. 160, 1986, 5 1(35-26), 11-4-86; Ord. No. 60, 1995, 5 9, 5-16-95) Fort Collins
City Code
Department: PFA Issue Contact: Michael Chavez
Topic: Genera/
Number:65 Created:l2/9/2003
REQUIRED ACCESS
A fire lane is required. The fire lane shall be visible by painting and signage, and
maintained unobstructed.
The criteria for a required fire lane contain several conditions that must be met.
1. The minimum width shall be 20 feet.
2. Inside turning radius shall be 25 feet and outside turning radius shall be 50
feet.
3. Compacted road base shall be used during the construction phase only. The
permanent fire lane shall consist of asphalt or concrete and shall be required to
support 40 tons
4. The fire lane shall be platted as an "Emergency Access Easement" on the final
plat.
Buildings three stories or more in height must have access to a 30 foot
unobstructed access roadway on at least (1) one side for aerial operations. PFA
Policy 85-5 (8)1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
Number: 66 Created: 12/9/2003
[12/9/03] ADDRESS NUMERALS:
Address numerals shall be visible from the street fronting the property, and posted
with a minimum of 6 inch numerals on a contrasting background. (Bronze numerals on
brown brick are not acceptable).
1997 UFC 901.4.4
An addressing scheme shall be submitted to the fire department for approval prior to
being posted on the building.
Page 8
Number: 67 Created: 12/9/2003
[12/9/03] WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved
roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute
at a residual pressure of 20 psi. 1997 UFC 901.2.2.2
Number: 68 Created: 12/9/2003
[12/9/03] SPRINKLER REQUIREMENTS:
These proposed buildings shall be fire sprinklered.
1997 UFC 1003.2.9
Number: 69 Created: 12/9/2003
[12/9/03] FIRE ALARM REQUIREMENTS:
A fire alarm system is required for this proposed project.
Number: 70 Created: 12/9/2003
[12/9/03] KNOX BOX:
Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new
building equipped with a required fire sprinkler system or fire alarm system.
1997 UFC 902.4; PFA POLICY 88-20
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 89 Created: 12/19/2003
The detention calculation can be reduced with using .64 as the C-f actor in the spread
sheet, which automatically adds the multiplier of 1.25.
Number: 90 Created: 12/19/2003
Please revise spillway elevation in the report to 4978.75 instead of 4978, which is
required due to the high water surface elevation being at 4978.75. The grading plan
shows the HWL to be at 4978.75 already.
Number: 91 Created: 12/19/2003
Please add a detention pond summary table to the drainage and erosion control plan
including volume required, volume provided, 100-year HWL, and water quality volume
required and provided.
Number: 92 Created: 12/19/2003
Please provide a detail for the new inlet ,ST-7, in the detention pond. This does not
have to be our standard water quality outlet structure detail, due to a different water
quality mitigation being used for this project.
Page 9
Topic: Erosion/Sediment Control
Number: 20 Created: 11/4/2003
[12/16/03]
1. Please remove the "Soil Erosion and Sediment Control Notes" on plan sheets C-9
and C-10 and replace with City of Fort Collins standard erosion control notes
(new version, September, 2003). Please add to these any specific notes you
have pertaining to the sediment/erosion control plan for this site (e.g.
revegetation).
2. Please prepare and submit an erosion control report with calculations per City of
Fort Collins specifications.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Plat
Number: 74 Created: 12/16/2003
[12/16/03] Please provide a signature block on the plat for the Spring Canyon Lateral
owners.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 30 Created: 11/4/2003
[12/16/03] The trees along Wheaton are still shown behind the sidewalk. According to
the City's street standards the trees need to be planted between the sidewalk and the
street. Is there a reason to locate the trees behind the sidewalk?
[11/4/03] Trees proposed along Wheaton need to be planted within the 8' parkway.
The submitted landscape plan depicts the tree trunks in the sidewalk.
Number: 31 Created: 11/4/2003
[12/16/03] There are still a few evergreen trees shown growing over the proposed
sidewalks/trail on the landscape plans. Please consider relocating these to an area that
doesn't impact the sidewalk & trail or change the tree species.
[11/4/03] The landscape plans shows the proposed evergreens along Harmony growing
into the sidewalk / trail. Please be aware that there is a required 8' clearance from the
walk to the first branch. A better option would be to relocate the proposed trees to a
location that does not grow into the walk now or into the future.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 77 Created: 12/17/2003
[12/17/03] Minimum slope for a 6-inch sanitary sewer is 1%. Please reflect this on all
appropriate sheets of the utility plans.
Page 10
Number: 78 Created: 12/17/2003
[12/17/03] Fire line may not pass-thru proposed water meter vault. Provide a If cot
minimum separation between meter vault and fire line.
Number: 79 Created: 12/17/2003
[12/17/03] Show and label 4"A" reducer in water service profile. Will a dielectric
coupling be required between the ductile iron pipe and the copper? If so show and label
the location on the profile view.
See site, landscape and utility plans for other comments.
This completes staff (and outside reviewing agencies) review and comments at this
time. It is possible that this item could be placed on the February 19, 2004 Planning
and Zoning Board public hearing agenda if these comments and concerns are addressed
in a timely fashion. City staff will be setting the February agenda on January 21'. This
proposal is subject to the 90-day revision re -submittal requirement (from the
date of this comment letter, being December 19, 2003) as set forth in Section
2.2.11(A) of the Land Use Code. Be sure and return all of Your red -lined plans when
you re -submit. The number of copies of each document to re -submit is shown on the
attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970)221-6341.
Yours Truly,
Steve Olt,
City Planner
cc: Marc Virata, Engineering
Wes Lamarque, 5tormwater
Current Planning File #13-82CR
Page 11
Project Comments Sheet
61a Selected Departments
City of Fort Collins
Department: Engineering
Date: December 22, 2003
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Construction Drawings
Number: 10 Created: 11/4/2003
[12/8/031 When noting previously that the approval block should be on all sheets, it wasn't intended to be on the
site and landscape plans, as these are not typically part of a construction drawing set. Please have the
approval block removed from the site and landscape plans.
11114/03] Please revise the approval block on the construction set as shown on the redlines. The approval block
should be on all sheets.
Number: 41 Created: 11 /7/2003
(12116/03] This item wasn't addressed, however it is not required to be addressed until the submittal after a public hearing. At
that time, please ensure that LCUASS details 706 and 1602 are added (and replace previous details reflecting driveway
approach and sidewalk installation). (In conjunction with a previous comment, ensure the CDOT detail for access ramps is
also included).
[ 11 /7/031 Please replace details on the details sheet with City standard details as redlined (such as access ramps,
driveways, etc.)
Topic: General
Number: 15 Created: 11/4/2003
(1218/03] The construction drawing set does not have the plat reference sheets in it. This is fine for purposes of review,
however the reference plat must be included in this construction set at the time of signature of the plans.
[11/4/03] Please separate the site and landscape plans from the construction drawing set (and not name them
C-2 and C-6 respectively). These are items that will be filed separate from the construction drawing set. The
construction drawing set should have all remaining sheets assembled together within the plan set (ensure that
the grading plan sheet included within the drainage report is also included in the construction drawing set). The
Signature ` Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility , Landscape
Page 1
plat, while also filed separately, should also be included in the construction drawing set as a sheet for reference,
placed immediately after the cover sheet. The cover sheet index should note that the second sheet in the plan
set is a plat for reference.
Number: 24 Created: 11/4/2003
[12/8/03] While this appears correctly on the title block of the construction plan set and the site plan, the title blocks on the top
part of the sheets should also be revised to reflect this.
[ 1 1 /4/031 Please revise the title on all the documents to read "Oakridge Business Park 36th Filing, Holiday Inn Express".
Number: 25 Created: 11/4/2003
[12/81031 My apologies, the comment was not clear and misinterpreted. PFA requires the emergency access easement to
connect the two driveways internal to the property (from Oakridge Drive north and then west out to Wheaton Drive). At the
same time, the area now shown on the plat as dedicated as an emergency access easement should be changed to a public
access easement to ensure a public access easement is maintained throughout the connection of the two driveways onto
Oakridge Drive.
[ 1 1 /4/03] It appears that PFA needs the drive aisle connecting the two driveways to be dedicated as an emergency access
easement. Please indicate such dedication on the plat.
Number: 27 Created: 11/4/2003
[12/8/031 Please ensure that the CDOT construction detail for this ramp is provided. An image of this was emailed on 11121,
and can be resent if not received.
[ 1 1 /4/031 The new access ramp at the southeast corner of Harmony Road and Wheaton Drive should be constructed as a
directional ramp, not a corner ramp.
Number: 71 Created: 12/11/2003
It 2/ 1 1 /03] There is conflicting information between the site plan and utility plans. The site plan calls out curb openings
in the middle parking island median which are not called out in the utility plan. Also, the survey overlay sheet on the utility
plan sheet shows the existing brick along Wheaton Drive is to be removed, but on the site plan it states it is to remain (the
brick needs to be removed).
Number: 72 Created: 12/12/2003
[12/12/03] The landscaping plan does not illustrate that trees are being removed which is only shown on the
survey overlay sheet (C-3) of the utility plan set. The landscaping plan needs to illustrate vegetation to be
removed, which may be of concern to Planning and/or Forestry.
Number: 73 Created: 12/16/2003
[ 12/ 16/031 Please realign the sidewalk along Harmony Road to ensure that the sidewalk is separated two feet from the
existing landscape wall structure.
Number: 75 Created: 12/16/2003
[ 12/16/031 Prior to a hearing, a letter of intent from the property owner of the outlot at Harmony and Wheaton as well
as the ditch company are required to verify that they do not object to the work within their property.
Number: 76 Created: 12/16/2003
[12/16/031 At time of final compliance approval, the ditch company will need to be a signatory to the plat and offsite
access easements are required from the outlot for the construction of the sidewalk.
Topic: Landscaping
Number: 60 Created: 12/17/2003
[ 12/ 17/031 Please situate the street trees along Wheaton Drive between the curb and sidewalk (parkway strip), not
behind the sidewalk.
Page 2
Topic: Plat
Number: 22 Created: 11/4/2003
[1218/031 After internal discussion it was concluded that, the developer is required to obtain the additional right-of-way along
Harmony Road (as was done on the project east) which would presumably overlap a portion of the ditch. The 9' of utility
easement along Oakridge Drive does not appear properly approaching Wheaton Drive, 9' of offset should follow around the
property line curve up to the point where it intersects the existing 15' easement along Wheaton Drive.
[ 1 1 /4/031 The plat needs to dedicate additional right-of-way for Harmony Road and additional access and landscape
easement behind the right-of-way as reflected on the 33rd filing. 9' of utility easement behind the right-of-way on
Oakridge Drive is also required to be dedicated. The site plan appears to dimension these items (but not call this out)
correctly but it is not reflected on the plat.
Number: 48 Created: 11/7/2003
[ 12/ 16/031 The response letter indicates that this notes refers to the Spring Canyon Lateral and that It has been revised;
I'm still not seeing an Item #7 labeled on the plat, just referenced in the notes.
[ 1 1 /7/031 On the plat, Item H7 mentions a right-of-way ditch but does not indicate on the plat where this might be. Is
this note pertinent to the plat?
Page 3
LIGHTOWLER JOHNSON ASSOCIATES
iNCoecC=a-Eo
ARCHITECTS ENGINEERS
February 6, 2004
Steve Olt, Project Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, Co 80522-0580
Re: Oakridgc Business Park 36"s Filling
I loliday Inn Express and Suites
Fort Collins. Colorado
IJA Project: No. 03030
Dear Mr. Olt,
Regarding the staff review comments for the proposed Holiday Inn Express, dated
12/17/01, we offer the following responses.
ISSUCS:
Department: Current Planning
Topic: Building Plan
63 We will be requesting a Modification of Standards concerning this issue. Also,
the East and West Elevations have been revised with more detail as shown on
Sheets A-4 and A-4.1.
95 We will comply with the review criteria as stated in the LUC.
96 We will be requesting a Modification of Standards concerning this issue.
97 The signagc has been removed, as requested, from the West Building Elevation
on Sheet A-4.
Topic: Landscape Plan
52 Note 16 was added to the landscape plan as requested.
86 The approval block has been removed from the landscape plan.
87 The street trees have been relocated between the sidewalk and the street curb.
88 The existing trees have been identified on the landscape plan and the survey
overlay. Previous submittals displayed the water service lines in the wrong
location. The mechanical room is on the north side of the hotel and the water
lines were moved accordingly. The Austrian pines identified as savable by the
city forestry department and the City planner will need to be removed for
installation of water services. Only one Cottonwood will need to be removed. A
700 MAIN AVENUE (701) 293-1350 (ND) FAX (701) 293-1353
POST OFFICE BOX 2461 (218) 233-3512 (MN) EMAIL: Ija r Ilghtowlerjohnson.com
FARGO, NORTH DAKOTA 58108-2464 WEBSITE: www. lightowlerjohnson.com
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: April 7, 2003
ITEM: Holiday Inn Express @ Oakridge Business Park
APPLICANT: Lightowler Johnson Associates
c/o Stevan Dewald, P.E.
700 Main Avenue
P.O. Box 2464
Fargo, ND 58108
LAND USE DATA:
Request for a new Holiday Inn Express Hotel in the Oakridge Business Park. The
hotel would be a 4-story building containing 87 units (guest rooms). The property is
2.17 acres in size and is located at the northeast corner of Oakridge Drive and
Wheaton Drive. The existing IHOP Restaurant is directly to the east and East
Harmony Road is along the north side. The property is in the HC - Harmony
Corridor Zoning District.
COMMENTS:
1. Gary Lopez of the Zoning Department offered the following comments:
a. This property is in the HC - Harmony Corridor Zoning District. The
HC District in the Land Use Code (LUC) permits lodging
establishments, subject to a Planning and Zoning Board (Type II)
review and public hearing.
b. Lodging establishments are considered to be Secondary Uses in the
Harmony Corridor District, as set forth in Section 421(0)(2) of the
LUC, and they can occupy no more that 25% of the total gross area
of the development plan. In this case, the overall Oakridge Business
Park is the development plan and the most current overall
development plan of record for the Oakridge Business Park shows
COMMUNITY PLANNING AND EN1RONMF.NTAL SERVICES 281 N. College Ave, PO.Box 580 Fort Collins, CO fl0922-OW (970)221-670
CURRENT PLANNING PI PAR "I MI -NI
tree mitigation schedule was added to the landscape plan and the required size of
mitigated trees adjusted as required.
94 The 4 Bur Oak trees were inadvertently left off the previous submittal. They have
been returned to the landscape plan.
98 The shrubs within the "setback zone" have been revised with the species chosen
from the recommended palette.
Topic: Signage
57 The signage has been removed, as requested, from the West Building Elevation
on Sheet A-4.
Topic: Site Plan
83 The expansion joint locations have been removed from the site plan and added to
the utility plan.
84 The site plan signature block has been revised as requested.
85 The drainage easement has been removed from the site plan and added to the
utility plan and the drainage plan.
Topic: Utility Plan
81
a. The existing gas lines along the South and West property lines have been
added as requested.
b. We have been in contact with Connie Woodward of Xcel energy. The
owner will contact her for service.
82 The wording of the 80' Easement has been revised as requested.
Department: Engineering
Topic: Construction Drawings
10 Approval blocks have been revised as redlined by the review staff.
41 LCUASS details 706 and 1602 have been added to the plans. CDOT access ramp
detail has been added as well.
Topic: General
15 Revised plat reference sheets have been included with this submittal.
24 The project titles at the top of the sheets have been revised to match the project
name in the title block.
25 A 30' wide emergency access easement has been added to the plat and the site
plan as requested. The area previously labeled as Emergency access easement has
been relabeled as a public access easement.
27 The CDOT access ramp detail has been added as requested.
71 Curb opening labels have been removed from the site plan and added to both the
utility and the grading plan. Reference to existing brick has been removed from
the site plan, it is now labeled as new concrete sidewalk.
72 The landscape plan has been revised to show existing trees to remain or be
removed.
73 The sidewalk along Harmony Road has been realigned as to maintain a minimum
distance of two feet from the existing landscape wall.
75 Letters of intent from the Everitt companies and the ditch company will be
provided prior to the public hearing.
76 The signature block on the site plan has been revised and includes a location for
the ditch company to sign. The revised plat provides the same.
Topic: Landscape Plan
80 Street trees have been relocated between the sidewalk and the street curb.
Topic: Plat
22 Additional right of way will be dedicated as requested. The 9' Utility easement
boundary along Oakridge Drive has been extended to the property line
48 Item # 7 has been located on the plat.
Department: Natural Resources
Topic: General/Utility Plans
37 A note has been added to sheets C-1 and C-4 as requested.
Department: PTA
Topic: General
65 No parking -Fire lane signs are located on the site plan. Signs shall be per
LCASS detail 1418.
a. A 30' wide fire lane is provided from Oakridge Drive to Wheaton
drive.
b. Internal turning radius of 25' and external radius of 55'are
provided.
C. Proposed fire lane is specified as reinforced concrete on the site
plan. A pavement detail is located on sheet C-6. The section to be
used accounts for heavy truck traffic and turning operations. The
pavement design is based on the Geo-technical engineering study
and pavement thickness design report provided by Kumar &
Associates dated May 21, 2003.
d. The fire lane is labeled as emergency access easement on the plat.
Topic: Address labels
66 A comment has been added to Sheet A-4 requiring "address numerals to be
visible from the street fronting the property, and posted with a minimum of 6 inch
numerals on a contrasting background' and "an addressing scheme shall be
submitted to the fire department for approval prior to being posted on the
building" as required.
Topic: Water Supply: Commercial
67 Existing public fire hydrants exist at the following locations:
1. Between the existing IHOP driveway and the proposed Holiday
Inn Express driveway, approximately 200 feet from the Southeast
building comer.
2. Across Wheaton Drive, approximately 135 feet from the
Northwest building comer.
3. Across Oakridge Drive, approximately 275 feet from the
Southwest building corner.
At no point does the proposed building exceed a distance of 300 feet from a
public fire hydrant.
Topic: Water Supply: Commercial
68 The proposed structure shall be sprinkled.
Topic: Fire Alarm system
69 A fire alarm system shall be installed and designed by a fire system contractor.
Topic: Knox Box
70 The Knox Box location has been specified on the Site plan, Sheet A-2, and Sheet
A-4.
Department: Stormwater Utility
Topic: Drainage
89 The detention requirement calculations have been revised as recommended. A
weighted coefficient of .68 was calculated and used in the drainage calculations.
90 The spillway elevation has been revised to an elevation of 4978.55 The drainage
report was adjusted as required and requested
91 A Detention pond summary table has been added to the drainage and erosion
control plan.
92 A detail for the inlet ST-7 has been added to the plan.
Topic: Erosion /Sediment Control
20
The Erosion Control notes has been revised as requested.
The Stormwater Management report and Erosion Control report has been
revised for clarity and as requested by staff review. We are submitting the
Erosion Control report separate from the Stormwater Management Report
for Review Purposes. We have also submitted the Reports under one
cover as in the previous submittals.
Department: Stormwater Utility
Topic: Plat
74 According to Kathy Parynik of Everitt Companies, all water and ditch rights were
purchased by Oakridge Business Park Association and the ditch no longer
delivers water. We have received a letter of intent from Everitt Companies and
have included a copy with this submittal.
Department: Transportation Planning
Topic: Transportation
30 The street trees have been relocated between the sidewalk and the street curb.
31 Several evergreen trees have been removed from the plan as to maintain 8 feet of
clearance from the walk and the first branch of the tree based on the expected size
of the trees. We have replaced some of the evergreen trees with alternate species.
Department: Water Wastewater
Topic: General
77 The slope of the 6" sanitary sewer has been revised to I %.
78 The fire line has been revised as requested.
79 A 4" x 3" reducer has been added to the water service profile. A dielectric
connection will be installed and also added to the profile.
We have also revised the plans per redlined drawings. The utility plan
sheet previously labeled as Erosion and Sediment control details has been
renamed Miscellaneous Details. The Stormwater Management and Erosion and
Sediment Control report has been revised for clarity. In addition to submitting the
SWM and E&S Report, a separate Erosion Control report has been submitted.
For your convenience, we have attached a copy of the comments from
which these responses originated. All of the redlined drawings are included with
this submittal as instructed. Please contact us with any comments or concerns.
Sincerely,
LIGHTOWLER JOHNSON ASSOCIATES, INC.
Andrew Werder
REVISION
RED '04FE011n 8
COMMENT SHEET
DATE: February 9, 2004 TO: Technical Services
PROJECT: 413-82CR Oakridge Business Park, 361h Filing,
Holiday Inn Express PDP — Type II (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
Te 4 2 S
ate, 2004 J
% hits t' 4 T S1-1 aw !C ENc r %zD l %GEh.. /O
,'n-- (,()TEAT/alrfral P'/V #Ij E (C..
No Comment
[D' Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
SA m Q, Thf c� T 7,l
2 C(}i�� IS
Nc %A(Z?.A Ur T(f� T I tip ?
u, Tl�c t)l��T ? - I/ DptTCa" l2UtC
F /
T %Na Ivy. LV . Gt7/L NCiI.
7(-t�r �%Tc y Sl QeW�z �lc''>> �S m 7-,
"��/
W/-1[7jz, 13o�� T7t� �O /�✓,3c« ��ctSl 5S,nT Ja 72) 147 %/fe Sr
CU,/ZIUe12, ��42i2��� JG� 7b 7He %� /�G� Cd�vt>�
Name (please print) Date
Cl IECK HERE, IF YOU WISH TO RECEIVE COPIES OF REVISIONS
6 Plat _Site _Drainage Report _Other
Utility Redline Utility _Landscape Citv of Fort Collins
60orw3h Project Comments Sheet
�� Selected Departments
Citv of Fort Collins
Department: Transportation Planning
Date: February 17, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
February 25, 2004
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: General
Number: 101 Created: 2/17/2004
[2/17/04] No further comments.
REM '84FEBI'M � 2=
:Z
Date 7
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1
6aProject Comments Sheet
Selected Departments
Citv of Fort Collins
Department: Water Wastewater
Date: February 25, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
February 25, 2004
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 105 Created: 2/25/2004
[2/25/041 See site, landscape and utility plans for comments.
2
SignatureDate
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility v' Landscape
Page l
Project Comments Sheet
(M6064t, Selected Departments
t l urt (od nor
Department: Stormwater Utility
Date: February 27, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
February 25, 2004
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 107 Created: 2/27/2004
Please see minor comments on redlined plans regarding revising elevations.
Topic: G�ni"l
Number: 106 Created: 2/27/2004
1. Please provide a report, calculations, and plan per City of Fort Collins specifications for
erosion/sediment control.
2. You include three sets of notes on plan sheets C-8 and C-9. Some are no longer in use,
many are redundant, some are contradictory to City of Fort Collins specifications. Please
make sure all notes comply with City specifications, and are not redundant or
contradictory.
3. Please make sure all the BMP's you indicate in your report are clearly indicated on the
plans.
If you have any questions regarding erosion control, please call Bob Zakely at (970) 221-
6700.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site ✓ Drainage Report Other_
f Utility/ Redline Utility Landscape
Page I
Project Comments Sheet
Selected Departments
Department: Engineering
Date: March 1, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II
Issue Contact: Marc Virata
Topic: General
Number: 100 Created: 2/16/2004
[2116/041 Why doesn't the sidewalk along Harmony Road heading west not curve south to tie directly with the access
ramp?
Number: 102 Created: 2/23/2004
[2123/04] The access ramp detail originally provided was not the latest CDOT drawing. These are now provided
with the Engineering comments.
Number: 109 Created: 3/1/2004
[3111041 Just as an FYI, CDOT will require a warranty deed for the right-of-way dedication along Harmony Road. This
is not required at this time.
Topic: Landscaping
Number: 103 Created: 2/23/2004
[2/23/041 CDOT requires that the trees along Harmony Road be set back 35' from the edge of the existing
southernmost through lane. With about 10 feet of pavement for the bike lane and runoff, the trees need to be set
back about 25' from the existing edge of pavement. All four burr oaks will need to be moved back.
Topic: Plat
Number: 104 Created: 2/23/2004
[2/23/041 Based upon information provided by Everitt Companies to the consultant, there doesn't appear to be any
ditch right-of-way on the site. The plat should be revised accordingly to reflect this information.
Number: 110 Created: 3/1/2004
[3111041 Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of the plat? (Additional right-of-way?)
3. Provide reception number on the plat for the offsite sidewalk and utility easement when recorded.
4. Where does the 30' public access easement go to, at the southeast corner? (Arrow goes to the 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where #10, #15, etc?
Signature
c/
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat -Site Drainage Report Other_
Utility _ Redline Utility -� Landscape
Page 1
('; STAFF PROJECT REVIEW
CirY of Purr (lillins
Lightowler Johnson Associates Date: 03/10/2004
c/o Andrew Werder
700 Main Avenue
Fargo, ND. 58103
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK 36TH FILING,
HOLIDAY INN EXPRESS PDP - TYPE II, and we offer the following comments:
ISSUES:
Department: Advance Planning Issue Contact: Clark Mapes
Topic: Building Plans
Number: 108 Created: 3/1 /2004
The building design would benefit from stronger horizontal detailing to mark the
stories. For example, on the brick end elements it could be done with courses; and
on the main faces of the building, with brick courses or EIFS details. In particular,
the multi -story area contained under the hoop or arch line does not express human
scale or building stories, nor any reason for the hoop. IF there is a strong desire for
such a tall element, it should be given a reason for being, with something different
happening within it -- e.g. different fenestration.
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 100 Created: 2/16/2004
[2/16/04] Why doesn't the sidewalk along Harmony Road heading west not curve
south to tie directly with the access ramp?
Number: 102 Created: 2/23/2004
[2/23/041 The access ramp detail originally provided was not the latest CDOT
drawing. These are now provided with the Engineering comments.
Number: 109 Created: 3/1 /2004
[3/1/041 Just as an FYI, CDOT will require a warranty deed for the right-of-way
dedication along Harmony Road. This is not required at this time.
Topic: Landscaping
Number: 103 Created: 2/23/2004
[2/23/04] CDOT requires that the trees along Harmony Road be set back 35' from
the edge of the existing southernmost through lane. With about 10 feet of pavement
for the bikelane and runoff, the trees need to be set back about 25' from the existing
edge of pavement. All four Bur Oaks will need to be moved back.
Page 1
this property to be in an area of the business park that is approved
for secondary uses; therefore, there is no problem with the Holiday
Inn Express Hotel being located on this site.
C. The request will have to comply with all the regulations and standards
set forth in Article 3 - General Development Standards and the
Permitted Uses, Land Use Standards and Development Standards
in Division 4.21 - Harmony Corridor District of the LUC. It is also
subject to the standards and guidelines set forth in the Harmony
Corridor Plan and Harmony Corridor Standards and Guidelines, both
adopted by City Council.
d. Lodging establishments are subject to maximum parking allowances,
as set forth in Section 3.2.2(K)(2)(a) of the LUC. The allowance is one
(1) parking space for each unit and there is no additional parking
allowance for conference focilities.
Please contact Gary, at (970)416-2338, if you have questions about these
comments.
2. Marc Virata of the Engineering Department offered the following
comments:
a. The standard utility plan submittal requirements will apply to this
development request.
b. Street oversizing fees will apply to this development request. The
fees are based on vehicle trip generation for the proposed land use in
the development plan. Please contact Matt Baker of Engineering, at
(970)224-6108, for detailed information on the fees. The fees will
be collected at the time of issuance of building permits.
C. The Lorimer County Road Impact Fees will apply to development on
this property.
d. A Transportation Impact Study (TI5), addressing all modes of
transportation, will be required with your Project Development Plan
(PDP) submittal. Please contact Eric Brocke of the Traffic
Operations Department, at (970)224-6062 and Tom Reiff of the
Transportation Planning Department, at (970)416-2040 to determine
what information may be needed in the TIS pertaining to Level of
Topic: Plat
Number: 104 Created: 2/23/2004
[2/23/04] Based upon information provided by Everitt Companies to the consultant,
there doesn't appear to be any ditch right-of-way on the site. The plat should be
revised accordingly to reflect this information.
Number: 110 Created: 3/1 /2004
[3/1/04] Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of the plat? (Additional right-
of-way?)
3. Provide reception number on the plat for the offsite sidewalk and utility easement
when recorded.
4. Where does the 30' public access easement go to, at the southeast corner?
(Arrow goes to the 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where #10, #15, etc?
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 107 Created: 2/27/2004
Please see minor comments on redlined plans regarding revising elevations.
Topic: Erosion/Sediment Control
Number: 106 Created: 2/27/2004
1. Please provide a report, calculations, and plan per City of Fort Collins
specifications for erosion/sediment control.
2. You include three sets of notes on plan sheets C-8 and C-9. Some are no
longer in use, many are redundant, some are contradictory to City of Fort
Collins specifications. Please make sure all notes comply with City
specifications, and are not redundant or contradictory.
3. Please make sure all the BMP's you indicate in your report are clearly
indicated on the plans.
If you have any questions regarding erosion control, please call Bob Zakely at
970-221-6700.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 101 Created: 2/17/2004
[2/17/04] No further comments.
Page 2
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 77 Created: 12/17/2003
[2/25/04]
[12/17/03] Minimum slope for a 6-inch sanitary sewer is 1 %. Please reflect this on
all appropriate sheets of the utility plans.
Number: 78
[2/25/04]
Created: 12/17/2003
[12/17/03] Fire line may not pass through the proposed water meter vault. Provide
a one (1) foot minimum separation between meter vault and fire line.
Number: 79
[2/25/04]
Created: 12/17/2003
[12/17/031 Show and label 4"xY reducer in water service profile. Will a dielectric
coupling be required between the ductile iron pipe and the copper? If so show and
label the location on the profile view.
See site, landscape and utility plans for other comments.
Number: 105 Created: 2/25/2004
[2/25/04] See site, landscape and utility plans for comments.
Additional comments:
A. A copy of comments received from QWEST (telephone) is attached to this
letter.
B. Len Hilderbrand of Xcel Energy (gas) indicated that the developer must contact
Connie Woodard to schedule installation of gas service to this site. Connie can
be reached at 970-225-7843.
C. A copy of the comments received from the City's Technical Services
Department (mapping / surveying) is attached to this letter.
D. Marc Virata of the Engineering Department indicated that some of the Bur
Oaks in the East Harmony Road setback area are too close to the street. They
must be at least 35' from the closest drive lane.
Page 3
E. Marc Virata of the Engineering Department indicated that the sidewalk
connection at East Harmony Road and Wheaton Drive must be somewhat
realigned to provide straight, continuous pedestrian movement. The sidewalk
must be aligned with the handicapped ramp.
This development proposal is in a condition that is sufficient to be scheduled for a
Planning and Zoning Board public hearing. The Holiday Inn Express item is being
placed on the April 15, 2004, P & Z Board public hearing agenda. The issues
and concerns expressed in this letter and on the enclosed red -lined plans will need
to be addressed with your Final Compliance review, which is the next step (after the
public hearing for the Project Development Plan) in the City's development review
process. Before submitting Final Compliance documentation please contact me for
the submittal requirements (fee, plans, reports, etc.)
Please be sure and return all of the red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 970-221-6341.
Yours Truly,
!`kd.d
Steve Olt,
City Planner
Page 4
00 00 00
LIGHTOWLER JOHNSON ASSOCIATES
INCORPORATED
ARCHITECTS ENGINEERS
June 8, 2004
Steve Olt, Project Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins. Co 80522-0580
Re: Oakridge Business Park 36th Filling
Holiday Inn Express and Suites
Fort Collins, Colorado
LJA Project No. 03030
Dear Mr. Olt,
Regarding the staff review comments for the proposed Holiday Inn Express, dated
1/10/2004, we offer the following responses.
Issues:
Department: Advance Planning
Topic: Building Plans
108 NR
Department: Engineering
Topic: General
100 The sidewalk along Harmony road has been realigned with the access ramp.
102 The current CDOT ramp detail has been added to the plans.
109 NA
Topic: Landscaping
103 All four bur oaks have been relocated 25' from existing edge of pavement.
Topic: Plat
110 Items 10 and 15 are not applicable and have been removed.
Department: Stormwater Utility
Topic: Drainage
107 Redlincd grade changes have been made as requested.
Topic: Erosion /Sediment Control
700 MAIN AVENUE (701) 293-13501ND) FAX (701) 293-1353
POST OFFICE BOX 2404 1218) 233-3512 WIN) EMAIL: Ija@lightoWerjohnson.com
FARGO, NORTH DAKOTA 58108-2464 WEBSITE: www.lightowlerjohnson.com
106 1. B%4P efficiency, performance and surety calculations have been added to
the erosion and sediment control plan.
2. Redundant and non -compliant notes have been removed.
3. BVIP's indicated in the report are located on plans.
Department: Transportation Planning
Topic: General
101 NA
Department: Water Wastewater
Topic: General
77 All sanitary sewer lines are labeled to have 1% slope. PVC downspout leaders
arc specified to have 0.5% slope. Both plan and profile for sanitary sewer have
pipe slopes labeled at 1%.
78 A note was added to sheet C-4 stating contractor shall provide 3-foot separation
between fire and domestic lines and contractor shall provide 1-foot separation
between fire line and meter box.
79 A 4" x 3" reducer is shown on both plan and profile views. A dielectric
connection for copper domestic line is specified on both plan and profile views.
105 Plan redlines have been corrected or clarified as requested.
The pervious paver stones specified on previous site plan submittals have
been removed. Additional detention was required and obtained by raising the
high water level by 0.15 foot. The high water level does not exceed 12 inches in
any parking location. The required water quality mitigation volume and required
sand filter basin surface area also increased. The required area and volume for
water quality were previously provided.
The Qwest telephone Pedestals along Wheaton Drive will not be
relocated. The public sidewalk will be placed to the East of the pedestals, within
the utility and public sidewalk easement.
We have also revised the plans per redlined drawings. For your
convenience, we have attached a copy of the comments from which these
responses originated. All of the redlined drawings are included with this
submittal as instructed. Please contact us with any comments or concerns.
Sincerely,
LIGFITOW RJOHNSO ASS IATES,INC.
Stcv ewald, P.E.
STAFF PROJECT REVIEW - -- --
a a?
/
Lightowler Johnson Associates Date: 03/10/2004 MAR 1 2 20G4
c/o Andrew Werder
700 Main Avenue L ��
Fargo, ND. 58103
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK 36TH FILING,
HOLIDAY INN EXPRESS PDP - TYPE II, and we offer the following comments:
ISSUES:
Department: Advance Planning Issue Contact: Clark Mapes
Topic: Building Plans
Number: 108 Created: 3/1/2004
The building design would benefit from stronger horizontal detailing to mark the
stories. For example, on the brick end elements it could be done with courses; and
on the main faces of the building, with brick courses or EIFS details. In particular,
the multi -story area contained under the hoop or arch line does not express human
scale or building .stories, nor any reason for the hoop. IF there is a strong desire for
such a tall element, it should be given a reason for being, with something different
happening within it -- e.g. different fenestration.
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 100 Created: 2/16/2004
[2/16/04] Why doesn't the sidewalk along Harmony Road heading west not curve
south to tie directly with the access ramp?
Number: 102 Created: 2/23/2004
[2/23/04] The access ramp detail originally provided was not the latest CDOT
drawing. These are now provided with the Engineering comments.
Number: 109 Created: 3/1/2004
[3/1/04] Just as an FYI, CDOT will require a warranty deed for the right-of-way
dedication along harmony Road. This is not required at this time.
Topic: Landscaping
Number: 103 Created: 2/23/2004
[2/23/04] CDOT requires that the trees along Harmony Road be set back 35' from
the edge of the existing southernmost through lane. With about 10 feet of pavement
for the bikelane and runoff, the trees need to be set back about 25' from the existing
edge of pavement. All four Bur Oaks will need to be moved back.
Page 1
Topic: Plat
Number: 104 Created: 2/2?'2004
[2/23/041 Based upon information provided by Everitt Companies to the consultant,
there doesn't appear to be any ditch right-of-way on the site. The plat should be
revised accordingly to reflect this information.
Number: 110 Created: 3/1 /2004
[3/1/04] Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of the plat? (Additional right-
of-way?)
3. Provide reception number on the plat for the offsite sidewalk and utility easement
when recorded.
4. Where does the 30' public access easement go to, at the southeast corner?
(Arrow goes to the 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where #10, #15, etc?
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 107 Created: 2/27/2004
Please see minor comments on redlined plans regarding revising elevations.
Topic: Erosion/Sediment Control
Number: 106 Created: 2/27/2004
1. Please provide a report, calculations, and plan per City of Fort Collins
specifications for erosion/sediment control.
2. You include three sets of notes on plan sheets C-8 and C-9. Some are no
longer in use, many are redundant, some are contradictory to City of Fort
Collins specifications. Please make sure all notes comply with City
specifications, and are not redundant or contradictory.
3. Please make sure all the BMP's you indicate in your report are clearly
indicated on the plans.
If you have any questions regarding erosion control, please call Bob Zakely at
970-221-6700. 01,
47a - L24 6oL�
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 101 Created: 2/17/2004
[2/17/04] No further comments.
Pale 2
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General Created: 12/17/2003
Number: 77
[2/25/04]
[12/17/031 Minimum slope for a 6-inch sanitary sewer is 1 %. Please reflect this on
all appropriate sheets of the utility plans.
Number: 78
[2/25/04]
Created: 12/17/2003
112/17/03] Fire line may not pass through the proposed water meter vault. Provide
a one (1) foot minimum separation between meter vault and fire line.
Number: 79
[2/25/041
Created: 12/17/2003
[12/17/031 Show and label 41'xY reducer in water service profile. Will a dielectric
coupling be required between the ductile iron pipe and the copper? If so show and
label the location on the profile view.
See site, landscape and utility plans for other comments.
Number: 105 Created: 2/25/2004
[2/25/041 See site, landscape and utility plans for comments.
Additional comments:
A. A copy of comments received from QWEST (telephone) is attached to this
letter.
B. Len Hilderbrand of Xcel Energy (gas) indicated that the developer must contact
Connie Woodard to schedule installation of gas service to this site. Connie can
be reached at 970-225-7843.
C. A copy of the comments received from the City's Technical Services
Department (mapping / surveying) is attached to this letter.
D. Marc Virata of the Engineering Department indicated that some of the Bur
Oaks in the East Harmony Road setback area are too close to the street. They
must be at least 35' from the closest drive lane.
Paoe 3
E. Marc Virata of the Engineering Department indicated that the sidewalk
connection at East Harmony Road and Wheaton Drive must be somewhat
realigned to provide straight, continuous pedestrian movement. The sidewalk
must be aligned with the handicapped ramp.
This development proposal is in a condition that is sufficient to be scheduled for a
Planning and Zoning Board public hearing. The Holiday Inn Express item is being
placed on the April 15, 2004, P & Z Board public hearing agenda. The issues
and concerns expressed in this letter and on the enclosed red -lined plans will need
to be addressed with your Final Compliance review, which is the next step (after the
public hearing for the Project Development Plan) in the City's development review
process. Before submitting Final Compliance documentation please contact me for
the submittal requirements (fee, plans, reports, etc.)
Please be sure and return all of the red -lined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 970-221-6341.
Yours Truly,
Steve Olt,
City Planner
Paoe 4
h
FINAL PLAN
COMMENT SHEET
City of Fort Collins
REM
Current Planning
DATE: June 9, 2004 TO: Tech Services
PROJECT: #13-87CU Oakridge Business Park, 36th Filing,
Holiday Inn Express — Final Plan
All comments must be received by Steve Olt no later than the staff
review meeting:
July 7, 2004
Note - Please identify your redlines for future reference
1. $a" yy � etos�.
Z,
AGc.,SJ EJAzT />' 7—
l yrc/1�o IT
/
(UIL-(—
IUdT
Sc—AN
Uj/A� I t S
,
r
3 T11�
P:�OIA�
�?�Al2,,�r,
AT Tifs Sctl GvR/vt�
Ct
:
r� 1JS To 3c �� f� w 7 r E rJ� /7—
w��� lap or diH2iL �iv�S,
4 W r/AT f S TNT Dp Tlc 1JA� 1 /� Trl� �4t2c.�
Teo r�u 1�cla�ss TrI� (�J��zrH 5,���i ter- lL4r
Name (please print)
CI�ECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
City of Fort Collins
_Utility _Redline Utility _Landscape
Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of
transportation.
e. The proposed attached sidewalk along Wheaton Drive does not
comply with the current City Street Design Standards. There is a
variance procedure available if the applicant wants to request the
ability to construct an attached walk.
f. East Harmony Road is a 6-lane arterial street and both Wheaton
Drive and Oakridge Drive are collector streets.
g. This property may have to dedicate additional street right-of-way
(ROW) for all 3 streets bordering it. Also, the necessary easements
behind the ROW's for each street must be dedicated with the
subdivision plat.
h. This development may be responsible for reimbursements for
improvements to Wheaton Drive and Oakridge Drive.
i. The drives and directional ramps are subject to the requirements set
forth in the Lorimer County Urban Area Street Standards
(LCUASS).
j. Please familiarize yourself with Appendix E-4, the complete
construction documentation checklist, in LCUASS as this development
request will be subject to the requirement.
k. There are requirements for minimum parking space setback from
street flowlines; and, the concept plan appears not to meet the
setback requirements.
Please coordinate off-street, cross -vehicular access with the IHOP
Restaurant to the east.
Please contact Marc, at (970)221-6750 or (970)221-6605, if you have
questions about these comments.
FINAL PLAN
2 COMMENT SHEET
City of Font Collins
Current Planning
DATE: June 9, 2004 TO: Engineering — Dave S.
PROJECT: #13-87CU Oakridge Business Park, 36th Filing,
Holiday Inn Express Final Plan
All comments must be received by Steve Olt no later than the staff
review meeting:
July 7, 2004
Note - Please identify your redlines for future reference
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat
Utility
Site Drainage Report _Other
Redline Utility Landscape
' " Project Comments Sheet
11""A Selected Departments
City of Fort Collins
Department: Water Wastewater
Date: July 7, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II AND FINAL PLAN
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Roger Buffington
Topic: Utility Plans
Number: 113 Created: 7/7/2004
[7/7/041 The 3-inch water service must be ductile iron pipe from the water main in
the street to a point 5 feet downstream of the meter vault.
Issue Contact: Jeff Hill
Topic: Utility Plans
Number: 111
[7/6/041 No comments
Created: 7/6/2004
Signature-' J Ddte
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility �C_ Redline Utility Landscape
Page 1
Project Comments Sheet
�Z - I Selected Departments
City of Fort Collins
Department: Engineering
Date: July 9, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II AND FINAL PLAN
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 109 Created: 3/1/2004
[7/9/04] Carried over for reference.
[3/1/04] Just as an FYI, CDOT will require a warranty deed for the right-of-way dedication
along Harmony Road. This is not required at this time.
Number: 116 Created: 7/9/2004
[7/9/04] The obtaining of the offsite easement on the corner parcel northwest of the site is
still believe unresolved. Mylars cannot be signed off until this is obtained (and the few
remaining comments from other departments are addressed).
Number: 117 Created: 7/9/2004
[7/9/04] Attached is an "information for development agreements" sheet that should be filled
out to start the development agreement process.
Number: 118 Created: 7/9/2004
[7/9/04] Coordinate between the site and construction plan as to whether pervious paver
blocks are still intended on the easternmost row of parking, which is shown on the site plan.
Topic: Plat
Number: 110 Created: 3/1/2004
[7/9/04] In response to the previous submittal, Technical Services offers the following
comments:
1. Boundary and legal
— --
Dat
HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other.
Utility Redline Utility Landscape
Page I
2. The shaded area of the access easement at the SE corner needs to be "hatched", it will
not scan the way it is.
3. The radial bearing at the sw corner of the plat needs to be replotted, it will not scan over
the top of other lines.
4. What is the additional line in the area dedicated as right-of-way, across the north side of
the plat?
[3/1/04] Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of the plat? (Additional right-of-way?)
3. Provide reception number on the plat for the offsite sidewalk and utility easement when
recorded.
4. Where does the 30' public access easement go to, at the southeast corner? (Arrow goes
to the 15' radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where #10, #15, etc?
Page 2
Project Comments Sheet
Selected Departments
Litho( Furl C oliinr
Department: Stormwater Utility
Date: July 9, 2004
Project:
OAKRIDGE BUSINESS PARK 36TH FILING, HOLIDAY INN EXPRESS
PDP - TYPE II AND FINAL PLAN
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 115 Created: 7/9/2004
Please see minor comments on redlined plans.
Topic: Erosion/Sediment Control
Created: 7/9/2004
Number: 114
1. Please remove notes #17, 18, and 19 on plan sheet C-9.
2. On your surety cost estimate, the costs you use for temporary seed and mulch
(BMP costs) appear way too high.
3. What is to protect downstream areas from the utilities installations in Wheaton
Drive?
4. Why is the curb opening on Wheaton left unprotected?
If you have any questions regarding erosion control, please contact Bob Zakely at (970)
224-6063.
-7 c 7
Date
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report. Other
i' Utility ✓ Redline Utility ' Landsciipe��`'�T
Page I
STAFF PROJECT REVIEW
Citvof for[ Collin
Lightowler Johnson Associates Date: 07/12/2004
c/o Andrew Werder
700 Main Avenue
Fargo, ND. 58103
Staff has reviewed your submittal for OAKRIDGE BUSINESS PARK
36TH FILING (HOLIDAY INN EXPRESS), PDP - FINAL PLAN (TYPE II -
LUC), and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 119 Created: 7/9/2004
[7/9/04] Light & Power has indicated that the existing
electric transformer on the IHOP property, proposed to be
replaced and shared with the Holiday Inn Express, must be in a
utility easement. The location of the existing transformer,
assumed to be the location for the replacement, is not in a
utility easement on the IHOP subdivision plat. This issue must
be resolved prior to issuance of building permit or
certificate of occupancy, whichever Light & Power requires.
Number: 120 Created: 7/9/2004
[7/9/04] The Current Planning Department has no further
comments. We are ready for mylars of the Site Plan, Landscape
Plan, Building Elevations, and subdivision plat to be
submitted to Current Planning. Please submit 1 mylar each of
the Site, Landscape, and Building Elevations Plans; and, 3
mylars of the subdivision plat. At least 1 plat mylar must
have original signatures of the Owner, Attorney, and Surveyor.
Department: Engineering Issue Contact: Marc Virata
Topic: General
Number: 109 Created: 3/l/2004
[7/9/04] Carried over for reference.
[3/1/04] Jus as an FYI, CDOT will require a warranty deed
for the right-of-way dedication along Harmony Road. This is
not required at this time.
Page 1
e
Number: 116 Created: 7/9/2004
[7/9/04] The obtaining of the off -site easement on the corner
parcel northwest of the site is I still believe unresolved.
Mylars cannot be signed off until this is obtained (and the
few remaining comments from other departments are addressed).
Number: 117 Created: 7/9/2004
[7/9/04) Attached is an "information for development
agreements" sheet that should be filled out to start the
development agreement process.
Number: 118 Created: 7/9/2004
[7/9/04] Coordinate between the site and construction plan as
to whether pervious paver blocks are still intended on the
easternmost row of parking, which is shown on the Site Plan.
Topic: Plat
Number: 110 Created: 3/1/2004
[7/9/04] In response to the previous submittal, Technical
Services offers the following comments:
1. Boundary and legal close.
2. The shaded area of the access easement at the SE corner
needs to be "hatched", it will not scan the way it is.
3_ The radial bearing at the sw corner of the plat needs to be
replotted, it will not scan over the top of other lines.
4. What is the additional line in the area dedicated as right-
of-way, across the north side of the plat?
[3/1/041 Technical Services offers the following comments:
1. Boundary and legal close.
2. Why is the area of the lot the same as the total area of
the plat? (Additional right-of-way?)
3. Provide reception number on the plat for the offsite
sidewalk and utility easement when recorded.
4. Where does the 30' public access easement go to, at the
southeast corner? (Arrow goes to the 15, radius curve.)
5. The plat shows reference to Item #10, #15 etc. What/where
#10, #15, etc?
Department: Light & Power Issue Contact: Alan Rutz
Topic: Utility Plans
Number: 112 Created: 7/7/2004
[7/7/04] An easement will be required for the existing
transformer and electric line that is on the IHOP property.
Page 2
Department: stormwater Utility Issue Contact: Wes
Lamarque
Topic: Drainage
Number: 115 Created: 7/9/2004
Please see minor comments on redlined plans.
Topic: Erosion/Sediment Control
Number: 114 Created: 7/9/2004
1. Please remove notes #17, 18, and 19 on plan sheet C-9.
2. On your surety cost estimate, the costs you use for
temporary seed and mulch (BMP costs) appear way too high.
3. What is to protect downstream areas from the utilities
installations in Wheaton Drive?
4. Why is the curb opening on Wheaton left unprotected?
If you have any questions regarding erosion control, please
contact Bob Zakely at (970) 224-6063.
Department: Water Wastewater Issue Contact: Roger
Buffington
Topic: Utility Plans
Number: 113 Created: 7/7/2004
[7/7/04] The 3-inch water service must be ductile iron pipe
from the water main in the street to a point 5 feet downstream
of the meter vault.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility Plans
Number: Ill Created: 7/6/2004
[7/6/04] No comments.
Be sure and return all redlined plans if/when you re -submit
If you have any questions regarding these issues or any other
issues related to this project, please feel free to call me at
(970)221-6341.
Yo rs Truly,
y,
Steve Olt
City Planner
Page 3
1 01111
LIGHTOWLER JOHNSON ASSOCIATES
INCORPORATED
ARCHITECTS ENGINEERS
July 26, 2004
Steve Olt, Project Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, Co 80522-0580
Re: Oakridge Business Park 361h Filling
Holiday Inn Express and Suites
Fort Collins, Colorado
LJA Project No. 03030
Dear Mr. Olt,
Regarding the staff review comments for the proposed Holiday Inn Express, dated
7/12/04, we offer the following responses.
Issues:
Department: Current Planning
Topic: General
119: The existing transformer will not be shared. A new transformer located along
Wheaton Drive is proposed I0-feet south of the proposed water meter vault.
Coordination with light and power has been made to determine a suitable
location.
120: The requested mylars have been enclosed with this submittal.
Department: Engineering
Topic: General
109 NR
116 A deed of dedication of easement has been sent to Oakridge Business Park
Association for signing. An exhibit drawing and legal description have been
submitted to Marc Virata for review. The reception number of the off -site
easement will be added to the plat before recording.
117 The information for development agreements form has been completed and sent
to Marc Virata via email.
118 Notation for pervious paver blocks have been removed from the site plan. Paver
blocks are not intended to be used in any parking areas.
700 MAIN AVENUE (701) 293-1350 IND) FAX (701) 293-1353
POST OFFICE BOX 2464 (218) 233-3512 (MN) EMAIL: Ija@lightowlerjohnson.com
FARGO, NORTH DAKOTA 58108-2464 WEBSITE: www.lightowlerjohnson.com
Topic: Plat
110 1. NR
2. The access easement at the Southeast has been hatched as requested.
3. A reception Number for the offsite easement has been provided.
4. The additional line does not apply to this plat and has been removed.
Department: Light & Power
Topic: Utility Plans
The existing transformer will not be shared. A new transformer located along
Wheaton Drive is proposed 10-feet south of the proposed water meter vault.
Department: Stormwater Utility
Topic: Drainage
115 Minor redlines have corrected as requested. The elevation of the control structure
rim was revised as requested. Rip -rap shall be 6" to 12" in diameter and placed in
6' wide by 5' long pads.
To ic: Erosion/Sediment Control
114 1. Notes have been removed as requested.
2. Surety cost estimate has been revised.
3. A note has been added advising contractors to complete utility installation
in streets within a timely fashion and to provide downstream inlet
protection within 300 feet of project site.
4. The curb opening along Wheaton Drive has been closed with silt fence.
Department: Water Wastewater
Topic: General
i 13 The 3-inch copper has been replaced with ductile iron.
"reel free to contact us with any questions or concerns.
Sincerely,
LIGJf EPdP-F.
ON ASSOCIATES, INC.
Stevan G. De
Enclosures
3. Jeff Hill of the Water/Wastewater Department offered the following
comments:
a. There is an existing 8" water main in Wheaton Drive and an existing
12" water main in Oakridge Drive.
b. There is an existing 8" sanitary sewer main in Wheaton Drive.
C. If there are any existing services stubbed into this site they must
be used or vacated at the main.
d. Domestic water service and the fire flow line cannot be in the some
water line.
e. Plant investment fees and water rights will apply to this development
request. They will be collected at the time of issuance of building
permits.
f. The City's water conservation standards for landscaping and
irrigation systems may apply to this development request.
Please contact Jeff, at (970)221-6674, if you have questions about these
comments.
4. Glen Schlueter of the Stormwater Utility offered the following comments:
a. The site is located in the McClellands/Mail Creek Drainage Basin,
where the new development fee is $3,717 per acre, which is subject
to the runoff coefficient reduction.
b. The site is on Stormwater Inventory Map #10Q. A ccpy of the map
can be obtained from the Utility Service Center at 700 Wood Street.
C. The standard drainage and erosion control report and construction
plans are required and they must be prepared by a professional
engineer registered in the State of Colorado.
d. The applicant asked about the outfalls into the streets. East
Harmony road is a State highway and drainage is not allowed into it.
Unless there is an existing Swale that has historic flows into it along
Harmony Road, the runoff outfoll in that direction would not be
00 00 00
LIGHTOWLER JOHNSON ASSOCIATES
NCORPORATED
ARCHITECTS ENGINEERS
September 24, 2003
Steve Ott, Project Manager
City of Fort Collins
281 North College Avenue
P.O. Box 580
Fort Collins, Co 80522-0580
Re: Iloliday Inn Express and Suites
Fort Collins, Colorado
LIA. Project No. 03030
Dear Mr. Olt,
Regarding; the conceptual review staff comm eats fee the proposed Holiday Inn
Express, dated April 18, 2002', we offer the follot %;ng resp wises.
ZONING
a. No response required.
b. No response required.
C. The Harmony Corridor Standards and (3uide.inc_-- were- us,-d in th:e
revised site design.
d. The total unit count is 89 rooms. A total of 8'") r'larkirl; stales is
provided.
ENGINEERING
a. The utility plan and requirements for utihh: plaits cbeekl=_st are
enclosed with this submittal.
b. Street oversizing fees wilt be paid by the ov:ner.
C. Larimer County R_nad Impact Feeskill be paid by the o,t,ner.
d. A Transportation Impact Study has been enclosed with this
submittal.
e. The sidewalk along Wheaton Drive has been placed within a 15'
access and utility easement. The proposed detached sidewalk is
now located 8' from the face of existing curb.
f. No response required.
g. A 9' utility easement along Oak Ridge Drive and a 15' access and
utility easement along Wheaton Drive are pro-: ided. An 80' access
and utility easement are provided along Ilormony Road. Ail
Easements are labeled on the site plan and tic pira.
700 MAIN AVENUE (701) 293-1350 (ND) FAX (701) 293-1353
POST OFFICE BOX 2464 (218) 233-3512 (MN) EMAIL: Ijae,lightowlegohnson com
FARGO, NORTH DAKOtA 58108-2464 WEBSITE. www.hghtowlerjohnson.com
h. Owner will be responsible for any street improvements required by
the City of Fort Collins.
i. LCUASS were used in the site design for drives and ramps.
j. Appendix E-4 has been completed and submitted for review.
k. According to the Harmony Corridor plan, the recommended
parking setback is 30' along collector streets. A setback of 20' is
required to obtain the area necessary for the water quality pond.
1. The existing public access easement on the IHOP property has
been incorporated into the Holiday Inn Express site plan. A
driveway is to connect the two properties providing an off street
vehicular connection.
WATERIWASTEWATER
a. New water service connections will be made at the 8" water main
in Wheaton Drive.
b. No response required.
C. No existing services are stubbed onto the property.
d. Separate domestic and fire flow lines will be installed.
e. Owncr shall be responsible for all fees associated with this
development.
f. A private irrigation designer is to be contracted by the owner.
STOP.P,4'WATER
a. The owner shall be responsible for all development fees. Extended
detention is provided for runoff reduction.
b. No response required.
C. A Storm Water Management & Erosion and Sediment Control
Report is included with this submittal. This report has been
prepared by Stevan G. Dewald, Colorado license 433672.
d. The existing storm inlet located on Wheaton will be used as the
discharge location. A release rate of 1.2 CFS through a control
orifice will be maintained.
e. A sand filter basin will provide extended water quality detention.
f. The UDFCD drainage criteria manual (volume 3) was used during
design. Detention capacity has been designed per the overall
Oakridge drainage report.
LIGHT AND POWER
a. Transformer location will be coordinated with the Light and Power
Department.
b. Owner shall be responsible for electric development charges.
C. A C-1 Commercial form has will be submitted.
NATURAL RESOURCES DEPARTMENT
a. Native plant materials and grasses were integrated in the landscape
plans. Bluegrass is not to be used.
b. A note has been included on the site plans stating "If prairie dogs
exist on the site, they shall be relocated or humanely eradicated
prior to commencement of any construction activities."
C. A 12'x24' trash enclosure is provided for recycling containers and
trash receptacles.
d. The owner shall be responsible for securing trash removal services.
Stipulations, as set forth by the City of Fort Collins, should be
directed to the Owner.
C. Provided provisions for bicycle traffic are as follows.
I . An 8' concrete sidewalk / bicycle trail within the 80' access
and landscape easement is provided. Said path shall
connect to the existing path in front of the IHOP and the
existing attached sidewalk located at the corner of
Harmony and Wheaton. A new accessible ramp and
sidewalk will be installed at this intersection to maintain
ADA regulations and accommodate the width of the path.
2. Bicycle parking is provided as per the Harmony corridor
regulations and LCUASS.
A Fugitive Dust Control permit will be obtained.
TRANSPORTATION PLANNING DEPARTMENT
U. A Transportation Impact Study has been included with this
submittal.
b. Cross access is provided between the IHOP and the Holiday Inn
Express.
C. All sidewalks with adjacent automobile overhang have been
designed at 6'in width.
CURRENT PLANNING
a. No response at this time.
b. The revised plan provides direct connection to the bicycle trail /
sidewalk along Harmony Road.
c. The plan has been revised to comply with the orientation to build -
to lines for street front buildings. The building has been placed at
a distance of six feet from the 80' landscape and access easement
line along Harmony Road.
d. No response required.
OTHER ITEMS
a. Owner shall be responsible for required fee.
b. No response required.
C. No response required.
d. A neighborhood meeting was held on May 20, 2003. No
opposition or negative concerns were voiced at that time.
For your convenience, we have attached a copy of the comments from
which these responses originated. Feel free to contact us if you have any
comments or concerns.
Sincerely,
LIGHTOWLEIR JOHNSON ASSOCIATES, INC.
�i�14t.1 W L�
Andrew Werder
COnlml]nitV Planning and Environmental S__ vices
Cunrnt Nannin-
City of Fort Collins
April 18, 2003
Lightowler Johnson Associates
c/o Stevan Dewald, P.E.
700 Main Avenue
P.O. Box 2464
Fargo, ND 58108
Dear Stevan,
For your information, attached is a copy of the Staff's comments concerning the request
for a Holiday Inn Express @ Oakridge Business ParR which was presented before the
Conceptual Review Team on April 7, 2003.
This is a request for a new Holiday Inn Express Hotel in the Oakridge Business Park. The
hotel would be a 4-story building containing 87 units (guest rooms). The property is 2.17
acres in size and is located at the northeast corner of Oakridge Drive and Wheaton Drive.
The existing IHOP Restaurant is directly to the east and East Harmony Road is along the
north side. The property is in the HC - Harmony Corridor Zoning District.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be
made at the time of formal review of this project.
If you should have! any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6341.
Sincerely,
Steve Olt, Project Planner
cc: Stormwater Utility
Streets
Steve Pfister
File
281 Vixlh (ullr"r "Acrnur • I'(7. lim "RI) • I ( ri � ullln•.. C(1 Slhoo-USSr) • "ITO) ^J-o, SII • 1-1vA (`), Ok -t lb --I, 0
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: April 7, 2003
ITEM: Holiday Inn Express @ Oakridge Business Park
APPLICANT: Lightowler Johnson Associates
c/o Stevan Dewald, P.E.
700 Main Avenue
P.O. Box 2464
Fargo, ND 58108
LAND USE DATA:
Request for a new Holiday Inn Express Hotel in the Oakridge Business Park. The
hotel would be a 4-story building containing 87 units (guest rooms). The property is
2.17 acres in size and is located at the northeast corner of Oakridge Drive and
Wheaton Drive. The existing IHOP Restaurant is directly to the east and East
Harmony Road is along the north side. The property is in the HC - Harmony
Corridor Zoning District.
COMMENTS:
Gary Lopez of the Zoning Department offered the following comments:
a. This property is in the HC - Harmony Corridor Zoning District. The
HC District in the Land Use Code (LUC) permits lodging
establishments, subject to a Planning and Zoning Board (Type II)
review and public hearing.
b. Lodging establishments are considered to be Secondary Uses in the
Harmony Corridor District, as set forth in Section 4.21(D)(2) of the
LUC, and they can occupy no more that 25% of the total gross area
of the development plan. In this case, the overall Oakridge Business
Park is the development plan and the most current overall
development plan of record for the Oakridge Business Park shows
COMMUNITY PLANN ING, AN O ENV IRONMENTAL SERVICES M l N. College Ave. PO.Box 580 Fort Collins, CO 80522-0580 (970)'21-5750
CURRENT PLANNING UEPMRI1%fl NT
this property to be in an area of the business park that is approved
for secondary uses; therefore, there is no problem with the Holiday
Inn Express Hotel being located on this site.
C. The request will have to comply with all the regulations and standards
set forth in Article 3 - General Development Standards and the
Permitted Uses, Land Use Standards and Development Standards
in Division 4.21 - Harmony Corridor District of the LUC. It is also
subject to the standards and guidelines set forth in the Harmony
Corridor Plan and Harmony Corridor Standards and Guidelines, both
adopted by City Council.
d. Lodging establishments are subject to maximum parking allowances,
as set forth in Section 3.2.2(K)(2)(c) of the LUC. The allowance is one
(1) parking space for each unit and there is no additional parking
allowance for conference facilities.
Please contact Gary, at (970)416-2338, if you have questions about these
comments.
2. Marc Virata of the Engineering Department offered the following
comments:
a. The standard utility plan submittal requirements will apply to this
development request.
b. Street oversizing fees will apply to this development request. The
fees are based on vehicle trip generation for the proposed land use in
the development plan. Please contact Matt Baker of Engineering, at
(970)224-6108, for detailed information on the fees. The fees will
be. collected at the time of issuance of building permits.
C. The Lorimer County Road Impact Fees will apply to development on
this property.
d. A Transportation Impact Study (TI5), addressing all modes of
transportation, will be required with your Project Development Plan
(PDP) submittal. Please contact Eric Bracke of the Traffic
Operations Department, at (970)224-6062 and Tom Reiff of the
Transportation Planning Department, at (970)416-2040 to determine
what information may be needed in the TIS pertaining to Level of
Service (LOS) for vehicle, pedestrian, bicycle, and transit modes of
transportation.
e. The proposed attached sidewalk along Wheaton Drive does not
comply with the current City Street Design Standards. There is a
variance procedure available if the applicant wants to request the
ability to construct an attached walk.
f. East Harmony Road is a 6-lane arterial street and both Wheaton
Drive and Oakridge Drive are collector streets.
g. This property may have to dedicate additional street right-of-way
(ROW) for all 3 streets bordering it. Also, the necessary easements
behind the ROW's for each street must be dedicated with the
subdivision plat.
h. This development may be responsible for reimbursements for
improvements to Wheaton Drive and Oakridge Drive.
The drives and directional ramps are subject to the requirements set
forth in the Lorimer County Urban Area Street Standards
(LCUASS).
j. Please familiarize yourself with Appendix E-4, the complete
construction documentation checklist, in LCUASS as this development
request will be subject to the requirement.
k. There are requirements for minimum parking space setback from
street flowlines; and, the concept plan appears not to meet the
setback requirements.
I. Please coordinate off-street, cross -vehicular access with the IHOP
Restaurant to the east.
Please contact Marc, at (970)221-6750 or (970)221-6605, if you have
questions about these comments.
3. Jeff Hill of the Water/Wastewater Department offered the following
comments:
a. There is an existing 8" water main in Wheaton Drive and an existing
12" water main in Oakridge Drive.
b. There is an existing 8" sanitary sewer main in Wheaton Drive.
C. If there are any existing services stubbed into this site they must
be used or vacated at the main.
d. Domestic water service and the fire flow line cannot be in the same
water line.
e. Plant investment fees and water rights will apply to this development
request. They will be collected at the time of issuance of building
permits.
f. The City's water conservation standards for landscaping and
irrigation systems may apply to this development request.
Please contact Jeff, at (970)221-6674, if you have questions about these
comments.
4. Glen Schlueter of the Stormwater Utility offered the following comments:
a. The site is located in the McClellands/Mail Creek Drainage Basin,
where the new development fee is $3,717 per acre, which is subject
to the runoff coefficient reduction.
b. The site is on Stormwater Inventory Map #10Q. A copy of the map
can be obtained from the Utility Service Center at 700 Wood Street.
C. The standard drainage and erosion control report and construction
plans are required and they must be prepared by a professional
engineer registered in the State of Colorado.
d. The applicant asked about the outfolls into the streets. East
Harmony road is a State highway and drainage is not allowed into it.
Unless there is an existing Swale that has historic flows into it along
Harmony Road, the runoff outfoll in that direction would not be
allowed. Wheaton Drive has a stormsewer in it so that would be the
best outf all. Oakridge Drive is an option and runoff could be
discharged into the curb and gutter since there is no stormsewer.
e. Water quality extended detention is required to treat the runoff.
f. The applicant's design engineer should refer to the overall Oakridge
drainage report for the detention requirements. In any case, there
would be some detention since rainfall requirements have increased
since the original report and there is the water quality extended
detention requirement, as mentioned above.
Please contact Glen, at (970)224-6065, if you have questions about these
comments.
5. Alan Rutz of the Light & Power Department offered the following
comments:
a. Please coordinate the transformer location with Light & Power.
b. The standard electric development charges will apply to this
development request. . .
C. A C-1 Commercial Form must be filled out to help determine the
power needs for this development.
Please contact Alan, at (970)224-6153, if you have questions about these
comments.
6. Doug Moore of the Natural Resources Department offered the following
comments:
a. Native plant materials and grasses should be incorporated in the
Landscape Plan for the development. The use of bluegrass should be
minimized.
b. If prairie dogs exist on this property they must be relocated or
humanely eradicated prior to any construction occurring on -site,
including overlot grading. This is set forth in Section 3.4.1(N)(5) of