HomeMy WebLinkAboutMULBERRY AND LEMAY CROSSINGS FILING NO. 2 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-03-02City of Fort Collins
Transportation Services
Engineering Department
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: `4-) C(' Issuance Date:
Project Name: Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot
Project A.K.A.: Home Depot
Project Location: Southwest corner of Magnolia and 12th Street
Permittee: Mike Martin R&O Construction, (801) 627-1403
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($300.00) $ paid
Construction Inspection Fee (paid prior to issuance of this permit) $ 392.00
Total $ 392.00
Development Bond or other approved security:
Amount of security deposited with the City for maintenance and repair guarantee for the
public infrastructure improvements constructed as shown on the approved plans for the
development.
$ 8,150.00
Form of security deposited with the City: 0 he c (L #'12.7 811 Fstr o+J
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Fngineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2R1 \orlhC'ollc,�,c'Venue • PO.Box580 • For Collin s,CO80522-0580 • (970)221-6605 • FAX(970)221-6378
www.xcgov.com
Transportation Services
Engineering Department
illins
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Number: Issuance Date:
Name: Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot
ProjectA.KA.: Home Depot
` Location: Southwest corner of Magnolia and L`t Street
Permittee: Mike Martin R&O Construction. (801) 627-1403
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($300.00) $ paid
Construction inspection Fee (paid prior to issuance of this permit) $ 392.00
Total $ 392.00
Development Bond or other approved security:
Amount of security deposited with the City for maintenance and repair guarantee for the
public infrastructure improvements constructed as shown on the approved plans for the
development.
S 8,150.00
Form of security deposited with the City: r-k dL. *#'117 811 ESQ'o+t )
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement. that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide -as -constructed" plans prepared by an Engineer prior to
the City s acceptance of the constructed public improvements. (All references above to the terms
"Project Ingineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
._81 V orth (b' ie;e:Ie cnue • IiG. Sox -,SO • Port (--Alins, CO S0522-0580 • (970) 221-6605 FAX i97n) 221-6378
'V%vW.rcgov.com
t-4t�o; 14o!-I Coinns
TO:
FROM
DATE:
RE:
Transportation Services
Engineering Department
MEMORANDUM
Galloway, Romero & Associates
Sheri Wamhoff, Construction Inspector / Reagan Yeomans
07/01/2004
Initiate Development Bond Account for Mulberry Lemay Crossing PUD,
Filing No. 2 Home Depot
This memo is to acknowledge the receipt of funds in the amount of $8,150.00 for the
following:
Southwest corner of Magnolia and 12th Street, Mulberry Lemay Crossing PUD,
Filing No. 2 Home Depot, Fort Collins, CO for guarantee of the completion of all
public improvements to be constructed as shown on the approved plans for the
development
When improvements to the Right -of -Way are completed, please call our
inspection recorder at 221-6609 to request an inspection (please allow 24 hours
for the inspection to take place). Once the improvements have passed inspection,
the funds in the development bond will be released to you as specified in the
Development Agreement for this development.
Development bond funds have been received from:
Galloway, Romero & Associates
Galloway, Romero & Associates
5350 DTC Parkway
Greenwood Village, CO 80111
303-770-8884
cc: Initiate Escrow file
Subdivision File
Judi Vos, Accounts Payable Clerk Initiated by: Sheri Wamhoff
^,v `J�rv•�,r)ll(u'' Ace°nuo - PO Box580 • Fort Colllns,CO80522-0580 • (970)221-6605 • FAX (970)_-21 64',S
www.fcgoc.Con
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/16/99)
For City use only: Application Number:A6aO q Application Date: (p . 2,Z , 0 q
Permit application fee: S 300.00
INSTRUCTIONS:
I. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer, , at 221-6605.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Project A.K.A. (Marketing name if different from Project Name):
Project Location: s% l"Z1 L<ri-°A% A✓,�-
Property Owner(At the time of this permit issuance):
Individual Name:
Company Name:Address: _ %v=>�_Pr„ �T_ ?14�✓c ��i:,0�� T<�K. �i<1� UN� 9�% ?<`
Phone number(s):
Office: ml _
Cellphone:
Fax number:'- 4- ','yo
Email:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name:
Company Name: .,ry,
Address: !:�F
Phone number(s):
Office:
Cellphone:
Fax number: - ?
Email: L`��:ir_ci� r v A,�P
G
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: N/A
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
arc met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the "as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
Page 2 of 5
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: No pavement impact fee will be charged provided the pavement is not
disturbed in the installation of the driveway cut. If the pavement is disturbed than street cut fees
shaI I be paid and the area repaired in accordance with street repair requirements.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that 1 am acting with the knowledge, consent, and authority of
the owners ofthe property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signatures t-aI Date: 7 Z-ho-cl
Approval for issuance:
p1 l
City Engineer Approval: C!ti e —Date, Z %
(Permit l4suarke Date)
Page 3 of 5
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot
Project A.K.A.:
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Wamhoff
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6750 0140
Construction Inspector:
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6605
Cell (970)
Current Planner: Steve Olt
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6750
Water Utilities Engineer: Elco and Boxelder
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, Co 80521
(970)224-6063
Natural Resources: Doug Moore
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6641
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970)224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Tom Reiff
210 E. Olive, Fort Collins, Co 80524
(970)224-6140
Page 4 of 5
Forestry: Tim Buchanan
281 N. College, Fort Collins, Co 80524
(970)221-6361
Light and Power: Doug Martine
700 Wood Street, Fort Collins, Co 80521
(970)221-6700
Developer's Contact Persons:
Project Manager: Blair Warehaime, Galloway, Romaro and Associates
5350 DTC Parkway, Greenwood Village, Co 80111
(303) 770-8884
Fax (303) 770-3636
Blair warehime!agraa.com
Developer/Owner: The Home Depot
370 Corporate Drive North Tukwila, Wa 98188
(206) 579-3581
Fax (206) 574-3489
Project Engineer: Gregory D. Kishiyama, Galoway Romero and Associates
5350 DTC Parkway, Greenwood Village, Co 80111
(303) 770-8884
Fax (303) 770-3636
Greg kishivama(F�raa.coin
Architect/Planner: Todd Sides, WD Partners
1201 Dublin Rd, Columbus, OH 43215
(614)221-0840
Fax (614) 225-0972
Todd. sidcs(.&wdpartners. coin
General Contractors: R & O Construction
933 Wall Avenue,Ogden, UT 84404
(801)627-1403
Fax (801)399-1480
Scot McGonegal — Superintendent
Cell (801) 781-0052
Scot MLy,, rindoco.com
Mike Martin
Cell (801)726-1689
Mike M�&randoco.com
Page 5 of 5
Q
J
7
O O
LL
F w
LU U J
a a
fA LU
w Q
Z LL
F- }
F
O W U
F-Ka W
wa>OFx-
U)wam
w
m
F-
F-
U
w w
wF-
J Q N
Q �Q F_
R N
O N Z O
F-w_U
tm
F-
LU
7
aww
U)2
W W
x Z
} Z
m w
WF
W
W
>0
00
Q K
„ a
w
J
m
Q
U
J
a�
a F_
aZ
0 W
Q W
U >O
J w
ma
E
EL
Q Q
> fn
K
Da
00000
00000000c�c�
0 0 0
c7 O
o O O O O o o O o O
0 0 0
0
0 0 0 0 0 0 0 0 0 0
1
N (O00 O (D CO M OOOOOO
r- O M M pp O O O O O O O O O O
fA EA EA kA b� O� EA fA tf3 (D (D m O M M
0 0 0 o 0 0 0 0 0 0 0 0 0 0
000y�io 0000000000
0 0 0 pp cc)
0 0 0 0 0 0 0 0 0
v> <» E» Q o
.r 0
w
o 0 0 o c 0
0 0 0 0 0 0 0 0 0 0
x
o 0 0 0 0
0 0 0 0 0 0 0 0 0 0
F-
o 0 0 0 di o
0 0 0 0 0 0 0 0 0 0
}
M to H3 fA O O
EA EA EA EA d� to 69 EA EA EA
m
to O O
O
w
O
m }
(L
S S m S S S S 2 2 2
ILL L}}UU f/JLLLL ILUUUUUUU
J U U W W J J J w w w w w w w
G
N
H
�
as
@
fl
U
�
m
a
m �
c
� O
m
U
E
p
�
N N O
Uw C L
ink
U�Q�
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
M of aO ro � O
O O O O O O O
N e�E»ea»u>o
yr
0 0 0 0 0 0 o b
0 0 0 0 0 0 o GGG
0 0 0 0 0 0 0 0
`ao�n �n �n000
u, �n orno0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
o co .-rio aiv0
EA EA d) O
N M N
2
LLii iiLLU
W
r r
w
m
O
0
W
W
Z
J
J_
N
Z
O .
F U`
W Z
n. z
mz
Z O
In
F 0
U 0
(� F-
ZV)
�O
— U
C m
� F-
HU
X
w
2N
W Q
>�
O LL
K �
aJ
i <
w 0
Q F-
> W
d F-
a,
Ft Coffins
4th Rev. HE) Develop" Schedule, 5il&04
me Depot Process
19 wks
Mon 5112103
Fri 9119M3
Preliminary
19 Wks
Mon 5/12/03
Fri 9/19/03
REEC
0 days
Mon 512103
Mon 5112/03
Due Ddigenxe
14 wks
Mon 6116/03
Fri 9/19103
Receive ALTA
4 wks
Mon 7114103
Fri 8/8/03
Receive Draft Soil & Geology Report
4.2 wks
Mon &16103
Mon 7114103
Receive Phase I Environmental
5 wks
Mon 7/14103
Fri 8/1S'03
Receive Phase II EwronrnerTtal
3 wks
Mon 8/18/03
Fri 9/5/03
Home Depot Review and Comment
2 wks
Mon 98M
Fri 9/19103
PreSubnrttal
Prepare Plans for Pre -Submittal
Preapplication (Concepbral Review)
78.7 wks Mon 721103 Thu 120/05
78.7 wks Mon 721/03 Thu 120165
25 wks Mon 7/21103 Wed 8/6103
0 Wks Mon 8/11 /03 Man 3111 /03
Design Review
65.8 wks
Mon 10tM03
Thu 120/05
Prepare Submittal (Major Amendment & POP)
5 wks
Thu 1023/03
Wed 11/26/03
Submit Application for MA & POP for Staff Review
4 Wks
Wed 11/19/03
Tue 12116/03
Receive Staff Comments at Staff Wg and Revise Submittal
0 wks
Wed 12/17/03
Wed 12/17/03
Receive Formal Wntten Staff Comments
0 wks
Fri 12/19/03
Fri 12l19/03
Resubmit to Staff for Fatal Review
2.6 wks
Mon I=G3
Wed 1f7/04
Receive Staff Finial Comments at Staff Mtg and set Agenda to P & Z Board
0 Wks
Wed If7/04
Wed 1!7/04
Neighborhood Meetings (Pending Staffs Reqrmt)
2 days
Wed 121/04
Thu 122/04
Receive Format Written Staff Comments
0 Wks
Fri 1/9l04
Fri 1/9/04
Public Notice for Planning & Zoning Board
10 days
Wed 1f28/O4
Tue 7/10/04
Planning & Zoning Board (Work Session)
0 wks
Fri 2113104
Fri 2/13104
Planning & Zoning Board
0 wks
Thu 2/19/04
Thu 2/19104
Appeal Period
11 days
Thu 2/19104
Thu 3l4/04
Bldo Construction Docs
3SA wks
Mon 10120/03
Fri 625M4
Shell Plan by W D Partners
1 wk
Mon 2/16104
Fri 220104
Shell Plan HD Store Plannina for FIodurina
3 Wks
Mon =04
Fri 3/12/04
BFD Meetna
0 days
Wed 22504
Wed
Consultant Kickoff
0 days
Thu 3/4/04
Thu
Prepare Site CD's (Part of Planning Submittal)
28 wks
Mon 1020l03
Fri ,
Prepare Building CD's
5 Wks
Mon 3/15/04
Fri ,
90% Revicw
0 days
Wed 61Y4
Wed
Building Permit
0 Wks
Fn 6/18/04
Fn E
Finial Deal
21 days
Wed 5/19/04
Wed E
End of Due Diligence
0 Wks
Fri 6/18/04
Fri E
Closing
0 Wks
Fri 62SO4
Fri E
Permit & Bid
9 wks
Mon 4119/04
Fri 6/18104
Submit for Buiktina & Site Permits
9 Wks
Mon 4119104
Fri 6/18/04
Bid & Award Contract
4 wks
Fri 521/04
Fri 6/18/04
Plants Ready to go Out to Bid
0 Wks
Fri 5/21/04
Fri 5121/04
Plans Out to Bid
3.6 wks
Mon 5/24J04
Wed 6/16R14
Prc>Bid at Site-1:00 PM
0 wks
Wed 6/2/04
Wed 6004
Bids to Horne Depot
0 wkS
Wed 6/16l04
Wed 6/16/04
Award Contract/ Notice to Proceed
0 wks
Fn 6118/04
Fri 6/18/04
Construction
30.8 Wks
Mon 621104
Thu 120105
Mobilize HD Contractor
1 wk
Mort 621/04
Fri 6Y2504
Site Work
3 wks
Mon 6/28/04
Fri 7116104
Building Contsbistion
20 wks
Mon 7/19/04
Fri 1213/04
Issue Critical Path
150 days
Fri 6/25/04
Thu 120/05
Fodurinw
4 Wks
Mon 11/B/C4
Fri 12(3/04
Turnover
0 Wks
Mon 12/5/04
Mon 12/6/04
Merchandising
6.6 wks
Mon 12/&G4
Wed 111 MS
Page 1
A,
dAGRNCHAHI&
t
3nrvaAV IV.3i arvv iaaais
9900MN'ON 3N6.L
iOd3(3 2 1
SN
RE:
Transportation Services
Engineering Department
MEMORANDUM
Galloway, Romero & Associates
Sheri Wamhoff, Construction Inspector / Reagan Yeomans
001111111180190
Initiate Development Bond Account for Mulberry Lemay Crossing PUD,
Filing No. 2 Home Depot
This memo is to acknowledge the receipt of funds in the amount of $8,150.00 for the
following:
Southwest corner of Magnolia and 12th Street, Mulberry Lemay Crossing PUD,
Filing No. 2 Home Depot, Fort Collins, CO for guarantee of the completion of all
public improvements to be constructed as shown on the approved plans for the
development
When improvements to the Right -of -Way are completed, please call our
inspection recorder at 221-6609 to request an inspection (please allow 24 hours
for the inspection to take place). Once the improvements have passed inspection,
the funds in the development bond will be released to you as specified in the
Development Agreement for this development.
Development bond funds have been received from:
Galloway, Romero & Associates
Galloway, Romero & Associates
5350 DTC Parkway
Greenwood Village, CO 80111
303-770-8884
cc: Initiate Escrow file
Subdivision File
Judi Vos, Accounts Payable Clerk Initiated by: Sheri Wamhoff
:31 .-.urtnt_.�'.le �':.:%enu- • 2< .:3nx--"1-,,n05 • ':.'��9if11��1--,3:8
-.c«,v.:cgov.com