Loading...
HomeMy WebLinkAboutMULBERRY AND LEMAY CROSSINGS FILING NO. 2 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-03-02City of Fort Collins Transportation Services Engineering Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: `4-) C(' Issuance Date: Project Name: Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot Project A.K.A.: Home Depot Project Location: Southwest corner of Magnolia and 12th Street Permittee: Mike Martin R&O Construction, (801) 627-1403 City and developer contacts: See attached Exhibit `A' for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee ($300.00) $ paid Construction Inspection Fee (paid prior to issuance of this permit) $ 392.00 Total $ 392.00 Development Bond or other approved security: Amount of security deposited with the City for maintenance and repair guarantee for the public infrastructure improvements constructed as shown on the approved plans for the development. $ 8,150.00 Form of security deposited with the City: 0 he c (L #'12.7 811 Fstr o+J PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Fngineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2R1 \orlhC'ollc,�,c'Venue • PO.Box580 • For Collin s,CO80522-0580 • (970)221-6605 • FAX(970)221-6378 www.xcgov.com Transportation Services Engineering Department illins City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Number: Issuance Date: Name: Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot ProjectA.KA.: Home Depot ` Location: Southwest corner of Magnolia and L`t Street Permittee: Mike Martin R&O Construction. (801) 627-1403 City and developer contacts: See attached Exhibit `A' for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee ($300.00) $ paid Construction inspection Fee (paid prior to issuance of this permit) $ 392.00 Total $ 392.00 Development Bond or other approved security: Amount of security deposited with the City for maintenance and repair guarantee for the public infrastructure improvements constructed as shown on the approved plans for the development. S 8,150.00 Form of security deposited with the City: r-k dL. *#'117 811 ESQ'o+t ) PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement. that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide -as -constructed" plans prepared by an Engineer prior to the City s acceptance of the constructed public improvements. (All references above to the terms "Project Ingineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) ._81 V orth (b' ie;e:Ie cnue • IiG. Sox -,SO • Port (--Alins, CO S0522-0580 • (970) 221-6605 FAX i97n) 221-6378 'V%vW.rcgov.com t-4t�o; 14o!-I Coinns TO: FROM DATE: RE: Transportation Services Engineering Department MEMORANDUM Galloway, Romero & Associates Sheri Wamhoff, Construction Inspector / Reagan Yeomans 07/01/2004 Initiate Development Bond Account for Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot This memo is to acknowledge the receipt of funds in the amount of $8,150.00 for the following: Southwest corner of Magnolia and 12th Street, Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot, Fort Collins, CO for guarantee of the completion of all public improvements to be constructed as shown on the approved plans for the development When improvements to the Right -of -Way are completed, please call our inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the improvements have passed inspection, the funds in the development bond will be released to you as specified in the Development Agreement for this development. Development bond funds have been received from: Galloway, Romero & Associates Galloway, Romero & Associates 5350 DTC Parkway Greenwood Village, CO 80111 303-770-8884 cc: Initiate Escrow file Subdivision File Judi Vos, Accounts Payable Clerk Initiated by: Sheri Wamhoff ^,v `J�rv•�,r)ll(u'' Ace°nuo - PO Box580 • Fort Colllns,CO80522-0580 • (970)221-6605 • FAX (970)_-21 64',S www.fcgoc.Con DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use only: Application Number:A6aO q Application Date: (p . 2,Z , 0 q Permit application fee: S 300.00 INSTRUCTIONS: I. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Project A.K.A. (Marketing name if different from Project Name): Project Location: s% l"Z1 L<ri-°A% A✓,�- Property Owner(At the time of this permit issuance): Individual Name: Company Name:Address: _ %v=>�_Pr„ �T_ ?14�✓c ��i:,0�� T<�K. �i<1� UN� 9�% ?<` Phone number(s): Office: ml _ Cellphone: Fax number:'- 4- ','yo Email: Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Company Name: .,ry, Address: !:�F Phone number(s): Office: Cellphone: Fax number: - ? Email: L`��:ir_ci� r v A,�P G 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, arc met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. Page 2 of 5 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: No pavement impact fee will be charged provided the pavement is not disturbed in the installation of the driveway cut. If the pavement is disturbed than street cut fees shaI I be paid and the area repaired in accordance with street repair requirements. Permittee's acknowledgment signature: By signing this permit I acknowledges that 1 am acting with the knowledge, consent, and authority of the owners ofthe property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signatures t-aI Date: 7 Z-ho-cl Approval for issuance: p1 l City Engineer Approval: C!ti e —Date, Z % (Permit l4suarke Date) Page 3 of 5 EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot Project A.K.A.: Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 0140 Construction Inspector: 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) Current Planner: Steve Olt 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 Water Utilities Engineer: Elco and Boxelder Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Transportation Planning: Tom Reiff 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Page 4 of 5 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970)221-6361 Light and Power: Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Developer's Contact Persons: Project Manager: Blair Warehaime, Galloway, Romaro and Associates 5350 DTC Parkway, Greenwood Village, Co 80111 (303) 770-8884 Fax (303) 770-3636 Blair warehime!agraa.com Developer/Owner: The Home Depot 370 Corporate Drive North Tukwila, Wa 98188 (206) 579-3581 Fax (206) 574-3489 Project Engineer: Gregory D. Kishiyama, Galoway Romero and Associates 5350 DTC Parkway, Greenwood Village, Co 80111 (303) 770-8884 Fax (303) 770-3636 Greg kishivama(F�raa.coin Architect/Planner: Todd Sides, WD Partners 1201 Dublin Rd, Columbus, OH 43215 (614)221-0840 Fax (614) 225-0972 Todd. sidcs(.&wdpartners. coin General Contractors: R & O Construction 933 Wall Avenue,Ogden, UT 84404 (801)627-1403 Fax (801)399-1480 Scot McGonegal — Superintendent Cell (801) 781-0052 Scot MLy,, rindoco.com Mike Martin Cell (801)726-1689 Mike M�&randoco.com Page 5 of 5 Q J 7 O O LL F w LU U J a a fA LU w Q Z LL F- } F O W U F-Ka W wa>OFx- U)wam w m F- F- U w w wF- J Q N Q �Q F_ R N O N Z O F-w_U tm F- LU 7 aww U)2 W W x Z } Z m w WF W W >0 00 Q K „ a w J m Q U J a� a F_ aZ 0 W Q W U >O J w ma E EL Q Q > fn K Da 00000 00000000c�c� 0 0 0 c7 O o O O O O o o O o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 N (O00 O (D CO M OOOOOO r- O M M pp O O O O O O O O O O fA EA EA kA b� O� EA fA tf3 (D (D m O M M 0 0 0 o 0 0 0 0 0 0 0 0 0 0 000y�io 0000000000 0 0 0 pp cc) 0 0 0 0 0 0 0 0 0 v> <» E» Q o .r 0 w o 0 0 o c 0 0 0 0 0 0 0 0 0 0 0 x o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F- o 0 0 0 di o 0 0 0 0 0 0 0 0 0 0 } M to H3 fA O O EA EA EA EA d� to 69 EA EA EA m to O O O w O m } (L S S m S S S S 2 2 2 ILL L}}UU f/JLLLL ILUUUUUUU J U U W W J J J w w w w w w w G N H � as @ fl U � m a m � c � O m U E p � N N O Uw C L ink U�Q� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M of aO ro � O O O O O O O O N e�E»ea»u>o yr 0 0 0 0 0 0 o b 0 0 0 0 0 0 o GGG 0 0 0 0 0 0 0 0 `ao�n �n �n000 u, �n orno0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o co .-rio aiv0 EA EA d) O N M N 2 LLii iiLLU W r r w m O 0 W W Z J J_ N Z O . F U` W Z n. z mz Z O In F 0 U 0 (� F- ZV) �O — U C m � F- HU X w 2N W Q >� O LL K � aJ i < w 0 Q F- > W d F- a, Ft Coffins 4th Rev. HE) Develop" Schedule, 5il&04 me Depot Process 19 wks Mon 5112103 Fri 9119M3 Preliminary 19 Wks Mon 5/12/03 Fri 9/19/03 REEC 0 days Mon 512103 Mon 5112/03 Due Ddigenxe 14 wks Mon 6116/03 Fri 9/19103 Receive ALTA 4 wks Mon 7114103 Fri 8/8/03 Receive Draft Soil & Geology Report 4.2 wks Mon &16103 Mon 7114103 Receive Phase I Environmental 5 wks Mon 7/14103 Fri 8/1S'03 Receive Phase II EwronrnerTtal 3 wks Mon 8/18/03 Fri 9/5/03 Home Depot Review and Comment 2 wks Mon 98M Fri 9/19103 PreSubnrttal Prepare Plans for Pre -Submittal Preapplication (Concepbral Review) 78.7 wks Mon 721103 Thu 120/05 78.7 wks Mon 721/03 Thu 120165 25 wks Mon 7/21103 Wed 8/6103 0 Wks Mon 8/11 /03 Man 3111 /03 Design Review 65.8 wks Mon 10tM03 Thu 120/05 Prepare Submittal (Major Amendment & POP) 5 wks Thu 1023/03 Wed 11/26/03 Submit Application for MA & POP for Staff Review 4 Wks Wed 11/19/03 Tue 12116/03 Receive Staff Comments at Staff Wg and Revise Submittal 0 wks Wed 12/17/03 Wed 12/17/03 Receive Formal Wntten Staff Comments 0 wks Fri 12/19/03 Fri 12l19/03 Resubmit to Staff for Fatal Review 2.6 wks Mon I=G3 Wed 1f7/04 Receive Staff Finial Comments at Staff Mtg and set Agenda to P & Z Board 0 Wks Wed If7/04 Wed 1!7/04 Neighborhood Meetings (Pending Staffs Reqrmt) 2 days Wed 121/04 Thu 122/04 Receive Format Written Staff Comments 0 Wks Fri 1/9l04 Fri 1/9/04 Public Notice for Planning & Zoning Board 10 days Wed 1f28/O4 Tue 7/10/04 Planning & Zoning Board (Work Session) 0 wks Fri 2113104 Fri 2/13104 Planning & Zoning Board 0 wks Thu 2/19/04 Thu 2/19104 Appeal Period 11 days Thu 2/19104 Thu 3l4/04 Bldo Construction Docs 3SA wks Mon 10120/03 Fri 625M4 Shell Plan by W D Partners 1 wk Mon 2/16104 Fri 220104 Shell Plan HD Store Plannina for FIodurina 3 Wks Mon =04 Fri 3/12/04 BFD Meetna 0 days Wed 22504 Wed Consultant Kickoff 0 days Thu 3/4/04 Thu Prepare Site CD's (Part of Planning Submittal) 28 wks Mon 1020l03 Fri , Prepare Building CD's 5 Wks Mon 3/15/04 Fri , 90% Revicw 0 days Wed 61Y4 Wed Building Permit 0 Wks Fn 6/18/04 Fn E Finial Deal 21 days Wed 5/19/04 Wed E End of Due Diligence 0 Wks Fri 6/18/04 Fri E Closing 0 Wks Fri 62SO4 Fri E Permit & Bid 9 wks Mon 4119/04 Fri 6/18104 Submit for Buiktina & Site Permits 9 Wks Mon 4119104 Fri 6/18/04 Bid & Award Contract 4 wks Fri 521/04 Fri 6/18/04 Plants Ready to go Out to Bid 0 Wks Fri 5/21/04 Fri 5121/04 Plans Out to Bid 3.6 wks Mon 5/24J04 Wed 6/16R14 Prc>Bid at Site-1:00 PM 0 wks Wed 6/2/04 Wed 6004 Bids to Horne Depot 0 wkS Wed 6/16l04 Wed 6/16/04 Award Contract/ Notice to Proceed 0 wks Fn 6118/04 Fri 6/18/04 Construction 30.8 Wks Mon 621104 Thu 120105 Mobilize HD Contractor 1 wk Mort 621/04 Fri 6Y2504 Site Work 3 wks Mon 6/28/04 Fri 7116104 Building Contsbistion 20 wks Mon 7/19/04 Fri 1213/04 Issue Critical Path 150 days Fri 6/25/04 Thu 120/05 Fodurinw 4 Wks Mon 11/B/C4 Fri 12(3/04 Turnover 0 Wks Mon 12/5/04 Mon 12/6/04 Merchandising 6.6 wks Mon 12/&G4 Wed 111 MS Page 1 A, dAGRNCHAHI& t 3nrvaAV IV.3i arvv iaaais 9900MN'ON 3N6.L iOd3(3 2 1 SN RE: Transportation Services Engineering Department MEMORANDUM Galloway, Romero & Associates Sheri Wamhoff, Construction Inspector / Reagan Yeomans 001111111180190 Initiate Development Bond Account for Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot This memo is to acknowledge the receipt of funds in the amount of $8,150.00 for the following: Southwest corner of Magnolia and 12th Street, Mulberry Lemay Crossing PUD, Filing No. 2 Home Depot, Fort Collins, CO for guarantee of the completion of all public improvements to be constructed as shown on the approved plans for the development When improvements to the Right -of -Way are completed, please call our inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the improvements have passed inspection, the funds in the development bond will be released to you as specified in the Development Agreement for this development. Development bond funds have been received from: Galloway, Romero & Associates Galloway, Romero & Associates 5350 DTC Parkway Greenwood Village, CO 80111 303-770-8884 cc: Initiate Escrow file Subdivision File Judi Vos, Accounts Payable Clerk Initiated by: Sheri Wamhoff :31 .-.urtnt_.�'.le �':.:%enu- • 2< .:3nx--"1-,,n05 • ':.'��9if11��1--,3:8 -.c«,v.:cgov.com