Loading...
HomeMy WebLinkAboutHECKART - Filed CS-COMMENT SHEETS - 2005-03-02ROJECT COM-7'JENT SHEET City of fort Collins ■ Current Plannine DATE: October 30, 2003 TO: Technical Services PROJECT: #k35-03 HECKART SUBDIVISION —TYPE I (LUC) REC,.p All comments must be received by Steve Olt no later than the staff review meeting: November 26, 2003 Note -PJ EASE identify your redlines for future reference 111L ;-III,- " s I p i " - Wr-A7- 14 /ja,T %H(s- ///E/eG,'2 t)iTcN '147 -`i-jC N- f= , S I n C GoL- L,, 1 Tb A CITILIT,7 C IL, Lit- 1 Tc; ::��nv,c — ` 0 T Z ? Tim l exi ���s /L1V7 �lCcT /ry SC.�} J Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS l Plat _Site _Drainage Report Other _Utility _Redline Utility _Landscape Number: 28 Created: 11/26/2003 [11/26/031 Provide a flowline profile for the design and construction of this development's frontage along LaPorte Avenue. Number: 29 Created: 11/26/2003 [11/26/031 Remove and replace the area inlet shown in LaPorte Avenue with a Type 3 inlet. Provide the appropriate details and approximate street cut. Provide the street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 30 Created: 11/26/2003 [11/26/031 Show where the existing yard hydrant is being relocated to. Number: 31 Created: 11/26/2003 [11/26/031 Correct the easement labels to read: 20' Emergency Access Easement 24' Emergency Access and Utility Easement 10' Drainage and Utility Easement Number: 32 Created: 11/26/2003 (11/26/031 what's happening with the sewer clean -out shown on Sheet 3? Does it tie into something? Is it being removed? Abandoned? Number: 34 Created: 11/26/2003 [11/26/031 Detail Sheet - Remove detail 706 and replace with 707. Change the design in accordance with 707. Number: 35 Created: 11/26/2003 [11/26/031 Place the Construction Notes on Sheet 6 behind the General Notes - in other words, Sheet 6 should be Sheet 2. Number: 37 Created: 11/26/2003 [11/26/031 Provide erosion control for Lot 2 and show on the Drainage & Erosion Control Sheets. Number: 40 Created: 11/26/2003 [11/26/031 Contact PFA as soon as possible. Lot 2 may be out of service and must be sprinklered. Lot 2 may not meet the 150' accessibility requirement. Department: Natural Resources Topic: General Number: 44 (11/28/031 No Issues. Page 4 Issue Contact: Doug Moore Created: 11/28/2003 Department: Police Topic: General Number: 6 [11/24/031 How will lot be addressed emergency vehicles. Issue Contact: Joseph Gerdom Created: 11/24/2003 concern about directing Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 41 Created: 11/26/2003 The inlet and storm sewer need to be improved with this PDP. A 5- foot Type-R inlet with a 15-inch diameter outlet pipe is required to replace the existing inlet and pipe. Please call Wes Lamarque at 416-2418 if you have nay questions. Number: 43 Created: 11/26/2003 Please revise the benchmark on the cover sheet. See redlined plan. Topic: Erosion/Sediment Control Number: 42 Created: 11/26/2003 There should be some text in the report and some proposed erosion control measures shown on the plans for this site even though the site is small. There are some imprcvements to be made on both lots. Please call Bob Zakely at 221-6700 for information regarding what is to be required. Department: Transfort Topic: General Number: 7 [11/24/03] No comments Department: Transportation Planning Topic: Transportation Number: 38 [11/26/031 No comments Issue Contact: Garold Smith Created: 11/24/2003 Issue Contact: Tom Reiff Created: 11/26/2003 Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 2 Created: 11/24/2003 [11/24/031 Meter pit and curb stop may not be located with in public right of way. Place curb stop 1 foot from rear of utility easement and meter pit no more than 2 feet beyond that. Provide utility easement for meter pit for Lot 2 on Lot 1. Label proposed 24 foot wide access easement as access and utility. Maintain 10 feet of separation on both sides of water and sewer lines to utility easement. Number: 3 Created: 11/24/2003 [11/24/031 Has 27-inch water main been pot holed? Pothole the existing water main now, to determine if this area is in a lowered section for the ditch crossing. The eater service may not be located in lowered section of water main. Paec 5 Number: 4 Created: 11/24/2003 [11/24/031 Provide existing sewer inverts in the existing manhole. Our records indicated that an existing 8-inch stub and a sewer service already, exist in the existing sanitary sewer manhole (see print out attached to utility plans). Remove the existing 8-inch stub and install new service in this existing location. Include note to grout opening closed with non -shrink grout. Number: 5 - Created: 11/24/2003 [11/24/031 See site, landscape and utility plans for other comments. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: 1 Created: 11/4/2003 [11/4/03] On Lot 2, there is no need to show the location of the proposed house on the site and landscape plans. It may change when it comes time to actually build. Its location will be reviewed when the permit is applied for to be sure that it complies with setbacks, etc. The following comments were expressed at staff review on November 26`": Engineering: 1. The design and construction for necessary improvements to LaPorte Avenue associated with this development request must be done at this time. 2. See Appendix 6 for scanability requirements. 3. Easements to Lot 2 are needed. 4. The curb returns must have a radius. 5. A building envelope, rather than a building, should be shown on the Site Plan. 6. Tie the proposed sidewalk along LaPorte Avenue into the existing walk. 7. An easement for the New Mercer Ditch, and a signature block for the Ditch Company, must be added to the subdivision plat. 8. Erosion control for Lot 2 must be provided. 9. There is a little off -site aradina needed for this development that requires an easement from than property owner. Paee 6 Water/Wastewater: 1. There is water and sanitary sewer in the LaPorte Avenue right- of-way. 2. There is an existing 8" sanitary sewer service stub into the property. 3. Where is the fire hydrant for Poudre Fire Authority service? Stormwater: 1. Type 'R' - 151, pipe must be used. Light & Power: 1. Electric service is from LaPorte Avenue. 2. Please contact Rob Irish, at 224-6167, if you have electric service -related questions. This development proposal is in a condition to be able to be scheduled for an administrative public hearing. Please contact me to schedule a date and time for the hearine, which must be held in the evening because the property for proposed development is in a residential neighborhood. We must have the required notification letter out to all Affected Property Owners at least 14 days prior to the date of the public hearing. The comments contained in this letter may be addressed with a re - submittal prior to public hearing or with a final plan check after the hearing. Please be sure and return all of your red -lined plans when you re -submit documents. If you have any questions regarding these issues or any other issues related to this; project, please feel free to call me at 221-6341. Yours �pTruly, ul� /,ur Steve Olt City Planner cc: Susan Joy, City Engineering Frank Heckart Current Planning File #35-03 Page 7 6 STAFF PROJECT REVIEW �t<,•„a�- 1 Ass_r__ates Lute: 12/3/_003 Ja,:,k 15ia'L:e 103 South Meldrum Street -rt Collins, C^. 80521 has ;'iewe ! surmittal fog- H3CKA T Sli BL?I`IISION - TYPE s a^ We c "er --e f::ilo��ng comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Landscape Number: 50 Created: 12/3/2003 [1^i3/(!'; Please see red -=fined Landsraoe Plan _'or Current P1anr,_.. mments. S&A Response: Revised per red -lined plan. Number: SI Created: 12/3/2003 11 _ proposed Autumn Purple Ash trees to be used as ret_ tr -s a'_ena-aP,--te Avenue are not on the City's Aopreved Etree� Tree L:_st. P-_ease make another selection from t�:e list. S&A Response: Revised Topic: Plat Ni::n"er: 4r Create:;: 1-/3/2C:-, i12/3/C31 Len Hilderbrand of Xcel Energy offered the following csmin er:ts a. The nropcsed 5' utility easements are not adequate. If the owner yequests natural g_s then the 5' easements would need to .S&AResponse: See "(". .-. DIo fences, trees, or bushes can obstruct the installation of - ..'_nes. .S'&A Response: Gas line to he in access drive. Is it possible to make the access drive a utility easement? S&A Response: Access drive made a utility easement forgas service also. Number: 47 Crewed: 12/3/2003 �12/3/C3] Rot Irish of City Light S Power offered the following ;purer--s : a. Power fc_ this property wi11 come from LaPorte Avenue. S&A Response: Acknou leda ed. Page I 1-1 caner w_11 -d to dinate the a'_.-ctri_ meter w i Light F Pow__. S&A Response: Acknoivlerl,ed �. .✓_; T i ti. s or rela-sting el . t-= ...-.�-r,._.__:.._ wil.i Co a- ..'::e -, owner'_ e.: r%ense. S&A Response: Acknowledged d. The property owne- will be -e sonsible for residentia- cieveloprr;ent charges. ,V&A Response: Acknowledged Number: 4p Created: 12/3/2003 ^i3/C?] There appears to be an error in the east procert_i lines of I-t 1 and the road ryar_t-�`_ .w Tee two distan(es of 319.9s' + 4- )'.' v_ ct add u_e c_.00 The wculd ecua1 36'_.98'. S&A Response: Reviser!. Topic: Site Plumber: 49 Created: 12/3/2003 [12/3/03] Please see red -lined Site Plan for Current Planning corr4nents . .V&A Response: Revised per Red -lines. Department: Engineering Issue Contact: Susan Joy Topic: General TV1lnber: _-- Crewed: 11/26/23C3 ;1!/_-:/C'3; This devel--pme.n.t _s responsible for the design and ;:'m;txu of L- 'orte a1-ng their frontage. Pleas_ revise a_1 olan =-t_s t.o _r.ci�,.de this req-._iroment. S&A Response: Per our meeting the owner can escrow for LaPorte Avenue. Language to be in the development agreement. C;.:rriber: 1? Created: 11/26/2003 See Apoendi ter, for Ica.^.abi'_i'y xeci,..irernents. Tr,.e current plan. sets do not meet t._� City's .scanning standards. S&A Response: OK Nur�oer: 14 Created: 11/26/2003 Please re^ise all plaa sets to pro -,-_de drivewa_Y access t-> J��iP-rte Avenue in accordance with detail 707. S&A Response: Please reviov this again. We are not a high use driveway. Number: 15 Created: 11/26/2003 Provide ut_-=tv ea=cements to Lot _. S&A Response: Dome Number: 16 Created: 11/26/2003 [11/26/03] Do not show the actual building but provide a building envei;:i�e instead. S&A Response: Have taken building off Sheet 3. Page 2 ^i�:ctrac i? Created: 11/26/2003 / ��_• _: c pr s-'J __S.c:va_^ Snc,,^n a—On3 LaFC- e Inca._- S&A Response: Revised as shown. Dicmber: _, .._eated: 11%26/2CC3 ;11/20/03 the L_t h C,^r:oanv's easement on all plan sets a -I pr ,_ae Nod Mercer S'gua_u_2 beck_ on the serious plan sets. S&A Response: Revised. i4cmbe-: 23 Created: 111'2F12903 C:2rdir.ata _ e =-..ents am —a -he oar�ous plan sets e_ i -he_ all E.r ide - same. infa.rm, Ic n. S& A Response: Reviser. Dlurr�er: 36 Created: 11/26/2003 [1'/2r/:73] IS the pl.a_emenc ,f t_ice Emerg-ncv Access dr5.ve ,:,:eptable tc PFA? The currer:- confrgtlraticn etas the fire truck st aqiscr anrnr a.ima-e,1 5 3 ' away f-om. the building. -hat leaves only =0:" tee oac} the tr._, _t part the building in order r- In_ b•iiId_ as event -cal r. _a�emen _ gcing mee- need to be ar+- i,te5 L i'A f S&A Response: Driveway OK as revised Actually Lill' distance ! believe is the norm Topic: Landscape Nurn'cer: 39 Crea-ed: _ /26/20u3 i 1/26%':;3; .�..ow all utilities _., the --andscane Dian. S&A Response: OK, will no. Topic: Plat Number: c .-reated: 11/26/20,G3 /'b/53; rom'''--.----_. al Ser.�,�s: D-undary and renal :-lcse. S&A Response: Good Nambe.r: 9 Created: 11/26/2003 �11/26/031 From Technical Services: What about the New Mercer Ditch at tn^ NE earner c_` Lot 1? You need to show the Ditch e-_em.ent and r -,T:de a siana`ure beck `or them to Sian S&A Response: Added easement and signature block. Number: 1G Created: 11/26/2003 From Ie _ni1 Ser -_ces: There needs to be a utili-, ec-me:_-nc. rasz I .._ 1 servi_r -ct _. S&A Response: Done Number: 11 Created: 11/26/2003 [11/26/03] From Technical Services: The text does not meet City scanning standards. Page 3 S&A Response: Reviser. r" 6/C31 radial ,_urb _ _.�_r� re^..grad atr entran:;es. S&A Response: Please review this comment main. 6i'e are Tjpe L or H. Dumber: 'S 11/26/200.. 1i 3; ePlerga: c P 5 s Bas Cme.^:t re C'ul r e s =5 _nsi Je ru—ning radii. S&A Response: Revised. NImber.-: _ r _ro-�'Jeeas�menrs .S'&A Response: Dome. Dumber: 45 Created: 12/2/2003 [12/:-:/03] Pro:ide the Notice z_` Dccurr,ents, see attached. S&A Response: Dore. Topic: Site "r]um'rer: 19 Crea'.ed: 11/26/2CC:3 :11 _6/'i3; Remc _on-.,urs ar.. uriLties. S&A Response: OKRevised. N.Amber: 20 Created: 11/26/2003 [11/"h/03] Spell out all' UE and DE labers to read "Utility F,asernant" and "Drainage Easement". S&A Response: Added note instead. Plurnl:>er: Creare:-1: _11i'J/C3 =_amp _ �Y!e "E_�rsti^g _C' Gracel Dr;veway" Labe- and _ei.iace with a 24' Em:rlency :cess >and Utility casement" label. S&A Response: Revised Topic: Utility Dumher: 27 Created: 11/26/2CC3 [11/26/C3 Shee`_ 3 - Provide a curve table and dimensions for t_ne >il-,calk a'_;ng LaPorte venue s., that they can lay this out in the -field. S&A Response: Done and added. ^Pami;er: _E, Created: I1/26/ 20n3 [11/26/03] Provide a flow -fine profile fer the design and :,_)nstruction of this develonment's fror.-age along LaPorte Avenue. S&A Response: Added to Sheet No. d. Dumber: 29 Created: 11/26/2CC3 11L/26/03; Remove and replace the area inlet shown in LaPorte Avenue with a Type 3 inlet. Provide the appropriate details and apE-:ro:;i:nate street cat. Provide the s`_reet cut rote: S&A Response: Revised to 7_ppe R. Added to details. Page 4 .r-`_s of cut �nnr- mat.. Fi na _imi:_ . ara rc be 9� --mine __ _�_, r, C E:.., .^ee-in" . -,a-r.; a �.:r:7 r—, W' Lena i _ and_. is. S&A Response: Revised Number: 30 Crewed: 11126120C3 1/ 25/'7? Stt ;w where he _c; . 3 -! 1:_;-Irant is 'being _oval= .S&A Response: (hvner will relocate where he decides. Number: 31 Created: 1'/26/2003 031 rxe,,t th- ease:ne*:` -abels nn read: -SEnroraen:,v A.�*cess Eases,en` _ : Emerger.cr,� Access and Gti11t-y Easement 10' Drainage and L'ti__ty Easement S&A Response: Reused .See notes. �i 1 imbe_ . 3_ [11/;,_b/031 What's ::^.apnenInq with D,3 it tie something? S&A Response: Revised to V1H now. Created: 1/26/2CO3 the sewer ..lean -out show.. on Snee` Is __ being removed.' Aba nd.ned: Ni.zmber: 34 Created: 11/26/2003 11/26/031 Det�.y� Sheet - Remoae detail 7C6 and replace with 70?. change the Jerrign in ,scordance with 707. S&A Response: Please review again. Dlumber: 35 Created: 1/26/20G3 li __/ G.' =1-. _ _ t:'1e C atr'1_ __r N tes _>n She,` o c'h1r.:7 Derr, --ai N _ - in -rhe. _rds, Sheet 6 shcr.yd be Sheet_ _. S&A Response: Done. Number: 37 Created: 11/26/20C3 r11/'6/03' P—vide eros`_or: control for =ot _ and show en the Er;,s_ rI ,-sntrol Sheets. .S&A Response: Revised. Number: 4n Created: 11/26/2003 ,11_/2 /031 Ccn-a. t PFA as _n as rxossible. Le-� 2 may be out �f x_c ar.l Lot may meet the - ,.1 .S&A Response: Will meet PFA required fire hydrant or etc. Department: Natural Resources Issue Contact: Doug Moore Topic: General t1,1mber: Created: 11/2P/ %003 1!33/C3] Nc lss'ces. S&A Response: Acknowledged Page 5 Department: Police Topic: General Number: /34/L'31 a wl-_ icz 'oe �meraencv ,ehi�__es. S&A Response: Numbered by the City Issue Contact: Joseph Gerdom Cleated:-1/'-4/-'/'—;3 ad,._esseci - coccern about directing Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Dumber: __ Created: 11/26/20C-, :d . a sew,_ need be ,mnroued wi-n this PDP. � -7 ' nle* w t,- a 'iiam cer .,u`lat plc �s r :ir--i t'- in.t a-- pipe. P case ca_'_ Vves Larrar_iie ac _- voa .:a_ques-.i rs. S&A Response: Revised. iJumber: 4? �_eated: 11/25/2003 -r, the c,e- sheet. See red_ined c=a^ S&A Response: Done. Thanks. Topic: Erosion/Sediment Control N(imber_: 42 Created: 11/26/2003 the a'rr.Ld be t_o= in the report and some proposed erosion Lr. = cr .:.crew `.-"a^. -n the 1- _ns �h-s site even trough t} e sma11. T/ , � m, _;rr,=,emen-s to be madam cn for ...__rTa`--.P, ,.33rdin, _E tc t_-euuired. S&A Response: Added silt fence asshown on Sheet 4 Department: Transfort Topic: General Miiinber: 7 [11/24/03] No ccminents .S&: t Response: Acknowledged Department: Transportation Planning Topic: Transportation Ne r : 3 �, 11L/26/03[ No com_*aents S&A Response: Acknowled,ed Department: Water Wastewater Topic: General Nuriber : .. Issue Contact: Garold Smith Created: 11/24/2003 Issue Contact: Tom Reiff *ed: 11/26/2003 Issue Contact: Jeff Hill Created: 11/24/2003 [11/24/03; Mates pit_ and curb stop may not be located with in public right of way. Place curb stop 1 foot from rear of utility easement cal m,�ter pit no more tnan 2 fce-_ bev=d that. Prov-de utility c,,cct,nt t meter oi- for Lot _ cn L,ot t. Label proposed 24 foot. N .,cce easement as arc�ss and utility. Maintain 10 f.et of sep,iration on both sides of water and sewer lines to utility easement. Page 6 Project Comments Sheet "I Selected Departments City of Fort Collins Department: Stormwater Utility Date: November 26, 2003 Project: HECKART SUBDIVISION - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: November 26, 2003 Note - Please identify your redlines for future reference Issue Contact: Wes Lamarque Topic: Drainage Number: 41 Created: 11 /26/2003 The inlet and storm sewer need to be improved with this PDP. A 5-foot Type-R inlet with a 15-inch diameter outlet pipe is required to replace the existing inlet and pipe. Please call Wes Lamarque at 416-2418 if you have nay questions. Number: 43 Created: 11 /26/2003 Please revise the benchmark on the cover sheet. See redlined plan. Topic: Erosion/Sediment Control Number: 42 Created: 11 /26/2003 There should be some text in the report and some proposed erosion control measures shown on the plans for this site even though the site is small. There are some improvements to be made on both lots. Please call Bob Zakely at 221-6700 for information regarding what is to be required. Signature it lb-O 3 Date CHECK ]HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ Plat _ Site / Drainage Report Other_ - y,' Utility _yam Redline Utility Landscape Page 1 Cc-. Sieve DL- S-5011 Sc �cwa�'�Qs S&A Response: Revised water line service and meter pit Locations. r,ii.Y/'i _sl Ha 1 mate_ .a-r: baen pOt nJ_ed: P. _��_e `ne -_^g •Nestor ^�.__ n_w, det._mine ifthis area is in a we-ed tt.e d. t Sing. water e�-"c� m-net or �. _=✓. wa-_.r ma S&A Response: A"o. ;tiloved tie into 27" main. ,d..a,ber: 4 C�ea..ad: ii/24/20C3 �11/'4./n3; Pr:-a'_de ._::istir.a sewer inserts in the e:+isting ma.^.nole. *_hat an -sting 6 inch stub and a sower a a r__ i .. e ring .an -tar_✓ sewor msnhr _ _— ._ nd -_a1L .'w location. ._ .�rcut nening _ sed l_n n shrirY: grout. S&A Response: Ada'ed to plans. C?•_(moer: Crea-ed: �l/24/20n3 [ll/24/03; See site, landscape ana ..tility plans fcr other comments . S&A Response: Revised per redlines. Department: Zoning Issue Contact: Jenny Nuckols Topic: Zoning Number: -reated: 11/4/2003 rlL/4/03] ,.n Lot there is nc need t" show the location cf the pr-,,nosed house :,n the site and landscape clans. T_ -ray change w e-. imes times to actuail✓ buil:i. Lts wii1 be reviewed when -h- saenlied for to be sure that itwith setba �b_s, S&A Response: revised The following comments were e:_pressed at staff review on November Engineering: 1. The design and construction for necessary improvements to La^orte Avenue associated with this development request must be dene at this time. _. See Appendia 6 for scanabiiity requirements. 3. Easements to Lot 2 are needed. 4. The curb returns must have a radius. Page 7 5. .. ruilding _oGe, _t,_..er than a buildine, should be chow^. on _11te Plan. E. Tle the :_r _osed sijewa,P.ven.ue rnt< etrsting walk. 7. n easementt � _ New Mercer D_tch, and a signature block for 't. Di .. „crrE ,T .�_ re i i. c� tine subd_v'_s_on plat. _. Erg_.:.. �tr.trc-foi Let _ must be provided. There a l__tie f ,__e *ad-^? der' fer th's deve�­pmer:_ -h,,` r (r .___-. a:: eas • e- fr.:m. tha_ property .-wner. Water/Wastewater There is water and sanitary sewer in the LaPorte Avenue right - of -'day. There is an e_cisting S." sanitary sewer service stub into the PL,Dpert„ 3. Where is tie fire hydrant for Poudre Fire Authority service? Stormwater: 1.. pipe must be 'us Light & Power: E'.-_-ctric _�__.i ce is from LaPorte Avenue. Please contact Rob Lrisr:, at 224-6167, __ you have elecr.ric. service -related questions. #i�X!+x-t<k<hkx�cxt kth.F<*xt%+#-kti-*<*X*'xx kzx%+max<**+rkxxx-2-kh ri tkzxz<—zt This development proposal is in a condition to be able to be scheduled for an administrative public hearing. Please ccntact me to schedul=_ a elate and time f:-r th:e hearing, which, must be held in the b cpus- -re property frr prcposed development is in ��,,uJentia] neijhbjrhooa. must have the required notificaticn 's t_r Want j r l I 2ror ert_i Owners a east la days prior tk_r gate _ t:�2 .io-ic n-ng. Th.- comments conta_ned in this ierter may be addressed with a re- .,uomit_tal prior tc public hearing or with a final elan check after '-h<_ hearing. Please be sure and return all of your red -lined plans when you re -submit documents. it you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-5341. Page 8 Yours Steve Flit City Planner -.7, Citp Engineer_ng crank Heck:a---- Current Planning File #35—Q3 Page 9 REVISION COMMENT SHEET DATE: March 31, 2004 TO: Technical Services PROJECT: #35-03 Heckart Subdivision PDP — Type I (LUC) All comments must be received by Steve Olt no later than the staff review meeting: April 14, 2004 No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** REC.� '84APR CGO�- Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site _Drainage Report _Other Utility _Redline Utility _Landscape Date Project Comments Sheet Selected Departments Department: Stormwater Utility Date: April 12, 2004 Project: HIECKART SUBDIVISION - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Wes Lamarque Topic: Drainage Number: 41 Created: 11 /26/2003 [4/12/041 Please revise notes on utilty and drainage plans. See redlined plan. The inlet and storm sewer need to be improved with this PDP. A 5-foot Type-R inlet with a 15-inch diameter outlet pipe is required to replace the existing inlet and pipe. Please call Wes Lamarque at 416-2418 if you have nay questions. Topic: Erosion/Sediment Control Number: 55 Created: 4/12/2004 Please add in text that the minimum $1,000 erosion control escrow will be provided. Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site /Drainage Report Other_ ✓ Utility _ / Redline Utility Landscape Page 1 Cl_ She e oL- Project Comments Sheet Selected Departments City of Fort Collins M Department: Engineering Date: April 15, 2004 Project: HE,CKART SUBDIVISION - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 13 Created: 11/26/2003 [4/12/041 Repeat comment. [11126/031 See Appendix E6 for scanability requirements. The current plan sets do not meet the City's scanning standards. Number: 14 Created: 11/26/2003 [4/12/041 In answer to your question of "Why 707 and not 706?", please see table 7-3 and 8-2 in LCUASS. All arterial streets require radial curb returns with 20' radii on all driveway entrances. Concrete to back of right of way. Please call if you have questions in the: future, it will save you a round of review. [11/261031 Please revise all plan sets to provide driveway access to Laporte in accordance with detail 707. Number: 16 Created: 11/26/2003 [4/12/041 Repeat comment. Show building envelope, all sheets, all plan sets. (11/26/031 Do not show the actual building but provide a building envelope instead. Number: 21 Created: 11/26/2003 [4/12/04) The emergency access easement is only shown for the for the western entrance and needs to be carried all the way around through the eastern entrance as well. [11/26/031 Remove the "EKisting 20' Gravel Driveway" label and replace with a "24' Emergency Access and Utility Easement" label. Number: 23 Created: 11/26/2003 [4/12/04) This comment applies to this round of review as well. [11/26/03] Coordinate the comments among the various plan sets so that they all provide the same information. ature / Datd 1 CHECK -KEG E IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ / Site Drainage Report / Other Utility _� Redline Utility --/ _ Landscape Page 1 Number: 24 Created: 11/26/2003 (4/12/04] Repeat comment. [11/261031 Radial curb returns required at drive entrances. Number: 25 Created: 11/26/2003 [4/12/041 The emergency access easement has changed since the first submittal. Please provide 25' inside and 50' outside turning radii. [11/26/031 The emergency access easement requires 25' inside turning radii. Topic: Plat Number: 8 [4/121041 Created: 11/26/2003 [11/26103] From Technical Services: Boundary and legal close. Topic: Utility Number: 18 Created: 11/26/2003 14/12/041 Repeat comment. Ditch signature block was only added to plat. [11/26/031 Show the Ditch Company's easement on all plan sets and provide a New Mercer Signature block on the various plan sets. Number: 28 Created: 11/26/2003 [4/121041 LCUASS requires a 1000' of preliminary design on either side of the project boundaries, however, you can give me just enough spot elevations along the flowline profile for me to verify the design. 25' on either side should do it. [11/26/031 Provide a flowline profile for the design and construction of this development's frontage along Laporte. Number: 30 Created: 11/26/2003 [4/121041 Repeat comment. [11/26/03] Show where the existing yard hydrant is being relocated to. Number: 31 Created: 11/26/2003 [4112/041 Repeat comment. Easements are still not shown correctly and they are not shown consistently between the various plan sets. [11/26/031 Correct the easement labels to read: 20' Emergency Access Easement 24' Emergency Access and Utility Easement 10' Drainage and Utility Easement Number: 34 [4/12/041 Repeat comment. Created: 11/26/2003 111/26/031 Detail Sheet - Remove detail 706 and replace with 707. Change the design in accordance with 707. Number: 37 [4/12/041 Repeat comment. Created: 11/26/2003 [11126/031 Provide erosion control for Lot 2 and show on the Drainage & Erosion Control Sheets. Number: 40 Created: 11/26/2003 [4/12/04] Repeat comment. Please show the building envelope on the plans and coordinate with PFA. Page 2 [11126/031 Contact PFA as soon as possible. Lot 2 may be out of service and must be sprinklered. Lot 2 may not meet the 150' accessibility requirement. Number: 56 Created: 4/12/2004 [4/12/041 Cover Sheet - Correction required to General Notes #41. Number: 57 Created: 4/12/2004 14/12/041 Sheet 4 and 5 - Is the ditch company requiring rip rap for the end of 8" drain pipe or anything else or are they ok with what's shown? I strongly suggest that you coordinate with the Ditch Co ASAP so that this doesn't become a problem for you later on. The Ditch Cc will be required to sign the mylars before I can route them for City signatures. Number: 58 Created: 4/12/2004 [4/12/041 Sheet 4 and 5 - spelling errors. Number: 59 Created: 4/12/2004 14/12/041 Dimension the utility easement shown on the west side of the east driveway entrance. Number: 60 Created: 4/15/2004 [4/15/041 Complete Appendix E4 and submit with the next rounds of review. Any applicable items from E4 not shown in the plans will become a new comment. Page 3 Project Comments Sheet L� Selected Departments itv' of Port Collins Department: Engineering Date: April 15, 2004 Project: HECKART SUBDIVISION - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 13 [4/12/041 Repeat comment. Created: 11 /26/2003 [11/26/031 See Appendix E6 for scanability requirements. The current plan sets do not meet the City's scanning standards. Number: 14 Created: 11 /26/2003 [4/12/041 In answer to your question of "Why 707 and not 706o", please see table 7-3 and 8-2 in LCUASS. All arterial streets require radial curb returns with 20' radii on all driveway entrances. Concrete to back of right of way. Please call If you have questions in the future, it will save you a round of review. [11/2(,,/03] Please revise all plan sets to provide driveway access to Laporte in accordance with detail 707 Number: 16 Created: 11 /26/2003 14/12/04] Repeat comment. Show building envelope, all sheets, all plan sets. [11/26/03] Do not show the actual building but provide a building envelope instead. Number: 21 Created: 11 /26/2003 [4/12/04] The emergency access easement is only shown for the for the western entrance and needs to be carried all the way around through the eastern entrance as well. [11/26/03] Remove the "Existing 20' Gravel Driveway" label and replace with a "24' Emergency Access and Utility Easement" label. Number: 23 Created: 11/26/2003 l4/12/04] This comment applies to this round of review as well. [11/26/031 Coordinate the comments among the various plan sets so that they all provide the same information. L A G t— Siguaiure 1 Datee�— CIIECK 11i?�E IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _� - - Drainage Report / Other Utility Redline Utility . Landscape I'agc 1 Number: 24 Created: 11/26/2003 [4/12/04] Repeat comment. [11126/03] Radial curb returns required at drive entrances. Number: 25 Created: 11/26/2003 [4/12/04] The emergency access easement has changed since the first submittal. Please provide 25' inside and 50' outside Wiring radii. 01/26/031 The emergency access easement requires 25' inside turning radii. Topic: Plat Number: 8 [4/12/04] Created: 11/26/2003 [11/26103] From Technical Services: Boundary and legal close. Topic: Utility Number: 18 Created: 11/26/2003 [4112104] Repeat comment. Ditch signature block was only added to plat. [11/26/03] Show the Ditch Company's easement on all plan sets and provide a New Mercer Signature block on the various plan sets. Number. 28 Created: 11/26/2003 (4/12/041 LCUASS requires a 1000' of preliminary design on either side of the project boundaries, however, you can give ire just enough spot elevations along the flowline profile for me to verify the design. 25' on either side should do it. [11/26/03] Provide a flowline profile for the design and construction of this development's frontage along Laporte. Number: 30 Created: 11/26/2003 [4/12/04] Repeat comment. [11/26/031 Show where the existing yard hydrant is being relocated to. Number: 31 Created: 11/26/2003 [4112104] Repeat comment. Easements are still not shown correctly and they are not shown consistently between the various plan sets. [11/26/031 Correct the easement labels to read. 20' Emergency Access Easement 24' Emergency Access and Utility Easement 10' Drainage and Utility Easement Number. 34 (4112/041 Repeat comment. Created: 11/26/2003 [11/26/031 Detail Sheet- Remove detail 706 and replace with 707. Change the design in accordance with 707. Number: 37 [41121041 Repeat comment. Created. 11/26/2003 [11/26/031 Provide erosion control for Lot 2 and show on the Drainage & Erosion Control Sheets. Number: 40 Created: 11/26/2003 [4/12/04] Repeat comment. Please show the building envelope on the plans and coordinate with PFA. Page 2 Fro j ect Comments Sheet Selected Departments w f;i Fort Collins Department: Water Wastewater Date: November 26, 2003 Project: HIECKART SUBDIVISION -TYPE I (LUC) All comments must be received Jy Steve Olt in Current Planning, no later than the staff review meeting: November 26, 2003 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: General Number: 2 Created: 11/24/2003 [11/24/03] Meter pit and curb stop may not be located with in public right of way. Place curb stop 1 foot from rear of utility easerr=mt and meter pit no more than 2 feet beyond that. Provide utility easernent for meter cit for lot 2 on lot 1. Label proposed 24 foot wide access easement as access and utility. Mz;ntain 10 feet of separation on both sides of water and sewer lines to utility easement. Number: 3 Created: 11/24/2003 [11/24/03] Has 27-inch water main been pot holed? Pothole the existing water main now, to determine if this area is in a lowered section for the ditch crossing. The water service may not be located in lowered section of water main. Number: 4 Created: 11/24/2003 [11/24/031 Provide existing sewer inverts in the existing manhole. Our records indicated that an existing 8-inch stub and a sewer service already exist in the existing sanitary sewer manhole (see print out attached to utility plans). Remove the existing 8-inch stub and install new service in this existing location. Include note to grout opening closed with non -shrink grout. Number: 5 Created: 11/24/2003 [11/24/03] See site, landscape and utility plans for other comments. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other_ Utility _ Redline Utility Landscape Page 1 [11/26/03] Contact PFA as soon as possible. Lot 2 may be out of service and must be sprinklered. Lot 2 may not meet the 150' accessibility requirement. Number: 56 Created: 4/12/2004 [4/12/041 Cover Sheet - Correction required to General Notes #41. Number: 57 Created: 4/12/2004 14/12/041 Sheet 4 and 5 - Is the ditch company requiring rip rap for the end of 8" drain pipe or anything else or are they ok with what's shown? I strongly suggest that you coordinate with the Ditch Co ASAP so that this doesn't become a problem for you later on. The Ditch Co will be required to sign the mylars before I can route them for City signatures. Number. 58 Created: 411212004 [4/12/041 Sheet 4 and 5 - spelling errors. Number: 59 Created: 4/12/2004 [4/12/041 Dimension the utility easement shown on the west side of the east driveway entrance. Number. 60 Created: 4/15/2004 [4/15/041 Complete Appendix E4 and submit with the next rounds of review. Any applicable items from E4 not shown in the plans will become a new comment. Page 3 iaProject Comments Sheet Selected Departments Citv of Fort Collins Department: Water Wastewater Date: April 16, 2004 Project: HECKART SUBDIVISION - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Jeff Hill Topic: General Number: 3 [4/16/04] Created: 11 /24/2003 [11/24/03] Has 27-inch water main been pot holed? Pothole the existing water main now, to determine if this area is in a lowered section for the ditch crossing. The water service may not be located in lowered section of water main. There is an existing 14-inch ELCO water main in this area. Field locate and show on the utility plans. Number: 4 [4/16/04] Created: 11 /24/2003 [11/4/03] On lot 2, there is no need to show the location of the proposed house on the site and landscape plans. It may change when it comes time to actually build. Its location will be reviewed when the permit is applied for to be sure that it complies with setbacks etc. Number: 5 Created: 11 /24/2003 [4/16/04] Call out all clean outs in traffic areas as traffic rated and include a traffic rated clean out detail. [11/24/031 See site, landscape and utility plans for other comments. Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other_ Utility _ ��"Redline Utility Landscape t% -/6 -O 4, Date Page t STAFF PROJECT REVIEW Ci h n( Kurt ('nllin� Stewart & Associates Date: 04/20/2004 c,o Sack Blake 103 South Meldrum Street Fort Collins, CO. 80526 Staff has reviewed your submittal for SECKART SUBDIVISION - TYPE I (LU('), and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Drainage Number: 62 Created: 4/20/2004 [4/20/04] Gone Fischer of the New Mercer Ditch Company indicated that this deve]opment request was previously reviewed by them. Unless there is some substantial change to the plans the previously given approval remains uchanged. Topic: General Nu_i:ber: 63 Created: 4/20/2004 [4/20/0V] Current Planning does not necessarily have to see a building envelope on Lot 2 on the Site Plan. There are the necessary easements on the lot along the west and south lines and any scrzcturos will have to meet the regc_red building setbacks from property iines. Planning strorgly recc:r_-r.ends that a building e_:.'C ope not be shown on the subdivis-on plat because any future change in the envelope v.,ould then require a replat of the lot. Topic: Landscape Number: 68 Created: 4/20/2004 [4/20/04] There are 2 lines shown near the northeast corner of the property that are noz: labeled on the scan. What are they? Please see the red lined plan. Number: 69 Created: 4/20/2004 [4/20/04] Please remove the reference to the sewer cleanout from the plan. Number: 70 Created: 4/20/2004 [4/20/04] Seedless is misspelled in the Plant List on the plan. Topic: Site Numher: 64 Created: 4/20/2004 [4/20/04] There is a discrepancy on the size of Lot 2 between the reference on the lot (12,690 s.f.) and in the Site Data (12,650 s.f.). Number: 65 Created: 4/20/2004 [4/20/04] Are bore any existing drive-»ays in either of the access easements? Paee I Number: 66 Created: 4/20/2004 [4/20/041 The reference to a sewer cleanout at the southeast side of the existing house should be removed from the plan. Number: 67 Created: 4/20/2004 [4/20/04] In the Site Data there is a reference to Existing Zoning being LMN. That: is fine. There is also a reference to Proposed Zoning being LMN. This should be removed from the plan. The existing zoning is LMN and there is no reques:: to change the zoning; therefore, only the Existing Zoning reference is sufficient. Topic: Utility Number: 61 Created: 4/20/2004 [4/20/04] Rob _Trish of Light & Power offered the following comments: a. The 5' wide utility & drainage easement on the west side of the property is adequate only for Light & Power facilities. If gas is going in this same easement then there will not be enough separation between services. If this is the case then the easement would need to be wider. b. Please coordinate the meter location with Light & Power. C. The property owner is responsible for electric development charges and any necessary syste_n modification charges. d. A pocket easement may be required from the property owner to set a pad -mounted transformer to feed the additional electric load. This transformer would need to be located within 10' of a paved or truck accessible surface. Department: Engineering Topic: General Number: 13 [4/12/04] Repeat comment. Issue Contact: Susan Joy Created: 11/26/2003 111/26/031 See Appendix E6 for scanability requirements. The current plan sets do not meet the City's scanning standards. Number: 14 Created: 11/26/2003 [4/12/04] In answer to your question of "Why 707 and not 706? please see table 7-3 and 8-2 in LCJASS. All arterial streets require radial curb returns with 20' radii on all driveway entrances. Concrete to back of right of way. Please call if you have questions in the future, it will save you a round of review. [11/26/03] Please revise all plan sets to provide driveway access to Laporte in accordance with detail 707. Page 2 Number: 16 Created: 11/26/2003 [4/12/041 Repeat comment. Show building envelope, all sheets, all plan sets. [11/26/031 Do not show the actual building but provide a building envelope instead. Number: 21 Created: 11/26/2003 [4/12/041 The emergency access easement is only shown for the for the western entrance and needs to be carried all the way around through the eastern entrance as well. 111/26/031 Remove the "Existing 20' Gravel Driveway" label and replace with a "24' Emergency Access and Utility Easement" label. Number: 23 Created: 11/26/2003 14/12/041 This comment applies to this round of review as well. 111/26/031 Coordinate the comments a-.ong the various plan sets so that they all. provide the same inforr;ation. Number: 24 Created: 11/26/2003 14/12/041 Repeat comment. [11/26/031 Radial curb returns r_eau'_red at drive entrances. Number: 25 Created: 11/26/2003 [4/12/0,1] The emergency access easement has changed since the first submittal. Please provide 25' inside and 50' outside turning radii. [11/26/031 The emergency access easeent requires 25' inside turning radii_ Topic: Plat Number: 8 Created: 11/26/2003 [4/12/04] [11/26/031 From Technical Services: Boundary and legal close. Topic: Utility Number: 18 Created: 11/26/2003 [4/12/04] Repeat comment. Ditch signature block was only added to Plat. [11/26/03] Show the Ditch Company's easement on all plan sets and Provide a NewIo rcer Signature block on the various plan sets. Number: 28 Created: 11/26/2003 [d/12/041 LCUASS requires a 1000, of preliminary design on either side of Lho project boundaries, however, you can give me just enough spot elevations along the flowline profile for me to verify the design. 25' on either side should do it. Page 3 [11/26/031 Provide a flowline profile for the design and construction of this development's frontage along Laporte. Number: 30 Created: 11/26/2003 (4/12/041 Repeat comment. [11/26/031 Show where the existing yard hydrant is being relocated to. Number: 31 Created: 11/26/2003 [4/12/041 Repeat comment. Easements are still not shown correctly and they are not shown consistently between the various plan sets. [11/26/031 Correct the easement labels to read: 20' Emergency Access Easement 24' Emergency Access and Utility Easement 10' Drainage and Utility Easement Number: 34 Created: 11/26/2003 [4/12/041 Repeat comment. [11/26/03] Detail Sheet - Remove detail 706 and replace with 707. Change the design in accordance with 707. Number: 37 Created: 11/26/2003 [4/12/041 Repeat comment. [11/26/031 Provide erosion control for Lot 2 and show on the Drainage & Eros -ion Control Sheets. Number: 40 Created: 11/26/2003 [4/12/041 Repeat comment. Please show the building envelope on the plans and coordinate with Poudre Fire Authority (PFA). [11/26/031 Contract PFA as soon as possible. Lot 2 may be out of service and, if so, must be sprirklered. Lot 2 may not meet the 150' accessibility requirement. Number: 56 Created: 4/12/2004 [4/12/041 Cover Sheet - Correction required to General Notes #41. Number: 57 Created: 4/12/2004 [4/i.2/04] Sheet. 4 and 5 - Is the ditch company requiring rip rap for the end of 8" drain pipe or anyth'_ng else or are they ok with what's shown? I strongly suggest that you coordinate with the Ditch Cc ASF;P so that this doesn't become a problem for you later on. The Ditch Cc will be required to sign the mylars before I can route them for City signatures. Number: 58 Created: 4/12/2004 (4/12/041 Sheet 4 and 5 - spelling errors. Paoe 4 Number: 59 Created: 4/12/2004 [4/12/04] Dimension the utility easement shown on the west side of the east driveway entrance. Numbcr: 60 Created: 4/15/2004 [4/15/04] Complete Appendix E4 and submit with the next rounds of review. Any applicable items from F.4 not shown in the plans will become a new comment. Department: St:ormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Numbcr: 41 Created: 11/26/2003 [4/12/04] Please revise notes on utility and drainage plans. See rodlined plan. The inlet and storm sewer need to be improved with this PIP. A 5- foot Type-R inlet with a 15-inch diameter outlet pipe is required to replace the existing inlet and pipe. Please call G1es Lamarque at 416-2418 if you have nay questions. Topic: Erosion/Sediment Control Number: 55 Created: 4/12/2004 Please add in text that the min -mum 51,000 erosion control escrow will be provided. Department: Water Wastewater Topic: General Number: 3 [4/16/04] Issue Contact: Jeff Hill Created: 11/24/2003 111/24/031 Has 27-inch water main been pot holed? Pothole the existing water main now, to determine i_` this area is in a lowered sect i_o❑ for the dirt-- crossing. The water service may not be located .in Icv:ered sect_on of water mai^,. There is an existing 14-inch ELCO water main in this area. Filed locate and show on the utility plans. Number: 4 [4/16/04] Created: 11/24/2003 111/4/031 On lot 2, there is no need to show the location of the proposed house on the site and landscape plans. It may change when it comes time to actually build. Its location will be reviewed when the permit is applied for to be sure that it complies with setbacks etc. Number: 5 Created: 11/24/2003 14/1.6/041 Call out all clean outs in traffic areas as traffic rated and include a traffic rated clean out detail_. 111/24/031 See site, landscape and utility plans for other comments. Page 5 The following comments were expressed at staff review on April 14, 2004: Engineering: 1. The driveway curb cuts onto Laporte Avenue must be radial cuts. 2. The New Mercer Ditch Company must sign the subdivision plat and utility plans. 3. Where is the existing hydrant going to be relocated? 4. Rip -rap may be needed at the end of the drainage pipe where it outlets into the New Mercer Ditch. Will the ditch company allow this? 5. A building envelope must be shown on the utility plans for Lot 2. Water/Wastewater: 1. Services must go all the way to a manhole. No 8" main can be in the drive. Stormwater: 1. There is an erosion control escrow fee of $1,000 that must be paid. 2. The New Mercer Ditch Company must approve the rip -rap that is needed at the outlet end of the drainage pipe. 3. There are inconsistencies in notes on the plans that must be revised. This completes staff (and outside reviewing agencies) review and comments at this time. Additional corm.ents and red -lined plans may be forthcoming. Another round of staff review is determined to be necessary be -'ore mylars can be subm__ted. This proposal is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being April 20, 2004) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of your red - lined plans when you re -submit. The num.�-.er of copses of each document to re -submit is shcom on the attached Revisions Routing Sheet. Pave 6 If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221- 6750. You s Truly, Steve Olt City Planner cc: Susan Joy Frank Heckart Current Planning File #35-03 Page 7 REVISION REM '84MAY COMMENT SHEET DATE: May 5, 2004 TO: Technical Services PROJECT: #35-03 Heckart Subdivision PDP - Type I (LUC) All comments must be received by Steve Olt no later than the staff review meeting: May 19, 2004 No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** Name (please print) Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _Other Utility _Redline Utility Landscape Project Comments Sheet �u01 Port Collins Selected Departments Department: Engineering Date: December 2, 2003 Project: HECKART SUBDIVISION - TYPE I (LUC) All comments must be received by Steve in Current Planning, no later than the staff review meeting: November 26, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 12 Created: 11/26/2003 [11/26/03] This development is responsible for the design and construction of Laporte along their frontage. Please revise all plan sets to include this requirement. Number: 13 Created: 11/26/2003 [11/26/031 See Appendix 1-6 for scanability requirements. The current plan sets do not meet the City's scanning standards. Number: 14 Created: 11/26/2003 [11/26/031 Please revise all plan sets to provide driveway access to Laporte in accordance with detail 707. Number: 15 (11/26/031 Provide utility easements to Lot 2. Created: 11/26/2003 Number: 16 Created: 11/26/2003 [11/26/03] Do not show the actual building but provide a building envelope instead. Number: 17 Created: 11/26/2003 [11/26/031 The proposed sidewalk shown along Laporte needs to tie into existing. Taper and terminate as shown on the redlines. Number: 18 Created: 11/26/2003 (11/26/03J Show the Ditch Company's easement on all plan sets and provide a New Mercer Signature block on the various plan sets. Number: 23 Created: 11/26/2003 [11/26/031 Coordinate the comments among the various plan sets so that they all provide the same information. Number: 36 _ V/ , ;. Created: 11/26/2003 Sigaanme Date CHECK HERE IF -YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other_ _Utility _ Redline Utilitv I Landscape Page 1 Project Comments Sheet 1r' l Selected Departments Citv of Fort Collins Department: Stormwater Utility Date: May 20, 2004 Project: HECKART SUBDIVISION - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: May 19, 2004 Note - Please identify your redlines for future reference Issue Contact: Wes Lamarque Topic: Utility Number: 79 Created: 5/20/2004 Please provide a signature block for the ditch company on the utility plans. t —0-r Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other Utility _ Redline Utility Landscape Page t C)J Se->o-. �Jlij L ,.a Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: May 24, 2004 Project: HECKART SUBDIVISION - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: May 19, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 16 Created: 11/26/2003 [5/12/041 Repeat comment. Show and label building envelope, all plan sets. [4/12/041 Repeat comment. Show building envelope, all sheets, all plan sets. [11/26/031 Do not show the actual building but provide a building envelope instead. Number: 31 Created: 11/26/2003 [5/12/041 Repeat comment. Easements are not shown consistently between the various plan sets. The easements are shown differently and labeled differently on the plat, utility, site, and landscape plans. All of them need to match. [4/12/041 Repeat comment. Easements are still not shown correctly and they are not shown consistently between the various plan sets. [11 /26/03] Correct the easement labels to read: 20' Emergency Access Easement 24' Emergency Access and Utility Easement 10' Drainage and Utility Easement Topic: Plat Number: 8 Created: 11/26/2003 [5/12/041 [4/121041 [11/26/03] From Technical Services: Boundary and legal close. Topic: Utility Number: 18 Created: 11/26/2003 [5/12/04) Repeat comment. Please provide a ditch company signature block on the utility sheets. a letter of intent from the ditch company prior to being allowed to go to hearing. (4112/041 signature block was only added to plat. Will need to provide 2 q Dat IF YOU WISH TO RECEIVE COPIES OF REVISIONS I Plat _ I Site Drainage Report -Z Utility 5C Redline Utility I Landscape Other Page 1 [11/26/03] Show the Ditch Company's easement on all plan sets and provide a New Mercer Signature block on the various plan sets. Number: 40 [5/12/041 Repeat comment. Created: 11 /26/2003 [4/12/041 Repeat comment. Please show the building envelope on the plans and coordinate with PFA. [11/26/031 Contact PFA as soon as possible. Lot 2 may be out of service and must be sprinklered. Lot 2 may not meet the 150' accessibility requirement. Number: 71 Created: 5/1212004 [5/12/041 Sheet 4 - Please label the curb side of the ramps at the driveway entrances so that there is no confusion in the field when this is constructed. Number: 72 Created: 5/12/2004 [5/12104] Sheet 4 - Please hatch the street cut using a large diagonal for scanability. Number: 73 Created: 5/12/2004 [5/121041 Sheet 5 - Label the building envelope. Remove the duplicated word in the rip rap label. Number: 74 Created: 5/12/2004 [5/12/041 Please dimension the narrowest width of the emergency access drive aisle. Is it less than PFA's requirement? Page 2 " STAFF PROJECT REVIEW (Wily al PortCollins Stewart & Associales Date: 06/02/2004 c/o Jack RIake 103 South Meldrum Street Fort Collins, CO. 80526 Staff has rcvic�wod your submittal for. HECKART SUBDIVISION - TYPE I and we offer the following comments: ISSUES: Department: Engineering Topic: General Number: 16 [5/12/041 Repeat comment plan sets. 4/12/041 Repeat comment plan sets. Issue Contact: Susan Joy Created: 11/26/2003 Show and label building envelope, all Show building envelope, allsheets, all [II/26/03] Do not show the actual building but provide a building envelope instca.d. Number: 31 Created: 11/26/2003 [5/12/041 Repeat comment. Easements are not shown consistently betwce: the various plan sets. The easements are shown differently and labeled differently on the plat, utility, silo, and landscape plans. All of them need to match. [A/I2/C41 Repeat comment. Easements are still not shown correctly and they are not shoum consistent-y between the various plan sets. [1l/26/031 Correct the easement labels to read: 20' Emergency Access Easement 2Q' ]!mergncy Access and Utility Easement 10' Prainngc and Utility Iasement Topic: Plat Numl)c:: 8 Created: 11/26/2003 [5/12/A4] [4/12/041 [11/26/03; From Technical Services: Boundary and legal ctose. Pagt I Topic: Utility Number: 18 Created: 11/26/2003 [5/12/041 Repeat continent. Please provide a ditch company signature block on the uti].i.ty sheets. Willneed to provide a letter of intent from the ditch company prior to being allowed to go to h( aring. [4/12/04] Repeat comment. Ditch signature block was only added to plat. 111/26/031 Show the Ditch Company's easement on all plan sets and provide a New Mercer Signature block on the various plan sets. Number: 40 [5/12/04] Repeat comment. Created: 11/26/2003 [4/12/041 Repeat comment. Please show the building envelope on the plans and coordinate with PFA. [11/26/03] Contact PFA as soon as possible. Lot 2 may be out of service and must be sprinklered. Lot 2 may not meet the 150' accessibility requirement. Number: 71 Created: 5/12/2004 [5/,12/04] Sheet 4 - Please label the curb side of the ramps at the driveway entrances so that there is no confusion in the field when this is constructed. Number: 72 Created: 5/12/2004 15/1.2/04] Sheet 4 - Please hatch the street cut using a large diagonal for scanability. Number: 73 Created: 5/12/2.004 [5/12/041 Sheet 5 - Label the building envelope. Remove the duplicated word in the rip rap label_. Number: 74 Created: 5/12/2004 [5/12/041 Please dimension the narrc:aest width of the emergency access drive aisle. Is it less than PFA's requirement? Department: Light & Power Issue Contact: Rob Irish Topic: Utility Number: '/5 Created: 5/17/2004 [5/17/041 The utility & drainago easement on the west side of thy, property is only adequate for Light & Power facilities. If gas or some other utility is going in this same casement there will not be enoueh separation. The easement ,pill need to be wider. Numbor: 76 Created: 5/17/2004 [5/17/04] Owne- will need to coordinate meter location with Light & Power. Owner wil1. be responsible for electric development charges & system modification charges if applicable. Page 2 Number: 77 Created: 5/17/2004 [S/17104] Packet casement maybe required by owner to set pad - mounted transformer to feed additional load. This transformer would need to be -located within 10' of a paved or truck accessible surface. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Utility Number: '79 Created: 5/20/2004 Please provide a signature block for the ditch company on the utility plans. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility Number_: 78 Created: 5/18/2004 15/18/041 No comments Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, Steve Olt, City Planner Cc: usan Joy Hob Irish Prank Hecka-t Page 3 [1 tlf3/03) Is the placement of the Emergency Access drive acceptable to PFA? The current cenE iuration has th^ fi,e trucestaging approximately 50' away from the bu,, ding. -haT leaves only 100' to the back of the furthest part of the building in order to meet fire code. Is the buildings eventuai : Iacement going to meet that requirement or does the eme.:,ency arive need to be aciusted now? Topic: Landscape Number: A Created: 11/26/2003 [11/26/031 Show all utilities on the Landscape Plan, Topic: Plat Number: 8 Created: 11 /26/20C 3 [11/26/031 From Technical Services: Boundary and legal close. Number: 9 Created: 11 /26/2003 [11/26/031 From Technical Services: What about the New Mercer Ditch at the NE corner cf Lot 1? You need to show the Ditch Company's easment and provide a signature block for them to sign off on the plat. Number: 10 Created: 11 /26/2003 [11/26/031 From Technical Services: There needs to be a utility easement across Lot 1 to :service Lot 2, Number: 11 Created: 11 /26/2003 [11/26/031 From Technical Services: The text does not meet City scanning standards. Number: 24 Created: 11 /26/2003 [11/26/03) Radial curb returns required at drive entrances. Number: 25 Created: 11 /26/2003 [11/26/031 The emergency access easement requires 25' inside turning radii. Number: 26 Created: 11 /26/2003 [11/26/03] Provide utility easements to Lot 2. Number: 45 Created: 12/2/2003 [12/2/031 Provide the Notice of Other Documents, see attached. Topic: Site Number: 19 Created: 11 /26/2003 [11/26/031 Remove contou,s and utilities. Number: 20 Created: 11 /26/2003 [11/26/03] Spell out all UE and DE labels to read "Utility Easement" and "Drainage Easement". Number: 21 Created: 11 /26/2003 [l 1/26/03] Remove the "Existing 20' Gravel Driveway' label and replace with a "24' Emergency Access and Utility Easement" label. Topic: Utility Number: 27 Created: 11 /26/2003 [11/26/031 Sheet 3 - Provide a curve table and dimensions for the sidewalk along Laporte so that they can lay this out in the field. Number: 28 Created: 11 /26/2003 [11/26/031 Provide a flowline profile for the design and construction of this development's frontage along Laporte. Number: 29 Page 2 Created: 11 /26/2003 [11/26/031 Remove and replace the area inlet shown in Laporte with a Type 3 inlet. Provide the appropriate details and approximate street cut. Provide the street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 30 Created: 11/26/2003 [11/26/03) Show where the existing yard hydrant is being relocated to. Number: 31 Created: 11/26/2003 [11/26/031 Correct the easement labels to read: 20' Emergency Access Easement 24' Emergency Access and Utility Easement 10' Drainage and Utility Easement Number: 32 Created: 11/26/2003 [11/26/031 What's happening with the sewer cleanout shown on Sheet 3? Does it tie into something? Is it being removed? Abandoned? Number: 34 Created: 11/26/2003 [11/261031 Detail Sheet - Remove detail 706 and replace with 707. Change the design in accordance with 707. Number: 35 Created: 11/26/2003 [11/26/031 Place the Construction Notes on Sheet 6 behind the General Notes - in other words, Sheet 6 should be Sheet 2. Number: 37 Created: 11/26/2003 [11/26/031 Provide erosion control for Lot 2 and show on the Drainage & Erosion Control Sheets. Number: 40 Created: 11/26/2003 [111/26/031 Contact PFA as soon as possible. Lot 2 may be out of service and must be sprinklered. Lot 2 may not meet the 150' accessibility requirement. Page 3 6QSTAFF PROJECT REVIEW Cilp ui Purt Collin+ Stewart & Associates Date: 12/3/2003 c/o Jack Blake 103 South Meld: -um Street Fort Collins, CO. 80521 Staff has reviewed your submittal `or HECKART SUBDIVISION - TYPE I (LUC), and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Landscape Number: 50 Created: 12/3/2003 [12/3/031 Please see red -lined Landscape Plan for Current Planning comments. Number: 51 Created: 12/3/2003 [12/3/03) The 2 proposed Autumn Purple Ash trees to be used as street trees along LaPorte Avenue are not on the City's Approved Street Tree List. Please make another selection from the list. Topic: Plat Number: 46 Created: 12/3/2003 [12/3/031 Len Hilderbrand of Xcel Energy offered the following comments: a. The proposed 5' utility easements are not adequate. If the owner requests natural gas then the 5' easements would need to be unencumbered. b. No fences, trees, or bushes can obstruct the installation of gas lines. C. Is it possible to make the access drive a utility easement? Number: 47 Created: 12/3/2003 [12/3/031 Rob Irish of City Light & Power offered the following comments: a. Power for this property will come from LaPorte Avenue. b. The owner will need to coordinate the electric meter location with Light & Power. C. Any modifications or relocations of existing electric facilities will be at the property owner's expense. d. The property owner will be responsible for residential development charges. Page i Number: 48 Created: 12/3/2003 [12/3/03] There appears to be an error in the east property lines of Lot 1 and the road right-of-way. The two distances of 319.98, + 42.00' do not add up to 350.001. They would equal 361.981. Topic: Site Number: 49 Created: 12/3/2003 [12/3/03] Please see red -lined Site Plan for Current Planning comments. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 12 Created: 11/26/2003 [11/26/031 This development is responsible for the design and construction of LaPorte Avenue along their frontage. Please revise all plan sets to include this requirement. Number: 13 Created: 11/26/2003 [11/26/031 See Appendix E6 for scanability requirements. The current plan sets do not meet the City's scanning standards. Number: 14 Created: 11/26/2003 [11/26/031 Please revise all plan sets to provide driveway access to LaPorte Avenue in accordance with detail 707. Number: 15 Created: 11/26/2003 [11/26/031 Provide utility easements to Lot 2. Number: 16 Created: 11/26/2003 [11/26/031 Do not show the actual building but provide a building envelope instead. Number: 17 Created: 11/26/2003 [11/26/031 The proposed sidewalk shown along LaPorte Avenue needs to tie into existing. Taper and terminate as shown on the redlines. Number: 18 Created: 11/26/2003 [11/26/031 Show the Ditch Company's easement on all plan sets and provide a New Mercer Signature block on the various plan sets. Number: 23 Created: 11/26/2003 [11/26/03] Coordinate the comments among the various plan sets so that they all provide the same information. Number: 36 Created: 11/26/2003 [11/26/031 Is the placement of the Emergency Access drive acceptable to PFA? The current configuration has the fire truck staging approximately 50' away from the building. That leaves only 100' to the back of the furthest part of the building in order to meet fire code. Is the buildings eventual placement going to meet that requirement: or does the emergency drive need to be adjusted now? Page 2 Topic: Landscape Number: 39 Created: 11/26/2003 [11/26/031 Show all utilities on the Landscape Plan. Topic: Plat Number: 8 Created: 11/26/2003 [11/26/03] From Technical Services: Boundary and legal close. Number: 9 Created: 11/26/2003 [11/26/031 From Technical Services: What about the New Mercer Ditch at the NE corner of Lot 1? You need to show the Ditch Company's easement and provide a signature block for them to sign off on the plat. Number: 10 Created: 11/26/2003 [11/26/03] From Technical Services: There needs to be a utility easement across Lot 1 to service Lot 2. Number: 11 Created: 11/26/2003 [11/26/031 From Technical Services: The text does not meet City scanning standards. Number: 24 Created: 11/26/2003 [11/26/03] Radial curb returns required at drive entrances. Number: 25 Created: 11/26/2003 [11/26/031 The emergency access easement requires 25' inside turning radii. Number: 26 Created: 11/26/2003 (11/26/031 Provide utility easements to Lot 2. Number: 45 Created: 12/2/2003 [12/2/03] Provide the Notice of Documents, see attached. Topic: Site Number: 19 Created: 11/26/2003 [11/26/031 Remove contours and utilities. Number: 20 Created: 11/26/2003 [11/26/031 Spell out ail UE and DE labels to read "Utility Easement" and "Drainage Easement". Number: 21 Created: 11/26/2003 [11/26/031 Remove the "Existing 20' Gravel Driveway" label and replace with a "24' Emergency Access and Utility Easement" label. Topic: Utility Number: 27 Created: 11/26/2003 [11/26/03] Sheet 3 - Provide a curve table and dimensions for the sidewalk along LaPorte Avenue so that they can lay this out in the field. Page 3