Loading...
HomeMy WebLinkAboutWHOLE FOODS CENTER - Filed GC-GENERAL CORRESPONDENCE - 2005-03-02Dave Stringer -Montgomery Wards conversion Page 1 From: Peter Barnes To: Gregory Byrne Date: Thu, Apr 27, 2000 3:54 PM Subject: Montgomery Wards conversion Greg, the proposed Montgomery Wards conversion to a back -office use (employees who primarily take phone orders or who make phone calls) is a permitted use in the C district. It is classified as simply an office use. Such use is listed as a type 1 use. However, since the site was originally developed as a use -by -right, the LUC allows the conversion to be processed as either a Type 1 or as a minor amendment. As I understand it, the proposed use may involve up to 700 employees when they get up to speed. The Type 1 requires an administrative public hearing and numerous routings to other departments and agencies. The minor amendment process does not require a public hearing and will result in a shorter review time, but submittal documents are still required and would need to be routed to key departments. The change of use triggers the need to bring the entire site into compliance with the standards of the LUC regardless of the review process. The minor amendment process normally takes about 1 to 2 weeks. However, due to the many site upgrades that will be required, the minor amendment process will take considerably longer than usual, and I think it would be beneficial if the applicant came to conceptual review as soon as possible. I would estimate the minor amendment process to take anywhere from 4 to 12 weeks, depending on how detailed a plan the Engineering and Storm Water Departments ask for and on how good the applicant's engineering consultants are. Even though the site improvments will be substantial, the review time for other departments involved should be no longer than a month, but if the engineering/storm water requirements lengthen the process, it might be difficult for the applicant to be up and running by their desired start up date in August. Some of the upgrades would be: - perimeter landscaping along College Avenue and along the railroad right of way, - interior landscape islands, - building facade remodeling to provide articlulation, embelishment, etc., - internal pedestrian connections, - possible public sidewalk improvements - possible Mason Street Corridor issues The installation of these required improvements will result in the need for some sort of storm drainage review since the drainage patterns will be changing. Also, the transportation department will require a traffic studty due to the large number of employees. The applicant may submit a building permit application at any time: prior to, during, or after the review process. However the permit for the acutal use conversion can't be issued until after the minor amendment has been approved. The only type of permit that can be issued prior to such approval would be for interior demolition and perhaps other minor interior alterations. We would be able to classify a permit for these types of things as an remodel to a retail store. Any interior remodel that clearly changes the building from a large retail establishment to an office would not be allowed to proceed until after approval. Assuming their development plan is approved, not all of the required site improvements will have to be completed prior to occupancy. Certain things like landscaping and some public improvements may be able to be financially guaranteed, thereby allowing the issuance of a TCO. CC: Dave Stringer, Glen Schlueter Sheri Wamhoff Re Old Wards Building Page 1 I From: Peter Barnes To: Dave Stringer Date: Fri, May 26, 2000 8:34 AM Subject: Re: Old Wards Building Since the Land Use Code specifically specifies parking stall and drive aisle dimensions, the only way that can be changed is through a modification or a zoning variance, depending on how we process the development app (minor amend. versus type 1). with regards to your question #2, 1 don't know about off -site improvements. But the on -site improvements from my end will probably be limited to landscaping, walkway connections, and facade changes. >>> Dave Stringer 05%25 2:26 PM >>> I have received a letter by way of Greg, from ZTI Group asking 4 questions. Can each of you supply me with the answers they are requesting? Following are the 4 issues: 1 Can we use narrower parking stall widths (i.e. 9' wide by 55' bays), as did DPC in redevelopment of the adjacent Towne Center? 2. Are there any other off -site impacts that we have not thought of other then landscaping, sidewalk and facade changes? If so what would they be? 3. How does the new water quality standard affect the change of use on this project should we decide to go this route? 4. Are there any unresolved issues that you or Glen Sluter sorry about the spelling, this is verbatim) knows of in relation to the capacity in Arthur Ditch behind the Wards property? Thanks, 1 need to respond ASAP, so your input is appreciated. Dave CC: Glen Schlueter, Sheri Wamhoff Sheri Wamhoff - Re Old Wards Building Page 1 From: Glen Schlueter To: Dave Stringer; Peter Barnes Date: Tue, May 30, 2000 9:55 AM Subject: Re: Old Wards Building Water Quality Stormwater encourages that water quality be addressed either by extended detention or some BMPs but unless the site is being regraded and new asphalt placed it is not a requirement. It is grandfathered. Offsite drainage and Arthur Ditch: Actually it is the Sherwood Lateral. It is easily confused since this lateral starts at the Arthur Ditch near Hillpond. Again the site is already developed so the imperviousness is grandfathered. If the total site were redeveloping the runoff could not flow to the ditch. It would have to be conveyed over or under the ditch to Spring Creek. Also there has been some erosion in the railroad ROW. Under today's 'standards there would need to be an easement or License agreement with the Railroad to discharge runoff there and then the outfall would need some work to stabilize it. However if there is no increase in imperviousness this condition is grandfathered but Stormwater would encourage at least stabilization of the outfall system. If internal parking lot landscaping and medians are required, a grading plan is needed to show how the parking lot will drain with new medians. I may have given you more information than you wanted. However if there are still questions, let me know. >>> Peter Barnes 05/26 8:34 AM >>> Since the Land Use Code specifically specifies parking stall and drive aisle dimensions, the only way that can be changed is through a modification or a zoning variance, depending on how we process the development app (minor amend. versus type 1). with regards to your question #2, 1 don't know about off -site improvements. But the on -site improvements from my end will probably be limited to landscaping, walkway connections, and facade changes. >>> Dave Stringer 05/25 2:26 PM >>> I have received a letter by way of Greg, from ZTI Group asking 4 questions. Can each of you supply me with the answers they are requesting? Following are the 4 issues: 1. Can we use narrower parking stall widths (i.e. 9' wide by 55' bays), as did DPC in redevelopment of the adjacent Towne Center? 2. Are there any other off -site impacts that we have not thought of other then landscaping, sidewalk and facade changes? If so what would they be? 3. How does the new water quality standard affect the change of use on this project should we decide to go this route? 4. Are there any unresolved issues that you or Glen Sluter sorry about the spelling, this is verbatim) knows of in relation to the capacity in Arthur Ditch behind the Wards property? Thanks, I need to respond ASAP, so your input is appreciated. Dave CC: Basil Hamdan; Donnie Dustin; Sheri Wamhoff Feb-03-2003 19:28 From-BROWNSTEIN HYATT AND FARBER. P.0 3036231956 T-638 P.004/005 F-061 Brownstein I Hyatt I Farber February 3. 2003 VIA FACSIMILE — 970416-2020 Cameron Gloss Director of Current Planning City of Fort Collins 300 La Porte Avenue P. O Box :580 Fort Collins, CO 80522-0580 410 Sr eMn th st-w Twenty-Sacono Fiwr Dane. Cow aoo BD202- 437 Core F,negan Anorney at Law T 303 223 1161 F 303.223.0961 cfinegan@bnf-jaw com RE: Text Amendment to Change Definition of "Grocery Store" Dear Mr. Gloss. Pursuant to our conversations with Deputy City Attorney Paul Eckman and with you, on behalf of Fort Collins WF 02, LLC, a Colorado limited liability company ("Property Owner'), we today are applying to begin the process of a text amendment to the City of Fort Collins Land Use Code (the "Code"). Most specifically pursuant to Section 2.9.3(13)(b), we are applying to amend the text of the Code. Please be advised also by this letter that the Property Owner is the owner of land located within the municipal boundaries of the City of Fort Collins. most specifically located at 2201 South College Avenue, Fort Collins, Colorado First. we wish to propose that the definition for Grocery Store, pursuant to Section 5.1.2 of the Code now reads, as follows. Grocery Store shall mean a retail establishment which primarily sells food, but also may sell other convenience and household goods. and which occupies a space of at least five thousand (5,000) square feet but not more than forty-five thousand (45,000) square feet. Accordingly, we also are requesting that the definition for Supermarket, pursuant to Section 5.1.2 of the Code be changed to read, as follows Su ermarket shall mean a retail establishment primarily selling food, as well as other convenience and household goods, which occupies Brownstein nyatz a Faroer. P.C. Dta.x. Cola s.; T303.2231100 r303.=11111 202.296 7353 F 202 296 7009 1970945W02 F97035A ZZ0 Feb-03-2003 19:29 From-BROWNSTEIN HYATT AND FARBER. P.C. 3036231956 T-639 ➢.005/005 F-061 Cameron Gloss February 3.2003 Page 2 a space of not less than forty-five thousand one (45.001) square feet. Lastly, we are requesting that Section 4.17(B)(3)(D) De amended and that Grocery Store be added to Section 4.17(B)(3)b) as a permitted Commercial/Retail use More specifically, a Grocery Store would be a use permitted in the Central Commercial District, subject to review by the Planning and Zoning Board. Please feel free to call me promptly at 303.223-1161 if you have any questions about the foregoing or if I can provide any additional information to you. Thank you for your prompt attention to this request. Sincerely yours, Cole Finegan PCF/sly cc Robert Kaufmann, Esq. Gary J Dragul Paul Eckman, Esq. 6479w6452152.1 Community Planning and Environmental Services Current Planning City of Fort Collins March 5, 2003 Brad March March & Olive P.C. 110 E. Oak St., Suite 200 Fort Collins, CO 80524-2880 Subject: Off -site easement requirement for former Montgomery Wards site at 2201 S. College Avenue Dear Brad, The City of Fort Collins has conditionally reviewed and approved a minor amendment to the former Montgomery Wards PUD allowing building and site improvements, including landscaping, parking lot reconfiguration, pedestrian walks, paving, and building facades. One of the conditions of approval requires acquisition of an off -site easement, from the adjacent property owner to the north, to permit. portions of the approved parking area landscape islands to encroach across the property line. In your recent telephone call, you had asked about the development implications such landscape island encroachments would have on the property to the north, referred to as the BankCenter property. This letter should be considered an official response from the City of Fort Collins to your question. Such landscape and curb encroachments would not trigger a development review applicatiion, i.e.-minor amendment or a Project Development Plan (PDP), or other physical improvements, to be completed on the Bank Center property. The encroachments are clearly incidental to the primary use of the BankCenter property and they bring the property closer to compliance with the present Land Use Code standards; therefore, the minor amendment is not applicable. Should you have any questions or require additional information, please feel free to give me a call at 970/221-6750. Sincerely Cameron Gloss, AICP y Current Planning Director cc: Steve Olt Marc Virata 281 North Collage Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (971 , 416-2020 November 19, 2003 City of Fort Collins Engineering Attention Marc Virata 281 North College Avenue Fort Collins, Colorado 80525 J R ENGINEERING Re: Minor Amendment Number 1 Montgomery Wards Redevelopment Site Dear Marc: Attached are the plans for signature for the Minor Amendment #1 as requested. Sorry it has taken so long but you requested to have the executed plat with the submittal and that did take some time. The following are some changes that you should be aware of: Plat 1. The title of the Plat has been changed to Whole Foods Center Utility Plans 1. Some revisions to the services and water main have been completed with the input and approval of Jeff Hill. In addition a new detail sheet was added. Elevations L Some minor changes have occurred on the elevation plan relative to man doors. If you should have any questions please don't hesitate to contact me at 491-9888. Sincerely Michael Brake, PE, PLS Director of Operations Cc: file 26'0 1(aa Road. Sur a 190. Forz Colllnc CO 80525 1I'0 91 9888 • 1'a, 971Y491-9984 • u� ,ajmnglnitirin�;,cum