HomeMy WebLinkAboutRAISING CANES - Filed OA-OTHER AGREEMENTS - 2005-03-02COLORADO DEPARTMENT OF TRANSPORTATION,
CDOT Permit No.
404085
STATE HIGHWAY ACCESS CODE
SH/S/MP
287C/344.710/R
NOTICE TO PROCEED
Local Jurisdiction
Fort Collins
Permittee(s): Applicant;
saine Gs appb<ar1 f- Raising Cane's Chicken Fingers
,._ ..d. 1212 S. Acadian Thruway
lb _. tl - Teel
Baton Rouge, LA 70806
For (225-383-7400
970-?194-6366 PlAy
The permittee is hereby authorized to proceed with access construction within state highway right-of-way in
accordance with the above referenced State Highway Access Permit and this Notice to Proceed.
This Notice to Proceed is valid only if the referenced Access Permit has not expired. Access Permits
expire one year from date of issue if not under construction, or completed. Access Permits may be extended in
accordance with Section 2.3(11)(d), of the Access Code.
Adequate advance warning is required at all times during access construction, in conformance with the
Manual on Uniform Traffic Control Devices for Streets and Highways.
All construction shall be completed in an expeditious and safe manner and shall be finished within 45 days
from initiation. The permittee or applicant shall notify the Department prior to commencing construction as
indicated on the Access Permit.
Both the Access Permit and this Notice To Proceed shall be available for review at the construction site.
This Notice to Proceed is conditional. The following items shall be addressed prior to or during construction as
appropriate.
1. This Notice to Proceed includes the Contractor's Certificate(s) of Insurance.
2. A Warranty Deed shall be provided to CDOT for a review by the ROW Manager. Once checked,
that Deed shall be recorded at Larimer County and a copy provided back to CDOT. This process
shall be completed no later than December 1, 2004, and will be incorporated into the original Access
Permit.
Municipality or County Approval (When the appropriate local authority retains issuing authority)
By
Title
Date
N
This Notice is not valid until signed by a duly authorized representative of the Department
Colorado Department of Transportation
- �C�
Title
Y�LCQSS
DateL(Xy)���tG^ II IeO4
Copy Distr ut n: Required 1. Region Permit files 2. Staff Access Section. As needed: Local 4uority, MTCE Patrol, Inspector Form 1265 8198
COLORADO DEPARTMENT OF TRANSPORTATION CDOT Permit No.
STATE HIGHWAY ACCESS PERMIT 404086
State Highway No/Mp/Side
287C/344.740/R
Permit fee
Date of transmittal
Region/Section/Patrol Local Jurisdiction
100.00
10/04/2004
04/01/04 Fort Collins
The Permittee(s); Applicant; Ref No. 2004
Raising Cane's Chicken Fingers
Timberline Tech Group, Ltd. 1212 S. Acadian Thruway
3030 S. College Avenue Baton Rouge, LA 70806
Fort Collins, CO 80525 225-383-7400
970-204-6306
is hereby granted permission to have an access to the state highway at the location noted below. The access shall be constructed, maintained and used in
accordance with this permit, including the State Highway Access Code and any attachments, terms, conditions and exhibits. This permit may be revoked
by the issuing authority if at any time the permitted access and its use violate any parts of this permit. The issuing authority, the Department and their duly
appointed agents and employees shall be held harmless against any action for personal injury or property damage sustained by reason of the exercise of
the permit,
Location:
The access is located on State Highway 287, a distance of 3,886 feet north from Mile Post 344 on the east/right side.
Access to Provide Service to:
Fast Food Restaurant..................................................................................... 3,244 Set Ft 100.00 %
Other terms and conditions:
• See Attached Pages 2 and 3 and Other Enclosures for Additional Terms and Conditions.
• Right -Out Only access (raised center median exists on SH 287)
• Access is also available from Remington and Dartmouth east of the site.
• Exhibits associated with this permit are included with the Right -In Only permit, #404085. (Exhibits A,B,C & D)
• The Notice to Proceed will be issued upon CDOT's receipt of the Contractor's Certificate(s) of Insurance.
MUNICIPALITY OR COUNTY APPROVAL
Required only when the appropriate local authority retains issuing authority.
By
Date
Title
(X)
Upon the signing of this permit the permittee agrees to the terms and conditions and referenced attachments contained
herein. All construction shall be completed in an expeditious and safe manner and shall be finished within 45 days from
Initiation. The permitted access shall be completed in accordance with the terms and conditions of the permit prior to
being used.
The permittee shall notify Linda McWilliams with the Colorado Department of Transportation in Greeley at 970-350-
2147 at least 48 hours prior to commencing construction within the State Highway right-of-way.
The person signing as the permittee must be the owner or legal representative of the property served by the permitted access and have full authority to
accept the permit and its terms and conditions.
Permittee
Date
(X) Ea ,Am 4 Ce1.tJrp Lie rr—,t,/
I v 25 /0 y
PAN1rvGGAlvc � � t�Mfr� i LI.C�
This permit is not valid until signed by a duly authorized representative of the Department.
COLORADO DEPARTMENT OF TRANSPORTATION
By Cy
(x)'at1
Date (of issue) .
I
Title
Access Manager
Copy Dj�st�ibution- Required. Makre copi6s as necessary for. Previous editions are obsolete and may not be used
1 J 1. Region Local Authority Inspector CDOT Form #101 8/98
2. Applicant MTCE Patrol Traffic Engineer
3.Slaff Access Section
_ C
C _ O Q) L
O C N m m m 'O C _ (n . T
0. c m L c `o.N m E> m m ca °c)� E c_ co c` m y 3 m
` m .C) O L L d Q 0 p r L m N L C >O m n 3 N C m m ca a) L C
N m 1 C T �'N a) ~ ~O N a- U w L C w E a) 3 0 .5 ` O L
N ro 0 O '-' L- Y C w N L N L_
m e -O N c m al Q- C ° m m m O E y E m 3 O o
omcTE2�o��°-w°�cOi¢a > �c-oEw.�N,J. o`omN¢° m°�EcLo)
�o�mcc.�Nm°3n�cm« o. aa(mnO-Eaci'(tlaci minaL.cm-o (°ate°�� o
G C U C d CA Lr, T C- m m x J c O E r E w C 6 H' 3 0 m m .- C
JO2o-0X ncmm J m a)N°�rro�vo 'roc m N Ym°cEo
O m C m a) -O N 3 ro L r O N O .N y r ro T> a) D a) a n T m j t Q U a) -O T n m
C .n o jC -O a) N N m ro a C (6 E E -O a) .� Y m O CC) N C' L N t6 m a) a) a) C L
N V Q) m N N L .0 N m m .-
x JmJ�mc'oLma)( na0 a°') cmm3Emmroc �oN"-N
N U w O J N p E m c a m a E .�. a) a.) C L_ r .-, m -O T �m G C 0 m w
m L C m c C O N C Q) co N m Ul ¢ O t� T m O a) ° O U m m 3 T T O J L N 3
U O T T O- W.0 m Y a O
m�Em�.N Oa -°> °�coi o �av o)m�ncr �`o-m a-0 o)E Etyma cow
Ycc°,moma roo:m��)am mi m�Nmm�a�i'o)n °mL..omm>, cwa) 0mmcca>m
m3 m (a c .��' ro to m c c L m° IL E o r c°° m .S
°- E ro y N m O 0 1 T:p N L J CA O
EJaTi�caY.L... aJN"C
¢N~>�cNm ca-y)nc"a°«aNc -D«wOm3
LCE
>L�yYn -:
x° S '� O ° 0-aC C C C- OE C o}° °' co N 0c Z a ua) E Ca oc N;m YNOm a
m>�c�E`oc zOZ�, �
c E NUN.0c c aa cq e a) o m
�° oc D0�oo��o oM'c ao ox000a,� wm.x m ocEE0c0
oO
O�oc ro�cacco 0N0a)o
omoZom
° m�0M,0cE�Z(DQ)amoom
N N U0 c omm
E a) :E N N O- L- U-V° mm ` N «r
NLc 00 ELL °C COF OUO
L
X 0
Co OO"aCnom E N oE M-- mm oo ocE2«:o
Cmow °n�O Occ3mco F-Oac amaaa. � za) E d e QE c m cc c - 0 a mE
O.N m aLZ .N N () NaO cn
m c
L- r"O C\lN o ° m aai
° m_ a O CV m a) �'
m
°Y s Co e o o E Em o o o 0
`o N m N O. c O- O� O N m m r N O m m J N E a) C O
UcpoN Lro'E= coEm Cmam E �- Lno°n c-tl >, mU m>.
mUU!�E3NaiE `m>oaaa))c O-'a) Jami cw -iam°m ro a) 0)
fN/)dNd N��Nd)a Enrroca roU,ca a —tl0 a"i am 6>-cE -3Eo
oEN«mN m�� F- _ a)mm Lc�- mmaEo
U 00 U O 3 C L m �' L a 0 c H a) L 0 ro L m e d« Intl = co N CI > N L ° (C
¢ O o_o)� mNm° u >Eo u� roTN me a)_c �> Us
m ro T c E m L m S] O O C O U L O S m D m L m L N Y J L C_ m L C 3>mmaE L'm a)c °o0-c pea) T'- £3-O "-O>E
La 3E > .o m n—O_N co 3 m000 o coN°c
O) ro O) E L C° troi) `> N ro 0 tT O J j m 0- C C C` U m C N N m> -O .S N C 2 E
.- m« - - CL c 'O O a) 'y C m O" C a) m O m O N a.N L y ro m E -O o m w
al °= O c c al .N.. m °- a) U «" m z `l m a UU N m Co N N C m Y N -O mN
o��)Le o)m �iN KNEEE a)L c=¢cam me �omo(Jn �Ec oc cFo`om Ez
(n -o(i7o o. (Nn Inc oEroo Q)co mJ �° >y Q�monE �'c«-OUo
.Lm.atoc�w-e rnoc a�°i �'-o-W-.Oc`o� � Coja�m�N>m Ec_a)cmm
`o c°)i oo w L c o m 4 w NAY c 3 E-o m y N E `� `� m a) E o
ac a�aL3o°> cca°cOo E-OENmr O'er EmEa(O -o U.c-c o�Y rocc
U> 0 ro a) O �' U 0 �) U C H a m (D m W � N ° O` m a O � � N L 'O ai U C N Q
E m o¢ ` LO m o as m o o o mo 0 0 �'o CO O 3 m o 0 0 E E o L o
m ro�a �.0DmaOai u°'i `°0Lm,�in '-Na �� Qitl� aNi���'�omE Emm-ac
IL NoO -mNOw nO m mm3o cc amJ J >> mmE on.-m m
N LTUmr�'NLCm aJLCrQ�='o-0 (v0— I.Cm�NCULO Oa)0ac�
N aowUaa)moi U z°m0mmEmm a) -m �o0)M.-0HU Tp a
cmi m.o aNi�cmmoUro E`oEcmo o 0w Aso Lm 3,>�-z c.N mm a3) ms uoiomN
Qy ��QomEcN�iE aacio-'yEUa)UaNio L�r °)c�EdENCL oLowao
am a> T�.�`Y o'a a) d'-a'��w J- m. c:o (n EL E E a� N.-_-;(n m ac
mm om °M._ �Epa"iOo oQ�' m3 .zO.c0a,0Lmm m3�Lm
3a o)Q�ooLcm7)0 Mm-oNc`ocm� a-o° E�EO>UJa)>>, aNm�'mo
OI 3 4l O a) ro 7 (/7 D w L_ c N m .N N` m w a) w U ro N w C m o 0) 3
=r Om C1]ECn m"Nm ¢L��-.N y'NHmm CmJ NO-NNNrofO .NN �faCro-
E m m° a n a CL N a m E c E o ca o ¢ m c c° m t p Oo m
m 0 L L m> a) N p- a) N a T N a -O 0 m O 0 a L a L E `-' > "O a« 'O 0 o v a a) (a
U) lL H F- N m 0 N m m 73 .N ¢ D� m m 0: C)m 0 m N 0 a ri o a C> ro c m 3 co 0 V C Co L
Cl)
N « m C 3 � m N N m .N L L E C
m o N m N a c o c C E m° o c 3 ac c - c d
m o o m « E J t aN 3 o t d c o Nco
c
3 N m L E U C m N --1 'J U U O 0«a) W L f. C w0 C ttl O Q U E 0 (tl O 'C C O
J a) a) Con L N« N E �c m i C N J a) U O m n Co« O m J 0 O m m °) o) E
m°« oom- mmmoba) �m=� vim��c>>Lp.t, p=Tc
U LV >, w O a p = p p 0 o C 0 a C C N m a) O J `-' -O _ N` U a°1 C .O °
6 2p°oc oaim a)m$0 U.�000 .m oo Eo>E0 -d�Foma¢c LL
C« m E .L-� a 0 -O « N- O 0°« r c a) m IN/1 ` m > N c a) j a m N
z°ET3°p -ivmm mp m0 00 0c�tla'
LoU Ta U.I'�UNmLNc Oo-t L_ Np`CU°UON mL nm wcc
N°E °CCN pivo°'«Lza)� cc°«.3 m�o.mmvcim2a)a) .-1,2 sE
mmpTc°i F-:-o`om�>3.m'C�' mE U a cN�.��oa°�ia)0a0co Ey`pm
a) « N D1 N L_ ¢ m O O m C a a Co N O m 'O d E C N L a C E y jn C c m m J _� O Ol O
COco —O oc.m °�o) a)mN n°-L0N CNNEO Nm=�O aro'3 Nm 0m-OJ«'C
Emm E_w oc �.3°0oa Yc o E m ymE>aaco O 2 m
ca0c�=g° m mo ) E
m mo00 am xN°No
LLZ_. �NN ana U O
O LO C-E O a) O) Cvl 3 acE «0
—.—oC _E N>> no °0
0
mt0 m
`L Eo
o of °omo
O yL ais
0 uL CL°CO N m E i0) m U N
`�E O) NL m Om c a) m
O ,E n`
m m r N C U C NLNNm«oaci ma-mo LrU O a=°Jai aam
YNp Lmv)a 0 O
J- E O N OUy NQ0N O p0U1 'O m O O m O O LC
o N C aUmJNQ:aaNCp_-
a) co 0)a N N '
o = n
U °a)«U E mpomN
L U =°« Q LE° a) v)L m -' 0 0 0 O
N ua«a) 'OO U
)m LLJ « c - Cca a)LLa)m JENro`N
pc-C)N O N O N L F omoc m O ,m a, EF co 0wE`�wccoE�1 Qn
0 0Dm�s
ro°momomca NN Nm3U 2�o EaEc)
0 0
N o c
°C OY OCm ra)0LmE 0 0 0 V r 0 Q ON E0, EoE >a)o a >Co m.> N0 m al EO>
UY°Em LNc« E SOa° pm a'Oal a a) NON U 0 mmE cC oro°a`L E m
c
n H
« =
a)c NN 0 U U oaO
0 N pa m
oa0 pm�a�O w�mcc`0D-.mo
Ca — m ap COID
O m N
C) Oo
O O N UO U wa) O
°E
mo«a�mwmac 0EaoEa0-O00 0L� CEI0O 0
� aOm>N
E co T a
Ca 0
CL
o
Yl N « Co CO a)
oEam 00a'E Oa-
N
_ omaE-cNcUaE) aE") LmamT�iYEa) '�rn�U -C aLm- ca) E�cai Vatii -ai m`viE>`._�cmi aNmi aaaJ,) anmmi acai �En -«�c �=°0)=:«U�m2 �N0m-'•mmcm0-
Ym«moE aO
OE U E
O m D m0E a) O c c
a OO1]HE O Co O O
«O 0
? a
`6o-0 E2=Tn-a
Eoro mmW0 a
a) oLE 0 ) E
.o
omN�°Noma°E m>oE
E fN D.O L~ m O NNw
O - E 'a O co °o a) 0) m
ca
ao-�omor
omma
°oE
� m(DO m Eu
ow
M0oU?¢aUEo o 3 0 `o FDL
ooo _L0� 000 oE�- °mm N o��� o per?mmmoao1mo=) aoEms>
p c o E ao-« p « a)m
O 0 �@r 0!
o o_rm Lmm o mr ?
�EQcop�pE
°aiwE N o°«Ofa N °N°Encm0OUa N 0 a a U 0
State Highway Access Permit Page 1
Attachment to Permit No. 404086 - Additional Terms and Conditions
1. If there are any questions regarding this permit, please contact Tess Jones at (970) 350-2163.
2. The Permittee shall refer to all additional standard requirements included with this permit and any enclosed
additional terms, conditions, exhibits, and noted attachments.
3. Incorporated as part of this permit are the following:
Application for Access Permit (CDOT Form No. 137)
Permit (CDOT Form No. 101) and its two page attachment
Exhibits:
See Permit #404085 for Exhibit A, B, C, and D
4. This permit is issued in accordance with the State Highway Access Code (2 CCR 601-1), and is based upon
the information submitted by the Permittee. This permit is only for the use and purpose stated in the
Application and Permit. Any changes in traffic volumes or type, drainage, or other operation aspects may
render this permit void, requiring a new permit to the be applied for based upon exisiting and anticipated
future conditions.
5. Access construction methods and materials shall conform to the Colorado Department of Transportation
Standard Specifications for Road and Bridge Construction (current edition).
6. If necessary, minor changes, corrections and/or additions to this permit may be ordered by the Department
inspector, other Department representative or local authority to meet unanticipated site conditions. Changes
may not be in violation of the State Highway Access Code. All major changes to the plans must be approved
in writing by the Department prior to commencement of any work on or within the State Highway
right-of-way.
7. This permit is subject to revocation due to: 1) Noncompliance with the provisions of this permit; 2)
Abandonment; 3) Supersedure by new permit covering the same installation; or 4) Conflict with necessary
planned highway construction and/or improvements. The Permittee shall promptly terminate occupancy upon
notice of cancellation of the permit from the Department, unless a new permit is applied for and granted.
8. This access is limited to RIGHT TURNS OUT ONLY.
9. Reconstruction and improvements to the access may be required when the Permittee has failed to meet the
required design and/or material specifications. If any construction element fails within two years due to
improper construction or material specifications, the Permittee is responsible for all such reparis.
10. The Department retains the right to perform any necessary maintenance work in this area.
11. Backing maneuvers within and into the State Highway right-of-way are strictly prohibited. All vehicles shall
enter and exist the highway right-of-way in forward movement. Backing into the right-of-way shall be
considered a violation of the terms and conditions of this access permit and may result in revocation of the
permit by the Department and/or the issuing authority.
12. The Permittee is responsible for obtaining any necessary additional federal, state, and/or City/County permits
or clearances required for construction of the access. Approval of this access permit does not constitute
verification of this action by the Permittee.
13. All costs associated with the installation of this access are the responsibility of the Permittee. This includes
design, construction, signing and striping, utility relocation, testing of materials, and inspections.
14. No work will be allowed at night, or on Saturdays, Sundays, and legal holidays without prior authorization
State Hiqhway Access Permit
Page 2
Attachment to Permit No. 404086 - Additional Terms and Conditions
from the Department. The Department may also restrict work within the State Highway right-of-way during
adverse weather conditions.
15. Traffic detours or lane closures will not be allowed, unless pre -approved by the Department.
16. Two-way traffic shall be maintained throughout the work area at all times unless specific written authorization
is obtained from the Department.
17. No construction vehicles shall be parked, or construction materials/equipment stored, on the State Highway
right-of-way overnight.
18. Landscaping and site construction shall not obstruct sight distance at any State Highway access point.
Landscaping within the State Highway right-of-way requies the Permittee to obtain a CDOT Landscaping
Permit from the Maintenance Section. The access permit does not authorize that activity, although a proposed
landscaping plan shall be included in the access permitting document. Irrigation of features within the
right-of-way may require the Permittee to install a subsurface drain in accordance with CDOT Standard
M-605-I or other approved system. The Permittee shall contact Don Miller at the Loveland Maintenance
Office, (970) 667-4650, to obtain the Landscaping Permit.
19. Routine, periodic maintenance and emergency repairs may be performed within the State Highway
right-of-way, under the general terms and conditions of the permit. Any significant repairs such as culvert
replacement, resurfacing, or changes in design or specifications, will require written authorization from the
Department. The Department shall be given proper advance notice whenever maintenance work will affect the
movement or safety of traffic on the State Highway. In an emergency, the Department Region Office and the
State Patrol shall immediately be notified of possible hazards.
20. All work is to conform to the plans referenced by this permit on file with the Department or as modified by
this permit. (If discrepancies arise, this permit shall take precedence over the plans.) The Department plan
review is only for the general conformance with the Department's design and code requirements. The
Department is not responsible for the accuracy and adequacy of the design, dimensions, elevations, and any
other elements which shall be confirmed and correlated at the work site. The Department through the
approval of this document, assumes no responsibility for the completeness and/or accuracy of the plans.
21. All materials, equipment, installation, construction, and design, including the auxiliary lane(s) and intersection
improvement(s) within the State Highway shall be in accordance with the following Department standard
references as applicable:
A. State Highway Access Code, 2 CCR 601-1
B. Roadway Design Manual
C. Materials Manual
D. Construction Manual
Standard Specifications for Road and Bridge Construction, latest edition
Standard Plans (M&S Standards)
G. Manual on Uniform Traffic Control Devices (M.U.T.C.D.) for Streets and Highways and the Colorado
Supplement thereto
H. A policy on Geometric Design of Highways and
Transportation Officials (AASHTO), latest edition
I. AASHTO Roadside Design Guide
Streets, American Association of State Highway and
J. Institute of Transportation Engineer's Trip Gneration Manual, 6th edition
State Highway Access Permit Page 3
Attachment to Permit No. 404086 - Additional Terms and Conditions
Some of the reference materials listed above (A thru F) may be purchased from:
Colorado Department of Transportation
Bid Plans Room
4201 East Arkansas Avenue
Denver, CO 80222-3400
(303) 757-9313
The State Highway Access Code may be purchased from:
The Public Records Corporation
1666 Lafayette Street
PO Box18186
Denver, CO 80218
(303) 832-8262
The website is:
www.dot.state.co.us/business/accessmgt/
22. Survey markers or monuments must be preserved in their original positions. Notify the Department at (970)
350-2173 immediately upon damage to or discovery of any such markers or monuments at the work site. Any
survey markers or monuments disturbed during the permitted work shall be repaired and/or replaced
immediately at the expense of the Permittee.
23. Should any excavation encounter plant or animal fossils, the remains of historic or prehistoric structures,
artifacts, (pottery, stone tools, arrowheads, etc.), the work shall be stopped and the Permittee shall notify the
Department inspector.
24. The Permittee or the contractor shall notify Linda McWilliams at (970) 350-2147, at least two working days
prior to beginning any access improvements or construction of any kind within the State Highway
right-of-way. Failure to comply with this requirement may result in revocation of this permit.
25. The Department inspector may suspend any work due to: 1) Noncompliance with the provisions of this
permit; 2) Adverse weather or traffic conditions; 3) Concurrent highway construction or maintenance in
conflict with permit work; 4) Any condition deemed unsafe for workers or the general public. The work may
be resumed upon notice from the Department inspector.
26. Upon completion of the work, a letter certifying that all project materials, construction, inspection and
workmanship was in accordance with the plans and applicable Department Standard Specifications for Road
and Bridge Construction shall be submitted to the Region Access Manager. The certification letter must be
signed and stamped (sealed) by a Colorado registered professional engineer.
27. The access shall be constructed 16 feet wide with 20' and 5' raddi, as shown on Exhibit "A', Sheet OR 2.
28. Construction traffic control devices, when not in use, shall be removed or turned away from traffic.
29. The access shall be completed in an expeditious and safe manner and shall be finished within 45 days from
initiation of construction within State Highway right-of-way.
30. All required access improvements shall be installed prior to the herein authorized use of this access.
State Hiahwav Access Permit Page
Attachment to Permit No. 404086 - Additional Terms and Conditions
31. The access shall be surfaced immediately upon completion of earthwork construction and prior to use.
32. Surfacing of the access shall be completed as per Exhibit "A", Sheet U I .
33. No paved surface shall be cut unless specified in this permit. Asphalt removal shall be saw cut to assure a
straight edge for patching.
34. The top layer of plant mix bituminous pavement shall not be placed between October I and April 1, unless
otherwise approved by the Department.
35. Any layer of bituminous pavement that is to have a succeeding layer placed thereon shall be completed full
width, before succeeding layers are placed.
36. If frost, water or moisture is present in the subgrade, no surfacing materials shall be placed until all frost,
water or moisture is gone or removed.
37. The access shall be constructed and maintained in a manner that will not cause water to enter onto the
roadway, and will not interfere with the existing drainage system within the State Highway right-of-way.
Drainage to the State Highway right-of-way shall not exceed historical rate of flow.
38. All existing drainage structures shall be extended, modified, or upgraded as necessary, to accommodate all
new construction and safety standards, in accordance to the Department's standard specifications.
39. The Permittee shall request final inspection by Linda McWilliams at (970) 350-2147, within 10 days
following completion of access construction, and prior to authorized use. The Permittee or their representative
shall be present.
40. A fully executed complete copy of this permit must be on the job site with the contractor at all times during
construction. Failure to comply with this or any other construction requirement may result in the immediate
suspension of work by order of the Department inspector or the issuing authority.
41. The design and construction of access and/or development of this property shall not negatively impact
adjacent nearby properties. Correction of the problem and cost resulting from damages shall be borne by the
Permittee.
COLORADO DEPARTMENT OF TRANSPORTATION
Issuing aW Bpplicati n
STATE HIGHWAY ACCESS PERMIT APPLICATION
acceptance to. t
instructions: - contact the Department of Transportation or your local government to determine your is uin authority.
- contact the issuing authority to determine what plans and other documents are required to b submitted
with your application.
- complete this form (some questions may not apply to you) and attach all necessary documents and
submit it to the issuing authority. Submit an application for each access requested.
. if you have any questions contact the issuing authority. Please print or type
1) properly owner(permitleo
�jm;¢ lu.fNi III . L. -
2)Alarcont ,
NG. E __C F)LKEN ni iii 25
slreotaddress, Sry �5^�� �T'Y�
A
12AZstreptoddress`-'dCY wCAp16N �' 12tir W"
oT 9
slat
phone#
state &zip
an..fe6il
FCI /I<•'J
1n—Yob1.030(�
it N P0144 E, I
2`zSalr4i.9�{W
3) Adds,, of propety to be served by permit (if known)
A-1ia-__..('.7� 0. �+F Px'1NCO ON e- 11i of ept.E41A-NJI
4) Legal do,fet to n of property:
y euatMvw decx for seorwn ry made
5) VP et slate highvey d yo„equesting access from?
6) what ado of the highway 0 N 0 5 WE U W
')How rnuny/1feel is lha proposetl access from the nearest mile post?
How many teat is th5e pmpose(tl{a�ctcersssffrom Ineares�l
M_ �D feot(cirdr S E W )from:/StyW
�c'r�o,smeet9
)from: reUS
e) eckhereifyouarereque ga
u new access ❑temporary access O improvement to existing access `}� cha gd in a c ss use ❑ removal of access
Cc Tn oZL.�
_
[)What Is the approximate date you intend to begin ecart coon?
5EPT; Z I L-1i
te) Do you have knowtedge of any Slate Highway access permits serving this property, or adjacent properties in which you have a property Interest.
if the
11� no ❑ yes, yes - what are permit numbers)?: and/or, permit date:
I1) ❑ces Iha propertyowner own or have any impresis r any adjacent property,
il no O yes, if yes - please describe:
12) Ara (ham othorexisting or dedicated public streets, roads, highways or access easements bordering or within the property?
X no Ll yes, if yes - list them on your plans and indicate the proposed and existing access points.
13) II yov are requesting commercial or IntlasVial access please indicate the types and number ofbusinesses and provitle the ilUor area Square footage or each.
business encore bui busineso. square footage
htSf�JG CA*E� Cr1-IekVA1 ,A ?,,VMhLneAvWkeci
--
wlLl,fiI &4 wjhg°F
—
(?ilRlpt9WTIF 7n C_iIl
14)Ityouaij apdculturaI field access- howroan, acres will theaccess ssuve?
w1kresting
_
15) It you are requesting residential dovelopement access, what is the type (single family, apartment, townhouse) and numberof ui
type number of units type number of units
16) provide the following vehicle [aunt estimates for vehicles that will r5c the access. Leaving the property par returning IS Me fromi 5_ Indicate if your counts are
wponk hour volumes or ❑ average daily volumes. SM h7RCft0-"5 QbI JAIII wii 11111 1`14 r1
nave=>mm;==�+,e ryr,r wrx.
ammw �m�uum
teww oeman:
am n's. w..ra..m.+uwn m sU e.
aar.,m ,a1 tram emi
Total counter all vehicles
I W K.
I
�u�
_
17) Chock with Ice issuing immodly to determine which of following documents are required to complete the review of your application.
(plans should be no large, than 24' x 36' )
c) pmparly map indicating an or access, bordering roads and streets.
a) Highway and driveway plan pri ile. D Proposed access design
b) Drainage plan showing' impact to the highway dght-of-wag g) Parcel and ownership maps lndluding casements.
c) flop and lottery detailing tnility bcaiions ba(dre antl agar h) Signing and striping plans.
development in and along therghtot way. i) Turi control plan.
d) Subdly¢ion, zoning, or development plan. j) Pmmoflimilityieverance.
If an access permit is issued to you it will state the terms and conditions for its use. Any changes in the use of the permitted
areas not consistent with the terms and conditions listed on the permit may be considered a violation of the permit.
The applicant declares under penalty of perjury in the second degree, and any other applicable state or federal
laws, that all information provided on this form and submitted attachments are to the best of their knowledge true
and complete.
Applicants signature
Date
If the applicant is not the owner of the property, we require this application also to be signed by the property owner or their
legally authorized representative (or ofh acceptable wriito vi ence). This signature shall constitute agreement with this
application by all owners -of-' forest ss fated in wr . if a permit is authorized, the property owner will be listed as
the permitted.
rropeny-ownmsignatur --- -- w--
Dole
Pravlous editrna may be usud until rupprias are..hwaid.d LOOT Farm A137 9196
a
RAISING CANE'S CHICKEN FINGERS RESTAURANT
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
JANUARY 2004
Prepared for:
Raising Cane's Chicken Fingers
1212 South Acadian Thruway
Baton Rouge, LA 70806
Prepared by:
aF��sr
MATTHEW J. DELICH, P.E.
aFp0
2272 Glen Haven Drive
Loveland, CO 80538
Phone:970-669-2061
FAX: 970 6695034
Wt i
LO
N
co
C
LO Ln to
N LO
Johnson
20/10
NOM —�
15/25
50145
�— NOM
50/75
Spring Park
0 0 0
N M N
N
N N N
O
0)
O
Y N
35/25
45/30 —
Exit nly c
LD cJ\
L
N
O
co
Cl)
N
T777i r Only
o
0
m
N
to V
- 10/10
O N 7n
1
20/20
50/35
/—
210/180
)
t r Rutgers
20/20
o o LO
65/65
o C o
1� N N
LO
N
LONG RANGE (2025) TOTAL
PEAK HOUR TRAFFIC
C
O
m
C
E
m
NOON/PM
Rounded to Nearest
5 Vehicles
A&
N
Figure 9
15
COLORADO DEPARTMENT OF TRANSPORTATION CDOT Permit No.
STATE HIGHWAY ACCESS PERMIT 404085
State Highway No/Mp/Side
287C/344.710/R
Permit fee
Date of transmittal
Region/Section/Patrol Local Jurisdiction
100.00
10/04/2004
04/01/04 Fort Collins
The Permittee(s), Applicant; Ref No. 2004
Raising Cane's Chicken Fingers
Timberline Tech Center, Ltd. 1212 S. Acadian Thruway
3030 S. College Avenue Baton Rouge, LA 70806
Fort Collins, CO 80525 225-383-7400
970-204-6306
is hereby granted permission to have an access to the state highway at the location noted below. The access shall be constructed, maintained and used in
accordance with this permit, including the State Highway Access Code and any attachments, terms, conditions and exhibits. This permit may be revoked
by the issuing authority if at any time the permitted access and its use violate any parts of this permit. The issuing authority, the Department and their duly
appointed agents and employees shall be held harmless against any action for personal injury or property damage sustained by reason of the exercise of
the permit.
Location:
The access is located on State Highway 287, a distance of 3,754 feet north from Mile Post 344 on the east/right side.
Access to Provide Service to:
FastFood Rest................................................................................................. 3,244 Sq Ft 100.00 %
Other terms and conditions:
• See Attached Pages 2 and 3 and Other Enclosures for Additional Terms and Conditions.
• Right -In Only access (raised center median exists on SH 287)
• Access is also available from Remington and Dartmouth east of the site. +'
• See also Permit #404086, for Right -Out Only access.
• A Warranty Deed shall be provided to document the dedication of additional ROW along SH 287. See Notice to
Proceed.
• The Notice to Proceed will be issued upon CDOT's receipt of the Contractor's Certificate(s) of Insurance.
MUNICIPALITY OR COUNTY APPROVAL
Required only when the appropriate local authority retains issuing authority.
By
Date
Title
(X)
Upon the signing of this permit the permittee agrees to the terms and conditions and referenced attachments contained
herein. All construction shall be completed in an expeditious and safe manner and shall be finished within 45 days from
Initiation. The permitted access shall be completed in accordance with the terms and conditions of the permit prior to
being used.
The permittee shall notify Linda McWilliams with the Colorado Department of Transportation in Greeley at 970-350-
2147 at least 48 hours prior to commencing construction within the State Highway right-of-way.
The person signing as the permittee must be the owner or legal representative of the property served by the permitted access and have full authority to
accept the permit and its terms and conditions.
Panoint a
Date
(X�l3rAV 2ANocKS SIaN I 66NjIll 1
�/ll�i/NG LAN�'u KEJi3i 1.iQA/w1.
/
This permit is not valid until signed by a duly authorized representative of the Department.
COLORADO DEPARTMENT OF TRANSPORTATION
By
1C.
Date (of issue)
Title
Access Manager
(x) 1, �,(LL 1.e�
Copy Distrlbution: Required. Make copied as necessary for. Previous editions are obsolete and may not be used
1. Region Local Authority Inspector CDOT Form 1101 8198
2.Applicant MTCE Patrol Traffic Engineer
3.Staff Access Section
I^
COLORADO DEPARTMENT OF TRANSPORTATION
Issuin a ihodq application
STATE HIGHWAY ACCESS PERMIT APPLICATION
aeae n date.
Instructions: - contact the Department of Transportation or your local government to delernmine'7di isiltung authority.
- contact the issuing authority to determine what plans and other documents are required to be submitted
with your application.
- complete this form (some questions may not apply to you) and attach all necessary documents and
submit it to the issuing authority. Submit an application for each access requested.
- if you have any questions contact the issuing authority. Please. print or type
u ltruperly owder (Permitted)
{may T
2) Appliseed
soZ#titt3,s city
eeet adtlnss my
street ddnss, city �,.rrr
c
uwaazip
-�v_ctd�i��
phone#
Ciwed)
sla[edzip
�y}yZ+✓ %ZvkG6
phone#
r_ �85 7yvn
)lddress of propetymbe servetl by pneed (if known)
_���J?�. L.23z_-!✓' vF lafnt,EGS o.v t• SroE of taLtEaE AyE. _-_-
-
4)Legaldcscrr'ptionotprapadV'
Iiii..n b. uclon ,trarrulp rya
L ZtAn l -Fir Goa y /
5)whafstralighw�a oumquestingaccessfrom?
S)Whatsde oflhehighway O N ❑ S E ❑ W
])How cianylaot is the proposed access from the moaned milopost? How feel is the roancdaccess or the nearest rsoss street?
��manA`y
�_ ,_feet(I,irde. N S E W )fmai- � c4deGiSA )fram:R
O) e�iack here If you nro requesting a "�
❑ new access ❑ temporary access ❑ improvement to exi5ting.1cge�s,u} ghgnt n access use It removal of access
�"- U4 HIV
9) What is me approximate date you intend to begin constructed?
4EPi'2+�fBl�"a� so tapoY
10) Do you have knowledge of any State Highway amens permits sop ing this property, or adjacent properties in which you have a property interest.
tyXno ❑ yes, if yes -what are the permit number(s)?: and/or, permit date:
11)noes Ih )openyownerownorhaveany Interestsmany sdjamm perfarry? �W
no it yes, if yes - please describe:
12)Arem 0 in c existing or dedicated public streets, cases, highways or access easements bordering orwthm lite property?
,ne ❑ yes, if yes - list them on your plans and indicate theproposed and existing access points.
t9)Ifyou ure requesting commercial or industrialaccessponne nterna fietypes anti number of businnssesandprovide thefloorerne square foot age of oorea
square footage business square footage
�business �
�8rrlA'4_ SG3t_r�_,It�ii! f% 2 ' t
t7l'+Glifi� /fle�5'S .✓1ct Eacd�I_ 6��r+/A-�/ cF
14)Il ynu are quosdng agricullmalfieltl amass -how many acres will rho across serve'1
15) If you am requesting msidentiade+clopomenl access, what is the type (single family, apartment, townhouse) and number of unit0
type numbefofunils type numberefunils
16)Providet o following vehicle count estimates for vehicles that will use the access. Leaving the property then returning is two counts. Indicate fpur counts are
- oak hour volumes or ❑ average daily volumes. LrE y)- 775' 0J ,p y J`4e1 -
Ad..... naxr e-,- n,NU '—e4u a
YpITJIr Un114Veka
a
pW IXtw mI,IWa .�
nan—wncles lrxu el•,ipmenu
Total count of all vehicles
y.erapplicauori.
I t) Check with the 'dormauthority to determine which or the following documerds are required to complete the review of
(plans should be no larger than 24-x 36-)
e) Property map indicating offer access, foddering roads and streets.
if Highway and driveway plan profile. t) Ptopasedaescradin ige
b) Drainage plan showing impact to the highway debtofway. g) Parcel and ownership maps including uasemenLs.
c) flap and letters detailing utility locations before and after h) Signingandenping puns.
development inand a long the right -at -way I) Traffic control plan.
dj Subd:vbion, zoning, or Development plan. if proof of liability insurance.
If an access permit is issued to you it will stale the terms and conditions for its use. Any changes in the use of the permitted
accoss not consistent with the terms and conditions listed on the pert it may be considered a violation of the permit.
The applicant declares under penalty of perjury in the second degree, and any other applicable state or federal
laws, that all information provided on this form and submitted attachments are to the best of their knowledge true
and complete.
ApplicaNs signature
pate
-Of
If the applicant is not the owner of the property, we require this application alsoto be signed by the property owner or than
legally authorized representative (or other acceptable written evidence). This signature shall constitute agreement with this
application by all owners -of -interest unless sl to writin a permit is authorized, the property owner will be listed as
the permitted.
PmPuny owner signaWre --mm4�
Cate
Previous oditlarejmy be used until supplies are exhausted 600TFarm#137 MCI
I
I
I
a
RAISING CANE'S CHICKEN FINGERS RESTAURANT
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
JANUARY 2004
Prepared for:
Raising Cane's Chicken Fingers
1212 South Acadian Thruway
Baton Rouge, LA 70806
Prepared by:
0 REG�ST
MATTHEW J. DELICH, P.E. o; •��W J. p� .F�
2272 Glen Haven Drive
Loveland, CO 80538
Phone:970-669-2061 �? 3
FAX: 970�69 5034 ��%
m
m
d
0
U
uO
N
I
C7
LO
N LO 50/45
f— NOM
y 50175
Johnson
20/10 Spring Park
NOM
15/25 N co,, N
LO N O
N N N
O
O
N
35/25
45130
Exit Only
LD
Lo
,S�
,/ Enter Only
o m
CD
L C
o Cl)N u� 10/10
Irn N v 20120
J 50/35
210/180 1 � r Rutgers
20120 —� o o n
65/65 o � o
i� CIA N
LO
v
N
LONG RANGE (2025) TOTAL
PEAK HOUR TRAFFIC
rAi
Oa\
y� a
NOON/PM
Rounded to Nearest
5 Vehicles
Alk
N
Figure 9
15
Revised Standard Plan M-608-1
EXHIBIT "C"
4040S5
„,koesisxeuLLEnx
Colorado Department of Tra sportati n Revised Standard Plan M-608-1
Project Development Branch 2003 Number 1, Page 1 of 2
Issue Date: October 29, 2003
Curb Ramps with Landings and Detectable Warnings
Revised Guidelines have been adopted by The Access Board under the American Disabilities Act
(ADA) defining traversable slope requirements and prescribing the use of a defined pattern of truncated
domes as detectable warnings at street crossings. The regulations issued by DOJ and USDOT state
projects must include accessibility standards for newly constructed and altered facilities covered by
Title II. The standards must be consistent with the guidelines issued by the Access Board.
CDOT is issuing new Standard Plans and Standard Special Provisions to follow the Access Board
requirements. New Standard Plan M-608-1, Curb Ramps (4 sheets), and associated Project Special
Provision, Revision to Section 608 — Curb Ramps (Detectable Warnings), will be used for construction
projects advertised on or after November 26, 2003, for installing new and replacing existing curb ramps.
Earlier use is permissible.
,m.
608010104.pdf
10
608010104_dwg
MAN
;;o-
608010204.pdf 608010304.pdf
60801dwg 608010 WG
W
608010404.pdf
The DOJ has determined that on all projects, curb ramps shall comp
regardless of ROW ownership orjurisdiction. This mandate also apl
Application requirements for specific types of projects are detailed in
Accessibility Requirements” with the transmittal from Tom Norton, Cl
Tom Norton
ADA Accessibility
Accessibility Requi...
Requirements...
th the n
to resur
attachei
.1=xecuti
Colorado Department of Transportation
Project Development Branch
DESIGN BULLETIN
Revised Standard Plan M-608-1
2003 Number 1, Page 2 of 2
Issue Date: October 29, 2003
Alternate materials and other construction techniques for truncated dome detectable warnings may be
used with concurrence of the Standards & Specifications Unit. Requests for information are out to
other suppliers and manufacturers of pavers and other detectable warning systems. The attached
Detectable Warnings Material Suppliers List will be updated and redistributed as it is received. Don't
hesitate to contact CDOT Standards & Specifications with any comments or questions.
5M
Detectable Waming
Materials 0...
The new Standard Plans and Project Special Provision can also be found on the Design and
Construction Project Support web page at: http://vnwv.dot.state.co.us/DesignSupport/
For paper copies of project details and project special provisions, or should you have any
questions or concerns on the application and use of the revised Standard Plan or project
special provision, please call: CDOT Standards & Specifications at (303)757-9474.
§
!)}
.,
.
,
}
!|
f
{;
(
}
A
No Text
No Text
\
-
/
77\
\
;
g=� b
:
£ !
E
\
\,
{
\\
Ri�\
/}
|)f)
( ƒ |
h
;
�
■ �
,
`
°�
}
00
O C
C _In O ��
CO N m 0 C N V U .- COE « T m� E C_ N V V m 3 co
c ° o c « �cc a� m o ,� -mo a) Coo a) a`) « c rLn c -o �' 3
« C m 3 .0 O r L. L a a° O L m c L c N n'3 J N'` c m N N C m
N m Y N C T U) O F' O N a D U O O) m t/) a) D N 3 L � L C
L c-'� m O w N L w O L
O C .0 C O) "O N Co .0 '0 0« m L __ N C `L-' o m c I U N E" 3 U
OU m C o E 2 'O « rC a C O U Q a N N y C E« . N« O U 0 m L Q O m m U N m m
oo°oNu)a'ma)°3�"-oocO1.oc ° QWOLEa�cictlaci 7D--CD— "�.o�YE
Co CO C >
c` o .° ° n m L °_'�: = m °' ` axi tJn ° r ro E o .- o °c ~ 3 y a) m m- 'E c
Cira��m,a)otJnL�r�roN�° m cNam.mo�mEmU m°-a-Oi�°c ««omro�
Nao�xam�nya)aiacmoE -o aNi: �'mo0a�a Et°awairo)a`ri a°i -m10 aai�
.N N m Q °) L O W ID sa) ° E w a n U C -% E 3 m O ro N C U° N N -NO T m a c O ro« y
N= C m c 0 ro C 41 O N N O N O` m d Q O N >, m O m ° o U m m 3 T T O j C a)L N 3
U E m` T N O d .- N L a 0 i9 m R r a L m L E �' E yam N '= m m �- m C o
moEE -o c( o J a.m'c -°ocr oc.o)E EN(,-oo0
« 0 O N o U �_ E m ro a (mj L a m U m U N m O U m m °- ° N« O m T c U m � N
w �O 0 3 � 7- d CCo 0
` T 3 m .. ° '= L O Ol C O L_ L .O O) 13 OC O m C LA - r ro O a c
-o E m m m o t L N z � c E a) o U
"Q ro m ID
a« .J m eE ID 'D .n c) C C t°/) .'L-' m ro .0 N L . m° L r-� D` O U N L a o w a .` "' E
W DEL a)�°-o)�c �o-CDM c Nr n�V-CN° c320c�°m pOcc«`o
J N .- ° N m c N m LLl U L a C T J N .E N C a) ° m C- a) ° f/) Z m O a r m O-° 3 C
N a) -' E D N N� f. « C tT ro Ol U m '- « O m O m ~ O m U O C O U T'0
N N T m- C U C '- N •-
°J- ZIDo ro o m J 3 o o E. c�Q m � o maw"- a-o 2 a w U«_o_J 2.o 0 a oID z_E E'ac
E U Z 0 N C u U a) m m N C m L «« N U N "m0 N L OC a) T D c m a) T O m .O O
o aN0 spa �u>o o Co oo °c oaN)D O>. - 3�a°x0 '=° .._ c
z° allo� omN Dom•- Ci'o oam oa mm,- x oa) OcEEoo
O�Y m.-«� AIL- CO) m c m `T° o c nm m`o c Na -o y� o E m o o n «am `m c i.
m Ci E m �-o E w E m 0 m.. E m m z E o m m E m° o c coi o)o.t° o o 0 c°-o
TC C C U'� «L O� U
Q L m O O) m E C m a) m L 7D m m U O .� E -O °- .- °= U U E o 'C N CW._ A 0) C« L m L
a Y zi
N L> d C O .O 'Q L «: 'C C .. m U U F- N p U° L 3 N in E a` >` al "O .�' Co 0 C ro Y tT
X E T> 'L" N -O N d a1 3 C j O w a a LL D O° W 0 a) C m 0 3 U 76 0 CZ N .o N N N
F °)�o°''oJami r`Ero`_rocota'n°° ¢co a°iD���3"m�ton ��ma) aomm m�cc3�
gQ°�m«�>`cmmE_c'ocra)a) t~i 0 �tmn .J`.. -°J L«LLE.�r`J L`.00,��
[[ o Ecmma0a,ao�-'�°-..'�° z a EEcton.cCU ~Zt.60ia)� ~c�c�rc
a�3m>.°`o)«°«c`ci0 maa))«ZZ C) 0 Na?a°am)�'o)$o c+i `o ma�a'E� �000.o)o
m N 2 O a)
73 a)C M m
« OL T m« Co a,ro
L aC Co 0 _ O O O L « C p E- CA C E
'm0 m m O m N �m N a a` O� p 'I) Co C N N L 3 p 3 O c 0
O c O 5 w Z L c E« m'E ro r m a mID C- L m C O a" m C m 0 V � N
U mOONE3NoE �.;occo°E°m cacti°-m° >' >3Etim
WEW=M=WW,a 'EarmOI:Dmc�-a ca mocaom>mE-->o'E-o
coiEami«mN a`)ror_.�mCiH _ o _ro a)oNa«.Sm ooaES
a° C a) ro« tU6 a« Lj m- m .., d CA ? m O
a UUO-��.0 mNmO~°«>EO DY mTw 0'tc m N.CC A>«UC
oa E - sa U m L.c `m L a
3> m m a E L@ 'O Oc ° .2 - O- °C O Q c- T `L-� « -a)O w D > E«
o) °) L .N a o m � c `� o m o c a� c �° 3 U o)CA
D M m > E c E o f
0 0= `a )3m o ma0 `N a �z coc m « )EE I°
O co « y -
Emm mmro oomEE
���o'� coa°NE
noa�°E??c,auoaaE�U ta N73'yC
aTEmNuUNrn YLt°ao�mmanm�'UTcL-mrrcLN Lm 0L0 ca)L
>oammU° ffUTcc�m LSmN°] pcaL.�JO.
m..m
N3 0ECmoycoEZ0 ENuuro Ta)Ea)
Co Cm E mz o O
O m ma
o mmEooao3oo` morom«
U oCO =a�o«aso 2IDmmE
xc0ocQa o
�CoN«CO o
U,Lm�mon�o 0"oLEc-omaiu im3toE E«
oo Cu°o N Nm�c
T«nJ m ID CO
m Oa) a) a) O m Q C 2 NLO
uao Ncor000uoc�_° mc
maC, M°
N aa�
-�°U E a)�Cm U.m0o N N ro ro (L) N o a m
EmN.E - C'c° cm�aom«y> EU 4 'c a °
�Y �cO
L a a .- O` O L O m I3 « � a 0 o N 0- O a al N C L m N« c a C> 3 L-
-O C O C a ID U > ] m> T N a)- m U
OI 3 a) O '� m J _- m to J <n o L C N ro N a' m w J w m J « C m o 0) .- m
T- O O m c- E m C -?! (a m J O O T .- .° N 3- w L N C T a) J N o- N N N m m .N .m C (CG
0o cmromrm QL o�mf°EEE~o)ci C 7D ccm cc m= c� ID c)cE
.m.. E N .O m m .0 - E tT C w(n« N m° N O C_ Q- N - O E o = a) D- U ¢ O N
°- J n ocn J a a o E c E o m a m° m L E '� a L E c o) m am c
r O L L m> a) N a •- (U to LL >, o a-O O m 0 ct L a L a. > 7D O a` ID O ° d am to
fn LL F H N m Q .N m MID _ Q � L« m m 0 U M 0 m N N a M 0 C> ro C ro 3 m 0 V C m L
M
O
O
N
(3)
N
LLI
m
O
U
O
I
OD
N
N
N
co
(D
00N
CD
000
O
_N
M
Cl)
m
cor
O
00
00
a0
(O
Il
M
@
O_
v
M
m
M
O
r
M
O
—
—N
3 c
a
N
O
N
N
O
,o
c
m
r
r
N
It
N
v
0000
(o
(O
(O
r
LO
(o
u
i
M
V
'
N
N
LO
N
U'
Ln
c
E O'
N
h
N
N
O
It
N
O
r
m T
co
oo N
N
N
0)
't
co
N
r
j, (Cp
O
co
M
co
�t
O
M
O
O
O
O
V L
0
0
0
0
0
0
(o
0
0
o
0)
co
co
v
OD
r
00
co
00
C 3
gym..
C d
mr
3a)
�^
�r-
mr
(n
U M
O O
E'
m
u
m
'V
o
E
m
a)
N
m
3
Ul
7
>
N
Y
C
'aC
(n
a
Z
(30
a
C
O
O
'O
)
Q
C m
C
C
C
-
-mi
°
d
d
U
m
Y
d
aa) J
(° o
0
w Cl)
O 00
V O
01
Q
N
OU
U
`O
O
Q
Q
�M
U
OU
OU
U
m
no
M
0
0
C)
n'
z
N
>
E m
m
d
`m
o
E
c
m
c
m
—
'v
>
>
>
o
0)
>
p
m
o
L
c
c o
m N
N
C
C
C
C
C
C
O
C
U
2
S
(n
m
in
ti
m 0
n>
N
N _m
Y
O
N
U
m
V
a
L_ U
°
m
m
0
d
c
O
_
m
O
N
C
Y
U
O
_
OU
co
m
1—
0
C
m
m
0 0
m
C
m
C
r
E
m
U)
Q
_m
Cl
m
m
CO
d
n.
W
0
U
W
(n
Cl)-
m
m N
E m
L
O
U
C C
(3
—
O
N
N
m
d
E
(D
Y m
N—
>
O
T
CO
m
U
u
a
rn
R
a
Qa
0
m
Q
=a
m
m
m°
O
C
C
�
U
F
=
>
m
r
>>
N
W
m
>
C
—
>
0
0
o
m
O
a)
U
m
m
�
E
L
N
N
m
a Q
a
m`
m`
F-
u,
0
.�
No Text
0
cn
rn
^
Ewa
Q -
^AHH
�
N J
m
m0
L�
1
ww
a
eL
m
<
m
!
)
|
}
)
]
\
_
;!
((
�
cmco
(\)
| |
§\
§
/
G
�)]
�� :
!•
/
m
Q;
)
{
7!
\
�\
|
�!
b
A!
§
_
;
|
0
}
/
-
(
}\(�
§
-
i
\!\
|!!
IL
�
{
\
�\\
!!\ !
�!
\ `� }
HYDRAULIC CLEARANCE -
The site plan was reviewed with Samer Al-Haj. He determined
that the planned redevelopment of the site would not
negatively impact the state highway ROW.
V r} 5
O Q.NG_ mJ cO
N m>C> NW o aiN>, W
co
IL
m-
Wa)E
EOc)cTE.�'p
NaNWi'a W 0 Q (tl a) O (D 00)
Lw L "�- M--
_«°CNcC- L•�oWCC--, .T(UJm0 wN GL3mmrn Cuoi ) C -d J`C C L� m am mnNatil �NNm L°U - a - O¢gN
o 0 O cNC('
L•Cm-
°
O - LL°o0 a) m m a WE W -0 E°_N0 /a'p
° CmmwoUOOc
�U mco
TE 3aamp
O (] L O N ° Lma)C� O
Nd C -c, EQa3 ooE�'�m°E Em-Eowo.n omaW ams mJ`N OFEI- OOOo a� am � o o mQO
NCOWEE-0
,�O-A�
Qo°E3
EL UmW '0- L N 0) a) �°« a WC
OCDm Gm Emr.O N ¢ C c O j ULN WN°N O
°h T W W 0 Or % n W`
EWdO U � m3ram J N
C
N m n G 0 N o .� m o L Q m a E m aci `� O, C J W T m m- m C 3: -, 0
2a3 Em0 ZaTy�J>>N 0m 0 alc°iic�w°�30`6T�m°�EH
L_ «Ea)L° UN � OO U 0 0 N a) U(Nz ."O�- ma) UWJ
r0
E_LO
E OpN m /.) CC Na O- W
W W° °d'Lc
"W �LC - N Em O C U
d Ora ms COW E O 0w jE -ON m=(D mW
W'ra m° > N
Op W 'O n U Q (6 m U W O m 0 W
N E E W E m N ¢� n 0 .Wc m W m m G N-:N U z Y E >, > LW-
N N
cWi W c d L- W ? E ra -- O 3 `m c U J c m z E •- a° ,N.`° Qzam maO)-m YC LQ UOm L3Wm UmN�
NO
m�C Tz«EO W"mC >O
n o roow wCEinmOm U W _c w3J U NU m«° 'w moam 0
o£ �mL_'3�naoa�anma
Mn p_mANc
°°�ai - °em N
W WJN N N0ca '00 O `«y oN� W oZ
NCE
ai oE -0oE so ;aa°U m oO
u E W �O
° OaQ ° °`
TW o ma)i
LoWO3>nNE ` -OO°QNJ`�EW • .LLL'NCpocE_' DL.!�NC'om�pNOm, �Y.m-cW L.�N-LmNmZEW p'Cma-W, mWE -L�cO «CE.L.-°_mE-' «mNo «m =y>3 .Wo' «u aNWa.. OL3J N m m Om J WmTe «WW mTm .N Oco p N 00ELU UW`EmUW L.Tmco
Om 0m m c C W aN CC a)
E ECa NC)- ] U U
_am� Ua O m O0r` jE U pU� «OaC Co �CNE m O- N aE 7C0O
Oa E O LW>O' L p a>
0 O 0 L W`/° >Y�m >Wmyo0E_nEEc
amma)m 3 °°L�Cmw0>nE C J N m
W ° °Oc 3W E :E oa o c mo a c o
oIN ED EooEWmW o�a
oT
£UW
' a) 0c�cno;ma Uaoo) aEM Wwm�oa'o
�o>cJ
uNi Y °
rE E 0—
NO W mCa� NW m O GN O ��W.N0YO 0 W E a c«off0 2p� W J O EV O C WN ~�0 N
UoaoOW co�_m p) Wa V Lj .w '� .N W O m C a W m h h? N y L C m�" N D W U° N d U 3 p O W
C-E
Coo��lcA�o WE 0 o IoEmm�o-c- LoiU�W�
Lcn .-i mmO
0o_o EyacmC >E `m -
ai
Ooa O ° �o Tja)N° o
O EroU ELp0 Wm ° .
E E E m Lo°o maaim Uo15
p0 0
`o m �-0 a°0w0a?oroacw0«mmo
State Highway Access Permit
Attachment to Permit No. 404085 - Additional Terms and Conditions
If there are any questions regarding this permit, please contact Tess Jones at (970) 350-2163.
The Permittee shall refer to all additional standard requirements included with this permit and any enclosed
additional terms, conditions, exhibits, and noted attachments.
Incorporated as part of this permit are the following:
Application for Access Permit (CDOT Form No. 137)
Permit (CDOT Form No. 101) and its two page attachment
Exhibits:
"A" - Final Development Plans for Raising Cane's
"B" - Site Plan and Landscape Plan
"C" - Standard for Truncated Domes (Revision of M-608-1)
"D" - Hydraulic Clearance
WAIVERS:
(N/A - the RURO accesses are at less than minimum spacing, but no waiver required since this is an
improved condition)
4. This permit is issued in accordance with the State Highway Access Code (2 CCR 601-1), and is based upon
the information submitted by the Permittee. This permit is only for the use and purpose stated in the
Application and Permit. Any changes in traffic volumes or type, drainage, or other operation aspects may
render this permit void, requiring a new permit to the be applied for based upon exisiting and anticipated
future conditions.
5. Access construction methods and materials shall conform to the Colorado Department of Transportation
Standard Specifications for Road and Bridge Construction (current edition).
6. If necessary, minor changes, corrections and/or additions to this permit may be ordered by the Department
inspector, other Department representative or local authority to meet unanticipated site conditions. Changes
may not be in violation of the State Highway Access Code. All major changes to the plans must be approved
in writing by the Department prior to commencement of any work on or within the State Highway
right-of-way.
7. This permit is subject to revocation due to: 1) Noncompliance with the provisions of this permit; 2)
Abandonment 3) Supersedure by new permit covering the same installation; or 4) Conflict with necessary
planned highway construction and/or improvements. The Permittee shall promptly terminate occupancy upon
notice of cancellation of the permit from the Department, unless a new permit is applied for and granted.
8. This access is limited to RIGHT TURNS IN ONLY.
9. Reconstruction and improvements to the access may be required when the Permittee has failed to meet the
required design and/or material specifications. If any construction element fails within two years due to
improper construction or material specifications, the Pennittee is responsible for all such reparis.
10. The Department retains the right to perform any necessary maintenance work in this area.
11. Backing maneuvers within and into the State Highway right-of-way are strictly prohibited. All vehicles shall
enter and exist the highway right-of-way in forward movement. Backing into the right-of-way shall be
considered a violation of the terms and conditions of this access permit and may result in revocation of the
permit by the Department and/or the issuing authority.
12. The Pennittee is responsible for obtaining any necessary additional federal, state, and/or City/County permits
State Highway Access Permit Page 2
Attachment to Permit No. 404085 - Additional Terms and Conditions
or clearances required for construction of the access. Approval of this access permit does not constitute
verification of this action by the Permittee.
13. All costs associated with the installation of this access are the responsibility of the Permittee. This includes
design, construction, signing and striping, utility relocation, testing of materials, and inspections.
14. No work will be allowed at night, or on Saturdays, Sundays, and legal holidays without prior authorization
from the Department. The Department may also restrict work within the State Highway right-of-way during
adverse weather conditions.
15. Traffic detours or lane closures will not be allowed, unless pre -approved by the Department.
16. Two-way traffic shall be maintained throughout the work area at all times unless specific written authorization
is obtained from the Department.
17. No construction vehicles shall be parked, or construction materials/equipment stored, on the State Highway
right-of-way overnight.
18. Landscaping and site construction shall not obstruct sight distance at any State Highway access point.
Landscaping within the State Highway right-of-way requies the Permittee to obtain a CDOT Landscaping
Permit from the Maintenance Section. The access permit does not authorize that activity, although a proposed
landscaping plan shall be included in the access permitting document. Irrigation of features within the
right-of-way may require the Permittee to install a subsurface drain in accordance with CDOT Standard
M-605-1 or other approved system. The Permittee shall contact Don Miller at the Loveland Maintenance
Office, (970) 667-4650, to obtain the Landscaping Permit.
19. Routine, periodic maintenance and emergency repairs may be performed within the State Highway
right-of-way, under the general terms and conditions of the permit. Any significant repairs such as culvert
replacement, resurfacing, or changes in design or specifications, will require written authorization from the
Department. The Department shall be given proper advance notice whenever maintenance work will affect the
movement or safety of traffic on the State Highway. In an emergency, the Department Region Office and the
State Patrol shall immediately be notified of possible hazards.
20. All work is to conform to the plans referenced by this permit on file with the Department or as modified by
this permit. (If discrepancies arise, this permit shall take precedence over the plans.) The Department plan
review is only for the general conformance with the Department's design and code requirements. The
Department is not responsible for the accuracy and adequacy of the design, dimensions, elevations, and any
other elements which shall be confirmed and correlated at the work site. The Department through the
approval of this document, assumes no responsibility for the completeness and/or accuracy of the plans.
21. All materials, equipment, installation, construction, and design, including the auxiliary lane(s) and intersection
improvement(s) within the State Highway shall be in accordance with the following Department standard
references as applicable:
A. State Highway Access Code, 2 CCR 601-1
B. Roadway Design Manual
C. Materials Manual
D. Construction Manual
E. Standard Specifications for Road and Bridge Construction, latest edition
F. Standard Plans (M&S Standards)
State Highway Access Permit
Attachment to Permit No. 404085 - Additional Terms and Conditions
G. Manual on Uniform Traffic Control Devices (M.U.T.C.D.) for Streets and Highways and the Colorado
Supplement thereto
H. A policy on Geometric Design of Highways and
Transportation Officials (AASHTO), latest edition
I. AASHTO Roadside Design Guide
Streets, American Association of State Highway and
J. Institute of Transportation Engineer's Trip Gneration Manual, 6th edition
Some of the reference materials listed above (A thru F) may be purchased from:
Colorado Department of Transportation
Bid Plans Room
4201 East Arkansas Avenue
Denver, CO 80222-3400
(303) 757-9313
The State Highway Access Code may be purchased from:
The Public Records Corporation
1666 Lafayette Street
PO Box 18186
Denver, CO 80218
(303)832-8262
The website is:
www.dot.state.co.us/business/accessmgt/
22. Survey markers or monuments must be preserved in their original positions. Notify the Department at (970)
350-2173 immediately upon damage to or discovery of any such markers or monuments at the work site. Any
survey markers or monuments disturbed during the permitted work shall be repaired and/or replaced
immediately at the expense of the Permittee.
23. Should any excavation encounter plant or animal fossils, the remains of historic or prehistoric structures,
artifacts, (pottery, stone tools, arrowheads, etc.), the work shall be stopped and the Permittee shall notify the
Department inspector.
24. The Permittee or the contractor shall notify Linda McWilliams at (970) 350-2147, at least two working days
prior to beginning any access improvements or construction of any kind within the State Highway
right-of-way. Failure to comply with this requirement may result in revocation of this permit.
25. The Department inspector may suspend any work due to: 1) Noncompliance with the provisions of this
permit; 2) Adverse weather or traffic conditions; 3) Concurrent highway construction or maintenance in
conflict with permit work; 4) Any condition deemed unsafe for workers or the general public. The work may
be resumed upon notice from the Department inspector.
26. Upon completion of the work, a letter certifying that all project materials, construction, inspection and
workmanship was in accordance with the plans and applicable Department Standard Specifications for Road
and Bridge Construction shall be submitted to the Region Access Manager. The certification letter must be
signed and stamped (sealed) by a Colorado registered professional engineer.
27. The access shall be constructed 16 feet wide with 20' and 5' radii, as shown in Exhibit "A", Sheet OR2.
State Highway Access Permit
Page 4
Attachment to Permit No. 404085 - Additional Terms and Conditions
28. Construction traffic control devices, when not in use, shall be removed or turned away from traffic.
29. The access shall be completed in an expeditious and safe manner and shall be finished within 45 days from
initiation of construction within State Highway right-of-way.
30. All required access improvements shall be installed prior to the herein authorized use of this access.
31. The access shall be surfaced immediately upon completion of earthwork construction and prior to use.
32. Surfacing of the access shall be completed as per Exhibit "A", Sheet U 1.
33. No paved surface shall be cut unless specified in this permit. Asphalt removal shall be saw cut to assure a
straight edge for patching.
34. The top layer of plant mix bituminous pavement shall not be placed between October 1 and April 1, unless
otherwise approved by the Department.
35. Any layer of bituminous pavement that is to have a succeeding layer placed thereon shall be completed full
width, before succeeding layers are placed.
36. If frost, water or moisture is present in the subgrade, no surfacing materials shall be placed until all frost,
water or moisture is gone or removed.
37. The access shall be constructed and maintained in a manner that will not cause water to enter onto the
roadway, and will not interfere with the existing drainage system within the State Highway right-of-way.
Drainage to the State Highway right-of-way shall not exceed historical rate of flow.
38. All existing drainage structures shall be extended, modified, or upgraded as necessary, to accommodate all
new construction and safety standards, in accordance to the Department's standard specifications.
39. The Permittee shall request final inspection by Linda McWilliams at (970) 350-2147, within 10 days
following completion of access construction, and prior to authorized use. The Permittee or their representative
shall be present.
40. A fully executed complete copy of this permit must be on thejob site with the contractor at all times during
construction. Failure to comply with this or any other construction requirement may result in the immediate
suspension of work by order of the Department inspector or the issuing authority.
41. The design and construction of access and/or development of this property shall not negatively impact
adjacent nearby properties. Correction of the problem and cost resulting from damages shall be borne by the
Permittee.
COLORADO DEPARTMENT OF TRANSPORTATION
CDOT Permit No.
404086
STATE HIGHWAY ACCESS CODE
SH/S MP
287C/344.740/R
NOTICE TO PROCEED
Local Jurisdiction
Fort Collins
Permittee(s): Applicant;
yume a3 appl,ca/t t Raising Cane's Chicken Fingers
1212 S. Acadian Thruway
4P;W S. College Aventie Baton Rouge, LA 70806
F'E)Ft GelliliQl 225-383-7400
9;9 294-634(r
The permittee is hereby authorized to proceed with access construction within state highway right-of-way in
accordance with the above referenced State Highway Access Permit and this Notice to Proceed.
This Notice to Proceed is valid only if the referenced Access Permit has not expired. Access Permits
expire one year from date of issue if not under construction, or completed. Access Permits may be extended in
accordance with Section 2.3(11)(d), of the Access Code.
Adequate advance warning is required at all times during access construction, in conformance with the
Manual on Uniform Traffic Control Devices for Streets and Highways.
All construction shall be completed in an expeditious and safe manner and shall be finished within 45 days
from initiation. The permittee or applicant shall notify the Department prior to commencing construction as
indicated on the Access Permit.
Both the Access Permit and this Notice To Proceed shall be available for review at the construction site.
This Notice to Proceed is conditional. The following items shall be addressed prior to or during construction as
appropriate.
The Notice to Proceed includes the Contractor's Certificate(s) of Insurance.
Municipality or County Approval (When the appropriate local authority retains issuing authority)
By
Title
Date
(X)
This Notice is not valid until signed by a duly authorized representative of the Department
Colorado Department of Transportation
By r 1 1
Title J
Date
/�
_(X) `�11�Q `�
CCItSS I \avLQ
)( IG'h`i
Copy Dist ributi n: Required 1. Region Permit files 2. Staff Access Section. As needed: Local Auth¢)r y, MTCE Patrol, Inspector t Form 1265 8/98