HomeMy WebLinkAboutRICHARDS LAKE PUD REPLAT LOTS 8-10 - Filed CS-COMMENT SHEETS - 2005-02-11PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannina
DATE: July 22, 2004 TO: Technical Services
PROJECT: 958-86H Richards Lake Replat of Lots 8-10,
Type I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
August 18, 2004
Note - PLEASE identify your redlines for future reference
i. a0-uNp��>' elasEs.
<:-f/A/VGE Td 21 ci44aZGd K� 1�(�1.� KC P4A7 U�
LorS f � l U
/�' i�c �r-or sc.4w o,e' KE�2ao%•cE- y✓F.1-c.. ,
Al-, Tex Try s 7�2 1 w.�e s �/[� V GovP
Name (please print)
CH , CK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report -Other-_
_Utility Redline Utility _Landscape
City of Fort Collins
s `' Project Comments Sheet
Selected Departments
�r
Department: St ormwater Utility
Date: August 19, 2004
Project: RICHARDS LAKE REPLAT OF LOTS 8 - 10 -TYPE I
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
August 18, 2004
Note - Please identify your redlines for future reference
Issue Contact: Basil Hamdan
Topic: General
Number: 5
[8/17/041 No comments.
Signature
Created: 8/17/2004
Please submit mylar capies of the revsions to the utility plans.
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline UtilihLandscape
Page I
Project Comments Sheet
City of Fort Collins Selected. Departments
Department: Engineering
Date: August 19, 2004
Project: RICHARDS LAKE REPLAT OF LOTS 8 - 10 -TYPE I
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
August 18, 2004
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Number: 7 Created: 8/19/2004
[8/19/04] The following comments are from technical services:
1. Boundary Closes.
2. Title - change to "Richard's Lake PUD Replat of Lots 8-10"
3. Some of the Text is too small for line width and will not scan or reproduce well.
4. The line and text of this plat drawing is very good.
Number: 8 Created: 8/19/2004
[8/19/04] Make corrections to certificate of dedication language, repair guarantee language, and
attorney certification language as shown on the plat.
Number: 9 Created: 8/19/2004
[8/19/041 Add the following note to the plat:
All easements shown on lots 8, 9, and 10 of Richards Lake Subdivision are hereby vacated by this
plat and rededicated as shown hereon.
Number: 10 Created: 8/19/2004
18/19/04] Revision to sheet C50
This is not needed, please don't revise this sheet the plan scale is so small and the document is not
clean enough to even see the lot line change you are proposing.
Number: 11 Created: 8/19/2004
[8/19/04] Revisions to sheet C19
What is meant by revision #5? There is no stationing shown on this plan and if a change to the street
design is occurring we also need to see the play, and profile sheet for that street with the changes
shown for review and approval.
Under revision #5 list the changes that are being done with this revision within the area bubbled as
#5 Change of lot corner elevations, adjust min finished floor elevation, add phasing notation. Also
need to bubble the phase 2 additional text that is not within the other bubble. I bubbled the changes
that are occurring within the area marked as revision #5 - you do not need to do that. The overall
bubble is adequate. I was just trying to determine what had changed. How are the lot corners at the
street changing when the street profile hasn't changed?
Include copies of the approval signatures for the 4 revisions that have been approved.
Signature
CHECK HERE IF YOU WISH'
Plat Site
_ Utility _ ✓Redline Utility
Dare
'YI91- -
RECEIVE COPIES OF REVISIONS
Drainage Report Other,
Landscape
Page I
K
ter-Mountain
Engineering Ltd.
December 14, 2004
Mr. Steve Olt
City of Fort Collins, City Planner
281 N. College Ave.
P.O. Box 580
Ft. Collins, CO 80522-0580
RE: Richard's Lake P.U.D., Replat of Lots 8-10
Response to City Comments dated October 18 and 25, 2004
ISSUES:
Plat
Topic: Original Mylars Needing Revisions
Created: 10/18/2004
1. The plat name in the statement of ownership needs to match the title.
RESPONSE: The plat name in the statement of ownership was revised to match the
title on all three mylars.
2. Missing attorney signature.
RESPONSE: The attorney has signed all three mylars.
3. Missing a date with the owners signature.
RESPONSE: The date was added to the owner signature on all three mylars.
4. The line and text of this plat drawing is very good.
RESPONSE: Thank you. None required.
ISSUES:
Utility Plan Revisions Sheets C9, C19, C25, C67, C78
Topic: Original Mylars with City Signatures
Created: 10/25/2004
1. "Sticky back" copies of original approvals on all mylars and provide mylar copies
(without sticky backs) and seven (7) signed and stamped blueline prints for files.
RESPONSE: This was done.
839? Continental Divide Pcad S .:ite t107 ! ittletcn, Colorado 80127 • Phone: 303/948 6220 • Fax: 303/948-6526
77 Wh rilfP(, I :I7n;) P(,Y n7,.� A. _ ., i.�: a. ; R 1W20 • Phone'. 970 949 507P • Rom Denver Dlroct Rya 3
ISSUES:
AB Sheet C83
Topic: Original Mylars Needing Revisions
Created: 10/25/2004
1. Two sets of info is provided on the sheet. No way to determine which is correct. X
out or remove old info and return mylar for filing with three blueline copies.
RESPONSE: New lines or heavier lines have been added through the old info to X it
out more clearly. Please note that this sheet is not marked "RECORD DRAWING" and
is NOT an as -built. Because of this, we have assumed the above comment on Utility
Plan Revisions will apply. Therefore, we "Sticky backed" copies of original approvals
on the mylar and provided you with a mylar copy (without sticky backs) and seven (7)
signed and stamped blueline prints for your files.
Please return with the post -it notes intact.
RESPONSE: The post -it notes were removed and thrown away by the printer. I
apologize for the inconvenience.
If you have any questions regarding the responses, or any additional questions, please give
me a call at 970-949-5072.
Sincerely,
Sandra E. Mendonca, P.E.
Project Manager
cc: John Baxter, Charter Homes
City Comments-oct-04doe Page 2 of 2 IME, Ltd.