Loading...
HomeMy WebLinkAboutMANHATTAN TOWNHOMES - Filed DCP-DEV. CONSTRUCTION PERMIT - 2009-11-30City of Fort Collins Transportation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 0�2 ­ 0? Issuance Date: PIL5?`_) Cab Project Name: Manhattan ProjectAXA.: Manhattan Townhomes Project Location: 3800 — 3860 Manhattan Street Permittee: David Hill City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400.00(PAID) Construction Inspection Fee (paid prior to issuance of this permit) $ 5,506.80 Total $ 5,906.80 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 199.710.46 Form of security deposited with the City: LOC PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com NEW FRONTIER BANK . 2425 35th AVENUE 4GfEELEY CO'8063 Casierlj4 A a (970).339 5100 67 5 6 8 Q; Date: 10/30/08 REMITTERI. LLP LN#15274402 1001. EXACTLY i PAY **5,506 AND 80/100 DOLLARS $5;506.80 T"HE ***CITY OF FORT COLLINS*** ORDER` OF T SIG�N/A�TU�RE�S REQUI 7777777 12000007. 5680h'. i: L0 T006 596l:. 0000 10`00041I' y.. Development Construction Permit, Page 2/6 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/6 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signatur . Date: Approval for issuance: City Engineer Approva • ea, Date: Z ��_ (Permit Issuance Date) Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Manhattan Project A.K.A.: Manhattan Townhomes City Staff Contact Persons: Development Engineer: Susan Joy, 281 N College Ave, Fort Collins, CO 80521 Phone 970-221-6605 Fax 970-221-6378 Email: sioy a,fcgov.com Construction Inspector: Tracy Dyer, 281 N College Ave, Fort Collins, CO 80521 Phone 970-221-6605 Fax 970-221-6378 Email: tdyernfc ov.com Current Planner: Steve Olt, 281 N College Ave, Fort Collins, CO 80521 Phone 970-221-6750 Fax 970-221-6378 Water Utilities Engineer: Erosion Control Inspector: D.A. Black, 700 Wood Street, Fort Collins, CO 80521 Cell 970-218-3011 Fax 970-221-6619 Email: dblack ,fc ov.com Natural Resources: Dana Leavitt, 281 N. College Ave., Fort Collins, CO 80521 Office 970-224-6143 Fax 970-416-2020 Email: dleavitt ,fc ov.com Traffic Operations: Street Closures: Syl Mireles, 626 Linden Street, Fort Collins, CO 80521 Office 970-221-6815 Fax 970-6282 Email: smireles cr fcgov.com Development Construction Permit, Page 5/6 Transportation Planning: Denise Weston, 215 N. Mason, Fort Collins, CO 80521 Office 970-416-2643 Fax 221-6239 Email: dwestonL&fcgov.com Forestry: Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521 Office 970-224-6302 Fax 970-221-6586 Email: rzentz@fcgov.com Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6152 Fax 970-221-6619 Email: dmartine(cr�,fc ov.com Developer' Contact Persons: Project Manager: David Hill, Consultant, 2485 S. Fillmore St, Denver, CO 80210 Phone 303-995-4409 Cell 720-334-1946 Fax 303-691-6116 Email: dhillconsultant(c�msn.com Developer: Scott Hubbell, Manhattan LLP, 9227 E. Lincoln Ave, Ste 200-234, Lone Tree, CO 80124 Phone 720-257-4040 Email: ScottHubbellk-)hotmail.com Owner(s): Scott Hubbell, Manhattan LLP, 9227 E. Lincoln Ave, Ste 200-234, Lone Tree, CO 80124 Phone 720-257-4040 Email: ScottHubbell cr,hotmail.com Planner: Geoffrey Robinson, Robinson Eng, Inc., 105 S Meldrum, Ft. Collins, CO 80521 Phone 970-217-4960 Fax 970-482-6776 Email: perobinsonL&juno.com Project Engineer: Patricia Kroetch, North Star Design, 700 Automation Way, Unit 1, Windsor, CO 80550 Phone 970-686-6939 Fax 970-686-1188 Development Construction Permit, Page 6/6 General Contractor: Jeff Down, Down Zankey Construction, Inc., 105 S Meldrum, Ft. Collins, CO 80521 Phone 970-482-9400 Cell 970-567-2453 Fax 970-482-9400 Email: jef ]kdownzankey.com Utility Contractor: Michael Normandin, Normandin Construction, 1903 Silvergate Rd, Ft Collins, CO 80526 Phone 970-567-0526 Cell 970-567-0526 Fax 970-204-0083 Email: NCI1903 a,msn.com H L11 W U) LU Q F- N W F- U) 0 U Q Q N W H f- Z Q d F- U W a OD O O N N 0 0 U U d) w O O O O O O O 0000000 0000000000 O�t Nt0 0 0 0 0 0 0 O O O O O O O O O O O O O O p r-OOO LA 000 �69�69 e964 ONN00000 LAO Efl Ln Ln V ITVi0 - N Cl) Ost NOCl) O N EA Ln NEA 69 ' co W O (0 N (0 00 - r- Ln 6% e9 69 64 va eri EA 69 _O to eri Vi 69 Q N J 0 •- Z Q W m W a Z LU o 0 LL 0000000 nn Ln Lq C0 O O M M M 0000000000 fa h 1l0000000 0 LA O OOL() m V:tt0007d• 0 J Z Z Q D D W U r- (M 69 69 ef! 69 O Efl O O O O O O M O N L!') lfi EA 60 69 I- N 0 1- M M M 0 OEf) U) > 69 e9 d9 to e» e9 era _ U W 2 LU LFL0 Z LL d m 0 W Q' Q O O O O O O O O O O O O O O 0000000 O O O O O O O O O O O O O O O O O O O O O O O N 0 0 0 0 0 0v: 0; d 42 F- Ci E69 [t H H9 L1J (ri Ni 0000 OOCV LO0 69 toe9 0 69 00 LO N O Om 0 (0 r-O (00 O (M 6) VS. O 69 .. O W W Q' _{ 0) ON CO LO -LO �60469�00 I. O M (0 O Q N J Q N =g9 �NLL0 Fa- W � W � U W = W F- 0000000 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O —— (M N M O O O (0 (0 (0 N N 0 > W N_ LI r Z F- U' LU m 00 0 0 0 N O �Efl69�N �69 O O O L('i Ih Lfi a0 N Ln O 69�69M N �wo� C O cli CM Lfi N 6 .— W W is LL 6e,v)6i�tq6n,v) W;'iW a' LU y e9 69 0000 O aQW> U) W SZ F- (�. C.) F.. 0IL U U O v U Q U ,W co M C0'J e0- M M N O (O N f� V N O± 0 WQ7 m O CD 00 {i.' Q = Z N W H V' W Z mWLLJ .:IJ m'— LU >O i:tea Z Qpa c7a p W? Nz LU Ir U)LLLL x x U JJUUWUW xxxxxxx LLLLLL:C) C)UU JJJQW vi�>LL U->i } Zo 00 LJJ W W W W W _.I(n(nJJJ(n(n UO 0 LL � LLI Z Q =0 U Ow CL mIL F- tn U QW _p m y c c eenn WFF- Q W U> d L V >+ J 0 c fj.c 0) U.0 N W JO Q m z U m 3 am N Z C m Y 03 >LL O m a IL c v y dci mp N c ;? c o F c y� a c m a E Ln o Z a.J J W '= O 2 m a m ) a3i c m e ` c a3i m 0 Q U N o Q Q Q p U a) ofj (n -C a) M m C C (L� 'O (0 C O > ui L N E o a) a) o C C V .� C Y L r > d. :: U x N O1 w w rn a) CD a� _ m a! C E E U N C y > W �a ... ° a� o m-•(-' m w�U�¢ (o m m m m@ m w f0 m m a~ �2 �1(n�i-3LL >�u � v�(9aaUoa¢U z Manhattan Townhomes Fort Collins, CO Schedule Date: 9-22-08 Item No. Desci tion Duration Start Completion 1 Mobilization 1 day 10/13/2008 10/13/2008 2 Erosion Control 3 days 10/13/2008 10/15/2008 3 Demolition/Removals 4 days 10/14/2008 10/17/2008 4 Stockpile topsoil 2 days 10/20/2008 10/21 /2008 5 Survey/Stake 4 days 10/22/2008 10/27/2008 6 Import Fill 4 da s 10/22/2008 10/28/2008 7 Grade/Compact site 7 days 10/24/2008 10/31/2008 8 Storm Sewer Install 4 days 10/30/2008 11/4/2008 9 Water line Install 14 days 11/4/2008 11/21/2008 10 Street Patch 3 days 11/10/2008 11/12/2008 11 Sanitary line Install 6 days 11/19/2008 11/26/2008 12 General Clean-up 4 days 12/1/2008 12/4/2008 13 Asbuilt Survey 2 days 12/4/2008 12/5/2008 14 De mobilization 1 day 12/5/2008 12/5/2008 Accela Automation: ShowPayDetai140 - T8108-D Page 1 of 1 RECEIPT CITY OF FORT COLLINS NEIGHBORHOOD & BUILDING SERVICES 281 N. COLLEGE AVE. Phone:970-221-6760 P. O. BOX 580 Fax:970-224-6134 Application #: B0806615 Project Name (Subdivision): MANHATTAN TOWNHOMES Application Type: Building / Misc / General / NA Receipt No.: 136804 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Check 075680 $5,506.80 10/30/2008 01:14:33 PM KTHARP DEVELOPMENT CONSTR Owner Info.: Work DEVELOPMENT CONSTRUCTION PERMIT #08-18 MANHATTAN Description: TOWNHOMES $5506.80 CK #075680 MANHATTAN LLP T8108-0 version '1.0 https:Hdtsweb02.fegov. corn/operationslpermitlindex.cfm?FUS EACTION=ShowPayDetai... 10/30/2008