Loading...
HomeMy WebLinkAboutMANHATTAN TOWNHOMES - Filed CS-COMMENT SHEETS - 2009-11-30MANHATTAN TOWNHOMES MAJOR AMENDMENT - TYPE SELECTION CRITERIA: Department = Engineering; Status = All ISSUES: Department: Engineering Topic: General Number: 4 [9/27/05] 1 only received sheets 1 What are the other sheets? Issue Contact: Susan Joy Created: 9/27/2005 Resolved and 2 of the 5 sheet Site plan so that is all I could review. Topic: Landscape Plans Number:9 Created:9/29/2005 Pending [9/29/05] Please label and dimension all easements. Site Topic: Ste Topic: Created: 9/27/2005 Pending Numbe[9/27/05] Please label ALL easements and who they belong to. Number:6 Created: 9/27/2005 Pending [9/27/05] Needs to match the utility plans - see redlines. Number:8 Created:9/29/2005 Pending [9/29105] The Site plan needs to match the utility plans submitted under the PDP. Please change the curb transition on the north and south end of Manhatten and show the existing drive to the north. Topic: Utility Plans Number: ? Created: 9/27/2005 Pending [9/27/05] The utility plans were reviewed under the PDP submittals. No redlines returned with the Major Amendment, please refer to the PDP. Page 1 Selected Issues Report Cite of Fort Coll.ills Date: 11 /27/2009 MANHATTAN TOWNHOMES MAJOR AMENDMENT - TYPE I SELECTION CRITERIA: Department = Transportation Planning; Status = All ISSUES: Department: Transportation Planning Topic: zoning Number: 3 [9/26/05] No comments Issue Contact: David Averill Created:9/26/2005 Pending Page 1