Department: Engineering Issue Contact: Susan Joy
Topic: General
Number:13 Created:8/12/2008 Pending
[4/20/09] Scanning issues remain with the Site, Landscape and Utility plans. Please see
Jeff County in Tech Services prior to running any mylars.
[11/18/08] Just carrying this comment into Final with a note that scanning requirements
must be met prior to the final mylar approval.
[8/12/08] Please see Appendix E6 for all scanning requirements.
Number:35 Created:4/21/2009 Pending
[4/21/09] All plan sets need to show the realignment of the Link N Greens driveway in its
entirety so that we end up with a constructable design.
Number:36 Created:4/21/2009 Pending
[4/21/09] A temporary construction easement is required for the work shown offsite to the
north.
Number:41 Created:4/21/2009 Pending
[4/21/09] Label the tow/bow of all retaining walls on all plan sets (site, landscape, utility).
Number:42 Created:4/21/2009 Pending
[4/21/09] There is a retaining wall shown within the UE along Lincoln. Please move the wall
to the north so that no portion of it lies within the easement. If you cannot move the wall, a
variance request and exhibit must be submitted so I can route that to all of the utilities for
their review and approval. This process can take approximately 2 weeks though, it might be
easier and faster to move the wall.
Number: 53
[4/24/09] From Technical Services:
Created:4/24/2009 Pending
1. Boundary closes.
2. Scanning issues (line over text, shading) on plat, site and utility plans.
3. Please change title of Plat to "Odell Brewing Company First Replat.
*From Engineering - please change the title to match the plat on all plan sets and sheets.
Topic: Utility Plans
Number: 38
Created:4/21/2009 Pending
Page 1
[4/21/09] Sheet EX1 - Please add eop and the type III barricade to the legend. Please
show any demo for the Link N Greens driveway realignment. Need to show the surrounding
existing features as it pertains to the drive.
Number:39 Created:4/21/2009 Pending
[4/21/09] Sheet HC1 - Please dimension all curve radii, etc, for the Link N Green driveway
and show how it ties into existing. Please do the same for the Odell driveway to the east.
Please show, label and dimension all existing and proposed easements.
Number:40 Created:4/21/2009 Pending
[4/21/09] Overall comment - the site plan is showing the concrete sidewalk connection as
"future". If this sidewalk is to be installed with the Phase 2 expansion, please label it as
such. Please change the "future expandsion" to read "Phase 2 Future Expansion" so that
the plan sets match. ***This sidewalk may be required in Phase I to meet your sidewalk
connection requirements. Please see Planning or Transp Planning if you have any
questions.
Number:43 Created:4/21/2009 Pending
[4/21/09] Sheet G1 - Please label the HP's on the driveways. Please provide spot
elevations at the row and around the curb returns. The proposed offsite grading needs to tie
into existing and it appear that some proposed contours aroudn the site do not tie in as well.
Please provide spot elevations at all property corners.
Number:44 Created:4/21/2009 Pending
[4/21/09] Sheet DR1 - Please add drainage arrows to all driveways. Please call out the
culvert size for the Link N Greens driveway.
Page 2
Selected Issues Repoil
City=af Tort Collins
Date: 11 /27/2009
ODELL BREWING COMPANY EXPANSION -MAJOR
AMEN DMENT/REPLAT-TYPE I AND FINAL PLANS
SELECTION CRITERIA: Department = Transportation Planning; Status = Unresolved
ISSUES:
Department: Transportation Planning Issue Contact: Matt Wempe
Topic: General
Number:25 Created:11/17/2008 Unresolved
[11/17/08) Per the memo dated November 11, 2008, Lincoln Avenue will remain a four -lane
arterial. Based on the traffic volumes, a 12-foot two-way left turn lane will be acceptable in
place of a median.
Number:26 Created:11/17/2008 Unresolved
[11/17/08] Per the letter from the City Traffic Engineer, Transportation staff will conditionally
support the variance request for a second access point on Lincoln Avenue. This support is
contingent upon the realignment of the golf course driveway to match the proposed western
access point.
Number:46 Created:4/22/2009 Pending
[4/22/09] This comment is a suggestion not a requirement. Add striping along the driveway
apron to extend the 6' concrete bike lane to the street.
Number:47 Created:4/22/2009 Pending
[4/22/09] This comment is a suggestion not a requirement. Consider installing unique or
Odell's branded bicycle racks. DK, FC Bikes Coordinator, has offered his expertise in
developing these racks.
Page 1
Selected Issues Report
C.Aty of Fort Collins
Date: 11 /27/2009
ODELL BREWING COMPANY EXPANSION -MAJOR
AMENDMENT/REPLAT-TYPE I AND FINAL PLANS
SELECTION CRITERIA: Department = Traffic Operations; Status = Unresolved
ISSUES:
Department: Traffic Operations Issue Contact: Ward Stanford
Topic: Traffic
Number:4 Created:7/28/2008 Unresolved
[8/16/08] Per LCUASS policy, (Fig. 8-1, Note 1) A left turn lane into the site is required if the
access (es) remain full movement. If the site is approved for the additional access, a second
left turn lane or a continuous left turn lane may also be required.
Number:19 Created:8/16/2008 Unresolved
[8/16/08] The letter dated June 23, 2008 from David Gasprzak to Matt Delich regarding the
Traffic Impact Memo Info has a statement about daily trips for truck traffic. Please clarify if
that is 10 daily trips for Semi's and 10 additional daily trips for delivery trucks, or if that is 10
total trips from semi's and delivery trucks.