HomeMy WebLinkAboutRANGEVIEW PUD - Filed CS-COMMENT SHEETS - 2009-03-13DA
I
T
'ft: ' D%..PARTMENT4`0m'"
-� Item �2�-go �
POD)
IUL load �yz d
Comments
�
�<<
0
� ��S �� a,—
XNC4
■ cf) Is ka w ey;c i). a(t) W; J AS.
j je- LU /Jc-
' � �l � ��S 4 h C L b � � � / /tC� (I � � � -
awl
Show 14 j PC, �',, w�ll� �'� ��m ��►�a c
P��1�; �o �
Sl,Oct) jf,�,
�-V4 it's j
All C (I-fS rn %j C, c-,'
EE 1440�-- I
C4 MO Ao uj A\ O-P IQ )I �-S C-9 pe-
0
I Mi
DATE" io/v/8; IDEPARTME.;.NT
J
z
L,L
�.
C
.cr)
tfa
ItCAM. -�Ug-008
POD, k7MngMIOtj /0
OWb -P,(),D. nub
Comments
AA��
115 COm•✓\oNL-V) Comma, � Oil
I(- NOE- 4AM-S'S
o� u
i„a, PvD
0
n
M
484-4220
DEVELOPMENT CENTER EXT. 655
October 27, 1982
Mr. Carr Biecker
ZVFK Architects/Planners
218 West Mountain
Fort Collins, CO 80521
Dear Carr:
The staff has reviewed the application for Preliminary Planned Unit Development
approval for the Rangeview, PUD and would offer the following comments:
1. The applicants should submit a soils report and storm drainage report as soon
as possible for staff review and comment.
2. Existing right-of-way widths should be indicated on site plan.
3. All existing sidewalks should be indicated on site plan.
4. The site plan should indicate radii of curves interior to the site.
5. Handicapped ramp in walk at Community Center parking lot should be indicated.
6. All curb cuts should be designed to City standards.
7. The site plan should indicate widths of interior sidewalks.
8. The width of the landscape strip between the curb and gutter and sidewalk must
be a minimum of 9-ft. Please indicate.
9. The building setbacks of buildings from rear of side,�alks or curbs as applicable
must be a minimum of 15-ft to allow for installation and maintenance of utilities.
10. A 15-ft utility easement along Harmony Road and interior utility easements will
be required. I would recommend that you meet with the individual utilities to
discuss their needs.
11. The proposed utilities will require minor revisions to the approved utility plan
for the Mail Creek PUD. Water and sewer lines should stay within paved drives.
Thirty -feet of easement area will be required when both water and sewer lines
exist in the same easement.
12. The proposed landscaping at the intersection of Larkbunting and Harmony Road
may present sight distance problems. The staff would recommend that landscaping
be limited to 30-inches in height in this critical area.
Mr. Carr Biecker
ZVFK Architects/Planne*
October 27, 1982
Page 2
E5
13. The dimensions of the lot lines should be indicated on the site plan.
14. Dimensions of building envelopes should be indicated. Setbacks of buildings
from parking aisles should be indicated.
15. Garage parking should be indicated in "Site Data" statistics.
16. All existing easements should be shown on the site plan.
17. The parking ratio for 2-bedroom units is 1.75, not 1.5 as indicated on the
site plan. Please revise.
18. The applicant should provide evidance to justify the distribution and amount
of parking. What happens if the project should convert to a non -elderly
project in terms of parking being provided?
19. The landscape plan should indicate typical landscaping adjacent to building
envelopes.
20. The landscape plan should provide additional detail on proposed treatment along
Harmony Road to mitigate noise and visual impacts. Additional screening should
be indicated between parking area of community center and street and between
buildings and street.
21. The 150-ft information should show existing structures.
22. What treatment is proposed for ditch canal to protect residents from potential
hazard?
23. What is the proposed pavement treatment? Please indicate.
24. Are handicapped parking spaces being provided?
25. The staff would recommend additional sidewalks in some locations on the site
plan.
26. The staff would like to discuss with applicants some suggested design changes
which would help to break-up the uniform setbacks of dwelling units.
27. Architectural elevations of community center and maintenance building should
be submitted as soon as possible.
28. Security lighting of "maintenance building" should be indicated.
29. The staff questions the utility of the 10-ft rear yards along the New
Mercer Canal as indicated on the site plan.
30. How will water be supplied to the community garden area? It appears that both
the garden area and the putting green are in the detention pond. Is this
practical?
Mr. Carr Biecker
ZVFK Architects/Planned,;
October 27, 1982
Page 3
M
31.. The landscape plan should indicate a note that maintenance of the detention
pond will be the responsibility of the Homeowners' Association for the
Rangeview PUD.
32. Security lighting for the interior pathways should be investigated.
I would recommend we meet as soon as possible to discuss the above comments. Revisions
to the above plans should be submitted no later than Wednesday, November 3, 1982.
Also, on November 15, 1982, 8-1/2"xll" reductions and colored renderings of all plans
and elevations should be submitted to this office. If you should have any questions,
please feel free to call.
Sincerely yours,
Joe Frank, AICP
Senior City Planner
JF/f
cc: Mauri Rupel, Development Center Director
Craig Farver, Engineering Analyst/
s
CITY OF FORT COLLINS
484-4220
DEVELOPMENT CENTER EXT. 655
March 1, 1983
Mr. Eldon Ward
ZVFK Architects/Planners
218 West Mountain
Fort Collins, CO 80521
Dear Eldon:
The staff has reviewed the application for final approval of the Rangeview
PUD and would offer the following comments: —
1. The applicants should provide detail as to how the storm water from this
project will be discharged into the New Mercer Canal. Ditch company
approval of accepting the discharge will be required prior to approval of
the final plan by the Planning and Zoning Board.
2. The site plan shows the New Mercer Canal to be on the property. The
subdivision plat does not show the canal to be part of the property.
Which is correct? Please clarify.
3. The northwest property line on the site plan does not correspond to the
same on thesubdivision plat. Please clarify.
4. Typical dimensions of parking spaces should be indicated.
5. All property line dimensions should be shown on site plan.
6. All easements should be shown on the site plan. The note to this effect
should be removed.
7. All building envelopes should be dimensioned from at least two platted
property lines.
8. All signs must comply with Sign Code.
9. The note "private streets" on the site plan should be deleted.
10. An access easement will be required for the temporary cul-de-sac for
Phase One. Please submit the required easement dedication instrument.
11. The site plan should include dimensions of building footprint inside of
the building envelope.
Mr. Eldon Ward
ZVFK Architects/Plan Ns
March 1, 1983 *%
Page 2
n
12. The number of dwelling units should be indicated for each building envelope.
13. The site plan should note the energy conservation measures being employed
in the development project.
14. The site plan should include a note clarifying the future parking.
15. The site data should include she floor area of the community center and
residential units.
16. The site data on parking should differentiate what is to be built and what
is "potential" parking.
17. The site plan should include the attorney's certification.
18. The site plan and landscape plan should indicate screening treatment of
residential units located along Harmony Road as agreed upon as part of the
preliminary approval of the PUD.
19. The staff would suggest that additional landscape screening be provided
along the perimeters of the property and where blank walls of sides of
buildings face pedestrian ways. The staff has some specific suggestir;;is
to revising the landscape plan in meeting this objective.
20. The landscape plan should indicate types of deciduous shrubs and evergreen
shrubs and the sizes and quantities of these plant materials.
21. On Monday, March 21, 1983, the applicants must submit the signed mylars
of the site, landscape plan, building elevations and subdivision plat.
Also on that date the applicant shall submit the signed landscape and
open space covenants document.
22. A note should be added to the site plan that the active open space area
will be the maintenance responsibility of the homeowner's association and
not the City.
I would recommend we meet as soon as possible to discuss the above comments.
Revisions to the plans reflecting the above comments should be delivered to
this office no later than Monday, March 14, 1983. Also, on Monday, March 21,
1983, 8-1/2"xll" reductions of the site, landscape, building elevations and
subdivision plat and colored renderings of the site, landscape plan and building
elevations should be delivered to this office. If you should have any questions,
please feel free to call.
Sincerely yours,
Joe Frank
City Planner
JF/f
cc: Mauri Rupel, Development Center Director
Bonnie Tripoli, Engineering Analyst �,/