Loading...
HomeMy WebLinkAboutRAINTREE COMMERCIAL PUD PHASE II - Filed GC-GENERAL CORRESPONDENCE - 2009-03-12CITY OF FORT COLLINS ENGINEERING SERVICES May 16, 1986 Mr. Mike Carver Taranto, Stanton & Tagge Consulting Engineers 748 Whalers Way Fort Collins, CO 80525 Dear Mike: This letter is to confirm the conversations that we have had regarding the deceleration lane off of Horsetooth Road for the 7-11 Convenience Store at Cunningham Corner. On May 2 I shot the lip elevation of the new curb installed by Loveland Excavation and the elevation of the existing edge of asphalt on Horsetooth Road to see if the minimal slope of 1.1% (as shown on the plan) existed between the curb and gutter and the existing edge of asphalt. It was determined that the new pavement if installed would not have the minimal slope and would in fact have a reverse slope in some places. After reviewing the elevation shots submitted by you, it appears that the curb and gutter installed by Loveland Excavation was installed to the plan grade. The alternate red -lined plan that you submitted to the City Planning Department using concrete in place of asphalt will be acceptable to the City under the following conditions: I. That the contractor installing the concrete pavement shall take extreme care in finishing the concrete so as to not create water ponds in the finished slab. 2. That the City Inspection Department be notified of the construction of the concrete pavement. Thank you for your help in this matter. Sincerely, Rick Richter Construction Inspector 4 vb ?�Ys,z.-i'i ENGINEERING SERVICES cc: Southland Corporation Loveland Excavation Lobar, Inc. Cunningham Corner Construction 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 9 (303) 221-6605