Loading...
HomeMy WebLinkAboutVOLUNTEERS OF AMERICA PDP - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-11-03Development Construction Permit, Page 115 DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 03-07 Issuance Date: 4-2-03 Project Name: Fort Collins Volunteers of America Elderly Housing Project A. K.A.: Project Location: West Horsetooth Road just south of Seneca Street Permittee: Robin Keller VP Operations Volunteers ofAmerica National Services City and developer contacts: See attached Exhibit `9 "for names and phone numbers of all contact persons for this project. lees: Permit Application Fee (paid at the time of application) Construction Inspection Fee (paid prior to issuance of this permit) Total $ 44403 40-n/a Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 103 797.59 n/a Form of security deposited with the City: n/a — certified affordable housing PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. DEVELOPMENT CONSTRUCTION PERMIT APPLICATION For City use only: Application Number: A035-01 Application Date: 10.03.01 Permit application fee: $0.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. Contact Katie Moore, Development Review Engineer at 970/221.6605 and/or e-mail: kamooregfcgov.com, if you have any questions. 3. Submit the Application and pay the Application Fee at the Engineering Counter, which is located at 281 North College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Fort Collins Volunteers of America Elderly Housing Project A.K.A. (Marketing name if different from Project Name): Project Location: West Horsetooth Road lust south of Seneca Street Property Owner (At the time of this permit issuance): Individual Name: Robin Keller —V.P. Operations Company Name: Volunteers of America National Ser Address: 1660 Duke Street, Alexandria, VA 2 Phone number(s): Office: 703-341-5000 Cell: Fax: 703-341-7001 Email: rkellelDvoa.org Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer' in the Development Agreement for this project): Individual Name: same as above Company Name: Address: Phone number(s): Office: Cell: Fax: Email: Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Kevin Tone Company Name: JVA Inc. Address: 1319 Spruce Street Boulder CO 80302 Phone number(s): Office: 303-444-1951 Cell: Fax: 303-444-1957 Email: ktone(a)ivaiva.com Developer (The party or parties responsible for the Developer's names below): Individual Name: Rot Company Name: Vol Address: 16C Phone number(s) referenced in the Development Agreement who are obligations contained in the Agreement —add additional — V.P. Office: 703-341-5000 Cell: Fax: 703-341-7001 Email: rkeller(o)voa.orq General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Liz McCapes — Project Manager Company Name: Brown Construction Inc. Address: 1465 Enterprise Boulevard Suite 100 W. Sacramento CA 95691 Phone number(s): Office: 916-373-9300 Cell: Fax: 916-374-8616 Email: Imccapes(a)brown-construction.com If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name: Address: Phone number(s Office: Cell: Fax: Email: Utility contractor: Individual Name: Company Name: Address: Phone number(s Office: _ Cell: _ Fax: Email: Concrete contractor for flat work: Individual Name: Company Name: Address: Phone number(s): Office: Cell: Fax: Email: Concrete contractor for structures: Individual Name: Company Name: Address: Phone number(s): Office: Cell: Fax: Email: Paving contractor: Individual Name: Company Name: Address: Phone number(s Office: _ Cell: _ Fax: Email: Landscape contractor: Individual Name: Company Name: Address: Phone number(s Office: _ Cell: _ Fax: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"x11" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): i Traffic control plan(s) for the project l Proposed haul routes shown on a City map Shop drawings I Other: CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the people's names and their respective title for those who will attend the pre -construction meeting: Name Title ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure estimated cost: $ 103 797.59 Private infrastructure estimated cost: $ 271,392.77 I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. Applicant Signature: f L'U� c Ulf Date: December 3 2001 !0, 9.02. DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET Contact name KAj-Xe iMoOr� Company Name cvj- , TC ✓f) Address 2 g 1 �-3. C D Phone Number nn LNA n-dZ A -A- L,J 13 l q, �P1•�a_cQ �®...s�.`OLQ.� CC7 �'jv�, ! t� s /n� � 71 Pros 1E4ufiTn2lr, 731sCoaS7— �I`% �oic �I�'D7GY� T CO(U�S, Cp g011l 0?0)2oo - 06 3o ZJ EST 54c , C Pv '75 77 $' 9i4, - 37- � SC.r,.v��`(11e�)� PN � L "C-OLN Awe �5vrttC-� 41C CVc.c.t t Go go5 - C VGt l S L. %D Ye vvi 4 n /I t,�j/(/cE ��^/�L�w•�-/ C /Ty a/ �T COLGJNS PiS1R1< NLAOU�JING' /`Yl �pr�isfS (� �Ukf�Q ZiS /voRTN iYJ�JON d ' 6 6 CS Y/G 6 �2 / Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements arc completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City F,rosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page?'I� planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Ilighway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as dclined in Section 1-2 of the City Code; and including common areas legally connected to or associated Milt the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority. I hereby permit City ollicials to enter upon the property for purposes of inspection and, it' necessary, to enter upon such Property to perlbrm work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signatur : _ Date: Approval for issuance: City Engineer Approval LL �" Date: (Permit Issuance Date) Development Construction Permit, Page 415 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Fort Collins Volunteers of America Elderly Housing Project A.K.A.: VOA City Contacts: Development Engineer: Katie Moore, 281 N. College Ave., Fort Collins, CO 80522 (970)221-6605 Construction Inspector: Dan Peterson, 281 N. College Ave., 221-6605 Current Planner: Steve Olt, 281 N. College Ave., 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Ft Collins, CO 80521 970 221-6854 Stormwater Utilities Engineer: Glen Schlueter 700 Wood Street, Ft Collins, CO 80521 970 221-6065 Erosion Control Inspector: Bob Zackley 700 Wood Street, Ft Collins, CO 80521 970 224-6063 Natural Resources: Doug Moore 281 N. College Ave, 221-6750 Traffic Operations: Eric Bracke 625 Ninth Street, Ft Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Ft Collins, CO 80524 970 224-6815 Transportation Planning: Kathleen Reavis Development Construction Permit, Page 515 215 N. Mason St, Ft Collins, CO 970 224-6104 Forestry: Tim Buchanan 215 N. Mason St, Ft Collins, CO 970 221-6641 Light and Power: Doug Martine 700 Wood Street, Ft Collins, CO 80521 970 224-6152 Developer' Contact Persons: Project Manager/ Developer/Owner: Architect/Planner: Robin Keller — VP Operations Volunteers of America National Services 1660 Duke Street Alexandria, VA 22314-3427 Office: (703) 341-5000 Fax:(703) 341-7001 Email: rkeller@voa.org Jennifer Thong Eidos Architects, LLC 7315 E. Orchard Rd., Suite 100 Greenwood Village, CO 80111 Project Engineer: Kevin Tone JVA, Inc. 1319 Spruce Street, Boulder, CO 80302 Office: (303) 444-1951 Fax: (303) 444-1957 Email: ktone@jvajva.com General Contractor: Liz McCapes — Project Manager Brown Construction, Inc. 1465 Enterprise Boulevard, Suite 100 Sacramento, CA Office: (916) 373-9300 Fax: (916) 374-8616 Email: Imccapes@brown-construction.com O 0 u JUL-24-2002 WED 10:59 AM BROWN CONSTRUCTION FAX NO. 916 374 8616 P. 02 p N NRbi C � M O O Nn of is �.� vl ha g �310 w�nig'i,� �`icg !�lalm A d gg�� rp 55 e 3 Oy` �@ 8 a yU a� NNo(J N ;gy W o719 - -; - f- f W a pry yy �. os€ I � h � s ti ooS'd I� Le �� I 2 •P `eQe' Y L c � � JUL-24-2002 WED 10:59 AM BROWN CONSTRUCTION FAX NO. 916 374 6616 P. 03 0 N i 19 r O Z) Lw U F-KOw U W > = wa0r w W W y zwam LL W 2 r W r r Z W Q m D w 2 Y =1 N W aQw> w r 0 C2in LL oa OOcl¢U W w T Z rE5 mw or w U O W > 0 0 if �a 2 W J m Q U J CL ar az_ QW U > O z m a a. �a� ] Juj r Y Q Q �r> 11 J a 0 o O o 0 0 m m o o o o N N o 0 0 0 V V (A fA (O m I� r M fA fA EA 0 0 0 0 0 0 o 0. o n o o o o orioo m 0 0 0 0 0 O O n O O 0 0 O r n » m m m o <» m m m N N N EA EA fA N m 0 0 0 0 N 0 0 0 O m m O O V 0 ua e» m m m m 0 0 0 M M N N i tiY>UU U U W W O o 0 0 0 o O 0 O 0 O v v 0000000 V N m 0 0 0 0 0 0 0 N m- V m o m m O v 000000000 W O(DOOOOOO 000000000 (»e»e�mmmmMM O V N O O o V 0 0 o M m m 0 (O O� V O O N m- N M O N M O m m m N l0 M 0 m m (A m N t9 U3 fA fA fA fA fA fA H3 Ism m 000m�(JOO OmtAN to�MNM� (» e» va F» ovvvM�n (o�o� m O m N N _=_____ LL LL U 000000 J J J Q Q Q Q Q Q Q W W W W W W W U) J N Z c U o U m d o N v c U (/l F, M m > m 3 n 2i > :�w LT 0000000 0000000 6000000 A (O m m m m m CO � N � EA EA EA 0 0 0 o O 0 0 0 0 0 0 0 F» F» (» (» ea (» O O O O O O O O V 0 0 0 0 0 fA lU O O O N O �(nv(ovv r N L m m N M N A fA fA EA O I O O O O O O w (n 0 0 m O M fA fA fA fA N m M 0 0 0 0 0 0 0 o O o 0 o u N N (O N N J (n J J J (n U)