DATE: December 6, 2006
TO: Engineering Pavement
PROJECT PLANNER: Shelby Sommer
#37-06 Human Bean at Spring Creek PDP — Type II
Please return all comments to the project planner no later than the staff
review meeting:
December 27, 2006
Note -Please identify Your redlines for future reference
54 No Problems
❑ Problems or Concerns (see below, attached, or DMS)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape City of Fort Collins
Selected Issues Report
'`` ". r-"' Collins
SWIM" Date: 11 /3/2009
HUMAN BEAN AT SPRING CREEK PDP - TYPE II AND FINAL
PLANS
SELECTION CRITERIA: Department = Traffic Operations; Status = All
ISSUES:
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number:29 Created:12/22/2006 Unresolved
[12/22/06] the TIS is acceptable
Page 1
Selected Issues Report
Cate of Foil Coll his
Date: 11 /3/2009
HUMAN BEAN AT SPRING CREEK PDP - TYPE II AND FINAL
PLANS
SELECTION CRITERIA: Department = Transportation Planning; Status = All
ISSUES:
Department: Transportation Planning Issue Contact: David Averill
Topic: General
Number:107 Created:3/19/2007 Pending
[3/19/07] No comments or concerns.
Page 1
Laboah.00)
Selected Issues Report
C.'ity of Fort Coll ifis
Date:
11 /3/2009
HUMAN BEAN AT SPRING CREEK PDP - TYPE II AND FINAL
PLANS
SELECTION CRITERIA: Department = Engineering; Status = All
ISSUES:
Department: Engineering Issue Contact: Randy Maizland
Topic: Engineering
Number:13 Created:12/22/2006 Resolved
[12/22/06] Refer to the Cover sheet — Please add Stuart Street to the Vicinity Map. Move
the Month and Year, updated, underneath the title. Provide benchmark data (2) to cover
sheet per LCUASS Appendix E. Provide Geotechnical Engineers address and phone along
with a reference to the latest soils report. Enlarge text as shown on the redlines for
scanability.
Number:14 Created:12/22/2006 Resolved
[12/22/06] Refer to the Plat — Please remove PDP from the title. Clearly show, label and
dimension College Avenue ROW on the Plat, existing and proposed. Will need to provide a
minimum of 141 feet of ROW for a 6-Lane arterial standard section (57.5 half ROW).
Provide a copy of referenced document for ROW dedication on College Bk 1094, pg. 574.
Show any off -site easements needed and label by separate document.
Number:15 Created:12/22/2006 Unresolved
[1/23/07] CDOT access permit to be obtained after the plans have been approved and prior
to issuance of a development construction permit.
[12/22/06] A CDOT Access Permit will be required for this project. Per discussions with
CDOT, a standard LCUASS driveway with radius curb on both sides will be required. Please
clearly show both sides of proposed driveway curb cut and call out standard driveway with a
detail added to the detail sheets. Any additional ROW or off -site easements must be
dedicated if needed to construct the driveway to standard.
Number:16 Created:12/22/2006 Resolved
[12/22/06] Please add the City standard street cut note, attached to red -lines, on the Utility
Plan sheet. A street cut may be needed for the driveway construction as determined by the
City inspector in the field.
Number:17 Created:12/22/2006 Resolved
[12/22/06] Solid rectangular black boxes are showing on the Utility Plan sheet. Please
correct and clarify what these are.
Number:18 Created:12/22/2006 Resolved
[12/22/06] Please use heavy solid line for proposed improvements and a lighter weighted
line, ghosted line, for existing improvements on the site. Label existing items to be
removed. See,redlines for clarification.
Page 1
Number:19 Created:12/22/2006 Resolved
[1/23/07] It is still unclear on the plans how much R.O.W. will be available after the
proposed dedication. Please clearly show, label and dimension the new R.O.W. on College
Avenue. Please show on the Plat and Utility Plan drawings.
[12/22/061 Clearly show, label and dimension the limits of ROW for College Ave. on the
Utility Plan sheet and Grading Plan sheet. Existing and proposed.
Number:20 Created:12/22/2006 Pending
[3/21/07] More detail needs to be shown to satisfy CDOT for an access permit. Clearly
show the entire raised median fronting the site on College. Clearly label as a raised median
with curb height. Provide dimensioning from westerly College curb line to median and show
existing lane striping on the utility plans. This is the level of detail that should be sufficient to
obtain an access permit from CDOT. I will be meeting with Glaria from CDOT on March 30.
If you can get me a copy of the plans showing this information I will pass them along to her
so she can include them with the package that you have already submitted to her.
[1/23/07] Per telephone discussion, exiting improvements may be shown based on rough
field measurments and known utility locations. An accurate survey is not needed to satisfy
this comment.
[12/22/06] Please show and label any existing buildings or improvements within 50 feet of
the site on all 3 sides.
Number:21 Created:12/22/2006 Resolved
[1/23/07] In addition to showing off -site easements on the Utility Plans, these proposed
offsite easements shall also be shown and labeled on the Plat. The recorded reception
numbers for these off -site easements will need to be provided for reference on the final Plat
prior to recording.
[12/22/06] Please show and label any off -site easements needed by separate document on
the Utility Plan and Grading Plan sheets.
Number:22 Created:12/22/2006 Resolved
[12/22/06] Please show the existing rip rap pad at the SD outfall on the Utility and Grading
Plan sheets.
Number:23 Created:12/22/2006 Resolved
[12/22/06] No less than four feet (4) of sidewalk maybe added to an existing sidewalk per
City Code. The sidewalk on College Ave. must be removed and replaced to a sufficient
width to satisfy Transportation Planning staff. Please contact David Averill with
Transportation Planning for minimum sidewalk width, attached or detached, along College
Avenue. Please clearly show and label the limits of new proposed sidewalk and
connections to existing sidewalk to the north and south.
Number:24 Created:12/22/2006 Resolved
[12/22/06] Please show the high point, grade break line at the entrance. No more than 750
square feet of paved surface shall drain over the sidewalk, driveway approach.
Number:25 Created:12/22/2006 Resolved
[12/22/06] Please use different line weights for existing and proposed grading topo. Rotate
all upside down contour elevations. Correct any overlapping text that will not scan well.
Number: 26
Created:12/22/2006 Resolved
Page 2
[12/22/06] Please show and label all storm drain pipe elevations at inlets, outlets and bend
points.
Number:27 Created:12/22/2006 Resolved
[12/22/06] Please add a LCUASS standard commercial driveway detail to the detail sheets.
Number:28 Created:12/22/2006 Resolved
[12/22/06] See Site Plan comments on redlines.
Number:89 Created:1/23/2007 Resolved
[1/23/07] All signed deeds of dedication or letters of intent must be submitted for off -site
easements prior to scheduling a hearing for the project
Number:115 Created:3/21/2007 Pending
[3/21/07] Need to enter reception numbers on the plat for all off -site easements - access
and utility prior to Plat approval and recordation. No easements have been submitted yet but
we did receive the signed letter of intent. Please submit easement deeds of dedication (type
I - admin. Approval). City review fee is $250 per document and we will collect a County
recording fee prior to recordation based on the number of sheets in each document.
Number:116 Created:3/21/2007 Pending
[3/21/07] Previous carry over comment. Please show all of the existing raised median on
college and label as such with curb height and dimensions from westerly flow line on
College on the Utility Plan drawings. Please show lane striping as well.
Number:117 Created:3/21/2007 Pending
[3/21/07] Clearly label the limits of the drainage easement for the detention pond on the
Utility Plan drawings.
Number:118 Created:3/21/2007 Pending
[3/21/07] Please add a note on sheet 5 to the existing rip rap pad to the south. Protect in
place, clean and repair as determined by the engineering inspector.
Number:119 Created:3/21/2007 Pending
[3/21/07] Please add a typical detail to sheet 7 for the on -site curb and gutter, in-flow/out-
flow.
Number:120 Created:3/21/2007 Pending
[3/21/07] All engineering comments may be addressed with mylar submittal. Please return
redlines with the mylars.
Topic: Engineering - Technical services
Number:91 Created:1/23/2007 Resolved
[1/23/07] Legal matches, area closes good. Used wrong diagram at section corners. See
redline comments.
Number:121 Created:3/21/2007 Pending
[3/21/07] Monument cap stamping diagrams are reversed.
Number: 122
Created:3/21/2007 Pending
Page 3
[3/21/07] Please remove PDP from the title on Utility plans and or Plat. I did not see this on
my last submittal ? Just verify that none of the titles have PDP in them on the mylars.
Number:123 Created:3/21/2007 Pending
[3/21/07] Please address all line over text scannability issues as shown on the Site Plan
redlines. Submit one copy of the Landscape Plan to Tech. services for review before going
to mylar. Thank you.
Department: Engineering Issue Contact: Susan Joy
Topic: Plat
Number:40 Created:12/26/2006 Unresolved
[12/26/06] From Technical Services: Plat closes, area checks, legal matches.
Number:41 Created:12/26/2006 Unresolved
[12/26/06] From Technical Services: There is an exception to lots 7 & 8 and this plat only
is involved with portions of those lots.
Number:42 Created:12/26/2006 Unresolved
[12/26/06] From Technical Services: Is a utility easement needed on the north portion of
lot 1 across the emergency and access easements?