Loading...
HomeMy WebLinkAboutHARMONY SAFEWAY MARKETPLACE PUD - Filed CS-COMMENT SHEETS - 2004-11-12PROJECT AMU ig" COMMENT SHEET City of Fort Collins Current Planning DATE: October 22, 2002 TO: Street Oversizing PROJECT: #33-94G Harmony Safeway Marketplace, Pad 8 PDP — Type I (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 20, 2002 Note - PLEASE identify your redlines for future reference 1�C'e✓ L 1 {' ( �:"7/ �e'e S.f'.' / e /I [dame (please print) X CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape - ♦_ City of Fort Collins REVISION COMMENT SHEET DATE: May 13, 1999 DEPT: ENGINEERING PROJECT: #33-94D Centennial Bank (Pad Site) - Final All comments must be received by Ted Sheppard no later than the staff review meeting: Wednesday, May 26, 1999 ❑ No Comment Problems or Concerns (see below or attached) • Issues regarding placement of utility service must be worked out prior to vacating portions of easements. • All access ramps should be in conformance with the Americans with Disabilities Act Guidelines. • Please show how flow is conveyed when leaving the parking lot; the plan gives the appearance that ponding will occur at locations in the parking tot. • It was previously noted on the site plan that Poudre Fire Authority might have an issue with a drive aisle less than 20 feet because of the canopy not being high enough for a emergency vehicle to pass under. For this submittal, the canopy has been reduced to allow for an unobstructed 20' aisle width. In subsequent discussions with Ron Gonzales about this project, he indicated that the previous site plan was sufficient from this regard; therefore, the canopy can be brought back to the original length if desired. Date: �ZZ-CLf� Signature:,%Fl Please send copies � of marked revisions _Plat /Site _Utility _Landscape ❑ NO COMMENTS — SUBMIT MYLARS — City of Fort Collins REVISION COMMENT SHEET DATE: May 13, 1999 TO: Engineering PROJECT: #33-94D Harmony Safeway Marketplace P.U.D., Lot 4, Centennial Bank — Final P.U.D. All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, May 26, 1999 No Comment Problems or Concerns (see below or attached) /-','. / %tE'as �7 h 7 Date: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ Site _ Drainage Report _ OIFer _ Utility _ Redline Utility _ Landscape PROJECT (iw�� COMMENT SHEET City of Fort Collins Current Planning Date: DATE: March 8, 1999 TO: Mapping/Drafting PROJECT: #33-94D Harmony Safeway Market Place P.U.D., Lot 4 Centennial Bank (Pad Site) - Final All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, March 24,1999 Signature: CHECK HERE IF YOU WISH TO RUNE COPIES OF REVISIONS _Plat _ Site _ Utility _ Redline Utility _ Drainage Report _ Ok PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: March 8, 1999 DEPT: ENGINEERING PROJECT: 433-94D Centennial Bank (Pad Site) - Final Harmony Safeway Marketplace P.U.D., Lot 4 PLANNER: Ted Shepard ENGINEER: Marc Virata All comments must be received by: March 24, 1999 ❑ No Problems 12_�Problems or Concerns (see below or attached) The submitted revised Trip Generation report indicates a 5,000-sq. ft. restaurant as one of the revised uses for the Harmony Safeway Center. The square footage given appears to coincide, and was intended for, lot 5. the proposed Blockbuster Video development. The restaurant usage in this report should be explained. Submit a Utility Plan developed by a licensed professional engineer, indicating existing and proposed utilities and elevations in relationship to the site design and layout. Submit an update to the overall development Drainage Plan. Site and Landscape Plan • It appears that the proposed building will be placed partially over an "Emergency Access & Utility Easement' with an existing water service within that easement. A request for vacation of the easement in conflict, or a re -plat of the Harmony Market Center shall be provided to Engineering. • As it appears that the existing water service is in conflict with this development proposal, unless demonstrated otherwise, relocate the water facility to a more suitable location within a granted utility easement. • Provide for on -site bicycle parking. (see plans for additional comments) Date: ' /� Signature: PLEASE SEND C� 'PLAT iZr Ce-r,ar% OF MARKED REVISIONS: SITE ❑ NO COMMENTS — SUBMIT MYLARS d UTILITY ❑ LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 28, 1999 DEPT: ENGINEERING PROJECT: #33-94E Harmony Safeway Marketplace PUD Lot 5, Village Inn (Pad Site) Final (LDGS) PLANNER: Ted Shepard ENGINEER: Marc Virata ❑ No Problems �kProblems or Concerns (see below or attached) General Comments: The General Notes should be revised: Note No.I should reference approval of utility plans, not a Development Agreement, as there :is no Development Agreement for this project. Add the following note: The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to The City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Date: / le�:� Signature: PLEASE SEND COP .S ❑ PLAT OF MARKED REVISIONS: ❑ SITE ❑ NO COMMENTS — SUBMIT MYLARS R UTILITY ❑ LANDSCAPE REVISION COMMENT SHEET DATE: May 13, 1999 DEPT: ENGINEERING PROJECT: 933-94E Blockbuster Video (Pad Site) - Final All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, May 26, 1999 ❑ No Comment Problems or Concerns (see below or attached) • Issues regarding placement of utility service must be worked out prior to vacating portions of easements. • Add an access ramp leading from the handicap parking to the site. All access ramps should be in conformance with the Americans with Disabilities Act Guidelines. • Plcase show how flow is conveyed when leaving the parking lot; the plan gives the appearance that ponding will occur at locations in the parking lot. Date:' i / Signature:'--7`- Please send copies of marked revisions _Plat - Site _Utility _Landscape x ❑ NO COMMENTS — SUBMIT MYLARS City of Fort Collins REVISION COMMENT SHEET DATE: May 13, 1999 TO: Engineering PROJECT: #33-94E Hannony Safeway Marketplace P.U.D., Lot 5,13lockbuster Video— Final P.U.D. All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, May 26, 1999 ❑ No Comment ❑ Problems or Concerns (see below or attached) i Date: Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _ Other Utility _ Redline Utility _ Landscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: March 8, 1999 DEPT: ENGINEERING PROJECT: #33-94C Blockbuster Video (Pad Site) - Final Harmony Safeway Marketplace P.U.D., Lot 5 PLANNER: Ted Shepard ENGINEER: Marc Virata All comments must be received by: March 24, 1999 ❑ 1 Jo Problems Problems or Concerns (see below or attached) Submit a Utility Plan developed by a licensed professional engineer, indicating existing and proposed utilities and elevations in relationship to the site design and layout. Submit an update to the overall development Drainage Plan. Site and Landscape Plan • It appears that the proposed building will be placed partially over an "Emergency Access & Utility Easement" with an existing water service within that easement. A request for vacation of the easement in conflict or a re -plat of the Harmony Market Center shall be provided to Engineering. • As it appears that the existing water service is in conflict with this development proposal, unless demonstrated otherwise, relocate the water facility to a more suitable location within a granted utility easement. Provide for on -site bicycle parking. Architectural Elevations No comments (see plans for additional comments) Date: Signature: � �Cle PLEASE SEND COPIES �� LAT(EF OF MARKED REVISIONS: Cd' SITE pppr UTILITY 11 NO COMMENTS — SUBMIT MYLARS 0 LANDSCAPE REVISION COMMENT SHEET DATE: June 24, 1999 TO: Engineering PROJECT: #33-94E Harmony Safeway Marketplace, Village Inn, Lot 7- Final — (LDGS) All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, July 7,1999 No Comment -9 Problems or Concerns (see below or attached) Date: / / Signature: CHECK HERE IF YOU R ISH TO RECEIVE COPIES REVISIONS — Plat i�Site _ Draminage Report Other „X Utility _ Redline Ubliri _ Landscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 28, 1999 DEPT: ENGINEERING PROJECT: #33-94E Harmony Safeway Marketplace PUD Lot 5, Village Inn (Pad Site) Final (LDGS) PLANNER: Ted Shepard ENGINEER: Marc Virata ❑ No Problems P,Problems or Concerns (see below or attached) General Comments: The General Notes should be revised: Note No.I should reference approval of utility plans, not a Development Agreement, as there is no Development Agreement for this project. Add the following note: The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to The City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Date: lr��//��� Signature: PLEASE SEND COP ES ❑ PLAT OF MARKED REVISIONS: ❑ SITE NO COMMENTS — SUBMIT MYLARS IR UTILITY ❑ LANDSCAPE Project Comments Sheet City oEFort Collin s Selected Departments Department: Engineering Date: November 20, 2002 Project: HARMONY SAFEWAY MARKETPLACE, PAD 8 #33-94G All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: November 20, 2002 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General 15 From Matt Baker (221-6605) in Street Oversizing: Street Oversizing fee estimated to be $42,427.00. No other comments. 16 This development is being reviewed under the October 1, 2002 LCUASS. Topic: Landscape 18 3.2.1.K requires 10' of separation between trees and water or sewer lines. 4' between trees and gas lines. Add a note with this requirement to *he cover sheet notes. Are you meeting this requirement? Topic: Site Plan 21 Remove the landscaping from the Site Plan. 22 Lot 4 is misslabeled. Topic: Utility Plans 17 Please see Chapter 3 and Appendix E4 of LCUASS for submittal and design requirements. Complete and fill out the checklist (appendix E4) with the next submittal. This submittal is missing a lot of information, expect more comments on the next submittal if any of these requirements are not provided on the plans. 20 Remove incorrect details and replace with the current details as required by LCUASS. Add the words "On -Site" to the on -site curb and gutter details. Design the sidewalk culvert in accordance with D-10 and put D-10 on the detail sheet, see attached. Provide details 701, 702, 1601, 1602, & 1603. Sion a-ture Date CHECK'RERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat I Site / Drainage Report 1 Other _I,- Utility Redline Utility / Landscape Page 1 PROJECT #M%�-z COMMENT SHEET City of Fort Collins Current Planning DATE: May 4, 1999 DEPT: ENGINEERING PROJECT: #33-94E Harmony Safeway Marketplace PUD Lot 7, Village Inn (Pad Site) Final (LDGS) PLANNER: Ted Shepard ENGINEER: Marc Virata All comments must be received by: May 26, 1999 ❑ No Problems aProblems or Concerns (see below or attached) • Please show the existing utility and access easements on this site to determine where they are in relation to the building layout. Any permanent structures being shown over the easement will require that portion of the easement to be vacated. • All access ramps should be in conformance with the Americans with Disabilities Act Guidelines. • Please show how flow is conveyed when leaving the parking lot; the plan gives the appearance that ponding will occur at locations in the parking lot. • Provide for onsite bicycle parking. Date: ZZ $ f Signature: y'- ,, , PLEASES ND 60PIES ❑ PLAT OF MARKED REVISIONS: ErSITE ❑ UTILITY NO COMMENTS —SUBMIT MYLARS 0 LANDSCAPE PROJECT i..� COMMENT SHEET City of Fort Collins Current Planning DATE: May 4, 1999 TO: Mapping/Drafting PROJECT: #33-94E Harmony Safeway Markerplace PUD Lot 7, Village Inn (Pad Site) Final (LDGS) All comments must be received by Ted Shepard no later than the staff review meeting: Date: Wednesday, May 26, 1999 ign CHECK HERE IF YOU WITH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility _Landscape Cit}, of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 28, 1999 DEPT: ENGINEERING PROJECT: #33-94E Harmony Safeway Marketplace PUD Lot 7, Village PLANNER: Ted Shepard ENGINEER: Marc Virata Inn (Pad Site) Final (LDGS) ❑ No Problems Cal Problems or Concerns (see below or attached) General Comments: The General Notes should be revised: • Note No. t should reference approval of utility plans, not a Development Agreement, as there is no Development Agreement for this project. • All instances of "Director of Engineering" should be replaced with "City Engineer". Add the following note: The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to The City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Provide documents necessary for easement dedication, (Deed of Dedication For Easement, Legal Description, Attorney's Certificate, sketch showing easement location.) Date: z-Y 9 Signature PLEASE END OPIES ❑ PLAT OF MARKED REVISIONS: ❑ SITEUD UTILITY FEI NO COMMENTS —SUBMIT MYLARS LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 28, 1999 DEPT: ENGINEERING PROJECT: #33-94E Harmony Safeway Marketplace PUD Lot 7, Village Inn (Pad Site) Final (LDGS) PLANNER: Ted Shepard ENGINEER: Marc Virata ❑ No Problems ❑ Problems or Concerns (see below or attached) General Comments: The General Notes should be revised: • Add the following note: The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to The City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. • Add the following note: The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of The City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. Easements: The easement dedication statement needs to be corrected: • Please use the language submitted and modify as necessary. (Note that the City will not accept duty of maintenance, note that acceptance by the City Clerk is needed, note that the Attorney's Certification area needs to be modified.) • I'd prefer the exhibits to be letter size. Exhibits in legal size will have to be reduced. Date: /��?.�� Signature: PLEASE SEND COPIES ❑ PLAT OF MARKED REVISIONS: ❑ SITE ❑ UTILITY NO COMMENTS — SUBMIT MYLARS 0 LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 24, 1999 DEPT: ENGINEERING PROJECT: #33-94E Harmony Safeway Marketplace PUD Lot 7, Village Inn (Pad Site) Final (LDGS) PLANNER: Ted Shepard ENGINEER: Marc Virata ❑ No Problems ❑ Problems or Concerns (see below or attached) General Comments • The General Notes does not call out a project benchmark. • Distinguish between inflow and outfall curb and gutter usage on the plan. Date: _� �' Signaturee- PLEASE SEND COPIES ❑ PLAT OF MARKED REVISIONS: ❑ SITE ❑ NO COMMENTS — SUBMIT MYLARS El UTILITY 0 LANDSCAPE PROJECT 11AM-1 COMMENT SHEET City of Fort Collins. Current Plannine DATE: April 25, 2001 TO: Engineering PROJECT: #33-94F HARMONY SAFEWAY MARKETPLACE — FUEL FACILITY — PAD 6 — FINAL COMPLIANCE (LUC) All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: May 9, 2001 Note- Please identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat site _Drainage Report _Other Utility Redline Utility _Landscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: December 5, 2000 DEPT: ENGINEERING PROJECT: 933-94F Harmony Safeway Marketplace, Pad 6 PLANNER: Ted Shepard ENGINEER: Marc Virata All comments must be received by: December 20, 2000 ❑ No Problems 2 Problems or Concerns (see below or attached) General Comments: 1. Coordinate the design of the bus pad and shelter with Gaylene Rossiter at Transfort. Indicate that the design is in accordance with City of Fort Collins Transit Standards and Guidelines. More detail is needed on this design, (no detail or reference is made on the utility plan set, which is required.) Curb and gutter is shown as being added in front of the shelter — this should not be used as it is not consistent with the Harmony Corridor Plan unless viewed as needed from Transfort for their respective guidelines and standards. This detail should be incorporated into the plans and agreed upon in concept by the appropriate City departments prior to mylar submittal. 2. The General Notes for the utility plan set have been revised (again). These notes have been electronically mailed to the Engineer. 3. Please indicate the states which the developer and owner entities reside for the Memorandum of Agreement and Notice (i.e., "Safeway Stores 46, Inc. a California Corporation"? and "S-B Properties No. 22, a Wyoming; Limited Partnership".) This information is needed to complete the draft of the document and will also be used for the drafting of the Development Agreement for the project. I�ESQon1St I� 4JJ�l�Ie uoiE SZ SIE 'T ZOF% Hf6 Be" FZE/ISE� FtLSOnNOTE �1Z IFAS t3tert REViS� I�FR C—MAJ� Seur 13y 9Etaly F2ie5�rs oa 1I7-101 Z) As N o7-E' 3) Nd ram! INF-0 e�2oViT>Et� rjy r C,Gyr-iet6s". Date: December 27, 2000 Signature_� PLEASE SEND COPIES OF MARKED REVISIONS 0 Plat 21 Site F] Utility Q Landscape ❑ Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: December 5, 2000 DEPT: ENGINEERING PROJECT: #33-94F Harmony Safeway Marketplace, Pad 6 PLANNER: Ted Shepard ENGINEER: Marc Virata All comments must be received by: December 20, 2000 ❑ No Problems 0 Problems or Concems (see below or attached) General Comments: 1. Coordinate the design of the bus pad and shelter with Gaylene Rossiter at Transfort. Indicate that the design is in accordance with City of Fort Collins Transit Standards and Guidelines. More detail is needed on this design, (no detail or reference is made on the utility plan set, which is required.) Curb and gutter is shown as being added in front of the shelter — this should not be used as it is not consistent with the Harmony Corridor Plan unless viewed as needed from Transfort for their respective guidelines and standards. This detail should be incorporated into the plans and agreed upon in concept by the appropriate City departments prior to mylar submittal. 2. The General Notes for the utility plan set have been revised (again). These notes have been electronically mailed to the Engineer. 3. Please indicate the states which the developer and owner entities reside for the Memorandum of Agreement and Notice (i.e., "Safeway Stores 46, Inc. a California Corporation"? and "S-B Properties No. 22, a Wyoming Limited Partnership".) This information is needed to complete the draft of the document and will also be used for the drafting of the Development Agreement for the project. Date: December 27, 2000 Signature--� PLEASE SEND COPIES OF MARKED REVISIONS 0 Plat 21 Site 0 Utility 0 Landscape 0 Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: August 3, 2000 DEPT: ENGINEERING PROJECT: #33-94F Harmony Safeway Marketplace, Pad 6 PLANNER: Ted Shepard ENGINEER: Marc Virata All comments must be received by: August 30, 2000 ❑ No Problems 0 Problems or Concerns (see below or attached) General Comments: I . Please remove all the "bubbled out" indications for revisions from the previous submittal and remove any indication of revisions on the Revision Block. "Revisions" are intended to be indicated after the plan set(s) are approved by the City and subsequent changes are made. 2. Per discussion with Transfort and Transportation Planning, the bus shelter should be located west of the proposed location, to provide a more direct and centralized connection to the anchor Safeway Store as well as interact more closely with the multi -family development(s) to the west. A culvert or bridge crossing of the swale should be provided. Offsite easements may be required with this connection. Coordinate the design with Transfort and provide the necessary details for this construction on the utility plan set. 3. Letter(s) of intent are required for offsite easements needed for the project prior to a hearing. 4. A Memorandum of Agreement and Notice will be required with the project, to be signed by the owner/developer and the City. I have enclosed a typical copy of this agreement, please indicate the name of the owner (and/or) developer as well as what type of entity each is. Also, please provide the name(s) of the individuals signing for the respective entity(s). Return this information to me and I will prepare the document, which will be finalized after hearing. (see plans for any additional comments) Date: November 9, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS ElPlat 0 Site 0 Utility 91 Landscape ❑ Drainage eport 11 NO COMMENTS -SUBMIT MYLARS PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: August 3, 2000 DEPT: ENGINEERING PROJECT: #33-94F Harmony Safeway Marketplace, Pad 6 PLANNER: Ted Shepard ENGINEER: Marc Virata All comments must be received by: August 30, 2000 ❑ No Problems El Problems or Concerns (see below or attached) General Comments: 1. Per discussion with Transfort and Transportation Planning, the bus shelter should be located west of the proposed location, to provide a more direct and centralized connection to the anchor Safeway Store. A culvert or bridge crossing of the swale should also be provided. Offsite easements may be required with this connection. 2. Letter(s) of intent an: required for any offsite easements needed for the project prior to a hearing. 3. A Memorandum of Agreement and Notice will be required with the project, to be signed by the owner/developer and the City. Utility Plan: I . The top sheet of the utility plan should have a title in the top center, with the drawing on a different sheet and the Index of Sheets should be displayed more prominently. 2. The tower structure/picnic table appears to encroach upon a utility easement. The trash enclosure also appears to encroach on an existing easement. The air and vacuum as well as the telephone and trash on the concrete pads appear to encroach on an 80' easement for drainage, pedestrian & landscaping. A portion of various utility easements need to be vacated in order to allow any structures. 3. Easements may need to be dedicated for the extension of water and sewer service. (It is recommended that because of potential numerous vacations/dedications of easements that a replat of the property is done, verses dedication/vacation by separate documents.) 4. Offsite easements are required with the offsite sidewalk construction. 5. The Drainage and Erosion Control sheets are missing Utility Plan Approval Blocks (sheets 5 & 6) 6. General Note #4 has been revised. Add the following to the end of the existing note: Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. Site Plan: 1. The approval block for the site plan is incorrect and should not reference "Administrative Hearing Officer Certification". Replace "Administrative Hearing Officer" with "Director of Planning". (see plans for any additional comments) Date: September 7, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS , 0 Plat 0 Site 0 Utility 0 Landscape 0 Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS City of Fort Collins Department: Engil Project Comments Sheet Selected Departments Date: February 20, 2003 Project: HARMONY SAFEWAY MARKETPLACE, PAD 8 #33-94G All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: February 05, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 44 Created: 2/4/2003 easement. The fire lane required by PFA will need to be dedicated by plat or by separate document as an emergency access Topic: Landscape Number: 48 The project title does not match the utility plans. Number: 49 Remove contours from the Landscape plans. Created: 2/20/2003 Created: 2/20/2003 Number: 50 Created: 2/20/2003 show them on the plans. Remove the sight distance triangles shown. When sight distance triangles fall within the ROW, you do not need to Number: 51 Show the existing sanitarysewer and add note on its removal. Topic: Site Plan Number: 52 Remove the contours. Number: 53 The project title must match the one on the Utility plans. Topic: Utility Plans Number: 20 Signature Created: 2/20/2003 Created: 2/20/2003 Created: 2/20/2003 Created: 11/19/2002 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page 1 PROJECT COMMENT SHEET City of Fort C011inS Current Planning DATE: August 3, 2000 TO: Engineering Pavement PROJECT: #33-94F Harmony Safeway Marketplace, Pad 6, Fuel Facility — Type II - PDP (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: August 30, 2000 Note- Please identify your redlines for future reference Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other Q6112 _Utility _Redline Utility _Landscape city of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: December 9, 1998 TO: Engineering PROJECT: #33-94B Harmony Safeway Marketplace P.U.D., Minor Amendment (includes vacation and re- dedication of drainage easement) A11 comments must be received by Ted Shepard no later than the staff review meeting: December 30, 1998 Note: The minor amendment form to be signed after review. Harmony Safeway Marketplace PUD. Minor Amendment January 5, 1999 - No problem with the utility plan revisions. At the time of mylar submittal need to provide sticky backs of the original signatures in the signature blocks. The City will sign the revision block for revisions to previously approved plans. -No update to the traffic report will be required with this change. An update/ new report will be required at the lime of submittal for Lots 4. 5, 6, 7 and 8. -A checks will be needed for the recording fees for the easement dedications and the easement vacation. I will notify you of these amounts once I determine what they are. Date: CHECK HERE IF YOU MSH TO RECEIVE COPIES OF REVISIONS _ Plat _ Site _ Drainage Repod _ Otber Utility _ Redline Utility _ I.andsrape Market). Provide standard access ramps and design the sidewalk with a minimum 915 centerline radius since it is also a recreational bikeway. ❖ No pavers are allowed in the public right-of-way. None appear to be proposed, but I can't tell for sure. If the right-in/right-out on Harmony Road is allowed, additional right-of-way dedication and widening of the asphalt will be required for any auxiliary lanes. It is not sufficient to restripe the existing asphalt shoulder. S Need to discuss the striping of travel lanes and bike lanes on Harmony with Kathleen Reavis in Transportation. She is working on a project to install on - street bikelanes on Harmony Road. The Developer of this site may be required to participate in this project. UTILITY PLANS ❖ Same issues as site plan, traffic study, drainage comments above - Harmony Access - Sidewalk layout on Harmony will conflict with Stormwater improvements if Harmony Road access is allowed - Additional R.O.W. dedication may be required, any auxiliary lanes and access design required to meet the State Highway Access Code (and /or variances to the Code granted) will affect the proposed grading and detention along Harmony Road. - At final, need to see design details for proposed improvements in the public r.o.w. Preliminary design details are needed for the proposed narrowing of the public streets, construction of islands,... In addition to all other standard requirements for final utility plans, please note that the applicant will need to include all proposed striping and signing on the public streets adjacent to the site (Wheaton, McMurray, Harmony, Monte Carlo) TRAFFIC STUDY City Transportation, Planning, and Engineering staff need to meet to discuss the proposed narrowing of Monte Carlo and the proposed traffic calming measures on Monte Carlo and at the intersections of Monte Carlo/McMurray and Wheaton This includes any changes to striping, signage, school zone flashers, ... ❖ No variance request/ engineering/traffic operations analysis was submitted to support the proposed narrowing of Monte Carlo and the proposed traffic calming measures. There are currently no City standards which allow the proposed street width nor the islands proposed. However, variance requests to the street standards may be submitted for City review as part of the P.U.D. process. Variance requests are required for all construction within the public right-of-way which does not meet standards. ❖ Traffic Engineering needs to evaluate if any changes to signal operations at Harmony and McMurray are required with this development. ❖ The traffic study states that level of service for all intersections analyzed will operate acceptably for background traffic (now) and with site build -out. Also acceptable L.O.S. in 2015 except left turns and through movement at Lemay/Wheaton. Need to know what, if any, assumptions were made about improvements to this intersection are to be done with this project or in the future. HARMONY ROAD ACCESS: ❖ The applicant did not submit any justification, engineering analysis, explanation, proposed cleometrics, comparison of State Highway Access Code requirements to site conditions,... for the proposed right-in/right-out on Harmony Road. The applicant, and previous applicants, have been informed that the Harmony Road Access Control Plan as currently adopted does not allow any access to Harmony Road from this site between Wheaton and McMurray. City staff needs the justification and supporting engineering analysis from the applicant to illustrate why the right-in/right-out on Harmony is necessary, why it is a benefit to the State Highway (not just to the site), that the geometrics necessary for any required auxiliary lanes can be accommodated (for example, is there adequate distance from the public street intersections to the proposed driveway access for turn lanes/decel lanes that the State Highway Access Code may require, and, if not, is a variance justified and why ? ) Staff needs this information to initiate discussions with the Colorado Department of Transportation about amending the Harmony Access Control Plan. Ultimately, if the access is adopted as part of the Plan, the applicant will be required to submit the design and construction details of the access, any auxiliary lanes, grading, striping, signage, ... in order for the City to issue a State Highway Access Permit for C.D.O.T. approval. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: June 25, 1996 DEPT: Engineering - Ping PROJECT: 3#33-9413 Harmony Safeway Marketplace PUD Final PLANNER: Ted Shepard All comments must be received by: July 5, 1996 HARMONY SAFE\NAY MARKETPLACE P.U.D. - Final 1st Submittal - July 17, 1996 Engineering Department Comments Site Plan and Utility Plans: • If the right-in/right-out is allowed, it is the City Traffic Engineer's opinion that the associated right turn accel and decel lanes will need to be continuous between Wheaton and McMurry since the distance between those two streets is so short. The Planning Department needs to determine where the 80' setback along Harmony Road will be measured from. Since we do not what C.D.O.T. will require in terms of turn lanes, bike lanes, breakdown lanes, etc., until the issue of the right-in/right-out is resolved one way or the other, it is not known where the ultimate r.o w. and edge of pavement will be. Therefore, the setback to buildings and parking areas may change. • The centerline of Monte Carlo and the centerline of the entrance to the school must align. Please redesign. Date: I i (t , Signatures'({ CHECK: IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS ❑ SITE ❑ LANDSCAPE ❑ UTILITY There will be additional comments made upon review of more drtailed plans. Please respond to all comments with the next plan resubmittal. It is Staff's understanding that plans are not be resubmitted until there is resolution of the right-in/right-out access proposed on Harmony Road. However, because of the utility, drainage, and other physical complications associated with narrowing Monte Carlo Drive, the applicant is strongly encouraged to continue to work on the design issues; with the City and utility agencies since this will likely be the most complex and time consuming civil design issue on the project. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: June 25, 1996 DEPT: Mapping PROJECT: #33-9413 Harmony Safeway Marketplace PUD Final PLANNER: Ted Shepard All comments ;must be received by: July 5, 1996 Date: o k. (lk� Signature CHECK IF YOU WISH TO RECEIVE COPIES OF REVISIONS ❑ PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY The process for amending the Harmony Road Access Control Plan requires both City Council action and action on the part of the C.D.O.T. The Plan must be amended by both parties before any application for an Access Permit can be made. The process for amending an access control plan can be lengthy. Eric Bracke of the City's Transportation Division has taken amendments to the South College Avenue Access Control Plan to the State in the past. Eric may be able to provide the applicant with more detailed discussion of the steps in the process and the probable timeframe involved. DRAINAGE REPORT: ❖ Detailed comments on the drainage report and plans will be provided by the Stormwater Utility. However, please note that the grading and detention along Harmony Road may be very significantly impacted by the outcome of the issues surrounding the Harmony Road access described above. For example, if the access is allowed by the C.D.O.T., additional right-of-way dedication and construction of auxiliary turn lane(s) may be required which would alter the grading and reduce the proposed detention area. ❖ If the driveway on Harmony Road is allowed, the culverts under the proposed driveway will need to be extended and grading modified so that the 8' wide public sidewalk on Harmony intersects at the curb return of the driveway instead of back inside the driveway as currently proposed (see redlined plans). The new transmission water main along Harmony Road in the 80' easement may conflict with the proposed detention ponds. There may be problems with adequate cover for the water line. SITE PLAN Same comments as above regarding proposed Harmony Road access, traffic calming, striping and signage on all public streets including Harmony Road adjacent to the site 4. No proposed design details for the traffic calming measures or cross -sections for Monte Carlo were received. For example, need to see proposed radii, ramps, design of curbs at McMurray/Monte Carlo intersection to begin establishing geometrics for proper turning radii as well as adequacy of pedestrian crossings. 4. Show the tie to the existing improvements at Monte Carlo and Wheaton. The Harmony Corridor Plan requires an 8' wide sidewalk along Harmony. As previously mentioned, if the access on Harmony is allowed, the sidewalk must be designed to intersect the driveway at the curb return for a proper pedestrian crossing at the intersection (an example is the right-in/right-out at Harmony TRAFFIC STUDY City Transportation, Planning, and Engineering staff need to meet to discuss the proposed narrowing of Monte Carlo and the proposed traffic calming measures on Monte Carlo and at the intersections of Monte Carlo/McMurray and Wheaton. This includes any changes to striping, signage, school zone flashers, ... ❖ No variance request/ engineering/traffic operations analysis was submitted to support the: proposed narrowing of Monte Carlo and the proposed traffic calming measures. There are currently no City standards which allow the proposed street width nor the islands proposed. However, variance requests to the street standards may be submitted for City review as part of the P.U.D. process. Variance requests are required for all construction within the public right-of-way which does not meet standards. Traffic Engineering needs to evaluate if any changes to signal operations at Harmony and McMurray are required with this development. The traffic study states that level of service for all intersections analyzed will operate acceptably for background traffic (now) and with site build -out. Also acceptable L.O.S. in 2015 except left turns and through movement at Lemay/Wheaton. Need to know what, if any, assumptions were made about improvements to this intersection are to be done with this project or in the future. HARMONY ROAD ACCESS: ❖ The applicant did not submit any justification, engineering analysis, explanation, proposed geometrics, comparison of State Highway Access Code requirements to site conditions,... for the proposed right-in/right-out on Harmony Road. The applicant, and previous applicants, have been informed that the Harmony Road Access Control Plan as currently adopted does not allow any access to Harmony Road from this site between Wheaton and McMurray. City staff needs the justification and supporting engineering analysis from the applicant to illustrate why the right-in/right-out on Harmony is necessary, why it is a benefit to the State Highway (not just to the site), that the geometrics necessary for any required auxiliary lanes can be accommodated (for example, is there adequate distance from the public street intersections to the proposed driveway access for turn lanes/decel lanes that the State Highway Access Code may require, and, if not, is a variance justified and why ? ) Staff needs this information to initiate discussions with the Colorado Department of Transportation about amending the Harmony Access Control Plan. Ultimately, if the access is adopted as part of the Plan, the applicant will be required to submit the design and construction details of the access, any auxiliary lanes, grading, striping, signage, ... in order for the City to issue a State Highway Access Permit for C.D.O.T. approval. • Show all other street intersections and driveway locations opposite the site on all adjacent streets (e.g. Rockbridge Condos entrance). Centerlines of driveways and through/turn lanes opposite each other must align. • There are many complex issues to be resolved related to the proposed narrowing of Monte Carlo Drive: - The utility plans need to show detailed information on the location of all existing and proposed utilities, existing and proposed grading and drainage, intersection details (how will the narrowed roadway tie into the existing intersections and grading?) Details of the design for the 'curb bump -outs" at Monte Carlo and McMurry including spot elevations, striping, profiles, and cross sections through the intersection to show there are no flat spots, etc. Need to see cross sections of the actual street to see where the crown of the roadway will be - or is the entire roadway being reconstructed to put the crown in the center ? Will cover over the utilities be adequate ? Need detail on the vertical and horizontal separation of all utilities from existing/proposed grade, from each other, and from the curb line and landscaping. Which direction will the sidewalk and parkway strip drain ? Are easements needed to do the reconstruction on the north side and/or for utilities and drainage? There are major problems with the location of the existing water and sewer mains in relation to the new proposed curb line. Once the engineer has spent some time designing the street narrowing and providing a sufficient level of detail to review the proposed design, it will be necessary to distribute revised utility, site, and landscape plans again to all utility agencies and have a utility coordination meeting after they have had time to conduct a detailed review of the plans. There are likely to be conflicts between utilities and the landscaping proposed along the parkway. In general, due to the complexities of the proposed changes to Monte Carlo Drive, the utility plans are not up to the level of design necessary to conduct a complete review. • Additional easement and r.o.w. dedication may be necessary to accommodate the ultimate design for Monte Carlo both on -site and off -site. • Be sure the intersection of Monte Carlo and McMurry is designed so that pedestrian crossings and ramps are at locations where vehicles will not be blocking the crosswalk areas. Show the signing and striping at the intersection. • Signing and striping plans are required for streets, driveways, and intersections adjacent to the site. In particular, for Harmony, Wheaton, McMurry, and at the intersections and driveway entrances. Remove incorrect details and replace with the current details as required by LCLIASS. Add the words "On -Site" to the on -site curb and gutter details. Design the sidewalk culvert in accordance with D-10 and put D-10 on the detail sheet, see attached. Provide details 701, 702, 1601, 1602, & 1603. 2/20/3: Repeat comment. Number: 54 Created: 2/20/2003 Items 40, 41, and 48 of the General Notes need to be corrected. Contact Bob Zakely at 970-224-6063 to complete line 14 of the Grading and Erosion Control Notes. Number: 55 Correct the street cut note in all instances to read: Created: 2/20/2003 Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 56 Dimension all sidewalks. Created: 2/20/2003 Number: 57 Created: 2/20/2003 Are you removing the existing sanitary sewer or abandoning it at the main Please add note describing what will be done and show approximate area of construction) for both the sewer service and the storm inlet being removed. Number:58 Created 2/20/2003 Correct your lineweights to be either existing or proposed. Do not contuse the project with all the proposed and existing should be "existing"? contours from the various phases. Also, the grading sheet appears to have off -site grading or perhaps the lineweight Number: 59 Provide spot elevations for all lot corners. Page 2 Created: 2/20/2003 STAFF PROJECT REVIEW CAHEN ARCHITECTURAL GROUP Date: 3/28/03 CRAIG CAHEN 7535 E. HAMPDEN AVE. #425 DENVER, CO 80231 Staff has reviewed vour submittal for HARMONY SAFEWAY MARKETPLACE, PAD 8 #33- 94G, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: General Number: 44 Created: 2/4/2003 The fire lane required by PFA will need to be dedicated by plat or by separate document as an emergency access easement. Topic: Landscape Number: 48 Created: 2/20/2003 The project title does not match the Utility plans. Number: 49 Created: 2/20/2003 Remove contours from the Landscape plans. Number: 50 Created: 2/20/2003 Remove the sight distance triangles shown. When sight distance triangles fall within the ROW, you do not need to show them on the plans. Number: 51 Created: 2/20/2003 Show the existing sanitary sewer and add note on its removal. Topic: Site Plan Number: 52 Created: 2/20/2003 Remove the contours. Number: 53 Created: 2/20/2003 The project title must match the one on the Utility plans. Topic: Utility Plans Number: 20 Created: 11/19/2002 Remove incorrect details and replace with the current details as required by LCUASS. Add the words "On -Site" to the on -site curb and gutter details. Design the sidewalk culvert in accordance with D-10 and put D-10 on the detail sheet, see attached. Provide details 701, 702. 1601, 1602, 8 1603. 2/20/3. Repeat comment. Number: 54 Created: 2/20/2003 Items 40, 41, and 48 of the General Notes need to be corrected. Contact Bob Zakely at 970-224-6063 to complete line 14 of the Grading and Erosion Control Notes. Number: 55 Correct the street cut note in all instances to read: Page 1 Created: 2/20/2003 Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 56 Created: 2/20/2003 Dimension all sidewalks. Number: 57 Created: 2/20/2003 Are you removing the existing sanitary sewer or abandoning it at the main? Please add note describing what will be done and show approximate area of construction ) for both the sewer service and the storm inlet being removed. Number: 58 Created: 2/20/2003 Correct your lineweights to be either existing or proposed. Do not confuse the project with all the proposed and existing contours from the various phases. Also, the grading sheet appears to have off -site grading or perhaps the lineweight should be "existing"? Number: 59 Created: 2/20/2003 Provide spot elevations for all lot corners. Department: PFA Issue Contact: Michael Chavez Topic: General Number: 33 Created: 2/3/2003 REQUIRED ACCESS: A fire lane is required. The fire lane shall be visible by painting and signage, and maintained unobstructed. 97 UFC 901.2.2,1; 901.3; 901.4.2; FCLUC Number: 34 Created: 2/3/2003 ADDRESS NUMERALS: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6-inch numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable) 97 UFC 901.4.4 NOTE: The building adjacent to Timberline road will require 10-inch numerals along Timberline Road in addition to 6-inch numerals along the fire lane side. Number: 35 Created: 2/3/2003 WATER SUPPLY: No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2 Number: 36 Created: 2/3/2003 STREET NAMES: Street names shall be verified and reviewed by City Planners prior to being put into service. 97 UFC 901.4.5 Number: 37 Created: 2/3/2003 BUILDING AREA: These proposed buildings exceed 5000 square feet and must be fire contained or fire sprinklered. 97 UBC Table 9B NOTE: This requirement pertains to the First Bank (5,468 sq. ft.) and Retail "A" (7,700 sq. ft.) Number: 38 Created: 2/3/2003 SPRINKLER REQUIREMENT: This proposed building shall be fire sprinklered. Page 2 NOTE: This requirement pertains to the King Soopers building (66,283 sq. ft.) and Retail "C (10, 160 sq. ft.) Number: 39 Created: 2/3/2003 KNOX BOX: Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. 97 UFC 902.41 PFA policy 88-20 Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 42 Created: 2/4/2003 Please revise the table with the C-factor comparisons to either be both 100-year C-factors or both 10-year C-factors. Number: 43 Created: 2/4/2003 The time of concentration value for basin N-18 seems a little high considering the area was reduced from the original N- 18 basin. The Tc should have reduced rather than increased. Please revise. Topic: Erosion Control Number: 47 I. City erosion control notes must be on the plan. 2. Need surety calculation. Department: Transportation Planning Topic: General Number: 41 No further comments Created: 2/13/2003 Issue Contact: Mark Jackson Created: 2/4/2003 Department: Water Wastewater Issue Contact: Jeff Hill Topic: Landscape Number: 14 Created: 11 /15/2002 Repeat comment from previous round of review - Include the standard general notes pertaining to landscape/utility separation distances and locates on the landscape plans. Irrigation connection to the water service must be made a minimum of 5 feet downstream of meter pit. Department: Water Wastewater Issue Contact: Roger Buffington Topic: Utility Plans Number: 46 Created: 2/9/2003 Add a note to the overall utility plan to "Contact water Utility crewsat 221-6700 to coordinate abandonment of the existing fire line and the existing 1.5-inch safer service". Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility Plans Number: 24 Created: 11 /21 /2002 Repeat comment from previous round of review - Show and label all fittings, valves and thrust blocks on the proposed fire line. Provide all necessary details (I.e. Typical water service, Thrust block, Traffic rated clean-cut, etc.). Number: 31 Created: 1 /22/2003 Show and label location of meter pit and curb stop on the overall utility plans. Draw meter pit to scale. Curb stop must be within a utility easements and meter pit may not be located in a hard surface (I.e. asphalt, concrete). Page 3 Number: 32 See site, landscape and utility plans for other comments. Department: Zoning Topic: General Number: 40 Please remove topo lines from final site and landscape plans Created: 1 /22/2003 Issue Contact: Jenny Nuckols Created: 2/3/2003 Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Ted Shepard City Planner Page 4 aProject Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: April 24, 2003 Project: HARMONY SAFEWAY MARKETPLACE, PAD 8 #33-94G All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: April 19, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: Landscape Number: 48 Created: 2/20/2003 The project title does not match the utility plans. 4/8/3: Repeat comment. Number: 51 Created: 2/20/2003 Show the existing sanitary sewer and add note on its removal. 4/8/3: Note added but still need to show the existing line. Topic: Site Plan Number: 52 Created: 2/20/2003 Remove the contours. 4/8/3: Repeat comment. Number: 53 Created: 2/20/2003 The project title must match the one on the Utility plans. 4/8/3: Repeat comment. Topic: Utility Plans Number: 20 Created: 11 /19/2002 Remove incorrect details and replace with the current details as required by LCUASS. Add the words "On -Site" to the on -site curb and gutter details. Design the sidewalk culvert in accordance with D-10 and put D-10 on the detail sheet, see attached. Provide details 701, 702, 1601, 1602, 8 1603. 2/20/3: Repeat comment. 4/8/3: Still neSO to add details 1601. 1602, 1603. CHECK HERE IF YOU WISH TO RECEIVE COPIES Plat I Site Drainage Report Z Utility _� Redline Utility I_ Landscape Page I Da OF REVISIONS Other