HomeMy WebLinkAboutSERVICE CENTER THIRD REPLAT - Filed DCP-DEV. CONSTRUCTION PERMIT - 2004-11-10DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: - 04-22 Issuance Date: 7.23,2004
Project Name: CITY OF FTC VEHICLE STORAGE BUILDINGS PDP
Project A.K.A.: Vehicle Storage Buildings
Project Location: 701 Wood Street
Permittee: Ron Kechter, City of Fort Collins
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 300.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 5,038.4
(f-#rn ctccf gt_15o242H07,529g9o,0 Total $ 5,338.40
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 135 668.00 (WAIVED) _
Form of security deposited with the City: WAIVED
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permitter
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility ity Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide `as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"1?nginecr" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/16/99)
For City use only: Application Number: A02.3-04 Application Date: July 7, 2004
Permit application fee: $ _ 300.00
INSTRUCTIONS:
I. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2 If you have any questions contact the Development Engineer, Katie Moore, at 221-6605.
3. Submit the Application and pay the Application Fee at the Engineering counter at 281 N. College
Avenue. Charge #: 50262407.529990.1
PROJECT INFORMATION:
Project Name (as approved by the City):
Vehicle Storage Buildings
Project Location: 701 Wood Street, Fort Collins, CO 80522
Property Owner (At the time of this permit issuance):
Individual Name: Tera Robinson
Company Name: City of Fort Collins - l ltilitiec
Address: 700 Wood Street, Fort Collins CO 80522 -_
Phone number(s):
Office: 221-6814
Fax number: 221-6619
Email: TROBINSON@ fegov.com
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name: Role Keehter
Company Name: City of Fort Cnllins - Operations Cer ieec
Address: 117 North Mason Street, Fort Collins, CO 80522
Phone number(s):
Office: 221-6805
Fax number: 221-6534
Email: rkechter@fcgov.com
Permittee (Person who is to sign the Development Construction Permit):
Individual Name: Ron Koehler
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person,
responsible for the design of this project, responsible for certification that improvements are constructed
in accordance with approved plans, responsible for making revisions to plans with City approval and for
providing as -constructed plans):
Individual Name: Aaron McKelvey
Company Name: The Engineering C )mnany
Address: 2310 East Prospect, Fort Collins CO 80525
Phone number(s):
Officc:484-7477
Fax number: 484-7488
Email:.Anicl,cicc\ a tec-c_ng,rs com
Professional License Number: 36795 (CO)
Architect/ Planner (The person responsible for the site design of this project)
Individual Name: Chris Freeland
Company Name: Aller-Lingly Architects
Address. 712 Whalers Way. Fort Collins CO 80525
Phone number(s):
Office:223-1820
Fax number: 223-1833
Email: efrceland(aaller-lingle.com
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement —add additional names below):
Individual Name: Rnn Kechter
General Contractor (The contractor in overall charge of the public infrastructure construction):
Individual Name: Jennifer Chavies_ Prniert Manager
Company Name: n r Henth C nsliucti n Management
Address: 141 Racquettc Drive, Fort Collins CO 80524
Phone number(s):
Office: 221-4195
Fax number: 221-2907
Email: Jennifer(a,HEATHCONSTRUCTION.com
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
81 /2"x I I " copy of the Site Plan
Proposed Project Schedule
Project quantities and cost estimate for all of the public improvements to be constructed. In
addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shown on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss
plans and special requirements for your project is required for all development projects. The people
required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land
Planner and General Contractor.
People to Attend: List the names and titles for those who will attend the pre -construction
meeting:
Name
Title
Lance Newlin
Chief Construction Inspector, Engineering
Katie Moore
Civil Engineer, Development Review, Engineering
Tcrry Robinson
Water Field Operations Manager, Utilities
Rodney Albers
Water Drainage System Supervisor, Utilities
Terry Popejoy
Water Distribution System Supervisor, Utilities
Dwight Dufloth
Water Utilities Supervisor, Utilities
Dennis Dutton
Maintenance Specialist, Utilities
Paul Simon
Telecom Technical Specialist, Information Technology
Ron Gonzales
Assistant Fire Marshall, PFA
Doug Martine
Electrical Project Engineer Supervisor, Utilities
Jennifer Chavies
Project Manager, R.C. Heath Construction
Derrel Baker
Superintendent, R.C. Heath Construction
Mick Aller
Principal, Aller-Lingle Architects
Aaron McKelvey
Design Engineer, The Engineering Company
Ron Kechter
Facilities Project Manager, Operations Services
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted by the City to own and
maintain. In addition provide the value of all private infrastructure improvements that the City will
inspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project Ouantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: $ 135,668.00
Private infrastructure, estimated cost: $ 24,000.00
1 certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required work.
Applicant Signature: @ tax Date: July 7, 2004
Development Construction Permit, Page 2/6
3. Construction time restrictions:
4. 'fhe applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient tojustify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.23(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/6
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code: and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature:( Date:
Approval for issuance:
City F,ngineer Approval: %Gy�� '' �� ��' C /Date:
( ermit I suance Date)
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: CITY OF FTC VEHICLE STORAGE BUILDINGS PDP
Project A.K.A.: Vehicle Storage Buildings
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Current Planner:
Katie Moore, 281 N. College Ave., Fort Collins, CO
80522 (970)221-6605
Dan Peterson, 281 N. College Ave., 221-6605
Bob Barkeen, 281 N. College Ave., 221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Ft Collins, CO 80521
970 221-6854
Stormwater Utilities Engineer: Glen Schlueter
700 Wood Street, Ft Collins, CO 80521
970 224-6065
Erosion Control Inspector: Bob Zackley
700 Wood Street, Ft Collins, CO 80521
970 224-6063
Natural Resources: Doug Moore 281 N. College Ave, 221-6750
Traffic Operations: Eric Bracke
625 Ninth Street, Ft Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Ft Collins, CO 80524
970 224-6815
Transportation Planning: Kathleen Reavis
215 N. Mason St, Ft Collins, CO
970 224-6104
Development Construction Permit, Page 5/6
Forestry: Tim Buchanan
215 N. Mason St, Ft Collins, CO
970 221-6641
Light and Power: Doug Martine
700 Wood Street, Ft Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Project Manager:
Owner/Developer:
Architect/Planner:
Project Engineer:
Ron Kechter
City of Fort Collins — Operations Services
117 N. Mason Street
Fort Collins, CO 80522
221-6805
fax 221-6534
rkechter@fcgov.com
Terry Robinson
City of Fort Collins — Utilities
700 Wood Street
Fort Collins, CO 80522
221-6814
fax 221-6619
tobinson@fcgov.com
Chris Freeland
Aller-Lingle Architects
712 Whalers Way
Fort Collins, CO 80525
223-1820
fax 223-1833
efreeland@alley-lingle.com
Aaron McKelvey
The Engineering Company
2310 East Prospect
Fort Collins, CO 80525
484-7477
fax 484-7488
Amckelvevrr&tec-engrs.com
Development Construction Permit, Page 6/6
General Contractor: Jennifer Chavies, Project Manager
RC Heath Construction
141 Racquette Drive
Fort Collins, CO 80524
221-4195
fax 221-2907
Jennifer@heathconstruction. com
Aoo 'SN11103 Ao J0A11
1N3WiAdo9301A38A.Lnun\�
.�� S§N<1ne ]S¥80ƒS3]aHBA 41"
�
c
%
,
ID
Task Name
Duration
Start
Finish
Predecessors
1
Design Charette
Schematic Design
City Review
Prepare & Submit PDP
Design Development
City Review
City Staff PDP Review
PDP Responses
City Staff Review & Type I Administrative Hearing
95% Construction Documents
Type I Administrative Approval
City Review
100% Constructions Documents
Final City Review
Final PDP Submittal
Prepare for Bid
Out for Bid
Final City Staff PDP Review/Approval
Obtain Permit
Award Contract
Obtain Development Construction Permit
Notice to Proceed
Demolition & Layout
Construction
Outfit Facilities
Utilities Vehicle Storage Buildings Occupancy
1 day Fri 7125/03 Fri 7/25/03
49 days Sat 7/26103 Fri 9/12/03 1
7 days Sat 9/13/03 Fri 9/19103 2
59 days Sat 9/20103 Mon 11 /17103 3
63 days Sat 9/20103 Fri 11/21/03 3
7 days Sat 11/22/03 Fri 11/28/03 5
24 days Tue 11/18/03 Thu 12/11/03 4
8 days Fri 12/12/03 Fri 12/19/03 7
48 days Sat 12/20/03 Thu 215/04 8
70 days Sat 11/29/03 Fri 2/6/04 6
14 days Fri 2/6/04 Thu 2/19/04 9
20 days Sat 2r7104 Thu 2/26/04 10
22 days Fri 2/27/04 Fri 3/19/04 12
41 days Sat 3/20/04 Thu 4/29/04 13
10 days Fri 4130104 Sun 5/9/04 14
10 days Fri 4/30/04 Sun 519104 14
26 days Mon 5/10104 Fri 6/4/04 16
43 days Mon 5110/04 Mon 6121104 15
63 days Mon 5/10/04 Sun 7/11/04 16
25 days Sat 6/5/04 Tue 6/29104 17
20 days Tue 6/22/04 Sun 7/11/04 18
6 days Wed 6/30/04 Mon 715104 20
6 days Tue 7/6104 Sun 7/11/04 22
210 days Mon 7112104 Sun 216105 21
7 days Mon 2r7/05 Sun 2/13/05 24
1 day Mon 2/14/05 Mon 2/14/05 25
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Page 1
i-
W
W
2
N
W
F-
Q
H
w
W
F-
ul
0
U
O
Z
a
LLl
F-
F-
Z
a
ci
F-
0
W
O
2
IL
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
co co 0 0 0 o r o � o 0 0 0 0 0
0 0 0 0 0 o
0 0 0 0 0 0
pa
1� r Ui r O c0 N N aD M
W
V V H3 N M r M N N E9 r to
O M N
7
N
Z
U
O
Z
J W
m
FF-z LL
Z
O O O O O O
0 0 0 0 0 0 0 0 0
N O O O N N
J
fA EA fA t» ON ON
N3 to t»
EA Y3 to fA fA Ef3
0 7 W U_
FA fA cN to fA
F-
U W o W
Z W
W a>0�
W
W
w
LL
zwfam
Z
O
_LL.—
O
x
w
x
o 0 0 0 0 0
o 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 o
0 0 0 0 0 0 o
U
OC a
�
:0
o 0 0 0 o
V fA N3 0 0 0
v N 0 0 0 0 0 0 0 0
N w fA to N 0 0 0 N fA
0 0 of v 00 0
fA 0 0 f� H3 to N
W
F
In N(O
mm mrornmN
oom
p.
Co r
o:
NmCo
N U3 fA fA
co
N3 r N3 N3 U3
NW; �o
VN fA H3
co
Z
W� ¢
W W
am
J
x
a
J
Q
� ¢ r
¢
F -
w
_
W
Owz00
w
N�
w
w
x
o 0 0 0 0 0
N o 0 0 0 0
0 0 0 0 0 0 0 0 0 0
o N o 0 0 0 0 0 0 0
0 0 0 0 0 0 o
0 0 0 0 0 0 0
0 0
Z F
W F-
F-
(O 0 0 0 0 0
M H fA O O O
a D M 0 0 0 0 0 0 0 0
M N tH fA N O N O N fA
O N (O N 0 0 0
fA V N fA fA fH
C i x
W
F-OZW
¢m
u> ornN
u>F» roNrnm(o
fA H3 U3
u>u>F»
W
U=)
Q
N.-N
fA fA fA
NFl3
EA
F 0
Q: 7 W N
F-Ew¢w>
W
U
Z � �
CO W
z
O a
w
LL O O W
a
U¢
m
Z U U O
V
00 M 0 0 0
0
W
M N
LL O
?
W Z
F c7
w
U z
Z
J J
m w
m J
O ❑V
7(n
F- w
a vi
z o o
p K
Q 0
F- F= C9
�ao
wd°a
W W
N 0
w -LLLL }}
`�
fAZ)
LL W }}UU
wLL LL000UUUU
F
¢
J J U U
J J J
J (n J J J (n (n
0
Z W
w w
w w w W W W W
U LL
D g
O F-
Z
0
J
m
w
Ox
U
w
(L
�
xH
� �
a
z�
c
O W
oa ? N
o c
g�
v
z
a n me
¢w
y
m ci
y
>W
m
V>
fi 0
m =°
m
.� c
m
m
is p_
O w
W. Z
`
Zma
c �U
in ~ o
3 `m
u3i E
aJ
�F
Oaf
dU a19iY aNi c
=1c0 w
�
a
W
WU
>
N
Cf)co
�/
EE 115
QF?Scm
N
m o m
x~
xa-
o
mwova
Z
i0, C) 7F
U)3»>L
d000_C0