Loading...
HomeMy WebLinkAboutNORTH COLLEGE MARKETPLACE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2009-09-21City of Planning, Development & Transportation Engineering Department Fort �0��' 281 North College Avenue s PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax DEVELOPMENT CONSTRUCTION PERMIT Permit Number: !7- J y Issuance Date: I F/0 Project Name: North College Marketplace I" Filing (Wetlands) Project A.K.A.: 1Citi oopE,� C l!/izr� CDcc�GE- Project Location: East of College Ave. north of Willox Ln Permittee: Lzd&�r City and developer contacts: See attached Exhibit "A "for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $ _ 814.484 50 Total $_ $14, 884. SO Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ $2,383,580.58 Form of security deposited with the City: URA letter PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Permittee (Person who is to sign the Develonment Construction Permit): Individual Name: — Blaine Rappe. —_Secretary/Treasurer Company Name : ►n*-+ b rollQCja M_rkei Address: 1043 Eagle Drive, Loveland CO 80537 Phone number(s): Office:. 970-667-7000 ext. 101 Cellphone: 970-566-4929 Fax number: 970-635-2514 Email: brappe@lovelandcamnercial eom Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name:. Linsey Chalfant Company Name: Ayres AGGnr i at-ecz Address: 3665 JFK Parkway, Bldg 2 #200• Fort Collins, CD 80525 Phone number(s): Office: 970-223-5556 Cellphone: Fax number: 970-223-5578 Email: ChalfantL@AvresAssociates.com Professional License Number: 27008 — Colo ado Architect/Planner (The person responsible for the site design of this project) Individual Name: David Kasprzak Company Name: BHA Dpsign Address: 1603 Oakridge Drive, Fort Collins CO 80525 Phone number(s): Office: 970-223-7577 Cellphone: Fax number: 970-223-1827 Email: dkapprzak@bhadesign.com Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement —add additionalnames below): Individual Name: Blaine Rappe, Secretary/Treasurer Company Name: North Collecre Marketplace Inc Address: 1043 Eagle Drive, Loveland CO 80537 Phone number(s): Office: 970-667-7000 ext. 101 Cellphone: 970-566-4929 Fax number: 970-635-2514 Email: br,-WM(alovel andccgurterci a, _cm Paving contractor: Individual Name: _ Company Name: _ Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Landscape contractor: Individual Name: Company Name: _ Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81 /2"x 11 " copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Dave Simpson Company Name: Connell Resources Inc. Address: 7785 Highland Meadows Parkway # 100, Fort Collins CO 80528 Phone number(s): Office: 970-223-3151 Cellphone: Fax number: 970-223-3191 Email: dsimpson@connellresources com If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Utility contractor: Individual Name: Company Name: _ Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for structures: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title Blaine Rappe Secretary/Treasurer Dave Simpson Project Mcfr. ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $ 2, 356, 087.18 Private infrastructure, estimated cost: $ I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon s c to perform work required of the applicant if the applicant were to fail to perform the reupireork. Applicant Signature. _ Date: �' ..Y4 N.m-W-----D%- f., — ,.e.. —D. - — — MN. ]s Wv — - 11 ..- B I., ­. iw. tD Y , 1 - I- L COLLEGE AVENUE I � =BLUE WRU DRIVE i ICI 11I II gag yS 8I 8I 8I S) SI 8 $ xa m o n o ..x cnc LOVELAND COMMERCIAL, LLC NORTH COLLEGE MARKETPLACE OVERALL PLAN enoin..n s ro uw uwwn A F'o°�.s�.D�:w.m A330CIATES iro,a o D, ee VD3il0/09 O a Development Construction Permit, Page 2/5 3. Construction time restrictions: N/ 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: N/A Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Si nature: Date: � Approval for issuance: City Engineer Approval Date:512 5? /0 !�t (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS City Staff Contact Persons: Development Engineer: Marc Virata 281 North College Avenue, Fort Collins, CO 80524 970 221-6605 Construction Inspector: Dan Peterson 281 North College Avenue, Fort Collins, CO 80524 970 222-8780 Current Planner: Steve Olt 281 North College Avenue, Fort Collins, CO 80524 970 221-6341 Water Utilities Engineer: Erosion Control Inspector: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 970 221-6854 D.A. Black 700 Wood Street, Fort Collins, CO 80521 970 221-6700 Natural Resources: Dana Leavitt 281 North College Avenue, Fort Collins, CO 80524 970 221-6143 Traffic Operations: Joe Olson 626 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Forestry: Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 970 221-6641 Development Construction Permit, Page 515 Light and Power: Doug Martine 700 Wood Street, Fort Collins, CO 80521 970 224-6154 Developer' Contact Persons: Developer/Owner/Applicant Blaine Rappe Project Manager/Permittee: North College Marketplace, Inc. 1043 Eagle Drive Loveland, CO 80537 970 667-7000 x 101 970 635-2514 (fax) 970 566-4929 brappe@lovelandcommercial.com Architect/Planner: David Kasprzak Bha design 1603 Oakridge Drive Fort Collins, CO 80525 970 223-7577 970 223-1827 (fax) dasprzak@bhadesign.com Project Engineer: Linsey Chalfant Ayers Associates 3665 JFK Parkway, Bldg 2 #200 Fort Collins, CO 80525 970 223-5556 970 223-5578 (fax) chalfantl@ayersassociates.com General Contractor: Dave Simpson Connell Resources, Inc. 7785 Highland Meados Parkway #100 Fort Collins, CO 80528 970 223-3151 970 223-3191 (fax) dsimpson@connellresources.com Accela Automation: ShowPayDetai140 - T8108-D RECEIPT Page 1 of 1 CITY OF FORT COLLINS NEIGHBORHOOD & BUILDING SERVICES 281 N. COLLEGE AVE. Phone:970-221-6760 P. O. BOX S80 Fax:970-224-6134 Application # : B0905253 Project Name (Subdivision) : NORTH COLLEGE MARKETPLACE INC. FILING 1 Application Type : Building / Misc / General / NA Receipt No.: 144378 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Check 1014 $14,484.50 08/28/2009 03:14:02 PM MSTEVENS NORTH COLLEGE MARK[ Owner Info.: Work Description: NORTH COLLEGE MARKETPLACE INC. City of Fort Collins DCP Permit Fee 6/18/2009 T8108-D Version 4 0 14,484.50 Advantage Bank DCP Permit Fee 14,484.50 https:Hdtsweb02.fcgov.com/operations/permit/index.cfm?FUSEACTION=ShowPayDetail... 8/28/2009 W N A A Wn WW WW W W 8 0N NV N N NA N N NO f0 -. nW N O N CD N A W N z� ,dN• 0>-00 c �W L*0 I o a•- < m r 5 s as < °' � w ID d °1 m m d v =o o m 2). c r.>>> arm m v' .a0 go3 �� � ufD, o� � =� w o m � 0 �o <-�o I-q ic 0o m v -ice m m ���Om ' '��5'm m= a� mr"D a3 m n m nQ" F _� ( , (Di n� NoC 3�0 z r� vm �m CD �5"i c�i� �Wz Dr -n0 v, CD m 2 � O� m �m 'c) m <n D y3 �o r f 3z N �zv CD 0 (D r"v n x c -q cn fD �m N cN m 0 z 0 m =m m z IQ v 3c mn m 0=1 -G cnmrrrCnr mmmmmmmrrr DDDDDDD. mm00rr DD y� r _ W DM?1m cn 0000000mmm 2 2= 2 2 00-<-<?iT NN C 0 z zm 2 2 = 2' 3 mm g m�04 rn CCO) 0 M< z 3 m cn mm4-4 3 0 0 0 = r o z z m my G)_ �� N mrn ONO0)00-• N V NANO V 0000-0 _ _ O CD -IN0Cn04�6 m � W m 0DA000 Z XO tn3cnzT Mtn r < m > Co C fA Uri to EA EA E A — w EA EA ) m v C C ;a m0 C m v rn EAR IV W OEAfA4AEA0 OC�n4w-P,-�O EA�p owCn w0 wwwN? N N � WfAfACnEA? a rn zC 0-4 _ (A00N00CA ONO W 00000OD W ? OOAO- m z C O 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0000 m m < -tU' O-nm0 m -� CA � -i -�CA3� M !�!�", -4� < cm CA N� b9�EA-- -4 N N A (A A v.69EA C m D + W N 4A Cn Cb N N O O N N N-N w PO O m CON 00 N OOfACn69<A0) - V W -I 0 N O -06 Cr ooOO-ICA000EAOcA CA OD w W-rA49-4A(no 0 Rol o0o0orn o� 000oVo0J�o0)G) Cb00000 o 0 o o00o0Oo 0 0 0 0 0 0 0 o w 0 0000o00orno 0 0 0 0 0 Ca oo0ooN M m m 'n WMmco m' =<mm z m 5 ;u c .69 fA EA .69 EA fA EA �\ EA 69 iA EA 69 EA W W W -I C)-1 V 40 69 iA .69 � -i C:) O Efl iA iA (e nmC� _ C z z c O O -- O (n Cn Cn O w O O O O O w W W w O O r r ?400b4 cnCAOo0cr, 000CD000-I V V 0o0oo00000 OOCnCn-J V OooOoo mZ0 O O ca r m 0 z � ei►0 c «.� M '. to 69 to <A EA 6969 z am v <A EA (A W� EA -' (A 7- N - �V N m v O O to EA EA ww0a)Oo 4? W W ((D 0 Cn WW o00oW0ocn0-4 N W cA N �V N �rnocnov, t CD o 0 0 0 0 O o 0 0 o o 0 0 0 0 0 0 0 0 -1 0 0 o 0 0 0 o O o 0 0 o 0 o o O w 0 0 0 0 0 0 May 29, 2009 City of Fort Collins PO Box 580 Fort Collins, CO 80522-0580 RE: North College Marketplace To Whom It May Concern: The Fort Collins Urban Renewal Authority (the "Authority") has agreed with the City of Fort Collins (the "City") that this letter will serve as the security as required by Section 3.3.2(C)(1) of the Fort Collins Land Use Code (the "LUC") for the North College Marketplace project (the "Project"). The Project is being constructed in the North College Urban Plan Area and the Project developer received financial incentives from the Authority. The Authority has agreed to post the required security in accordance with the approved Project Quantities and Cost Estimate Sheet in the amount of Two Million Four Hundred Sixty Thousand Thirty Two Dollars and Fifty Eight Cents ($2,460,032.58). This amount includes $76,452.00 for erosion control for both phases for construction. This letter of security is intended to assure the funding required for the completion of the construction and the maintenance and repair of the public infrastructure in connection with the Project. The Authority and the City acknowledge that this amount of security will be available until such time as the public improvements are constructed and accepted by the City. At that time the Authority's obligation will terminate and be replaced by the Project developer's security as required in the Redevelopment Agreement (North College Marketplace) dated March 18, 2009 and the LUC. Sincerely, E -- -V6��� Christina Vincent URA Planner 281 North College Avenue • PO Box 580 • Fort Collins, CO 80522-0580 970-221-6376 9 TDD 970-224-6002 • renewfortcollins.com DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1/16/06) For City use only: Application Number: Application Date. 3.25.09 Permit application fee: $ 400.00 INSTRUCTIONS: I. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): North College Marketplace — Wetlands Project A.K.A. (Marketing name if different from Project Name): North College Marketplace Project Location: N.E. Corner of College Ave & Willox Lane Fort Collins, OD Property Owner(At the time of this permit issuance): Individual Name: Blaine Rappe - Mgr. Company Name : 1908 North rnl 1 T, UP Address: 1043 Eagle Drive, Loveland CO 80537 Phone number(s): Office: 970-667-7000 Cel 1phone: 970-566-4929 Fax number:970-635-2514 Email: brappe@lovelandconanercial.com Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Blaine Rappe, Secretary/Treasurer Company Name : -North College Marketplace Inc Address: 1043 Eagle Drive, Loveland CO 80537 Phone number(s): Office: 970-667-7000 ext. 101 Cellphone: 970-566-4929 Fax number: 970-635-2514 Email: brappe@lovelandcommercial.com