Number: 86 Created: 5/20/2003
Show a type III barricade at the end of Limon Street. If one doesn't already exists it needs to be
installed.
Number: 87 Created: 5/20/2003
The slope on Limon where you are removing curb and gutter and installing the new street
intersection does not match the approved plans. Need to put the new c&g in and the x-pan in
with the slope that was approved (match the approved plans as much as possible). Can not
install all the c&g you are showing as Limon has not been designed past the PCR. Can not put
in c&g that has not been designed.
Number: 88 Created: 5/20/2003
Need to provide centerline information for Limon and existing Kansas. Need to be able to
determine that the intersections are meeting criteria and align properly thru the intersection.
Will need elevations for this full intersection.
Number: 89 Created: 5/20/2003
Need to show the limits of removal for the street intersection that is to be removed on Limon.
Provide tie in points and elevations as needed to show what is to be done here. It should be a
straight grade across the intersection so no flowline design is needed as long as that is what
remains.
Topic: Landscape
Number: 68
Notes 10 and 25 conflict.
Created: 5/20/2003
Number: 69 Created: 5/20/2003
Note 23 states that the trees are to be planted a minimum of 5 feet from the backs of walks in
public row. The parkways except for Drake Road are only 6 feet wide. This would place the
tree 6 inches behind the curb head. Don't believe that will work and is not what we want.
Topic: Plat
Number: 60 Created: 5/20/2003
Correct title of plat to match other documents: Rigden Farm 9 h Filing — Parkside Commons.
Number: 61 Created: 5/20/2003
Need to add the private drive maintenance note.
Number: 62 Created: 5/20/2003
Correct the dedication statement, maintenance guarantee statement, notice of other documents
statement, attorney certification statement, approved as to form city engineer statement, and
planning approval statement.
Number: 63
Need to dedicate Kansas with this project.
Number: 64
Remove the word private from note
easements or private open space.
Created: 5/20/2003
Created: 5/20/2003
The property cannot be private access
Page 5
Number: 65 Created: 5/20/2003
Need to provide the minimum 9 foot easement behind the row on Limon, Kansas and Rockford.
Do not appear to have that on Limon. Provide the additional easements as discussed in the
utility coordination meeting.
Number: 66
Tract B is not labeled.
Number: 67
Created: 5/20/2003
Created: 5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an easement.
If the entire area is retained as an easement then this plat will need to vacate the area with in the
building envelope.
Topic: Site plan
Number: 70 Created: 5/20/2003
Use type I driveways and show concrete to the property line at the driveway entrances.
Number: 71 Created: 5/20/2003
The easements shown do not match what is being shown on the plat.
Number: 72 Created: 5/20/2003
Change the midblock crossings on Rockford and Kansas as indicated by Tom Rieff.
Number: 73 Created: 5/20/2003
Show the installation of the midblock ramps on Limon to match the ramp locations across the
street and the dips in the curb and gutter that should have been done when the curb and gutter
was built.
Number: 74 Created: 5/20/2003
No trash enclosures are to be placed over the utilities in utility easements.
Number: 75 Created: 5/20/2003
The pan around the outside of the site needs to go away.
Number: 76 Created: 5/20/2003
If any of the curb chases end up being allowed show the sidewalk chase and the curb chase
going out all the way to the curb line.
Page 6
Parkside Commons
Response to Comments
July 2, 2003
Troy Jones
City of Fort Collins
Community Planning and Environmental Services
P.O. Box 580
Fort Collins, CO 80522
RE: Rigden Farm, 9" Filing, Parkside Commons — Project Development Plan Comments and
Responses
Dear Troy,
Included below are the comments received from City Staff regarding the first round of Project
Development Plans for Parkside Commons. An explanation (in italics) of how issues have been
addressed follows each comment.
With the response to these comments and this re -submittal, the consultant team considers the Project
Development Plan review complete and requests that a hearing be scheduled. The applicant
requests that comments from this submittal be addressed at Final Compliance.
ISSUES:
Department: Advance Planning Issue Contact: Clark Mapes
Topic: General
Number: 36 Created: 5/13/2003
1 would like to have a conversation with the developer about allowing the architect to provide a little
model variation.
Two separate models exist. These models vary in color scheme, size and scale. Please see the
elevations included in this submittal set.
Department: Current Planning Issue Contact: Troy Jones
Topic: General
Number: 28 Created: 5/13/2003
We would like the name of all filings in the Rigden Farm development to be consistent. To that end,
the official name of this project needs to be changed on all drawings (including site plan, landscape
plan, plat and utility plans) to the following: "Rigden Farm, Filing 9, Parkside Commons".
The name of the development has been revised to Rigden Farm, 9fh Filing, Parkside Commons.
Number: 29 Created: 5/13/2003
Based on discussions at the utility coordination meeting conducted on 4/30/03, it sounds like utility
meters will need to be integrated onto the west facades of buildings C, B, A, and K, and on the east
facades of buildings F_, F, H, and 1. These are all street facing facades, which requires that screening
of those utility meters be "incorporated into the overall design theme of the building and the
landscape," and that "no attention is attracted to the functions by use of screening materials that are
different from or inferior to the principal materials of the building and landscape," and that "the visual
and acoustic impacts of these functions are fully contained and out of view from adjacent properties
and public streets." [LUC 3.5.1(1)(2)] As shown on the elevations, the meters are located on the
facade with 2 doors on the end wall (labeled "6 plex right elevation"). If the meters are to be street
Page I
facing, they need to be shown on the end wall with a single door (labeled "6 plex left elevation").
From an aesthetic perspective, it would be preferable to have the utility meter located on facades
other than the street facing facades, however if they are, adequate screening must be provided. An
enclosure made of the same materials of the building would successfully screen it from view.
Landscaping material that is intended to act as screening of the utility meters needs to be tall enough
to do so. Please clarify how tall the landscaping will be when used as screening. Such screening is
also required in accordance with Section 3.2.1(E)(6) of the LUC.
The meters have been screened with landscape material and, in addition, the meters will be painted
the same color as the wall they are mounted upon. Please refer to the elevations provided in this
submittal package.
Number: 30 Created: 5/13/2003
The Light & Power Utility has indicated that a duct bank is anticipated to be located beneath the
parkway strip between the curb of Drake Road and the street sidewalk. This is typically 30" to 42"
deep. Trees can be planted over the duct bank to satisfy street tree requirements, however, be sure
to coordinate the trees species selection and spacing with the design of the duct bank. Also, there is
a large stormwater pipe in the Drake right-of-way. Be sure that any revision to the layout continues to
allow street trees along Drake to not conflict with the placement of this storm drain pipe.
Street trees have been retained along Drake Road and placed to work with the existing and proposed
utility locations. We have contacted Tim Buchanan regarding specific species that would be best
suited for this application and he stated that the proposed species were approved street trees and did
not believe they would be in conflict given what was proposed.
Number: 97 Created: 5/27/2003
The plans show a concrete trickle pan adjacent to the sidewalk around the perimeter of the project.
We discussed this at staff review between the Engineering Department, Stormwater Utility, and the
Planning Department and we all agree this is not necessary and should be removed. It sounds as if
there was perhaps a misunderstanding that caused this element in the proposed design. Limited
areas of yard can sheet flows across sidewalks, and should in this case.
At the request of the City of Fort Collins, the pan has been removed.
Number: 98 Created: 5/27/2003
Show streetlights on the landscape plan. Streetlights and street trees need to be coordinated.
Canopy shade trees require 40 feet of separation from streetlights, however ornamental trees can be
as close as 15 feet to a street light. As specified in Section 3.2.1(K) of the Land Use Code, tree/utility
separations shall not be used as a means of avoiding the planting of required street trees.
Street light locations have shown on the landscape and site plans per coordination with Monica
Moore.
Number: 99 Created: 5/27/2003
Electric Vaults, if pad mounted, should integrate landscape screening in accordance with Section
3.2.1(E)(6) of the LUC.
All above ground Electric Vaults (transformers) have been screened with landscape material.
Number: 100 Created: 5/27/2003
Specify the materials of the trash enclosures. The enclosures need to be incorporated into the overall
design theme of the buildings and landscape so that no attention is attracted to the functions by use
of screening materials that are different or inferior to principal materials of the building and landscape.
The enclosure (whether made from fencing or walls material) must provide plant material in
conjunction with the enclosure's wall in accordance with 3.2.1(E)(1)(d) of the LUC. Such screening
Page 2
shall be established on all sides of trash collection enclosures except where an opening is required
for access in accordance with Section 3.2.1(E)(6) of the LUC.
Trash enclosures have been eliminated and individual trash containers have been utilized for each
residence. The residents will house the trash containers in their garages.
Number: 101 Created: 5/27/2003
An additional tree needs to be integrated between buildings C and D in or near the vehicular area, at
the southeast corner of building A, between building J and K in or near the vehicular area, and
between buildings I and J in or near the vehicular area to satisfy the full tree stocking requirement in
accordance with 3.2.1(D)(1)(c) of the LUC.
Trees have been located in the aforementioned areas.
Number: 102 Created: 5/27/2003
Does each and every unit have at least a single car garage accessible to the unit? If not, bike racks
must be provided in accordance with 3.2.2(C)(4) of the LUC.
Each unit has at least a single car garage accessible to the unit.
Number: 103 Created: 5/27/2003
Crosswalks internal to the site must use the material of the sidewalk as it crosses the vehicular area
as required in section 3.2.2(C)(5)(b) of the LUC.
The crosswalks have been denoted by concrete where they cross the asphalt drive aisles.
Number: 105 Created: 5/27/2003
Replace the "Planning and Zoning Board" approval block on the plat with the "Director of Planning"
signature block.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 106
Created: 5/27/2003
The block directly south of this site is being planned as a charter school, and is currently in the
planning stages. I recommend that you carefully coordinate any street cuts with that development, to
combine efforts, and potentially reduce the chance of more street cuts than necessary. Steve
Steinbecker at 207-0424 is the point of contact for the school application. Also Jim Sell Design at
484-1921 is potentially working on a development plan west of tract U, and they were the land
planners for the filing that created the streets in the first place, so you may want to coordinate with
them.
Jim Sell Design confirmed no progress on the parcel west of this project. No ramp locations at this
time. Steve Steinbecker confirmed one ramp facing north. The ramp is located on the southeast
corner of Minnesota Drive and Limon Drive. The ramp location is evident in the field and has been
shown on the plans.
Number: 107 Created: 5/27/2003
The drive aisles internal to your site are designed at 28 feet wide. You can make them that wide if
you want to, but they don't need to be that wide. I recommend making them narrower and providing
more landscaped areas. Section 3.2.2(L)(1) specifies that the drive aisle width can be as narrow as
20 feet wide when parking spaces are served on one side of the drive aisle, and can be as narrow as
24 feet when parking spaces are served on both sides of the drive aisle. This is not to be confused
with the requirement that in instances when garage doors face each other (such as across a drive
aisle from one another), the garage doors themselves need to be 28 feet apart from one another, but
the drive aisle width itself can be the widths mentioned above.
Page 3
The applicant would prefer to retain the additional paved width for ease of maneuverability for
personal vehicles and fire apparatus.
Number: 108 Created: 5/28/2003
Lighting fixture specifications were only provided for fixture "A175." Provide fixture specifications for
fixtures B, C, and R175. Ensure that the specifications for fixture R175 clarify that they are cut-off
and down directional.
Fixture specifications have been provided for fixtures B, C and R175 and are included in this
package. The material states that the R175 are cut-off fixtures. Please see sheet E2.
Number: 109 Created: 5/28/2003
Joe Gerdom from the Police Department is concerned that the lighting levels are a little too dim at the
driveway intersections with the street. Coordinate the solution of this directly with Joe Gerdom at
416-2522.
The light levels at the street intersections have been increased.
Number: 110 Created: 5/28/2003
The color scheme rendered for Palette #1 does not seem to be the same colors as the color samples
provided for Palette #1. The rendered picture has a green body color, whereas the color sample has
no green sample. Please clarify your intentions.
The color samples are the correct schemes to reference for the specific color. The color printer and
software used to generate the rendering does not have the color range that can identically match the
proposed colors. These renderings should be used for determining tonal variation.
Number: 111 Created: 5/28/2003
The proposed new segment of Kansas Drive needs to be dedicated as part of this plat.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 112 Created: 5/28/2003
In accordance with Section 2.2.11(A) of the LUC, revisions based on these comments must be
submitted to the Current Planning Department within 90 days. See the' total" line on the attached
revision routing sheet for the number of copies of the various documents that will need to be
resubmitted.
So noted. Thank you.
Number: 113 Created: 5/28/2003
The "front" and "rear' elevations are labeled incorrectly. The front is typically the elevation that faces
on opens directly onto the street. The rear elevation typically faces the internal portion of the lot.
The elevations labeling has been corrected.
Number: 114 Created: 5/28/2003
Calculate the net acreage in accordance with 3.8.18 of the Land Use Code now that the Kansas right-
of-way is within the project boundary. State the project's density based on the new net residential
acreage. The overall density of the residential land within the MMN zone must be 10 units per net
acre, however, individual filings such as this can be as low as 7 units per net acre of residential land,
so long as the density range listed on the overall development plan is satisfied [4.5(D)(1)(a) of the
LUC].
Page 4
The density calculations include the area of Kansas and Drake R.O.W. to be dedicated. The net
density calculation exceeds the 7 units per acre required. See the Cover Sheet of planning
documents for a complete breakdown of density calculations.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: Details
Number: 90 Created: 5/20/2003 \
Need to remove old details and use current details. Also remove details showing corner ramps as all
ramps within the row will be directional ramps. If the corner ramps are to be used on -site label the \ D
detail for on -site use.
i
Please refer to TST Engineering's response letter that addresses this comment.
Number: 91 Created: 5/20/2003
Make changes to the typical x-section. It needs to be labeled as a connector local, and it needs to
have vertical curb and gutter (which is what the plans and profile sheets said it was). The x-section is
to be two 10 foot travel lanes and two 11 foot bike and parking lanes with a solid white channelizing
line 8 inches wide between the travel lanes and the bike, parking lanes. Need to note that this is to
be provided. The parkway is to be 6 feet wide and is not a landscape and utility easement as it is
within the row. Identify that the x-slope on the street is 2.0% to 3.0%. Need to identify the range
since a constant 2% x-slope is not being provided on the street.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 92 Created: 5/20/2003
Need to provide the following details in addition to the ones that need to be updated as indicated on
the plans:
Sleeve locations #1202
Sidewalk detail # 1602
Standard sidewalk # 1601
Pedestrian ramp # 1606
Access ramp scoring # 1607
Please refer to TST Engineering's response letter that addresses this comment.
Number: 93 Created: 5/20/2003
If underwalk drains can not be avoided and are allowed detail #709 will also be needed.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: General
Number: 34 Created: 5/13/2003
Naming - This should follow the same naming convention that the other did. It should be called
Rigden Farm 9th Filing - Parkside commons and should be changed on all documents.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 45 Created: 5/20/2003
The driveways cannot be high volume driveways, they need to be standard curb cuts, and per the
traffic study they do not meet high volume requirements.
The driveways have been modified to a typical driveway standard.
Number: 46
Page 5
Created: 5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the driveway
cuts within the row do not have a curb. Concentrated flow is not allowed out of the driveways, thus
from the highpoint in the driveway there is to be no curb and gutter, just a concrete or asphalt edge so
sheet flow occurs. (See next comment regarding the amount of flow allowed out a driveway)
Please refer to TST Engineering's response letter that addresses this comment
Number: 47 Created: 5/20/2003
A very limited amount of drainage is allowed to go out the driveway. The eastern driveway has more
drainage going out it than allowed. Revise the grading and get the drainage to the interior inlet or to
the street by a different method.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 48 Created: 5/20/2003
The drainage swales/ pans that border the site need to be removed. The drainage needs to be
handled in another way. Non -concentrated flows can go over the landscaping and across the
sidewalk out to the street. Concentrated flows should be directed to and picked up by area inlets or
into the internal drainage system. Sidewalk chases and curb cuts shall be limited. Please work with
stormwater.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 49 Created: 5/20/2003
Need to coordinate a Ibunch of work with the Drake/ Ziegler plans. Any work within Drake Road or
that affects the curb. clutter or pavement must be shown as a part of the Drake Road plans and
constructed with that construction. Need to work with JR eng to get the items incorporated into the
plans and work with Matt Baker to pay for the cost of the installation of those items.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 50 Created: 5/20/2003
This project will have extensive street cut fees and repairs. Once all the utilities, curb cuts and
repairs are shown correctly (per the utility coordination meeting there will be some different
connections than are shown now) I can have the plans reviewed and can identify the types and limits
of patching to be done. Some areas will be required to be milled and overlayed as a part of the
patching. The street cut fees are tripled for cutting into a street that is less than 5 years old. Which
will apply to all the existing streets around this site.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on this site. If
for some reason the Drake Road work is not proceeding and this project is ready to build then it will
need to incorporate the needed improvements (storm sewer ad water line) into this plan set and build
them.
The City of Fort Collins is aware of the progress on Drake Road by the Rigden Farm developer. The
applicant is aware that he is ultimately responsible for these road improvements but has been
assured that these improvements will begin before commencement of Parkside Commons.
Number: 52 Created: 5/20/2003
May not meet the minimum cover requirements over the storm sewer line. You meet it now, but have
not shown the concrete encasement - with that it may not meet it. How thick is the concrete
encasement?
Page 6
Please refer to TST Engineering's response letter that addresses this comment.
Number: 53 Created: 5/20/2003
Only install the sidewalk on your block. Label the sidewalk on the west side of Kansas as future. It
needs to be shown so that the curb depressions for the ramps get put in the proper place when it is
built.
The sidewalk along the west side of Kansas has been labeled as future sidewalk.
Number: 54 Created: 5/20/2003
High groundwater was, not encountered, subdrains are not required. Remove subdrain detail or
provide a subdrain report and design. The outlet will need to be above the 100 yr water elevation.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 55 Created: 5/20/2003
We do not want the trash enclosures within the easement areas or over utilities. They are structures.
The trash enclosures have been eliminated from the project. Individual trash containers will be used
by each resident and stored in their garages.
Number: 56 Created: 5/20/2003
Change the mid -block crossings on Rockford and Kansas as indicated by Tom Rieff.
So noted. Thank you.
Number: 57 Created: 5/20/2003
Show the installation of the mid -block ramps on Limon to match the ramp locations across the street
and the dips in the curb and gutter that should have been done when the curb and gutter was built.
Per conversations with the engineer for the school site (Tract E) located on the south of Limon Drive,
the only mid -block crossing is located on the southeast corner of Minnesota Drive and Limon Drive.
The southwest corner of the intersection does not show a ramp pointing north. A mid -block ramp on
this project site has been added to coincide with the ramp on the south side of Limon Drive. There
are existing depressions in the vertical curbing along Limon indicating where the ramps are intended
to exist that have been previously approved by the city. The applicant has located ramps at the
locations indicated by staff.
Number: 58 Created: 5/20/2003
Show ramps at the intersections going across Drake.
Ramps have been shown as indicated in the redline drawings. These ramps coincide with the
proposed ramps as shown on the Drake Road improvement drawings slated for construction this
summer.
Number: 59 Created: 5/20/2003
Add patching note to the plans where street cuts are shown. Limits of street cut are approximate.
Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in
accordance with City street repair standards.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 77 Created: 5/20/2003
Make changes to the general notes as shown. Add the missing general note, and missing
construction note. Indicate that the variance to drawing 19-03 is approved.
Page 7
Please refer to TST Engineering's response letter that addresses this comment.
Number: 94 Created: 5/20/2003
See additional comments on the plans.
So noted. Thank you.
Number: 95
See returned check list.
Created: 5/20/2003
So noted. Thank you.
Topic: Kansas Design
Number: 78 Created: 5/20/2003
In accordance with LCUASS centerline station is required. Until a meeting with the various
Engineering firms interested in this issue is held to determine what the final requirements for submittal
will be the following is what is being required. For Arterials and Collectors - the existing criteria
remains in place. Centerline stationing is to be provided along with the required x-sections every 50
feet. For Residential and Local Streets - in lieu of providing centerline stationing flowline stationing
can be used if actual x-sections of the roadway at the beginning of a horizontal curve, end of a
horizontal curve, and additional x-sections be provided if there are other elevation changes, grade
changes and street width changes that occur within the horizontal curve. Also need to identify the
location of beginnings and endings of horizontal curves with elevations noted on the profile and plan
view. Since this roadway is a local roadway flowline station can be used if the above information is
provided.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 79 Created: 5/20/2003
Need to show the removal limits for the existing intersection.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 80 Created: 5/20/2003
Need to coordinate the design of Kansas with the Drake/Ziegler plans. This set shows different
elevations at the PCR on Kansas than the other plans do. Also the plans differ in where the
improvements will tie together.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 81 Created: 5/20/2003
The cross pan at Drake and Kansas will only be a 6 foot crosspan as that is the requirements of
which the Drake Road plans were designed under. You are correct that the current standard would
be a 10 foot pan.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 82 Created: 5/20/2003
Need to show that the minimum slope going into the inlet is .50%. Per Section 7A.B.4 even within a
sag vertical curve located at the flowline the minimum slope needs to be maintained.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 83 Created: 5/20/2003
The vertical curves need to meet minimum length requirements. See figures 7-17 and 7-18 for
minimum design requirements. Design speed for this roadway since it is a connector local is 30 mph,
Page 8
Page is too large to OCR.
which means that for the algebraic grade differences shown the minimum length of crest and sag
curves is 90 feet.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 84 Created: 5/20/2003
If curb chases are used need to show the location and size of them on the plan and profile.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 85 Created: 5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need to
provide the transition elevation and identify its location.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 86 Created: 5/20/2003
Show a type III barricade at the end of Limon Street. If one doesn't already exists it needs to be
installed.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 87 Created: 5/20/2003
The slope on Limon where you are removing curb and gutter and installing the new street intersection
does not match the approved plans. Need to put the new c&g in and the x-pan in with the slope that
was approved (match the approved plans as much as possible). Can not install all the c&g you are
showing as Limon has not been designed past the PCR. Can not put in c&g that has not been
designed.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 88 Created: 5/20/2003
Need to provide centerline information for Limon and existing Kansas. Need to be able to determine
that the intersections are meeting criteria and align properly thru the intersection. Will need
elevations for this full intersection.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 89 Created: 5/20/2003
Need to show the limits of removal for the street intersection that is to be removed on Limon. Provide
tie in points and elevations as needed to show what is to be done here. It should be a straight grade
across the intersection so no flowline design is needed as long as that is what remains.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: Landscape
Number: 68
Notes 10 and 25 conflict.
Note number 10 has been removed.
Number: 69
Page 9
Created: 5/20/2003
Created: 5/20/2003
Note 23 states that the trees are to be planted a minimum of 5 feet from the backs of walks in public
row. The parkways except for Drake Road are only 6 feet wide. This would place the tree 6 inches
behind the curb head. Don't believe that will work and is not what we want.
Note #23 was amended to read "All trees that cannot be located in the parkway due to utility conflicts
will be placed outside of the R.O. W. and shall be a minimum of 5' from the back of walk."
Topic: Plat
Number: 60 Created: 5/20/2003
Correct title of plat to match other documents: Rigden Farm 91" Filing - Parkside Commons.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 61 Created: 5/20/2003
Need to add the private drive maintenance note.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 62 Created: 5/20/2003
Correct the dedication statement, maintenance guarantee statement, notice of other documents
statement, attorney certification statement, approved as to form city engineer statement, and planning
approval statement.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 63
Need to dedicate Kansas with this project.
Created: 5/20/2003
Please refer to TST Engineering's response letter that addresses this comment.
Number: 64 Created: 5/20/2003
Remove the word private from note 1. The property cannot be private access easements or private
open space.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 65 Created: 5/20/2003
Need to provide the minimum 9 foot easement behind the row on Limon, Kansas and Rockford. Do
not appear to have that on Limon. Provide the additional easements as discussed in the utility
coordination meeting.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 66
Tract B is not labeled.
Created: 5/20/2003
Number: 67 Created: 5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an easement. If the
entire area is retained as an easement then this plat will need to vacate the area with in the building
envelope.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: Site plan
Number: 70 Created: 5/20/2003
Use type I driveways and show concrete to the property line at the driveway entrances.
Page 10
Please refer to TST Engineering's response letter that addresses this comment.
Number: 71 Created: 5/20/2003
The easements shown do not match what is being shown on the plat.
The easements shown on the site plan and landscape plan have been amended to match the plat.
Number: 72 Created: 5/20/2003
Change the midblock crossings on Rockford and Kansas as indicated by Tom Rieff.
Please refer to TST Engineering's response letter that addresses this comment
Number: 73 Created: 5/20/2003
Show the installation of the midblock ramps on Limon to match the ramp locations across the street
and the dips in the curb and gutter that should have been done when the curb and gutter was built.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 74 Created: 5/20/2003
No trash enclosures are to be placed over the utilities in utility easements.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 75 Created: 5/20/2003
The pan around the outside of the site needs to go away.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 76 Created: 5/20/2003
If any of the curb chases end up being allowed show the sidewalk chase and the curb chase going
out all the way to the curb line.
Please refer to TST Engineering's response letter that addresses this comment.
Department: Light & Power Issue Contact: Monica Moore
Topic: General
Number: 1 Created: 5/6/2003
Since this site appears to be very tight, a utility coordination meeting is strongly recommended.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 2 Created: 5/6/2003
Electric facilities will need to be coordinated with the City of Fort Collins early on so that they can be
shown on the utility plans.
Transformer and meter locations as well as electric line placement will be required to be shown on
utility plans.
Please refer to TST E=ngineering's response letter that addresses this comment.
Number: 4 Created: 5/6/2003
Existing and proposed street lighting must be shown on both the utility plans and the landscape
plans.
The proposed and existing street lighting per coordination with Monica Moore have been shown on
the site and landscape plans.
Page I
Number: 5 Created: 5/6/2003
Street trees must maintain minimum clearances to streetlights
(45-ft for shade trees and 15-ft for ornamental trees.)
So noted. Thank you.
Number: 6 Created: 5/6/2003
Building G might be problematic to provide electric service to and still maintain clearances to other
utilities.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 7 Created: 5/6/2003
Electric facilities must maintain minimum clearances to other utilities. A 10-ft separation is required
from water, sewer and stormdrain. A 4-ft separation is required from gas. Transformer locations
must be located within 10-ft of a paved surface.
Please refer to TST Engineering's response letter that addresses this comment.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 43 Created: 5/14/2003
No issues.
So noted. Thank you.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 37 Created: 5/13/2003
Lighting:
Several fixtures listed in the Luminaire schedule don't appear to be on plan.
Trash enclosures - insufficient lighting. Located near Bldgs A, F, H, J. Lighting levels need to be 0.5 -
0.7fc around all sides of enclosures.
Parking between Bldgs I & J plus spaces north of Bldg G is below 0.5fc.
Entrance lighting: Need 1.0fc at driveways to Rockford and Kansas.
Landscape/Lighting conflict: The three (3) R175 fixtures around Bldg B need to be moved - or the
plant materials - to avoid conflict (shown well within the circumference of the Burr Oak). To lesser
degree at southeast corner of Bldg F.
The luminaire schedule has been modified. The trash enclosures have been removed. The
remainder of these comments have been addressed.
Department: Stormwater Utility Issue Contact: Basil Hamden
Topic: Drainage Plan
Number: 27 Created: 5/12/2003
Please add a hydrology summary table on the plan.
Please provide an analysis as to what drainage flows were designed by the Rigden Filing 6 plan to be
coming from this site. How do the flows actually compare to those that were assumed by that overall
drainage master plan for this site only. The discharges from the master plan quoted in the report
represent discharges that are for a larger area than that of your site.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: Drake Road Storm Drain
Page 12
Number: 26 Created: 6/12/2003
It is not clear fro this set of plans what will be installed by the overall Rigden Farms developer and
what storm lines will be installed by this development. Please call this out on the utility plans. If the
Rigden Farms overall development is to install the Drake Road storm sewer then this project would
be dependent on that development in order to complete its construction.
Please explain what the storm sewer stub on the north side of the property for. Please remove if not
needed.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: Erosion Control
Number: 12 Created: 5/9/2003
Please remove the Larimer County Urban Street Standards notes on plan sheet 2 under" Grading
and Erosion Control Notes".
Please put City of Fort Collins standard erosion control notes on the erosion control plan, Sheet # 5.
What will protect downstream areas (inlets) from the construction of Kansas Drive?
Please put a note on the plan (Sheet #5) that all disturbed areas are to be seeded and mulched (per
your report).
Please provide an erasion control surety calculation.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: Grading
Number: 96 Created: 5/23/2003
It is not clear why the site was graded with a pan around the whole perimeter. It would be preferable
to have most of the site drain to the center of the plan, with the outside buildings sheet flowing out
over sidewalks, if you avoid concentrated runoff then chases would not be needed.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: Plat
Number: 33 Created: 5/13/2003
Please describe a minimum 20-foot wide drainage easement width for any storm line proposed on the
site. Keep storm lines at least 10 feet away from building envelope.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: Utility plans
Number: 25 Created: 5/12/2003
Please call out the size and type of all existing storm sewers on the utility plans.
The current storm sewer alignment shows the line going under a trash enclosure. Please make sure
that it is moved such that the line is within a 20-foot easement and not under the trash enclosure.
The storm sewer connection on Limon Drive will necessitate a cut into an existing street, please
specify street patch extent on the plans.
Please specify which lines will be built by this project and which one will be done "by others" on the
utility plans. What happens if the ones to be built "by others" are not built at the time this project goes
to construction?
Page 13
Please refer to TST Engineering's response letter that addresses this comment
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 38 Created: 5/14/2003
Please replace the high volume driveways off of Kansas and Rockford Drive with Type 1 driveways
as described in the LCUASS (dwg. 706 & 1601).
Please refer to TST Engineering's response letter that addresses this comment.
Number: 39 Created: 5/14/2003
Limon and Kansas Drive have previously been identified as connector local streets with combined
parking / bike lanes. These streets will need to be striped to include an 11 foot combined park / bike
lane. Please include a single illustration in the utility details sheet depicting this striping plan and add
to the notes. The notes should also indicate that a single 8" striped line will delineate the combined
park / bike lane.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 40 Created: 5/14/2003
Additional access ramps need to be added to the plan at the intersections of Drake Road and
Minnesota Drive. (see red lines) The directional ramps should align as much as possible with the
sidewalk to accommodate the visually impaired, and the ramps should be as wide as the sidewalks.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 42 Created: 5/14/2003
Suggestion: The 28' drive aisle widths seem to be overkill for internal drives and will induce speeding.
Please consider a width of 24', and increase the landscaping, which would allow the units fronting the
drive aisles to have more greenery or larger porch.
So noted. Thank you. The lesser width has been considered and the applicant would prefer the
greater width. The applicant prefers the greater maneuverability for vehicles and fire apparatus
associated with the 26' width.
Number: 44 Created: 5/15/2003
Please relocate the midblock access ramps on Rockford to align with the north side of the driveway
into Parkside West development and relocate the midblock ramps on Kansas to align with the
walkway spine between Bldgs A and B.
Please refer to TST Engineering's response letter that addresses this comment.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 24 Created: 5/12/2003
Maintain 10 feet of separation between water/sewer lines and all mail kiosk, electric
services/transformers, trash enclosures, light poles, etc.
See site, landscape and utility plans for other comments.
Please refer to TST Engineering's response letter that addresses this comment.
Topic: Landscape
Number: 23 Created: 5/1212003
Include a note to maintain a 5 feet minimum separation between shrubs and all water/sewer lines.
Maintain the required landscape/utility separation distances on the landscape plans.
Page 14
A five-foot separation distance has been maintained between shrubs and watedsewer lines. The
five-foot separation has also been maintained from meters as well.
Topic: Plat
Number: 13 Created: 5/12/2003
Curb stops and meter pits may not be located in building envelopes.
Please refer to TST Engineering's response letter that addresses this comment.
Department: Water Wastewater Issue Contact: Roger Buffington
Topic: Utility plans
Number: 31 Created: 5/13/2003
The location of gas and electric meters appear to conflict with location of domestic water services and
fire lines. This puts four underground services in very close proximity to each other which sets up a
hazardous situation.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 32 Created: 5/13/2003
Extend the water and sewer mains between Bldgs H and I to connect with the mains in Rockford
Drive. Eliminate the sewer between Bldgs J and K.
Please refer to TST Engineering's response letter that addresses this comment.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Utility plans
Number: 14 Created: 5/12/2003
Place all curb stops within 2 feet of meter pits. Meter pits and curb stops may not be located in
hardscaped surfaces (i.e. driveways, sidewalks, etc.). Place meter pits adjacent to drives and
roadways.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 15 Created: 5/12/2003
Maintain 10 feet minimum separation between water/sewer services and permanent structures (i.e.
trash enclosures, entry signage, etc.). Maintain 5 feet separation between water/sewer lines and curb
and gutters. No water services are permitted on dead-end mains beyond the last fire hydrant.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 16 Created: 5/12/2003
All existing stubs must be used or abandoned at the mains. Clearly define all abandonment
procedures.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 17 Created: 5/12/2003
Clearly define all connections to existing and proposed water and sewer mains. Show and label all
tees, elbows, thrust blocks, gate valves, etc. All water mains and fire lines 3-inch diameter or greater
must be constructed with D.I.P. (Ductile Iron Pipe). Clearly define this on the utility plans and label
distances between all fittings.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 18 Created: 5/1212003
Page 15
Shift water and sewer mains so that the manholes are located on center lines of drives and streets.
Provide stationing of sanitary sewer services from the downstream manholes on the sanitary sewer
profile sheet. List all inverts which enter or exit a manhole including services. Do not extend sanitary
sewer mains beyond last service unless it is to facilitate future development.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 19 Created: 5/12/2003
Raise or lower storm sewer where possible to eliminate the need for water main lowerings. Water
mains may not be raised by fittings unless air relief valves/vaults are to be installed. These will be
considered on a case by case basis.]
Please refer to TST Engineering's response letter that addresses this comment.
Number: 20 Created: 5/12/2003
Provide concrete encasement on all sanitary and storm sewers which cross above or within 18-inches
vertically of a water main.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 21 Created: 5/12/2003
4-inch fire lines must connect to the water main with a tee or saddle and a 4-inch gate valve. Fire
lines 3-inch or larger must be constructed with D.I.P. Cleary define this on the utility plans.
Please refer to TST Engineering's response letter that addresses this comment.
Number: 22 Created: 5/12/2003
Detail sheet has a detail for subdrains. Where are sub drains being installed? Provide all information
for every water main lowerings (i.e. volume of gravity blocks, sizes of fittings, length of pipe between
fittings, etc.).
Please refer to TST Engineering's response letter that addresses this comment.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 8 Created: 5/8/2003
Building envelope/dimensions are being shown for all buildings except bldg H — plea we not them on
this bldga s well
The dimensions have been added to the building envelope for Building H.
Number: 9 Created: 5/8/2003
Note HC ramps and provide/show patterned/striped crosswalks at entrances into the development off
of Kansas and Rockford Dr
So noted. Thank you. Striping has been shown at both intersections to indicate a pedestrian
crosswalk.
Number: 10 Created: 5/8/2003
Are the crosswalks internal to the site going to be painted striping or enhanced/patterned concrete -
please clarify
Concrete paving has been included to indicate pedestrian crossing locations within drive aisles.
Number: 11 Created: 5/8/2003
Page 2 of 2 of the final plat - Tract A contains the drive aisles, Tract C contains bldgs/envelopes A, B,
F. G and H. Which tracts are bldgs C, D, E, K, J and I located in?
Page 16
Please refer to TST Engineering's response letter that addresses this comment.
The redlined plans are included in this resubmittal.
If you have any comments or questions regarding this submittal please give me a call at 223-1177.
Joe Carter
Cityscape Urban Design
Page 17
REVISION
COMMENT SHEET
DATE: July 2, 2003 TO: Technical Services
PROJECT: #56-98T RIGDEN FARM, PARKSIDE COMMONS,
9TH FLG - TYPE I (LUC) u6
All comments must be received by Troy Jones no later than the
staff review meeting:
July 23, 2003
No Comment
E3Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
Nante (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
Ulllity _Redline Utility _Landscape
Date
Citv of Fort Collins
f PROJECT
i..• COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 2, 2003 TO: Technical Services
PROJECT: #56-98T RIGDEN FARMS, PARKSIDE COMMONS —
TRACT U — TYPE I (LUC) �tL
All comments must be received by Troy Jones no later than the staff
review meeting: r__ _--� ,---- ,
I APR 3 0 2003
May 2003 LBY:_�_ --
Note - PLEASE identify your redlines for future reference'�crw�nr.naRf
1. (,EL=/'! Lt G.'.. .i tf '��. �iliJyia" /✓`8' �_ �i'.::r !�4'lM t.i/'f.'lk _ L
I/
Hccj
IS rCANsa�
T
je rn � i(� rc. a
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
City of Fort Collins
Cityof Fort Collins
mm+mmmw .
Department:
Project Comments Sheet
Selected Departments
Date: July 30, 2003
Project:
RIGDEN FARMS, PARKSIDE COMMONS -TRACT U-9th FLG-TYPE I
(LUC) 56-98T
All comments must be received by Troy Jones in Current Planning, no later than the
staff review meeting:
July 23, 2003
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wa-irmhoff
Topic: Details
Number: 92 Created: 5/20/2003
Need to provide the following details in addition to the ones that need to be updated as
indicated on the plans:
SIPPVA lenafinp-s #12-92
Sidewalk detail # 1602
Standard sidewalk # 1601
Pedestrian ramp # 1606
7/22/03 Still need to provide the three details indicated above
Topic: General
Number: 46 Created: 5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the
driveway cuts within the row do not have a curb. Concentrated flow is not allowed out of the
driveways, thus from the highpoint in the driveway there is to be no curb and gutter, just a
concrete or asphalt edge so sheet flow occurs. (See next comment regarding the amount of
flow allowed out a driveway)
7/22/03 The drainage has been fixed, but still need to identify where the curb and gutter
ends. The driveway cuts do not have curb and gutter need to indicate that the on -site curb
and gutter ends at the high point. From that point it can just be a asphalt edge or a concrete
edge if desired. Also need to identify the driveway widths.
Number: 49 Created: 5/20/2003
Need to coordinate a bunch of work with the Drake/ Ziegler plans. Any work within Drake
Road or that affects the curb, gutter or pavement must be shown as a part of the Drake
Road plans and constructed with that, construction. Need to work with JR eng to get the
Signature % Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ ' Site " Drainage Report Other_
Utility _ %< Redline Utility < Landscape
Page 1
items incorporated into the plans and work with Matt Baker to pay for the cost of the
installation of those items.
7/22/03 this applies to the waterline as well. The extension of the waterline from Drake into
Kansas needs to be done with the Drake road construction.
Number: 51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on
this site If for some reason the Drake Road work is not proceeding and this project is ready
to build then it will need to incorporate the needed improvements (storm sewer ad water
line) into this plan set and build them.
7/22/03 Drake road plans are not yet approved.
Number: 52 Created: 5/20/2003
May not meet the minimum cover requirements over the stormsewer line. You meet it now,
but have not shown the concrete encasement — with that it may not meet it. How thick is the
concrete encasement?
7/22/03 you no longer meet the minimum cover requirement. The stormdrain needs to be
lowered or the street raised to meet minimum cover requirements. You only have about 1.6
feet of cover where 3 feet is needed here.
Number: 94 Created: 5/20/2003
See additional cornments on the plans.
Number: 95
See returned check list.
Created: 5/20/2003
Number: 126 Created: 7/30/2003
1 have shown the anticipated street cut limits on the plans. This was reviewed with
Engineering Inspection. What I have shown is the minimum amount of patching that will be
required for the street cuts and curb and gutter work. Please show these on your site plan
so the contractor has an idea of what the limits of the repairs will be.
Topic: Kansas Design
Number: 78 Created: 5/20/2003
In accordance with LCUASS centerline station is required. Until a meeting with the various
Engineering firms interested in this issue is held to determine what the final requirements for
submittal will be the following is what is being required. For Arterials and Collectors — the
existing criteria remains in place. Centerline stationing is to be provided along with the
required x-sections every 50 feet. For Residential and Local Streets — in lieu of providing
centerline stationing flowline stationing can be used if actual x-sections of the roadway at
the beginning of a horizontal curve, end of a horizontal curve, and additional x-sections be
provided if there are other elevation changes, grade changes and street width changes that
occur within the horizontal curve. Also need to identify the location of beginnings and
endings of horizontal curves with elevations noted on the profile and plan view. Since this
roadway is a local roadway flowline station can be used if the above information is provided.
7/22/03 Need to provide the x-section if the flowline profiles are to be used.
Number: 79 Created: 5/20/2003
Need to show the removal limits for the existing intersection.
7/22/03 As well as for the other cuts that are needed.
Page 2
Number: 80 Created: 5/20/2003
Need to coordinate the design of Kansas with the Drake/Ziegler plans. This set shows
different elevations at the PCR on Kansas than the other plans do.
where the impraweMeRtS will tie tGgether.
7/22/03 Still showing different elevations at the PCR than the Drake road plans do. Are you
planning on rebuilding this intersection to your elevations? If so the whole pan section will
need to be rebuilt: and street cut fees paid. If not the elevations at the PCRs need to match
those shown on the Drake Road plans.
Number: 82 Created: 5/20/2003
Need to show that the minimum slope going into the inlet is .50%. Per Section 7.4.13.4 even
within a sag vertical curve located at the flowline the minimum slope needs to be
maintained.
7/22/03 Not yet showing this. The vertical curve as you show it may not work if minimum
grades can't be maintained in the flowline.
Number: 85 Created: 5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need
to provide the transition elevation and identify its location.
7/22/03 Need to provide the transition elevations and identify the location from the flowline
of the pan. The elevation that is provided at the southend of Kansas that may have
intended to be the transition elevation doesn't work as the transition elevation. The
transition elevation is the location where the street starts its transitions from its standard
crowned configuration. At this point the slope on the west side of the street is 0%. This is
okay as long as this is within the area transitioning from the crown to the pan (at some point
you will have 0 x-slope but vertical slope to keep the water from ponding).
Number: 89 Created: 5/20/2003
Need to show the limits of removal for the street intersection that is to be removed on Limon.
Provide tie in points and elevations as needed to show what is to be done here. It should be
a straight grade across the intersection so no flowline design is needed as long as that is
what remains.
7/22/03 still applies.
Number: 127 Created: 7/30/2003
Just doing a quick calculation it looks like the minimum x-slope is not being met on the east
side of the street at the high point (— station 12+86). If it is not the design needs to be
adjusted so that the x-slopes are within the required ranges for new streets.
Number: 128 Created: 7/30/2003
You have not been showing a cross pan at the south side of the Kansas Limon intersection.
Was it not built with the x-pan? It was suppose to be built with a cross pan. If it doesn't
have a cross pan the cross pan will need to be built in accordance with the original plans.
Number: 129 Created: 7/30/2003
Show the curb return information at the north end of the street. This can be shown as
existing since Drake will need to be built first or concurrently. Currently have larger than
allowed grade breaks where the flowline /ou have designed ties into the Drake Road curb
returns.
Page 3
Number: 130 Created: 7/30/2003
You are showing a vertical curve that is not a vertical curve, but a straight grade line.
Please remove the vc information.
Topic: Plat
Number: 67 Created: 5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an
easement. If the entire area is retained as an easement then this plat will need to vacate
the area with in the: building envelope.
7/22/03 Still may be true — need to see what the utilities want.
Page 4
STAFF PROJECT REVIEW
City of Fort Collins
CITYSCAPE URBAN DESIGN, INC. Date: 07/31/2003
JOE CARTER
3555 STANFORD RD, #105
FT. COLLINS, CO 80525
Staff has reviewed your submittal for RIGDEN FARMS, PARKSIDE COMMONS —TRACT U-
9th FLG-TYPE I (L.UC) 56-98T, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Troy Jones
Topic: General
Number: 131 Created: 7/31/2003
A hearing for the project has been scheduled for Wednesday August 20 at 4:00 p.m. in the conference room at 281
North College.
Department: Engineering
Topic: Details
Number: 92
Issue Contact: Sheri Wamhoff
Created: 5/20/2003
Need to provide the following details in addition to the ones that need to be updated as
indicated on the plans:
Sleeve leeaHens #lI&l)
Sidewalk detail # 1602
Standard sidewalk # 1601
Pedestrian ramp # 1606
eri Rg # 1607
7/22/03 Still need to provide the three details indicated above.
9/5/03 Required details added to sheets 12, 13 and 15.
Topic: General
Number: 46 Created: 5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the
driveway cuts within the row do not have a curb. Concentrated flow is not allowed out of the
driveways, thus from the highpoint in the driveway there is to be no curb and gutter, just a
concrete or asphalt edge so sheet flow occurs. (See next comment regarding the amount of
flow allowed out a. driveway)
7/22/03 The drainage has been fixed, but still need to identify where the curb and gutter ends. The driveway
cuts do not have curb and gutter need to indicate that the on -site curb and gutter ends at the high point. From
that point it can just be a asphalt edge or a concrete edge if desired. Also need to identify the driveway widths.
9/5/03 End of Curti and gutter are called out and driveway widths are dimensioned in the
grading plan, sheet 5.
Number: 49
Created: 5/20/2003
Need to coordinate a bunch of work with the Drake/ Ziegler plans. Any work within Drake
Road or that affects the curb, gutter or pavement must be shown as a part of the Drake Road
plans and constructed with that construction. Need to work with JR eng to get the items
Page I
incorporated into the plans and work with Matt Baker to pay for the cost of the installation of
those items.
7/22/03 this applies to the waterline as well. The extension of the waterline from
Drake into Kansas needs to be done with the Drake road construction.
9/5/03 Acknowledged. Client has been informed about the need to coordinate certain
aspects of construction with the Drake improvements. Also aware of their responsibility to
construct portions of the Drake improvements if Parkside Commons is constructed before
the Drake improvements.
Number: 51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on this
site. If for some reason the Drake Road work is not proceeding and this project is ready to
build then it will need to incorporate the needed improvements (storrn sewer ad water line)
into this plan set and build them.
7/22/03 Drake road plans are not yet approved.
9/5/03 Acknowledged. Client has been informed about the need to coordinate certain
aspects of construction with the Drake improvements. Also aware of their responsibility to
construct portions of the Drake improvements if Parkside Commons is constructed before
the Drake improvements.
Number: 52 Created: 5/20/2003
May not meet the minimum cover requirements over the stormsewer line. You meet it now,
but have not shown the concrete encasement - with that it may not meet it. How thick is the
concrete encasement?
7/22/03 you no longer meet the minimum cover requirement. The stormdrain needs to be
lowered or the street raised to meet minimum cover requirements. You only have about 1.6
feet of cover where 3 feet is needed here.
9/5/03 Storm lines have been adjusted to meet cover requirements on sheet 9.
Number: 94 Created: 5/20/2003
See additional continents on the plans.
9/5/03 Acknowledged.
Number: 95
See returned check list.
9/5/03 Acknowledged.
Created: 5/20/2003
Number: 126 Created: 7/30/2003
1 have shown the anticipated street cut limits on the plans. This was reviewed with Engineering Inspection. What I
have shown is the minimum amount of patching that will be required for the street cuts and curb and gutter work.
Please show these on your site plan so the contractor has an idea of what the limits of the repairs will be.
9/5/03 Acknowledged. Approximate limits of street repair have been shown on sheets 6, 7,8
and 10.
Page 2
Topic: Kansas Design
Number: 78 Created: 5/20/2003
In accordance with LCUASS centerline station is required. Until a meeting with the various
Engineering firms interested in this issue is held to determine what the final requirements for
submittal will be the following is what is being required. For Arterials and Collectors - the
existing criteria remains in place. Centerline stationing is to be provided along with the
required x-sections every 50 feet. For Residential and Local Streets - in lieu of providing
centerline stationing flowline stationing can be used if actual x-sections of the roadway at the
beginning of a horizontal curve, end of a horizontal curve, and additional x-sections be
provided if there are other elevation changes, grade changes and street width changes that
occur within the horizontal curve. Also need to identify the location of beginnings and
endings of horizontal curves with elevations noted on the profile and plan view. Since this
roadway is a local roadway flowline station can be used if the above information is provided.
7/22/03 Need to provide the x-section if the flowline profiles are to be used.
9/5/03 Acknowledged. Cross sections shown on sheet 10.
Number: 79 Created: 5/20/2003
Need to show the removal limits for the existing intersection.
7/22/03 As well as for the other cuts that are needed.
9/5/03 Acknowledged. Approximate limits of street repair have been shown on sheets 6, 7,8
and 10.
Number: 80 Created: 5/20/2003
Need to coordinate the design of Kansas with the Drake/Ziegler plans. This set shows
different elevations at the PCR on Kansas than the other plans do. Also the plans difAg. in
where the ifflprei,effiefAs will tie tegether-.
7/22/03 Still showing different elevations at the PCR than the Drake road plans do. Are you
planning on rebuilding this intersection to your elevations? If so the whole pan section will
need to be rebuilt and street cut fees paid. If not the elevations at the PCRs need to match
those shown on the Drake Road plans.
9/5/03 Acknowledged. Spot elevations matching the Drake plans are shown on sheet 10.
Number: 82 Created: 5/20/2003
Need to show that the minimum slope going into the inlet is .50%. Per Section 7A.B.4 even
within a sag vertical curve located at the flowline the minimum slope needs to be maintained.
7/22/03 Not yet showing this. The vertical curve as you show it may not work if minimum
grades can't be maintained in the flowline.
9/5/03 Acknowledged. A series of grade breaks was added to the profiles on sheet 10.
Number: 85 Created: 5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need
to provide the transition elevation and identify its location.
7/22/03 Need to provide the transition elevations and identify the location from the flowline
of the pan. The elevation that is provided at the Southend of Kansas that may have intended
to be the transition elevation doesn't work as the transition elevation. The transition
Page 3
elevation is the location where the street starts its transitions from its standard crowned
configuration. At this point the slope on the west side of the street is 0%. This is okay as
long as this is within the area transitioning from the crown to the pan (at some point you will
have 0 x-slope but vertical slope to keep the water from ponding).
9/5/03 Acknowledged. Transition elevations and distance from flowline of pans has been
added on sheet 10.
Number: 89 Created: 5/20/2003
Need to show the limits of removal for the street intersection that is to be removed on Limon.
Provide tie in points and elevations as needed to show what is to be done here. It should be a
straight grade across the intersection so no flowline design is needed as long as that is what
remains.
7/22/03 still applies.
9/5/03 Acknowledged. Approximate limits of street repair have been shown on sheets 6, 7,8
and 10.
Number: 127 Created: 7/30/2003
Just doing a quick calculation it looks like the minimum x-slope is not being met on the east side of the street at the high
point (— station 12+86). If it is not the design needs to be adjusted so that the x-slopes are within the required ranges
for new streets.
9/5/03 Acknowledged. Cross slopes have been adjusted in the street profiles on sheet 10
Number: 128 Created: 7/30/2003
You have not been showing a cross pan at the south side of the Kansas Limon intersection. Was it not built with the x-
pan? It was suppose to be built with a cross pan. If it doesn't have a cross pan the cross pan will need to be built in
accordance with the original plans.
9/5/03 Acknowledged. Existing pan has been shown in sheets 5, 6, and 10.
Number: 129 Created: 7/30/2003
Show the curb return information at the north end of the street. This can be shown as existing since Drake will need to
be built first or concurrently. Currently have larger than allowed grade breaks where the flowline you have designed
ties into the Drake Road curb returns.
9/5/03 Acknowledged. Curb return slopes have been labeled, and grade breaks were
added to eliminate the excessive grade breaks at the curb return tie-in on sheet 10.
Number: 130 Created: 7/30/2003
You are showing a van cal curve that is not a vertical curve, but a straight grade line. Please remove the vc
information.
9/5/03 Acknowledged. VC information was removed on sheet 10.
Topic: Plat
Number: 67 Created: 5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an
easement. If the entire area is retained as an easement then this plat will need to vacate the
area with in the building envelope.
7/22/03 Still may be true - need to see what the utilities want.
Page 4
9/5/03 Acknowledged. Survey department has included the vacation on the plat, sheet 2 (or
sheet 4 of 16)
Department: Light & Power Issue Contact: Monica Moore
Topic: General
Number: 119 Created: 7/16/2003
The proposed electric line between buildings I and J needs to maintain a minimum separation from the proposed storm
sewer of 10-feet. This needs to be shown on the utility plans.
9/5/03 Acknowledged. Proposed electric line has been adjusted to maintain a 10' min.
separation from the proposed storm sewer line on sheet 6.
Number: 120 Created: 7/16/2003
Sidewalk and landscaping are not to be installed along Drake Road until such time as Drake Road is built and all
electric facilities are installed.
9/5/03 Acknowledged
Department: Police
Topic: General
Number: 125
Lighting and landscape issues appear to be resolved.
Department: Stormwater Utility
Topic: Erosion Control
Number: 12
July 24, 2003
Plan is OK. Thank you.
Topic: Utility plans
Issue Contact: Joseph Gerdom
Created: 7/23/2003
Issue Contact: Basil Hamdan
Created: 5/9/2003
Number: 25 Created: 5/12/2003
The outfall of the northen portion this site is dependent on the construction of the outfall storm sewer to be built by the
overall Rigden Farms developer in accordance with the Drake/Ziegler plans. Please specify which lines will be built by
this project and which one will be done "by others" on the utility plans. What happens if the ones to be built "by others"
are not built at the time this project goes to construction 7
9/5/03 Acknowledged. Client has been made aware of the need to coordinate with the Drake
improvements. Client is also aware of their responsibilities to construct portions of the
Drake improvements if Parkside Commons is constructed before the Drake improvements.
Construction of storm line ST-2 should be coordinated between this developer and the Rigden Farms overall developer
in order to make sure that the lines are compatible. It might be a good ides to have one contractor build the line all the
way from the proposed inlet on Kansas to the Rigden Farms storm line on Drake.
An inlet should be added between building I and J to capture localized runoff and to ddelineate the break from public
system to private system.
9/5/03 Acknowledged. A sidewalk chase was added at this location to convey runoff to the
street.
Page 5
Please provde a detail for how the existing sewer in Limon Drive will be modified to add the manhole and the incoming
18" RCP. Call out collared joints at the proposed stom manhole. Show approximate limits of street cut on the utility
plan.
9/5/03 Acknowledged.
Please specify water -tight joints on the pipe profile sheets since the 100 year HGL exceeds the pipe crown.
9/5/03 Acknowledged.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 123 Created: 7/22/2003
The handicap ramps wil:hin the development need to be depicted on the utility plan sheets in addition to the site and
landscape plans. Currently, the utility plans show these areas as raised curbs with no indication of a handicap ramp.
9/5/03 Acknowledged.
Number: 124 Created: 7/22/2003
Please note that "No Parking Bike Lane" signs may be necessary along Limon Drive where the curb extends out into
Limon Drive. Contact Traffic Operations regarding the appropriate signage.
9/5/03 Acknowledged. Sign locations are called out in the grading plan, sheet 5.
Topic: Transportation
Number: 38 Created: 5/14/2003
Please replace the high volume driveways off of Kansas and Rockford Drive with Type 1 driveways as described in the
LCUASS (dwg. 706 & 1601). (FOLLOW UP COMMENT 7-22.03) Why are there sidewalk ramps shown at the
driveways to Kansas and Rockford Dr.? If the ramps are necessary please be aware that the concrete sidewalks need
to continue across these driveways. Refer to drawing # 706 in the utility details sheet for the acceptable sidewalk grade
across Type 1 driveways.
9/5/03 Acknowledged. Drives were changed to Type 1 driveways.
Number: 40 Created: 5/14/2003
Additional access ramps need to be added to the plan at the intersections of Drake Road and Minnesota Drive. (see red
lines) The directional ramps should align as much as possible with the sidewalk to accommodate the visually impaired,
and the ramps should be as wide as the sidewalks. (FOLLOW UP COMMENT 7.22-03) An additional handicap ramp
still needs to be added on the west side of the Limon and Minnesota intersection (see red lines). It will also need to
align with the future ramp across Limon Drive that leads to the future Pioneer School. Please refer to the Pioneer
School construction plans for the ramp location.
9/5/03 Acknowledged. Handicapped ramps were updated.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Landscape
Number: 23 Created: 5/12/2003
As previously indicated, include a note to maintain a 4 feet minimum separation between shrubs and all water/sewer
lines. Correct the note on the landscape plans pertaining to tree/utility separation to read 10 feet of separation.
Maintain the required landscape/utility separation distances on the landscape plans.
Topic: Utility plans
Number: 14 Created: 5/12/2003
Meter pits may not be placed closer than 4 feet to the building envelope. Place all curb stops within 2 feet of meter pits.
Meter pits and curb stops may not be located in hardscaped surfaces (i.e. driveways, sidewalks, etc.). Place meter pits
adjacent to drives and roadways.
Page 6
tM5W'1;r;— —.4 Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Transportation Planning
Date: May 15, 2003
Project:
RIGDEN FARMS, PARKSIDE COMMONS —TRACT U—TYPE I (LUC) 56-98T
All comments must be received by Troy Jones in Current Planning, no later than the
staff review meeting:
May 28, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 38 Created: 5/14/2003
Please replace the high volume driveways off of Kansas and Rockford Drive with
Type 1 driveways as described in the LCUASS (dwg. 706 & 1601).
Number: 39 Created: 5/14/2003
Limon and Kansas Drive have previously been identified as connector local streets
with combined parking / bike lanes. These streets will need to be striped to include
an 11 foot combined park / bike lane. Please include a single illustration in the utility
details sheet depicting this striping plan and add to the notes. The notes should also
indicate that a single 8" striped line will delineate the combined park / bike lane.
Number: 40 Created: 5/14/2003
Additional access ramps need to be added to the plan at the intersections of Drake
Road and Minnesota Drive. (see red lines) The directional ramps should align as
much as possible with the sidewalk to accommodate the visually impaired, and the
ramps should be as wide as the sidewalks.
Number: 42 Created: 5/14/2003
Suggestion: The 28' drive aisle widths seem to be overkill for internal drives and will
induce speeding. Please consider a width of 24', and increase the landscaping,
which would allow the units fronting the drive aisles to have more greenery or larger
Date
CHECK 11 R3E IF YOU WISH TO RECEIVE COPIES OF REVISIONS
p4at X Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
9/5/03 Acknowledged. Services and meter pits have been adjusted
Number: 16 Created: 5/12/2003
All existing stubs must be used or abandoned at the mains. Clearly define all abandonments on these plans.
9/5/03 Acknowledged.
Number: 19 Created: 5/12/2003
As previously indicated, raise or lower storm sewer where possible to eliminate the need for water main lowerings.
9/5/03 Acknowledged. Storm sewer has been adjusted to eliminate lowerings.
Number: 24 Created: 5/12/2003
As previously indicated, maintain 10 feet of separation between water/sewer lines and all mail kiosk, electric
services/transformers, trash enclosures, light poles, etc.
9/5/03 Acknowledged
Number: 121 Created: 7/22/2003
Will a lowering of the proposed water main in Kansas be required at the 54-inch storm sewer? Provide a detail if
required.
Water line lowering detail shown on the detail sheet is very confusing. Are the water mains being deflected in multiply
directions?
See site, landscape and utility plans for other comments.
9/5/03 Acknowledged. Water line lowerings have been eliminated.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Troy Jones
City Planner
Page 7
September 5, 2003 co ^ O o
Troy Jones urban design, inc.
City of Fort Collins
Community Planning and Environmental Services 3555 stanford road, suite 105
P.O. Box 580 fort collins, colorado 80525
Fort Collins, CO 80522 (970) 226-4074
fax (970) 226-4196
e@cityscapeud.com
RE: Rigden Farm, 9" Filing, Parkside Commons — Final Compliance Plan Comments and Responses
Dear Troy,
Included below are the comments received from City Staff regarding on Rigden Farm, 91h
Filing, Parkside Commons. Please consider this the Final Compliance Application. The project was
subject to a Type 1 hearing on August 20, 2003 and received approval in a letter dated August 25,
2003. An explanation (in italics) of how issues have been addressed follows each comment.
ISSUES:
Department: Current Planning Issue Contact: Troy Jones
Topic: General
Number:131 Created:7/31/2003
A hearing for the project has been scheduled for Wednesday August 20 at 4:00 p.m. in the
conference room at 281 North College.
The hearing was held at the aforementioned time and the project was approved. Thank you.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: Details
Number:92 Created:5/20/2003
Need to provide the following details in addition to the ones that need to be updated as indicated on
the plans:
Sidewalk detail # 1602
Standard sidewalk # 1601
Pedestrian ramp # 1606
7/22103 Still need to provide the three details indicated above.
Please refer to civil engineer's comment responses.
Topic: General
Number:46 Created:5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the driveway
cuts within the row do not have a curb. Concentrated flow is not allowed out of the driveways, thus
from the highpoint in the driveway there is to be no curb and gutter, just a concrete or asphalt edge so
sheet flow occurs. (See next comment regarding the amount of flow allowed out a driveway)
7/22/03 The drainage has been fixed, but still need to identify where the curb and gutter ends. The
driveway cuts do not have curb and gutter need to indicate that the on -site curb and gutter ends at
the high point. From that point it can just be a asphalt edge or a concrete edge if desired. Also need
to identify the driveway widths.
Please refer to civil engineer's comment responses
Page 1
Number 49 Created:5/20/2003
Need to coordinate a bunch of work with the Drake/ Ziegler plans. Any work within Drake Road or
that affects the curb, gutter or pavement must be shown as a part of the Drake Road plans and
constructed with that construction. Need to work with JR eng to get the items incorporated into the
plans and work with Matt Baker to pay for the cost of the installation of those items.
7/22/03 this applies to the waterline as well. The extension of the waterline from Drake into Kansas
needs to be done with the Drake road construction.
Please refer to civil engineer's comment responses.
Number, 51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on this site. If
for some reason the Drake Road work is not proceeding and this project is ready to build then it will
need to incorporate the needed improvements (storm sewer ad water line) into this plan set and build
them.
7/22/03 Drake road plans are not yet approved
So noted. Thank you.
Number:52 Created:5/20/2003
May not meet the minimum cover requirements over the storm sewer line. You meet it now, but have
not shown the concrete encasement - with that it may not meet it. How thick is the concrete
encasement?
7/22/03 you no longer meet the minimum cover requirement. The storm drain needs to be lowered or
the street raised to meet minimum cover requirements. You only have about 1.6 feet of cover where
3 feet is needed here.
Please refer to civil engineer's comment responses.
Number:94 Created:5/20/2003
See additional comments on the plans.
So noted. Thank you.
Number:95 Created:5/20/2003
See returned check list.
So noted. Thank you.
Number:126 Created:7/30/2003
1 have shown the anticipated street cut limits on the plans. This was reviewed with Engineering
Inspection. What I have shown is the minimum amount of patching that will be required for the street
cuts and curb and gutter work. Please show these on your site plan so the contractor has an idea of
what the limits of the repairs will be.
Please refer to civil engineer's comment responses.
Topic: Kansas Design
Number:78 Created:5/20/2003
In accordance with LCUASS centerline station is required. Until a meeting with the various
Engineering firms interested in this issue is held to determine what the final requirements for submittal
will be the following is what is being required. For Arterials and Collectors - the existing criteria
remains in place. Centerline stationing is to be provided along with the required x-sections every 50
Page 2
feet. For Residential aind Local Streets - in lieu of providing centerline stationing flowline stationing
can be used if actual x-sections of the roadway at the beginning of a horizontal curve, end of a
horizontal curve, and additional x-sections be provided if there are other elevation changes, grade
changes and street width changes that occur within the horizontal curve. Also need to identify the
location of beginnings and endings of horizontal curves with elevations noted on the profile and plan
view- Since this roadway is a local roadway flowline station can be used if the above information is
provided.
7/22/03 Need to provide the x-section if the flowline profiles are to be used.
Please refer to civil engineer's comment responses.
Number:79 Created:5/20/2003
Need to show the removal limits for the existing intersection.
7/22/03 As well as for the other cuts that are needed.
Please refer to civil engineer's comment responses.
Number:80 Created:5/20/2003
Need to coordinate the design of Kansas with the Drake/Ziegler plans. This set shows different
elevations at the PCR on Kansas than the other plans do. Also the _ plans d 4er :�'F"e'he
rnen,ts ;��!! t Aegether.
7/22/03 Still showing different elevations at the PCR than the Drake road plans do. Are you planning
on rebuilding this intersection to your elevations? If so the whole pan section will need to be rebuilt
and street cut fees paiid. If not the elevations at the PCRs need to match those shown on the Drake
Road plans.
Please refer to civil engineer's comment responses.
Number:82 Created:5120/2003
Need to show that the minimum slope going into the inlet is .50%. Per Section 7.4.13.4 even within a
sag vertical curve located at the flowline the minimum slope needs to be maintained.
7/22/03 Not yet showing this. The vertical curve as you show it may not work if minimum grades can't
be maintained in the flowline.
Please refer to civil engineer's comment responses.
Number:85 Created:5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need to
provide the transition elevation and identify its location.
7/22/03 Need to provide the transition elevations and identify the location from the flowline of the pan.
The elevation that is provided at the south end of Kansas that may have intended to be the transition
elevation doesn't work as the transition elevation. The transition elevation is the location where the
street starts its transitions from its standard crowned configuration. At this point the slope on the west
side of the street is 0%. This is okay as long as this is within the area transitioning from the crown to
the pan (at some point you will have 0 x-slope but vertical slope to keep the water from ponding).
Please refer to civil engineer's comment responses.
Number:89 Created:5/20/2003
Need to show the limits of removal for the street intersection that is to be removed on Limon. Provide
tie in points and elevations as needed to show what is to be done here. It should be a straight grade
across the intersection so no flowline design is needed as long as that is what remains.
7/22/03 still applies.
Page 3
Please refer to civil engineer's comment responses
Number:127 Created:7/30/2003
Just doing a quick calculation it looks like the minimum x-slope is not being met on the east side of
the street at the high point (— station 12+86). If it is not the design needs to be adjusted so that the x-
slopes are within the required ranges for new streets.
Please refer to civil engineer's comment responses.
Number:128 Created:7/30/2003
You have not been showing a cross pan at the south side of the Kansas Limon intersection. Was it
not built with the x-pan? It was suppose to be built with a cross pan. If it doesn't have a cross pan
the cross pan will need to be built in accordance with the original plans.
A field visit confirmed there is an existing cross -pan on the south side of the Kansas Limon
intersection. Please refer to civil engineer's comment responses.
Number:129 Created:7/30/2003
Show the curb return information at the north end of the street. This can be shown as existing since
Drake will need to be built first or concurrently. Currently have larger than allowed grade breaks
where the flowline you have designed ties into the Drake Road curb returns.
Please refer to civil engineer's comment responses.
Number 130 Created:7/30/2003
You are showing a vertical curve that is not a vertical curve, but a straight grade line. Please remove
the vc information.
Please refer to civil engineer's comment responses.
Topic: Plat
Number:67 Created:5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an easement. If the
entire area is retained as an easement then this plat will need to vacate the area with in the building
envelope.
7/22/03 Still may be true - need to see what the utilities want.
Please refer to civil engineer's comment responses.
Department: Light & Power Issue Contact: Monica Moore
Topic: General
Number:119 Created:7/16/2003
The proposed electric line between buildings I and J needs to maintain a minimum separation from
the proposed storm sewer of 10-feet. This needs to be shown on the utility plans.
Please refer to civil engineer's comment responses.
Number:120 Created:7/16/2003
Sidewalk and landscaping are not to be installed along Drake Road until such time as Drake Road is
built and all electric facilities are installed.
General note 21 and Landscape note 27 have been added to the plans to address this comment.
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Page 4
Number:125 Created:7/23/2003
Lighting and landscape issues appear to be resolved.
So noted. Thank you.
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Erosion Contrail
Number: 12 Created- 5/9/2003
July 24, 2003
Plan is OK. Thank you.
Please refer to civil engineer's comment responses.
Topic: Utility plans
Number:25 Created:5/12/2003
The outfall of the northern portion this site is dependent on the construction of the outfall storm sewer
to be built by the overall Rigden Farms developer in accordance with the Drake/Ziegler plans. Please
specify which lines will be built by this project and which one will be done "by others" on the utility
plans. What happens if the ones to be built "by others" are not built at the time this project goes to
construction
Construction of storm line ST-2 should be coordinated between this developer and the Rigden Farms
overall developer in order to make sure that the lines are compatible. It might be a good ides to have
one contractor build the line all the way from the proposed inlet on Kansas to the Rigden Farms storm
line on Drake.
An inlet should be added between building I and J to capture localized runoff and to delineate the
break from public system to private system.
Please provide a detail for how the existing sewer in Limon Drive will be modified to add the manhole
and the incoming 18" RCP. Call out collared joints at the proposed storm manhole. Show
approximate limits of street cut on the utility plan.
Please specify watertight joints on the pipe profile sheets since the 100-year HGL exceeds the pipe
crown.
Please refer to civil engineers comment responses.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number:123 Created:7/22/2003
The handicap ramps within the development need to be depicted on the utility plan sheets in addition
to the site and landscape plans. Currently, the utility plans show these areas as raised curbs with no
indication of a handicap ramp.
Please refer to civil engineer's comment responses.
Number:124 Created:7/22/2003
Please note that "No Parking Bike Lane" signs may be necessary along Limon Drive where the curb
extends out into Limon Drive. Contact Traffic Operations regarding the appropriate signage.
Cityscape contacted Traffic Operations. Traffic Operations stated they would visit the site and make
a recommendation. The applicant will work with Traffic Operations on signage.
Topic: Transportation
Number: 38 Created, 5/14/2003
Page 5
Please replace the high volume driveways off of Kansas and Rockford Drive with Type 1 driveways
as described in the LCUASS (dwg. 706 & 1601).
(FOLLOW UP COMMENT 7-22-03) Why are there sidewalk ramps shown at the driveways to
Kansas and Rockford Dr.? If the ramps are necessary please be aware that the concrete sidewalks
need to continue across these driveways. Refer to drawing # 706 in the utility details sheet for the
acceptable sidewalk grade across Type 1 driveways.
Please refer to civil engineer's comment responses
Number:40 Created:5/1412003
Additional access ramps need to be added to the plan at the intersections of Drake Road and
Minnesota Drive. (see red lines) The directional ramps should align as much as possible with the
sidewalk to accommodate the visually impaired, and the ramps should be as wide as the sidewalks.
(FOLLOW UP COMMENT 7-22-03) An additional handicap ramp still needs to be added on the west
side of the Limon and Minnesota intersection (see red lines). It will also need to align with the future
ramp across Limon Drive that leads to the future Pioneer School. Please refer to the Pioneer School
construction plans for the ramp location.
An additional ramp has been added on the north side of Limon Drive to align with the ramp on the
west side of Minnesota Drive as proposed by the Pioneer School.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Landscape
Number:23 Created:5/12/2003
As previously indicated, include a note to maintain a 4 feet minimum separation between shrubs and
all water/sewer lines. Correct the note on the landscape plans pertaining to tree/utility separation to
read 10 feet of separation. Maintain the required landscape/utility separation distances on the
landscape plans.
Section 3.2.1 of the Fort Collins Land Use Code specifies a 6-foot minimum separation is required.
The landscape plans have been designed to this standard. Shrubs have been kept a minimum of 4
feet away from meters as requested by city staff.
Topic: Utility plans
Number:14 Created:5/12/2003
Meter pits may not be placed closer than 4 feet to the building envelope. Place all curb stops within 2
feet of meter pits. Meter pits and curb stops may not be located in hardscaped surfaces (i.e.
driveways, sidewalks, etc.). Place meter pits adjacent to drives and roadways.
Please refer to civil engineer's comment responses.
Number:16 Created:5/12/2003
All existing stubs must be used or abandoned at the mains. Clearly define all abandonments on
these plans.
Please refer to civil engineer's comment responses.
Number:19 Created:5/12/2003
As previously indicated, raise or lower storm sewer where possible to eliminate the need for water
main lowerings.
Please refer to civil engineer's comment responses.
Number 24 Created:5/12/2003
As previously indicated, maintain 10 feet of separation between water/sewer lines and all mail kiosk,
electric services/transformers, trash enclosures, light poles, etc.
Page 6
A note has been added to the plan stating that a 10-foot separation shall be maintained between all
water/sewer lines and mail kiosks. All common trash enclosures have been removed from the plan.
Residents will use individual poly -carts. Please refer to civil engineer's comment responses for
additional comments.
Number:121 Created:7/22/2003
Will a lowering of the proposed water main in Kansas be required at the 54-inch storm sewer?
Provide a detail if required.
Water line lowering detail shown on the detail sheet is very confusing. Are the water mains being
deflected in multiply directions?
See site, landscape and utility plans for other comments.
Please refer to civil engineer's comment responses.
Please see the attached Redlines.
Thank you.
Joe Carter
Cityscape Urban Design
Page 7
REM '635EP
"M
i.� FINAL COMPLIANCE
City of Fart Collins. COMMENT SHEET
Current Plannin11 e
DATE: September 5, 2003 TO: Technical Services
PROJECT: #56-98V Rigden Farm, Parkside Commons,
9th Filing — FINAL COMPLIANCE
All comments must be received by Troy Jones no later than the staff
review meeting:
September 24, 2003
Note - Please identify your redlines for future reference
I /C/i% � LcG/7L i�G. Y'L/ii � L�i./la .Pd .'i �+`f^�7TL Ll„ �S�c':-'s•>G.::.'cs�--"� � %�
q2 C VS
[)C Sc- 12C;-1 T-Ht�
t_ l l S L I 1 ✓; c�;7
(�i`_ c 7 L C-
C7 C''h. i I Z]
�C SC. 1�� 1 /S C:- %G : si ��--i•--
j
�. 1 t{c Oc
�T
I TI-(C
I,L�A;'_Ii,�=� G
T(F�
Vci_Try /i,�
�t1= 7 J1c
t._-4YIG,a
��i,-_ CI�C. iJ—
TH-T n.'
L'L, t4I- i
t-i cJ.J
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
6a
City of Fort Collins
L41 ""-1 Project Comments Sheet
r, Selected Departments
City of Furt Cuilins
Department: Water Wastewater
Date: September 23, 2003
Project:
RIGDEN FARM, PARKSIDE COMMONS —TRACT U-9th FLG-TYPE I &
FINAL COMPLIANCE (LUC) 56-98T
All comments must be received by Troy Jones in Current Planning, no later than the
staff review meeting:
September 24, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: Landscape
Number: 23 Created: 5/12/2003
As previously indicated, include a note to maintain a 4 feet minimum separation
between shrubs and all water/sewer lines. Maintain the required landscape/utility
separation distances on the landscape plans.
Topic: General
Number: 16 Created: 5/12/2003
9/23/03 All existing stubs must be used or abandoned at the mains. Clearly define
all abandonment's on these plans.
Number: 133 Created: 9/23/2003
Correct the sanitary sewer profiles to correctly station proposed services. Include
sanitary sewer service inverts which enter manholes on the profile.
See site, landscape and utility plans for other comments.
-�,3-u 3
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
� Utilitv _ Redline Utility- Landscape
Page 1
Number: 44 Created: 5/15/2003
Please relocate the midblock access ramps on Rockford to align with the north side
of the driveway into Parkside West development and relocate the midblock ramps on
Kansas to align with the walkway spine between Bldgs A and B.
Page 2
Project Comments Sheet
Selected Departments
Department: Engineering
Date: September 25, 2003
Project:
RIGDEN FARM, PARKSIDE COMMONS —TRACT U-9th FLG-TYPE I &
FINAL COMPLIANCE (LUC) 56-98T
All comments must be received by Troy Jones in Current Planning, no later than the
staff review meeting:
September 24, 2003
Note - Please identify your redlines for future reference
Issue Contact: Sheri wamhoff
Topic: General
Number: 46 Created: 5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the driveway
cuts within the row do not have a curb. Concentrated flow is not allowed out of the driveways, thus
from the highpoint in the: driveway there is to be no curb and gutter, just a concrete or asphalt edge
so sheet flow occurs. (See next comment regarding the amount of flow allowed out a driveway)
7/22/03 The drainage has been fixed, but still need to identify where the curb and gutter ends.
The driveway cuts do not have curb and gutter need to indicate that the on -site curb and gutter
ends at the high point. From that point it can just be a asphalt edge or a concrete edge if desired.
Also need to identify the driveway widths.
9/22/03 Have identified that the curb and gutter ends - but it needs to end at the high point in the
driveway not the right-of-way line.
Number:51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on this site. If
for some reason the Drake Road work is not proceeding and this project is ready to build then it will
need to incorporate the needed improvements (storm sewer ad water line) into this plan set and
build them.
7/22/03 Drake road plans are not yet approved.
9/22/03 Drake Road plans have still not been approved.
Number: 94 Created: 5/20/2003
See additional comments on the
plans.
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat
X Utility
X Site
Redline Utility t/ Landscape
Drainage Report Other,
Page I
Number: 126 Created: 7/30/2003
I have shown the anticipated street cut limits on the plans. This was reviewed with Engineering
Inspection. What I have shown is the minimum amount of patching that will be required for the
street cuts and curb and gutter work. Please show these on your site plan so the contractor has an
idea of what the limits of the repairs will be.
9/22/03 One needs to be extended from what is shown due to where the waterline is in the street.
Number:137
Created:9/25/2003
Need to information for development agreement sheet filed out
Topic: Kansas Design
Number: 85 Created: 5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need to
provide the transition elevation and identify its location.
7/22/03 Need to provide the transition elevations and identify the location from the flowline of
the pan. The elevation that is provided at the southend of Kansas that may have intended to be the
transition elevation doesn't work as the transition elevation. The transition elevation is the location
where the street starts its transitions from its standard crowned configuration. At this point the
slope on the west side of the street is 0%. This is okay as long as this is within the area
transitioning from the crown to the pan (at some point you will have 0 x-slope but vertical slope to
keep the water from ponding).
9/22/03 Need to look at the transition points that are provided. At the south end of the street
the cross section of the street reaches and even exceeds the maximum x-slope before the
transition elevation is reached. At the north end of the street the elevations in the street didn't
quite match that shown on the profile.
Number: 127 Created: 7/30/2003
Just doing a quick calculation it looks like the minimum x-slope is not being met on the east side of
the street at the high point (— station 12+86). If it is not the design needs to be adjusted so that
the x-slopes are within the required ranges for new streets.
9/22/03 the section above is within range - but one of the x-sections probvided is not though. One
of the sections provided exceeds the 3% maximum although you had indicated that the cross slope
was 3 %. The profiles need to be adjusted so that the cross slopes are within parameters. The
other cross slope provided is within parameters, but is not the 2% indicated.
Number: 138 Created: 9/25/2003
Have several places where items on the plan and profiles do not match or are not shown correctly.
Topic: Plot
Number: 67 Created: 5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an easement. If
the entire area is retained as an easement then this plat will need to vacate the area with in the
building envelope.
7/22/03 Still may be true - need to see what the utilities want.
9/22/03 The Ordinance to vacate the row and retain it as a utility easement is Ordinance No. 131,
2003.
Page 2
November 17, 2003 C�� j'/ \ @@ P@
Troy Jones
urban design, inc.
City of Fort Collins
Current Planning Department
3555 Stanford road, suite 5
281 North College Avenue
fort CollinsColorado 52
, 4074
(970) 226-
Fort Collins, CO 80522
fax (970) 226-4196196
e@cityscapeud.com
RE: Rigden Farm, 9" Filing, Parkside Commons — Final Compliance Plan Comments and Responses
Dear Troy:
Included below are the comments received from City Staff regarding on Rigden Farm, 91h Filing,
Parkside Commons. An explanation (in italics) of how issues have been addressed follows each
comment.
ISSUES:
Department: Current Planning Issue Contact: Troy Jones
Topic: General
Number:139 Created:9/26/2003
Take the City Clerk signalure line off the plat. The City Clerk does not sign a plat. Be sure that when we are ready for
mylars, you bring in the those mylars with owner, lien holder, and attorney's signatures on them where necessary. The
cover sheet of the site plan also needs an owner's certification signature block. Let me know if you need me to fax you
an example of this.
Please refer to the Civil Engineer's comment responses for the plat. The signature block on the cover sheet of
the site plan has been amended to include notarization.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: General
Number 46 Created:5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the driveway cuts within the row do
not have a curb. Concentrated flow is not allowed out of the driveways, thus from the highpoint in the driveway there is
to be no curb and gutter, just a concrete or asphalt edge so sheet flow occurs. (See next comment regarding the
amount of flow allowed out a driveway)
7/22103 The drainage has been fixed, but still need to identify where the curb and gutter ends. The driveway cuts do not
have curb and gutter need to indicate that the on -site curb and gutter ends at the high point. From that point it can just
be a asphalt edge or a concrete edge if desired. Also need to identify the driveway widths.
9/22/03 Have identified that the curb and gutter ends - but it needs to end at the high point in the driveway not the right-
of-way line.
Please refer to the Civil Engineer's comment responses.
Number: 51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on this site. If for some reason the
Drake Road work is not proceeding and this project is ready to build then it will need to incorporate the needed
improvements (storm sewer ad water line) into this plan set and build them.
7/22/03 Drake road plant; are not yet approved.
9/22103 Drake Road plans have still not been approved.
So noted. Thank you
Number:94 Created:5/20/2003
See additional comments on the plans.
So noted. Thank you.
Page l
Co��y��caa o
urban design, inc.
Number:126 Created:7/30/2003
1 have shown the anticipated street cut limits on the plans. This was reviewed with Engineering Inspection. What I have
shown is the minimum amount of patching that will be required for the street cuts and curb and gutter work. Please
show these on your site plan so the contractor has an idea of what the limits of the repairs will be.
9/22/03 One needs to be extended from what is shown due to where the waterline is in the street.
Please refer to the Civil Engineer's comment responses.
Number:137 Created:9/25/2003
Need to information for development agreement sheet filed out.
Please see attached sheet for the required information.
Topic: Kansas Design
Number:85 Created:5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need to provide the transition
elevation and identify its location.
7/22/03 Need to provide the transition elevations and identify the location from the flowline of the pan. The elevation that
is provided at the southend of Kansas that may have intended to be the transition elevation doesn't work as the
transition elevation. The transition elevation is the location where the street starts its transitions from its standard
crowned configuration. Al. this point the slope on the west side of the street is 0%. This is okay as long as this is within
the area transitioning frorn the crown to the pan (at some point you will have 0 x-slope but vertical slope to keep the
water from pending).
9/22/03 Need to look at the transition points that are provided. At the south end of the street the cross section of the
street reaches and even exceeds the maximum x-slope before the transition elevation is reached. At the north end of
the street the elevations in the street didn't quite match that shown on the profile.
Please refer to the Civil Engineer's comment responses.
Number:127 Created:7130/2003
Just doing a quick calculation it looks like the minimum x-slope is not being met on the east side of the street at the high
point (— station 12+86). If it is not the design needs to be adjusted so that the x-slopes are within the required ranges for
new streets.
9/22/03 the section above is within range - but one of the x-sections probvided is not though. One of the sections
provided exceeds the 30% maximum although you had indicated that the cross slope was 3 %. The profiles need to be
adjusted so that the cross slopes are within parameters. The other cross slope provided is within parameters, but is not
the 2% indicated.
Please refer to the Civil Engineer's comment responses.
Number: 138 Created: 9/25/2003
Have several places where items on the plan and profiles do not match or are not shown correctly.
Please refer to the Civil Engineers comment responses.
Topic: Plat
Number:67 Created:5/20/2003
More than likely when the row stub is vacated the whole area will be retained as an easement. If the entire area is
retained as an easementthen this plat will need to vacate the area with in the building envelope.
7/22/03 Still may be true - need to see what the utilities want.
9/22/03 The Ordinance to vacate the row and retain it as a utility easement is Ordinance No. 131, 2003.
Please refer to the Civil Engineers comment responses.
Department: PFA,
Topic: Addressing
Page 2
Issue Contact: Michael Chavez
COKY2@@ o
urban design, inc.
Number: 136 Created: 9/24/2003
ADDRESS NUMERALS:
Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6 inch numerals
on a contrasting background. (Bronze numerals on brown brick are not acceptable).
1997 UFC 901.4.4
A. In Multi -family buildings more then one floor shall abide by the following requirements.
1. The first floor units shall be designated with 100's.
2. The second floor units with 200's
3. The third floor units with 300's, and so forth.
B. All brass letters and numerals shall be posted on a black background.
C. Some multi -family layouts may require address postings from the back side as well as the front of
the buildings.
D. A counter clock addressing pattern shall be maintained when ever possible.
E. An addressing scheme shall be submitted to the fire department for approval prior to being posted
on the building.
So noted. Thank you. Buildings have been relabeled to reflect a counter -clock addressing scheme. A minimum
of 6-inch high address numerals will be placed against a contrasting background for building addresses.
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Details
Number: 135 Created: 9/24/2003
Please provide a City of Fort Collins standard metal sidewalk chase detail.
Please refer to the Civil Engineer's comment responses.
Topic: Drainage Plan
Number:27 Created:5112/2003
9/23/2003
The hydrology summary table should only have some of the information provided, it should have basin numbers, basin
areas, basin runoff coefficients, design points, 2-year flows , 10-year flows and 100-year flows. All additional information
is extraneous and makes the table harder to decipher.
Please refer to the Civil Engineer's comment responses
Topic: ST-2 Alignment
Number:134 Created: 9/23/2003
ST-2 is currently designed to go in the Kansas Drive right of way, between the curb line and the sidewalk. That would
put it in conflict with any future trees in the parkway strip and potentially with electric lines. Please move the line such
that it is in the Kansas Drive right of way, since there seems to be ample room in that area.
Please refer to the CivilEngineer's comment responses.
Topic: Utility plans
Number:25 Created:5/12/2003
9/23/2003
The outtall of the northern portion this site is dependent on the construction of the outfall storm sewer to be built by the
overall Rigden Farms developer in accordance with the Drake/Ziegler plans. Please specify which lines will be built by
this project and which one will be done "by others" on the utility plans. What happens if the ones to be built "by others'
are not built at the time this project goes to construction ? This development is dependent on the Rigden Farms 6th
Filing obtaining all necessary easements and having the Drake Road storm sewer built ahead of the construction of
drainage facilities associated with this development.
Page 3
�o�YV( a o
urban design, inc.
Construction of storm line ST-2 should be coordinated between this developer and the Rigden Farms overall developer
in order to make sure that the lines are compatible. It might be a good ides to have one contractor build the line all the
way from the proposed inlet on Kansas to the Rigden Farms storm line on Drake.
Please provide a detail for how the existing sewer in Limon Drive will be modified to add the manhole and the incoming
18" RCP. Call out collared joints at the proposed stom manhole. Show approximate limits of street cut on the utility plan.
Please refer to the Civil Engineers comment responses
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number:132 Created:9/22/2003
No further comments.
So noted. Thank you
Department: Water Wastewater Issue Contact: Jeff Hill
Topic. General
Number: 133 Created: 9/23/2003
Correct the sanitary sewer profiles to correctly station proposed services. Include sanitary sewer service inverts which
enter manholes on the profile.
Please refer to the Civil Engineer's comment responses
See site, landscape and utility plans for other comments.
So noted. Thank you
Topic: Landscape
Number: 23 Created: 5/12/2003
As previously indicated, include a note to maintain a 4 feet minimum separation between shrubs and all water/sewer
lines. Maintain the required landscape/utility separation distances on the landscape plans.
The landscape note describing landscape and utility separations has been amended per a meeting between Joe
Carter of Cityscape Urban Design and Jeff Hill on October 2nd 2003.
Topic: Utility plans
Number:16 Created: 5/1212003
9/23/03 All existing stubs must be used or abandoned at the mains. Clearly define all abandonments on these plans.
Please refer to the Civil Engineer's comment responses
P t ttac15 Redlines.
Thank u,
Joe r
Cityscape Urban Design
Page 4
MEMORANDUM
TO: unie-Woodard, Xcel Energy
FROM: Sheri Wamhoff, Development Review Engineer
DATE: July 29, 2003
RE: REQUEST TO VACATE A PORTION OF RIGHT OF WAY
Attached for your review and comment is a sketch showing a street stub that was plated with
Rigden Farm First Filling on the North side of Limon Drive. Rigden Farm 9`h Filing, Parkside
Commons, a current development proposal in the area does not wish to continue this planed
street through the site and would like to vacate the right-of-way for this street stub. The curb
returns were built for this intended street and will need to be removed if this vacation occurs.
Please let me know if you have any problem with the right of way vacation and if the entire area
would need to be retained as easement or if only the standard 9 foot utility easement we would
have behind the row should be retained. Sign and return any comments to Sheri L. Wamhoff in
the Development Review Center by August 15, 2003. If we do not hear from you by this date,
we will assume you have no objections to the proposed vacation. Please call Sheri at 221-6750 if
you have any questions. Thank you.
No Problems
�/Problems/Concerns as follows:
NtU PROALl-'PI WITH YACItT //V& ROM
R 0
W.
P3W ivOLJL1)
Llkl' TU .SLH 9' L1.E. REMMN
FOR
FUTURE
liJE_
fl�CE�V,
?003
MEMORANDUM ANT PANNING
TO: Dennis Greenwalt, AT& T Broadband
FROM: Sheri Wamhoff, Development Review Engineer
DATE: July 29, 2003
RE: REQUEST TO VACATE A PORTION OF RIGHT OF WAY
Attached for your review and comment is a sketch showing a street stub that was plated with
Rigden Farm First Filling on the North side of Limon Drive. Rigden Farm 9`h Filing, Parkside
Commons, a current development proposal in the area does not wish to continue this planed
street through the site and would like to vacate the right-of-way for this street stub. The curb
returns were built for this intended street and will need to be removed if this vacation occurs.
Please let me know if you have any problem with the right of way vacation and if the entire area
would need to be retained as easement or if only the standard 9 foot utility easement we would
have behind the row should be retained. Sign and return any comments to Sheri L. Wamhoff in
the Development Review Center by August 15. 2003. If we do not hear from you by this date,
we will assume you have no objections to the proposed vacation. Please call Sheri at 221-6750 if
you have any questions. Thank you.
No Problems
xProblems/Concerns as follows:
Comcast Cable would like to see a drawing that shows were the existing Utilities are located before making
any commitments about vacating this area.
MEMORANDUM
TO: Roger Buffington, Water/ Wastewater
FROM: Sheri Wamhoff, Development Review Engineer
DATE: July 29, 2003
RE: REQUEST TO VACATE A PORTION OF RIGHT OF WAY
Attached for your review and comment is a sketch showing a street stub that was plated with
Rigden Farm First Filling on the North side of Limon Drive. Rigden Farm 9`h Filing, Parkside
Commons, a current development proposal in the area does not wish to continue this planed
street through the site and would like to vacate the right-of-way for this street stub. The curb
returns were built 'For this intended street and will need to be removed if this vacation occurs.
Please let me know if you have any problem with the right of way vacation and if the entire area
would need to be retained as easement or if only the standard 9 foot utility easement we would
have behind the row should be retained. Sign and return any comments to Sheri L. Wamhoff in
the Development Review Center by August 15, 2003. If we do not hear from you by this date,
we will assume you have no objections to the proposed vacation. Please call Sheri at 221-6750 if
you have any questions. Thank you.
No Problems
A X— Problems/Concerns as follows:
fkr� A�
I ti Inc LL
VT1 L- 1' tT '
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: May 20, 2003
Project:
RIGDEN FARMS, PARKSIDE COMMONS —TRACT U—TYPE I (LUC) 56-98T
All comments must be received by Troy Jones in Current Planning, no later than the
staff review meeting:
May 28, 2003
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: Details
Number: 90 Created: 5/20/2003
Need to remove old details and use current details. Also remove details showing corner ramps
as all ramps within the row will be directional ramps. If the comer ramps are to be used on -site
label the detail for on -site use.
Number: 91 Created: 5/20/2003
Make changes to the typical x-section. It needs to be labeled as a connector local, and it needs
to have vertical curb and gutter (which is what the plans and profile sheets said it was). The x-
section is to be two 10 foot travel lanes and two 11 foot bike and parking lanes with a solid
white channelizing line 8 inches wide between the travel lanes and the bike, parking lanes.
Need to note that this is to be provided. The parkway is to be 6 feet wide and is not a landscape
and utility easement as it is within the row. Identify that the x-slope on the street is 2.0% to
3.0%. Need to identify the range since a constant 2% x-slope is not being provided on the
street.
Number: 92 Created: 5/20/2003
Need to provide the following details in addition to the ones that need to be updated as indicated
on the plans:
Sleeve locations #1202
Sidewalk detail # 1602
Standard sidewalk # 1601
Pedestrian ramp # 1606
Access ramp scoring # 1607 q
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
x Plat L Site Drainage Report Other
Utility _X Redline Utility_ Landscape
Page 1
Number: 93 Created: 5/20/2003
If underwalk drains can not be avoided and are allowed detail 9709 will also be needed.
Topic: General
Number: 34 Created: 5/13/2003
Naming — This should follow the same naming convention that the other did. It should be called
Rigden Farm 9t' Filing — Parkside Commons and should be changed on all documents.
Number: 45 Created: 5/20/2003
The driveways can not be high volume driveways, they need to be standard curb cuts,
per the traffic study they do not meet high volume requirements.
Number: 46 Created: 5/20/2003
Need to identify how and where the curb and gutter on the on site driveways end, as the
driveway cuts within the row do not have a curb. Concentrated flow is not allowed out of the
driveways, thus from the highpoint in the driveway there is to be no curb and gutter, just a
concrete or asphalt edge so sheet flow occurs. (See next comment regarding the amount of flow
allowed out a driveway)
Number: 47 Created: 5/20/2003
A very limited amount of drainage is allowed to go out the driveway. The eastern driveway has
more drainage going out it than allowed. Revise the grading and get the drainage to the interior
inlet or to the street by a different method.
Number: 48 Created: 5/20/2003
The drainage swales/ pans that border the site need to be removed. The drainage
needs to be handled in another way. Non concentrated flows can go over the
landscaping and across the sidewalk out to the street. Concentrated flows should be
directed to and picked up by area inlets or into the internal drainage system. Sidewalk
chases and curb cuts shall be limited. Please work with stormwater.
Number: 49 Created: 5/20/2003
Need to coordinate a bunch of work with the Drake/ Ziegler plans. Any work within
Drake Road or that affects the curb, gutter or pavement must be shown as a part of the
Drake Road plans and constructed with that construction. Need to work with JR eng to
get the items incorporated into the plans and work with Matt Baker to pay for the cost of
the installation of those items.
Number: 50 Created: 5/20/2003
This project will have extensive street cut fees and repairs. Once all the utilities, curb cuts and
repairs are shown correctly (per the utility coordination meeting there will be some different
connections than are shown now) I can have the plans reviewed and can identify the types and
limits of patching to be done. Some areas will be required to be milled and overlayed as a part
of the patching. The street cut fees are tripled for cutting into a street that is less than 5 years
old. Which will apply to all the existing streets around this site.
Page 2
Number: 51 Created: 5/20/2003
This site is dependent on Drake Road improvements occurring before work can occur on this
site. If for some reason the Drake Road work is not proceeding and this project is ready to build
then it will need to incorporate the needed improvements (storm sewer ad water line) into this
plan set and build them.
Number: 52 Created: 5/20/2003
May not meet the minimum cover requirements over the stormsewer line. You meet it now, but
have not shown the concrete encasement — with that it may not meet it. How thick is the
concrete encasement?
Number: 53 Created: 5/20/2003
Only install the sidewalk on your block. Label the sidewalk on the west side of Kansas as
future. It needs to be shown so that the curb depressions for the ramps get put in the proper
place when it is built.
Number: 54 Created: 5/20/2003
High groundwater was not encountered, subdrains are not required. Remove subdrain detail or
provide a subdrain report and design. The outlet will need to be above the 100 yr water
elevation.
Number: 55 Created: 5/20/2003
We do not want the trash enclosures within the easement areas or over utilities. They are
structures.
Number: 56 Created: 5/20/2003
Change the midblock crossings on Rockford and Kansas as indicated by Tom Rieff.
Number: 57 Created: 5/20/2003
Show the installation of the midblock ramps on Limon to match the ramp locations across the
street and the dips in the curb and gutter that should have been done when the curb and gutter
was built.
Number: 58 Created: 5/20/2003
Show ramps at the intersections going across Drake.
Number: 59 Created: 5/20/2003
Add patching note to the plans where street cuts are shown. Limits of street cut are
approximate. Final limits are to be determined in the field by the City
Engineering Inspector. All repairs to be in accordance with City street repair
standards.
Number: 77 Created: 5/20/2003
Make changes to the general notes as shown. Add the missing general note, and missing
construction note. Indicate that the variance to drawing 19-03 is approved.
Number: 94 Created: 5/20/2003
See additional comments on the plans.
Page 3
Number: 95 Created: 5/20/2003
See returned check list.
Topic: Kansas Design Created: 5/20/2003
Number: 78
In accordance with LCUASS centerline station is required. Until a meeting with the various
Engineering firms interested in this issue is held to determine what the final requirements for
submittal will be the following is what is being required. For Arterials and Collectors — the
existing criteria remains in place. Centerline stationing is to be provided along with the required
x-sections every 50 feet. For Residential and Local Streets — in lieu of providing centerline
stationing flowline stationing can be used if actual x-sections of the roadway at the beginning of
a horizontal curve, end of a horizontal curve, and additional x-sections be provided if there are
other elevation changes, grade changes and street width changes that occur within the horizontal
curve. Also need to identify the location of beginnings and endings of horizontal curves with
elevations noted on the profile and plan view. Since this roadway is a local roadway flowline
station can be used if the above information is provided.
Number: 79 Created: 5/20/2003
Need to show the removal limits for the existing intersection.
Number: 80 Created: 5/20/2003
Need to coordinate the design of Kansas with the Drake/Ziegler plans. This set shows different
elevations at the PCR on Kansas than the other plans do. Also the plans differ in where the
improvements will tie together.
Number: 81 Created: 5/20/2003
The cross pan at Drake and Kansas will only be a 6 foot crosspan as that is the requirements of
which the Drake Road plans were designed under. You are correct that the current standard
would be a 10 foot pan.
Number: 82 Created: 5/20/2003
Need to show that the minimum slope going into the inlet is .50%. Per Section 7.4.13.4 even
within a sag vertical curve located at the flowline the minimum slope needs to be maintained.
Number: 83 Created: 5/20/2003
The vertical curves need to meet minimum length requirements. See figures 7-17 and 7-18 for
minimum design requirements. Design speed for this roadway since it is a connector local is 30
mph, which means that for the algebraic grade differences shown the minimum length of crest
and sag curves is 90 feet.
Number: 84 Created: 5/20/2003
If curb chases are used need to show the location and size of them on the plan and profile.
Number: 85 Created: 5/20/2003
Provide intersection elevations in accordance with detail 7-27. Missing elevations and need to
provide the transition elevation and identify its location.