Loading...
HomeMy WebLinkAboutHARMONY SCHOOL SHOPS THIRD - Filed GC-GENERAL CORRESPONDENCE - 2004-09-07SEP 06 '01 13:2e FR AER 3035263394 TO 9-19702216378 P.03i06 Page 2 Sheri. Wamhoff September 6, 2001 Ik development is :more conceptual at the moment. In that case, perhaps it is more^ appropriate to rcfcr to AER as the Owner of Lot I and the Phase I or Lot 1 Developer and L Western VII as the Owner of Lot 2 and the Phase II or Lot 2 Developer. Recitals: In general the Recitals should be revised to reflect that AER will develop Phase I or Lot 1, and Western VII will develop Phase II or Lot 2, and that the provisions that follow apply to each of them as to their respective developments. With respect to Phase I (Lot l), I would appreciate it if a Recital could be added J (-rr 1' which refers specifically to the approved final development plan, since the DA often refers to plans in general, but there is no specific reference to the plans for this project. J This will assist us in working with our bank to obtain Letters of Credit to secure w� performance of the work included in Phase I of the approved plans. Perhans a rnfaranra to the specific approved plans could appear in the second W1MREA0' I)a.cg. 1, and/or the fourth WHEREAS paragraph. General Conditions: Starting on the bottom of Page 1 and continuing through Page 4, you have outlined general provisions telating to the development of the "Property." Sin" the "Property" description encompasses the entire development and does not take into account the fact that AER will only develop Lot 1, and Western VII will only develop Lot 2, perhaps a sentence could be added following the words "General Conditions" in N Paragraph I at the bottom of Page 2, which states something like: "These General Conditions shall apply separately to the development activities of each Developer k� improving Lot 1 and Lot 2, respectively, as each such Lot is developed_" Then, where there is any reference in Sections A through K to the "Property," Ali perhaps amending the word to refer to " ... the Lot being developed. " or some similar words would clarify the phasing of the two projects. Section D on Page 2 refers to the sequencing of work, but you have indicated in ' ?0l Exhibit A that this does not apply. It is my understanding that the final developiucnt �.' plans show separate utility connections for the most part for the buildings on each Lot. , __ Consequently, I believe it may be clearer if this paragraph and/or the Exhibit were } w revised to state that each Lot Developer will complete those utilities and/or streets 1. identified in Section D which are intended to serve only the Lot being developed. 1}J ,ate Section E should also state that each Lot Developer will pay for facilities required for their respective Lots. - a"> r1 At the end of Section F, at the top of page 3, adding the words " ... of the applicable Lot." should clarify this section. cLi lv�.�c-c' PROJECT i 11KNAA COMMENT SHEET , City of Fort Collins Current Planning DATE: October 25, 2000 TO: PFA PROJECT: 1#42-89H Hannony School Shops, 3rd Filing — PDP - Type 1 (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 22, 2000 Note- Please identify your redlines for future reference ADDRESS NUMERALS: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6 inch numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). 1, WATER SUPPLY: Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. No commercial building can be greater then 300 feet from a Fire hydrant. BUILDING AREA: AREA: e feet and must be fire contained or fire sprinklered. Buildings A and B exceed 5000 squat - 1 %- oc- C Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _Other Utility Redline Utility _Landscape City of Fort Collins PROJECT i.■..� COMMENT SHEET City of Foil Collins Current Planning DATE: October 25, 2000 TO: Stormwater Util PROJECT: #42-89H Harmony School Shops, 3" Filing — PDP - Type 1 (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 22, 2000 Note- Please identify your redlines for future reference It may not be completely clear in the manual, but under the new LUC there are no preliminary submittals. All submittals should be final submittals and completed to that standard. Engineering drawings submitted to the City of Fort Collins Stormwater Division should be completed to the standard listed in the City of Fort Collins Storm Drainage Design Criteria manual. Therefore the comments enclosed will not be comprehenswe and many new comments should be expected upon the return of the subsequent submittal. 2. Approval of this project will be contingent on the completion of the proposed resizing of the detention pond in addition to the completion of the review process to ensure compliance with all city specifications listed in the City of Fort Collins Storm Drainage Design Criteria manual. We have enclosed material to assist in the determination of the flows from your site. The offsite flows from the property to the north must he considered in your calculations as well. The maximum allowable release will be 15.1 cis. Please provide detention so the 15.1cfs release rate will not exceeded. RESPONSE: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS o ��nSulo� _Plat Site /DrainageReport _Other _futility �Redlinc Utility �Landscapc S Please show that the capacity of the inlets on Milestone Dr. will not be exceeded with the addition of flow from basin 6. RESPONSE: 4. Water quality must be addressed on site. Onsite water quality is a requirement that will not be waved. Water quality and onsite detention should be considered in the redesign of the drainage system. Any water detained must be done in a drainage easement. RESOPNSE: 5. Please provide cross sections of the swale and trickle pan and show the 1.33*100-yr WSEL. Please provide spot elevations along the pan to define flow direction. RESPONSE: Please provide calculations for the storm sewer pipe and swale being installed. Show that any new structure can convey I00yr flows. Also note that the storm sewer junction with the box culvert may require a special manhole. We will allow a connection here without a manhole if a detail of the connection is provided. Notice that the box culvert is 1'X 6' and please correct inverts. Please provide a detail of how the box will be closed off at the north end. RESOPNSE: 7. Please provide some means of conveyance for the parking lot flows to the swale and also provide riprap protection of the slope where flows enter the swale. Call out any structures that will be installed and include dimensions for riprap on plans. RESPONSE: S. Please ensure that all basins are delineated on the based on grading. See redlined onsite drainage area plan. RESPONSE: Erosion/Sediment Control Comments: 1. This is a preliminary submittal; erosion control plan will be checked when a complete submittal has been made. February 26, 2001 Ted Shepard Current Planning City of Fort Collins 281 N. College Ave. Fort Collins, CO 80521 Re: Harmony School Shops 3rd Filing Dear Ted, COOM@@ o urban design, inc. 3555 Stanford road, suite 105 fort collins, colorado 80525 (970) 226-4074 fax (970) 226-4196 e@cityscapeud.com Staff comments received in a letter, dated November 29, 2000, have been reviewed, and plan revisions based on those comments have been made to the Project Development Plans and Preliminary Plat. The following are specific responses to the staff review comments made: Engineering conment sheet: Site and LS Plan- 1. The sidewalk between the child care center and the associated parking has been widened to seven feet. 2. The cross pan has been corrected. 3. The driveway has been aligned so that the proposed driveway centerline intersects with the existing driveway centerline at the centerline of Milestone Drive. 4. The buildings do not extend into the easements. Verification of this will be completed with building permit review. Plat- t. The proper signature blocks are provided. 2. A certificate of dedication paragraph is provided. 3. Maintenance and repair guarantee language is included. 4. The proper signature blocks are provided. 5. A notice of other documents paragraph is provided. 6. Vacation of the temporary easements is noted on the revised plat. 7. A cross -access easement has been added in the shared parking and drive area to permit access for both lots. 8. No structures are proposed in the easements. 9. The improvements have been removed from the plat. 10. A drainage easement has been added, as appropriate. 11. Children's World attorneys have indicated that US West will not need to sign the plat since it is not owned in fee. US West has easement rights but should not be required to sign the plat. Therefore, no signature block is provided for them. 12. The red -lines on the plat has been addressed on the revised plat. Utility Plans 1. A title sheet has been added and the title has been changed. 2. General notes have been added. 3. City signature blocks are added. 4. The vacated easements have been removed. 5. The driveway has been aligned so that the proposed driveway centerline intersects with the existing driveway centerline at the centerline of Milestone Drive. 6. The access drive is now shown as concrete to the property line. 7. Dimensions for the drive have been added. 8. The radius entry has been removed and a standard entry added such that a variance will not be required. 9. Curb removal and replacement limits are shown as well as a note that patching must be to City of Fort Collins standards. 10. Curb and gutter details are included. 11. A driveway detail is included. 12. Details of the pedestrian ramps at the drive are included. 13. Parking lot drainage does not exit through the driveway. 14. A plat has been included with the utility set. 2. Stormwater comment sheet: 1. A Final Drainage and Erosion Control Report and Plan is included with this resubmittal. 2. The Final Drainage and Erosion Control Report and Plan address the issue of the detention pond resizing and the consideration of offsite flows to the subject site. Calculations are included in the report to demonstrate that the 15.1 cfs allowable release rate can be met. 3. Water/Wastewater comment sheet: ♦ The landscape design has been coordinated with the civil design to alleviate conflicts. ♦ A 4 foot separation between the building envelopes and the meter pits is maintained. ♦ The meter pits and curb stops are located adjacent to mains, as requested. ♦ All meter pits and curb stops are shown and labeled. The mains and services lines are clearly labeled as well. ♦ Separate water and sewer services are provided for each building. ♦ A minimum of 10 feet has been maintained between all underground utilities. ♦ The fire hydrant(s) is connected to the main with a swivel tee. All utility connections are shown and labeled. ♦ All appropriate details are now shown. ♦ Standard general notes are now included. ♦ No fire lines or irrigation taps are expected to be needed for the development. 4. Light & Power comment sheet: ♦ The existing stub at the site entrance will be extended onto the site to provide electric service. ♦ Electric Line and transformer locations for each building — and associated easements — have been determined through discussion with Light & Power. Keyed Note 11 on the Utility Plans as been removed. 5. Poudre Fire Authority comment sheet: All UBC and UFC requirements will be met. Further detail will be provided with the Final Compliance Plans and with building permits. The requested Hazardous Materials Impact Analysis is included with this resubmittal. This report specifically addressed the questions you raised regarding the appropriateness of the proximity of the child care center to the Diamond Shamrock filing station. 6. Poudre Fire Authority— see responses above. 7. Plat comments — A. The proper signature blocks have been added to the plat. B. The extraneous CAD layers have been removed. C. A cross -access easement has been added in the shared parking and drive area to permit access for both lots. 8. The parking associated with the child care center is not intended to serve as shared parking during "staggered peak periods." Due to the nature of the child care center, it is likely that it will share at least some of the same peak hours as the office buildings — with peak hours ranging from 7:15 am to 8:30 am, and 3:30 pm and 6:00 pm. The child care center would actually prefer additional parking beyond what is shown based on their experiences in other locations, but is restricted by the lot size and city codes. We would request the requested number of spaces be approved. The hours of operation of the child care center are anticipated to be from 7am — 6pm. 9. The parking has been reconfigured to offer a ramp in the area of the front entrance to facilitate safer pedestrian access. 10. A number of circumstances led to a misunderstanding on the parking for Lot 2. Building A is intended to be a 2-story office building with a total of 10,000 square feet of leasable area (the elevations have been modified accordingly), which in conjunction with the square footage for Building B provides a total of 16,000 square feet of office space on Lot 2. The maximum parking allotment for that area, therefore, is 48 spaces. The parking area was revised to provide more screening, to the dumpster area at the end of the entry drive, which leaves Lot 2 with a total of 46 proposed parking spaces. 11. Lighting Plan: A. This sheet has been added to the plan set. B. The detail has been revised to re-emphasize the cutoff distribution of the luminaires, while still indicating the azimuth aiming (or orientation) of the luminaire, which relates the plan view arrow symbol of the fixture with the aiming in the detail, specifying each luminaire's photometric zero azimuth. The IESNA Roadway Luminaire Classification information has been added to the luminaire schedule. C. The illumination on the adjacent lots has been reduced where feasible, with the 13-foot poles located at the project perimeter. D. House side shields are not available for the luminaires used in the project perimeter. E. The luminain: adjacent to the landscaping area to the northeast has been respecified to reduce the illumination as requested. F. The luminain= schedule has been revised to indicate the quantity of each type. G. A statistical summary of the proposed lighting has been added, showing the maximum, minimum and average values for the illuminance values shown on the plan. H. This information is noted. I. Cut sheets are attached to this response letter. 12. Landscape Plan: A. The street tree selected for Milestone Drive has been changes. B. The street trees have been relocated between the curb and walk, where practical. C. An additional parking island has been added to ensure no more than 15 spaces occur in a row. D. A tree has been added as requested. E. The spacing of the trees in the central island has been modified as requested. F. Additional landscape materials have been added to buffer Lot 28 from the potential impacts of the play areas. With the existing 6' rear yard fence, the orientations of that home and the single -story Building B, the location of the existing stormwater conveyance system, and the potential uses in Building B, it seems a better use of resources to concentrate landscaping efforts on other areas of the site. We do not feel that there will be any adverse impacts to Lot 34. G. The phasing line has been clarified to coincide with the proposed lot line. 13. Playground fence: A. The height of the fence is indicated as 6 feet. B. The intent is to use a black vinyl -clad chain link fence material that will be densely vegetated, per city code. The fence along the east and north will be vegetated with a creeping vine. C. Solid wood was determined not to be the best material choice for this fence. There is a concern that an unmanageable and potentially hazardous condition could be created along the northern boundary where a 15' landscape buffer has been added. Solid fencing along the parking area would create an unpleasant environment along the walkway to the building. Also, it does not seem to fit with the Harmony School character, while the black -clad fence effectively disappears visually behind any landscaping. D. As we decided to continue with the chain -link fence, a fence detail seemed unnecessary. 14. The "tulip tile" lis illustrated on the columns of the child care center building. There are four tiles on the south elevation, and two each on the north, east, and west elevations. We have reviewed the pattern of tiles on the Harmony School and find that it appears that the proposed tiles do provide the needed connection to this detail on the historic school — especially given the decreased scale of these proposed buildings. The staff -recommended band of tiles above the doorways of the buildings is not a feature on any other buildings on the Harmony School Shops site — including the school itself — and with the tiles measuring 12" x 36" each, it is difficult to integrate more of them into the smaller scale buildings without them becoming overwhelming. We would like to note, however, that the brick soldier course along the top of the exterior walls of the child care center is planned to be the lighter, cream color brick, such as is used on the Diamond Shamrock buildings, and may serve to highlight these "tulip tiles." 15. Signage locations on Buildings A & B have been added to the elevations. 16. The sign language has been removed from the elevations, and the elevations have been more clearly labeled. 17. Site Plan: A. The extraneous CAD layers have been removed from the Landscape Plan. B. A building envelope is shown, with dimensions and distances noted. C. The width of the walks next to the child care centers have been expanded one foot for increase safety. The remainder of the walks on site are all a minimum of six feet wide. D. One of the HC spaces is dimensioned. E. The legend) has been moved, as requested. F. A "Total" column has been added to the Land Use Breakdown. G. The signature blocks have been revised, as requested. H. The signature blocks have been revised, as requested. I. The signature blocks have been revised, as requested. J. The scale of the site plan has been changed, as requested. K. The index has been revised. L. An additional title in the lower left and right of all sheets has been added. 18. We have reviewed the layers that are shown on the Landscape Plan, and believe that the utility and proposed grading should remain as they are important in the review of the landscape plan. In a previous phone conversation, you mentioned the desire to notify the immediately -adjacent neighbors about this project proposal. I have obtained copies of the Larimer County property records with the owners of each of those adjacent lots and am prepared to contact them. I would, however, like to further discuss what type of contact may be necessary. As there is no L.U.C. required neighborhood meeting for PDP's, I would like to avoid the preparation and time involved in a full-blown neighborhood meeting presentation if possible. I propose, alternatively, that we send each owner a letter describing the proposed project, with a colored site/Is plan and architectural elevations, with contact information if they would like to further discuss any specific concerns. I think that should suffice for alerting the neighbors that something is proposed at this time, and providing them the opportunity and means to raise any questions or concerns they might have regarding the project:. Let's discuss this issue further in the next week and decide how to proceed. We look forward to a timely and favorable review of the revised plans submitted with this letter. Please ensure that all reviewers are provided a copy of this letter so they may review the written responses to their comments. Please contact me with any further questions. Sincerely, Kimberly Straw, AUc.IP Project Manager Copy to: Michael Morlock, Aramark Educational Resources Stan Whitaker, Western Property Advisors Eric Morff, Farnsworth & Polk David Keith, Marshall Design REVISION COMMENT SHEET DATE: February 27, 2001 TO: Engineering PROJECT: #42-89H HARMONY SCHOOL SHOPS, 3RD FILING — PROJECT DEVELOPMENT PLAN — TYPE II - (LUC) All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: March 21, 2001 1-1 No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** Harmony School shops 3"' filing Sheet 1 of March 30, 2001 Site and landscape plan I . See utility plan for sight distance easement that is needed. 2. The phase line can not be the property line. The phase line needs to be on the east side of the drive isle as this is the minimum amount ofdrive that is needed to access the Child Care Facilitv. 3. The parking stalls on the north side of the parking lot are to short with the curb stops as shown. The curb stop need to be placed behind the edge of pavement for the 17 foot stall shown if you are not putting a curb there. The stalls across from this adjacent to buildings A and B appear to short. What is the actual dimension of these stalls? Plat I . Change the font on the plat as indicated, as it is not readable. 2. Show the sight distance easement that is needed from the access drive. 3. Number the plat sheets with the sheet containing the signatures being sheet I of 2. Utility plans I . I did not notice with the last review that a sight distance easement is needed for the access drive. The easement as shown on the plans affects Building A. The building can not encroach into the casement. This is a public safety issue and the easement is needed. Comer sight distance is measured from a point on the access drive at 10 feet back from the Ilowline to a point 310 feet along the centerline of the roadway. (sec attached figure) (continued on next page) CHECK HERD IF YOU WISH TO RECENE COPIES OF REVISIONS Plat Site Drainage Report _ Other utility Redline Utility Landscape Datc: Signature: SEP 06 '01 13:20 FR AER 3035263394 TO 9-19702216378 P.04i06 Page 3 Sheri Wamhoff September 6, 2001 In Section 1, at the bottom of Page 3, it should be clarified that a Developer of a .^ specific Lot will only be required to pay fees relating to its specific Lot. Special Conditions: References throughout the Special Conditions (Sections A through J, pages 4 through 11) to "this Development" should be changed to refer to the "Lot being developed" and a general statement to the effect that the Special Conditions will be applicable to each Lot separately should be added following the beading to Section 11— Special Conditions to clarify that each Lot Developer will be responsible for satisfying conditions as to its own Lot. Based on my discussion with Stan Whitaker and your indication that you had also discussed it with Roberta at Western VII, I assume that you are checking into whether or not the stun specified in Section B for the installation of the Warren Lake Trunk Sewer had already been paid_ If it has, perhaps Section B(1) should be revised to say "Not Applicable" or it should state that this fee has been paid as it maybe applicable to both Lots. Section C(1) might be clarified by stating that the first Developer wt11 be — �c �4 + C responsible for installation of off -site storm drainage improvements which may be required in connection with the Development. As I understand it AER will install the on - site drainage improvements necessary to convey storm water from the child care site around the back of Lot 1 to the culvert under Milestone Drive in connection with its development. In addition, as the first to develop, AER may perform minor grading on Lot 2 which will ensure that any storm water draining from Lot 2 continues to reach the culvert until future development of Lot 2. It is likely that AER will be the first to develop, so it is my understanding that the off -site improvements to the retention basin are probably going to be AER's initial responsibility. vy; Section C(2) should reflect that each Lot Owner shall be responsible for these cJ matters as they relate to their separate Lots. ` V:, t r r� I believe that when we spoke you indicated that you would double-check to see if A', 1 Al c the amount of the security deposit required in this Section was for both Lots or just the Phase I development. Please revise if this guarantee is to be reduced �'' x <✓-� J" C As I stated on the phone, AER will not be grading Lot 2 to its final proposed grades. Section 4 should be clarified to state that each Developer will be responsible only for the final grade and certifications relating to its individual Lot. `' Section 5 on Page 6 refers to residential lots. Should this section be re -worded to — be applicable to this cormnercial development. Harmony School shops 3rd filing Sheet 2 of 2 March 30, 2001 2. I f possible please move the signature blocks to the bottom right comer, as this is the standard location. 3. Provide a index of sheets on the cover page. 4. Need to indicate the phasing to be done on the utility plans. The site and landscape plans indicate that the project will be phased. The phasing of the project may require some temporary drainage facilities. If so these needed to be shown and indicated on the plans. Indicate what utilities are to be installed with each phase. �. Provide project benchmark information. I have attached copy of points near the site for your use and information. 0. Would prefer that the general notes are placed on the cover sheet rather than the utility sheet. 7. The details provided need to be readable. Please increase size so that the text is readable. REVISION .. COMMENT SHEET 116 DATE: February 27, 2001 DEPT: Water/Wastewater PROJECT: #42-89H Harmony School Shops, 3rd Filing — Project Development Plan - Type II (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: March 21, 2001 ➢ Are 1 ''/2" water services truly needed for each of these buildings? Provide assumed water use demands for our review. Provide utility easements for a curb stops and fire hydrants. ➢ Provide required landscape/utility separation distances on the landscape plans. Maintain 4 feet minimum depths of bury over all sanitary sewer mains and services. ➢ Both the water and sewer mains were stubbed into this site. Clearly reflect this on the overall utility plans and define all connections to the existing water and sewer main stubs. ➢ Maintain 5 feet separation between water/sewer mains and flow lines of the curb and gutter. ➢ No water services are permitted beyond the last fire hydrant. 5 Provide the meter pit detail with the next submittal. See site, landscape and utility plans for additional comments. Date: 3 - Zv - o Signature: ( IIF.('K HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS x Plat X Site Drainage Report _Other x Utility X Redline Utility x Landscape REVISION COMMENT SHEET DATE: February 27, 2001 TO: Technical Svs PROJECT: #42-89H HARMONY SCHOOL SHOPS, 3RD FILING — PROJECT DEVELOPMENT PLAN — TYPE II - (LUC) All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: March 21, 2001 ❑ No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** Ui1I14P Ct�4blE 61C'� IINt'��sr�, CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS N Plat Site Dreinage Report Other utility Redline Utility Landscape Date: Signature: REVISION COMMENT SHEET DATE: February 27, 2001 TO: Stormwater PROJECT: #42-89H HARMONY SCHOOL SHOPS, 3RD FILING — PROJECT DEVELOPMENT PLAN — TYPE II - (LUC) All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: March 21, 2001 ElNo Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** 1. Please note that in addition to the temporary construction BMP's for erosion control, a permanent USDCM 40-hour extended detention basin is required. Please provide a water quality extended detention basin with calculations for percent impervious, volume, and outlet in the report. RESPONSE: (over) CC . Ted S ForMs� CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS N Plat -Site _c Drainage Report k Other a"ime-is k Utility bRainc Utility '>-Landseape Date: __30/o r __ _ Signature: 4.(fF Please limit the outflow of the site to 15.1 cfs, per the Timberline Farm Master Plan and a telephone conversation with Glen Schleuter on 3/20/01. This may require onsite detention, which would best be integrated with the water quality pond. Please include calculations for this. Also, please size an emergency spillway to carry the entire 100-year flow from the site with 1 foot of freeboard in the event of a clogged inlet, and show the location and a cross section on the plans. RESPONSE: 3. Please analyze the storm sewer for the limiting flow of 15.1 cfs. Please note that per a City field visit, the box culvert opening is not 1.4 feet (the total height maybe). Please calculate capacity of this culvert using the size of the actual opening of the box culvert. The storm sewer will be reviewed in more detail when these calculations are received. 'RESPONSE: 4. '.Please provide a detail of the junction of the 14"x23" elliptical RCP with the box culvert. A special manhole may also be required. Because. of the low opening of the box culvert relative to the incoming pipe, explicit plans will -be needed when this feature is constructed in the field. This is a repeat comment. RESPONSE: 5. -Please provide a note on the profile drawings stating that all storm sewers shall be inspected by the City of Fort Collins. Also, please use the allowable site release rate rather than the capacity, and show all rim elevations. RESPONSE: 6. 'Please clarify the C-coefficient used in the hydrology for the offsite areas draining to Pond 1. , Please show impervious areas in the Sunstone subdivision to help verify the coefficients used. RESPONSE: 7. Please show cross sections of all swales on the plans, not just the trickle pans. Please provide calculations and drawings showing that swales have capacity for freeboard of 1.33*Q100, while fitting into the easements provided. MIT9826" HannonySchShps2.doc Paget of 8. Please note that one foot of freeboard is not currently provided between the eastern overflow swale and the adjacent building. This should be addressed in the next submittal, probably with the creation of the onsite pond and spillway. RESPONSE: 9. Please affix the Fort Collins General Notes, benchmark, and vicinity map to the cover sheet per SDDC Section 2.2.1.1. RESPONSE: Erosion/Sedimerit Control Details: Straw bales cannot be installed on concrete or asphalt. It would be effective to utilize a gravel filter sediment trap on the pond outlet until construction is complete and resecding/sodding are established. If there is regrading of the off -site area, a sediment trap should be utilized there, and reseeding/mulching should be noted on that sheet. RESPONSE: The report discusses the use of straw mulch, there needs to be a note to this effect on the plan, and if appropriate, an indication of the area to be mulched. RESPONSE: Please refer to the redlined plans and report for additional comments. HarmonySchShps2.doc Page 3 of 3 REVISION COMMENT DATE: February 27, 2001 TO: PFA SHI PROJECT: ##42-89H HARMONY SCHOOL SHOPS, 3RD FILING — PROJECT DEVELOPMENT PLAN — TYPE II - (LUC) All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: March 21, 2001 No Comment a Problems or Concerns (see below or attached) *"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE ADDRESS NUMERALS: REFERENCE** Address numerals shall be visible from the street fronting the property, and posted with a minimum of 6 inch numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). 9? 1Jf `_'O t -- A WATER SUPPLY: Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gailons ofwater per minute at a residual pressure of 20 psi. No commercial building can be greater then 300 feet from a tire hydrant. CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _ Drainage Report _ Other Utility Redline Utility Landscape Date: — -, - — _— Signature: HAZARDOUS MATERIALS: Requirement meet in previous submittal. BUILDING AREA: Buildings A and B exceed 5000 sq. $. and must be fire contained or fire sprinklered. NOTE: Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. �� "r' �' i;. R; -2i REVISION COMMENT SHEET DATE: May 23, 2001 TO: Technical Services PROJECT: #42-89H Harmony School Shops, 3rd Filing, PDP -- Type II (LUC) Al comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: June 13, 2001 No Continent ElProblems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** - ,Z CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _ Other Datuilo Redline Utility Landscape _Signature: City of Fort Collins Project Comments Sheet Selected Departments Citv of Tort Collins Current Planning DATE: .June 12, 2001 PROJECT: Harmony School Shops, 3rd Filing - PDP - Type 11 #42-8911 All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: Note - Please identift• pour redlines for future reference Dept: Stornnvater Utility 10 11 Issue Contact: Basil Hamdan Pond release rate: Please note that the pond release rate should be done in accordance with the enclosed Milestone Drive drainage plan. According to the plan the total release rate from the pond can be up to 18.8 cfs, which is the combined release rate from basins G-1 and 8-1. Issue Contact: Basil Hamdan Basin delineation: According to the Milestone Drive plan, the northesasterly part of Winterstone Drive drains into an existing catch basin on Winterstone and not to the inlet on Milestone. Please correct drainage plan basin delineation. 1 of 2 SEP 06 '01 13:21 FR AER 3035263394 TO 9-19702216778 P.05i06 Page 4 Sheri Wamhoff September 6, 2001 Section 8 should stated that both Developers will be responsible for the ��v t ` maintenance of the drainage facilities —APR and Western VII will need to separately address the allocation of costs relating to maintenance of off -site drainage facilities that serve both Lots. JK� up1s.. fit Section D2 provides for the payment of reimbursement fees for the construction of Timberline Road and Milestone Drive. This Section should be clarified to provide that each Lot Owner/Developer shall pay the fee applicable to its Lot in order to cbls_' building permit. In other words, the fee due for the Lot retained by '✓h chm,ld not have to be paid in order for AER to get a permit for development of Lot 1. x `=c - I discussed Section D(3) with you briefly on the phone. AER has taken the P position with Western VII that any reimbursement fees applicable to Lot 1 which may relate to improvements to Harmony Road are to be borne by Western VII, per the terms of our purchase agreement with Western VII. I believe you have had some contact with V7 Roberta at Western VII about this provision and that you may consider confining the responsibility for these costs to the remaining property owned by Western VII in Filing 2. c C Either way, it is AER's position that this reimbursement is not AER's responsibility. If it is determined that this charge must be collected as to all or any part of Filing 3 before a building permit issues for Lot 1, the fee(s) must be paid by Western VII at the time of AER's closing on Lot 1, Miscellaneous: v Again, a general statement indication that these provisions apply to each /— Developer as to each separate Lot and a change in any reference to the "Property" or "this Development" to refer only to the Lot being developed by a Developer s',^, Y necessary. The Information you will need for Section N relating to Notices to the Developer/Owner of Lot 1 will be as follows: Attn: Real Estate Services ARAMARK Educational Resources, Inc. 573 Park Point Drive Golden, CO 80401 Section P on Page 14 can be deleted in light of the fact that both AER and ; ✓ Western VTI need to be parties to the DA as both Developers and Owners. In order for , the obligations of the Developers to survive any transfer, it may be advisable to include language stating that the provisions of the DA shall run with the land and be binding upon successors in interest, though you may already have that covered in Section I on Page 12. 12 Issue Contact: Basil Hamdan Overflow design: Please provide a trash rack on the culvert out of the site. The trash rack should be designed to be self cleaning, with a transverse slope. Please ensure that there is at least one foot of freeboard in the condition where the outlet pipe is plugged between overtopping water surface elevation and the minimum opening elevation of the buildings adjacent to that outlet pipe. As currently designed there is only a foot of freeboard between the building Finished Floor elevation and the overflow crest elevation. 13 Issue Contact: Basil Hamdan Water quality: Please clearly out off -site water quality outlet revision on the plans. Please clearly state in the report that the water quality mitigation will be done in the off -site pond. Please clarify who maintains this water quality outlet, add a note on the plans 14 Issue Contact: Basil Hamdan Erosion Control: Please identify the areas to be seeded and mulched on the erosion control plan. 15 Issue Contact: Basil Hamdan Culvert capacity: Please note that 1.4 feet is the outside dimension of the culvert and due to wall thickness the inside dimension should be used for pipe capacity calculations. �r1Z1°1 signalu •e Date CIIECK IIFRE IF YOU LAVISH TO RECEIVE COPIES OF REVISIONS Plat Side _ Drainage Report Other Utility __ Redline Utility Landscape 2 of Project Comments Sheet „ Selected Departments Citv of Fort Collins Current Planning DATE: June 13, 2001 PROJECT: Harmony School Shops, 3rd Filing - PDP - Type H #42-89H All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: Note - Please identify rota• redlines for figure reference Dept: Water Wastewater 16 Issue Contact: Jeff Hill REPEAT REPEAT Show all water/sewer lines on landscape plans and provide required landscape/utility separation distances. 17 Issue Contact: Jeff Hill Water services must remain the same size from the main to a point 5 feet downstream of the meter pit. 18 Issue Contact: Jeff Hill Draw meter pits to scale and maintain 4 feet of separation between the outside wall of meter pits and all permanent structures. 19 Issue Contact: Jeff Hill Connection to the existing water main must be made using a tapping saddle. 20 Issue Contact: Jeff Hill See site, landscape and utility plans for other comments. 1 of 2 Signature ell CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS /Plat XSite X Utility Redline Utility Drainage Report Other XLandscape 2 of2 Transportation Services Engineering Department City of Fort Collins September 11, 2001 Ms. Leslie A. Armstrong National Director of Real Estate Aramark Educational Resources 573 Park Point Drive Golden, Co 80401 RE: Harmony School Shops P Development Agreement Dear Leslie, This letter is in response to your letter of September 6, 2001 commenting on the draft development agreement (DA) for Harmony School Shops 3`d Piling that was sent to you. Your comments were reviewed by the City Attorneys' office and myself from the Engineering Department and we offer you the following response to your comments. The sections are laid out as they were in your letter with the addition of identifying each paragraph by a letter under each section. I. Parties: a) As per our telephone conversation, a conversation with Roberta Martin of Western VII Investments I have added them as a Developer within the first paragraph of the DA. Western VII Investments is now a signatory as the "Developer" and as the "Owner" and Aramark Educational Resources, Inc (AER) is a signatory as the "Developer" (see attached copy of the draft DA). We do not feel that it is necessary to identity what each party is to develop, the agreement is to state what is to be done. Which party to do it does not matter to the City, if the work required is not completed building permit(s) and/or certificate(s) of occupancy can be held. In your letter it states that the purchase of the property by AER will occur after a draft DA is agreed upon. If this transaction is to occur before the DA is signed the identification ol'parties and ownership on the DA will need to be modified to reflect what the parties are at the time of signing. The plat will also need to reflect the current ownership at the time of filing. The plat can not be filed until the utility plans and DA for the project are signed and what ever other documents that the Current Planning Department may require in order to file the plat 2. Recitals: a) The DA identifies that there are two developers as indicated above the City does not feel that it is necessary to identify what each party is to develop. The split in who is responsible for what should be a separate private agreement that the City is not a part of. It does not matter to the City which party does what as long as the items that are required to be completed are completed. b) It was asked that a reference be made to the approved final development plans. The second whereas statement of the DA does specifically reference the utility plans and includes those documents in the defined teen "final development plan documents". "WHEREAS, the Developer desires to develop the I'lorth� .vII Ayv��u ?O.: rov -80 - Fo t(-Alms,:_ 0�2^_-�8811 • �u7(1) 1 +60� • i\i'170)"1 57' yl . %I %t A' :goA.com Property and has submitted to the City all plats, plans (including utility plans), reports and other documents required for the approval of a final plan according to the City's development application submittal requirements master list (the final development plan documents) copies of which are on file in the office of the City Engineer and made a part hereof by reference; and" 3. General Conditions: a) The addition of a paragraph indicating that these paragraphs apply to both developers is not needed. b) Request to delete the word "Property" within Section I. paragraphs A through K and replace it with `the lot being developed', Property is a defined term, it is defined in the first whereas statement in the DA and is related to the legal description of the property. `The lot being developed' is not a defined term and could not be universally substituted for and provide the same meaning as Property does within the DA. c) Information can be added into Exhibit A regarding the sequencing of work. In order to do this I will need to receive a copy of the utility plans as the last copy I received was returned with comments and I do not have a set of plans that shows the phasing. Please provide a set of plans and information can be added to Exhibit A although it should be noted that doing the work as it is defined by the phasing on the utility plans does not constitute work out of sequence. It is work within the sequence defined on the plans. d) You asked that Section LE state that the Developer of each Lot will pay for facilities required for their respective lots. Section LE as it exists states that "... the Developer agrees to pay for all water, sanitary ... and other improvements required by this Development as shown on the Final Development Plan Documents ...". As discussed previously Final Development Plan Documents is a defined term that includes such approved documents as the utility plans and the utility plans show the phasing of this property and how the utilities are to be installed for each phase. Therefore the utility installations that the Developer will be required to install are those shown for the phase in which they are constructing. It should be noted that if phase 2 were to proceed prior to or not concurrently with Phase 1, Phase 2 would be required to install the utilities shown with Phase 1. e) It was requested that "of the applicable Lot" be added to the end of Section I.F. It doesn't make sense to do this, the phasing plan approved as part of the utility plan set defines this. Beside the only street improvements associated with this project are the driveway connection and the utility connections which are located below the driveway connection, and all of this work needs to be installed with Phase t) This is not needed, since this fee is paid at the time of building permit request the fee paid is for that lot. 4. Special Conditions: a) Request to change "this Development" to "Lot being developed". Development is a defined term in the first whereas statement of the DA and is the appropriate word for reference in these paragraphs. "The following changes can and will be made: Section II.C.3 regarding the erosion control amount. This amount can be split up by the phasing. In order to do this the Engineering consultant will need to update the erosion control calculations that were done in the drainage report to reflect the phasing and this information will need to be approved by the stonnwater department. Once this information is approved the paragraph can reflect the deposit required for each phase. Section II.C.4 — in the first sentence the following can be added "and/ or lots" after buildings so that it reads "...the following additional requirements shall be followed for all buildings and/or lots in this development." b) It is my understanding that the paragraph under Section II.B. I is under review by the City. If it is determined that this paragraph is no longer applicable it will be deleted. c) It is not necessary to identify that the first developer is responsible for construction the off -site drainage improvements. As per Section II.C.1 these improvements have to be completed prior to the issuance of any certificate of occupancy, they maybe built by either Developer, but neither Developer will receive a certificate of occupancy until these improvements are built and certified. d) It was requested chat Section II.C.2 regarding maintenance of storm drainage facilities be split indicating that each lot owner is responsible for these matters as they relate to their separate Lots. This is not possible since the drainage facilities for the two lots in this development are combined. As per the DA if the drainage facilities no longer comply with the approved plans the City shall give the Developer (both developers) notice. It is up to the two developers to determine their responsibility in this event and how the work to bring the facilities back to standards is to be done. e) As indicated in paragraph 4.a) above the erosion control amount as specified in Section II.C.3 can be split by phases. f) As per Section II.C.1 and ILCA certification of all on -site and off -site drainage improvements associated with this development as well as certification that the lot and building finish floor elevation(s) have been graded correctly and built according to plans is required prior to issuance of certificate of occupancy for a building. Per this either developer is responsible for the final grades and building elevations for the lot and building they are requesting a certificate of occupancy for, as well as the drainage improvements for the Development whether they are on that lot or the other lot. Therefore a statement that each developer is only responsible for the final grade and certifications relating to its lot can not be made. g) In Section II.C.5 the word `houses' will be changed to `buildings'. h) Since Developer as defined in the first paragraph of the DA represents both parties Section ILC.8 does not need to be modified to represent that both developers are responsible. i) The last sentence of Section ILD.2 states "Payment shall be made to the City for each lot prior to the issuance of any building permit on such lot." This clearly indicates that the payment for the lot on which the building permit is being requested is what is required. No further clarification is needed. j) A meeting with Western VII regarding Section ILD.3 is currently being scheduled to discuss this paragraph. If this paragraph is to remain payment will be due at the time of building permit for each lot. It doesn't matter who pays this, but each lots portion will need to be paid prior to issuance of a building permit for that lot. 5. Miscellaneous: a) As indicated previously Property is a defined term and will not be replaced by reference to the Lot being developed. b) Information regarding notices to the Developer for AER will be added to the DA. The information will not be identified as the contact information for Lot I though, if any information needs to be sent to .,the Developer it will be sent to all parties represented as the Developer as the City will not try determine which partv(ies) listed should be notified, but notify all parties listed as contacts for Developer. c) Section IILP can not be deleted as long as Western VII is also listed as the owner of the Property. If both parties are owners and developers than this paragraph can be deleted as separate reference to developer and owner is not needed. d) 1 had previously received the shown changes for the Western VII signature block and those changes have been made. If you have any questions, please contact Sheri Wamhoff at 221-6750. Sincerely, Sheri Wamhoff, PE cc: W. Paul Eckman — City of Fort Collins Ted Shepard, Planner - City of Fort Collins Stanley E. Whitaker — Western Property Advisors Mike Maxwell — Hassler, Fonfara and Maxwell LLP file ENGINEERS ARCHITEC,S Farnsworth_ SURVEYORS p GIAOUP SCIENIISTS January 2, 2002 City of Fort Collins Engineering Department 281 North College Avenue Fort Collins, Colorado 80522-0580 Attn: Ms. Sheri Wamhoff Dear Sheri: Re: Harmony School Shops Third Filing Milestone @ Timberline Fort Collins, CO FG Project #200284.1 We are in receipt of the latest review comments regarding the PDP mylars for the above -referenced project. We offer the following responses. Water/Wastewater Comments 16. All water/sewer lines are shown on the landscape plans and the required separation distances are provided. Refer to the enclosed landscape plan. 20. All references to the construction of the water -main taps have been removed as requested. Refer to sheet PDP-3. 21. A copy of the latest site and landscape plan is enclosed as requested. 22. All red -line comments have been addressed. Refer to sheet PDP-3. Stormwater Utility Comments 23. References to the existing concrete box have been revised as requested. Refer to sheets PDP-3 and PDP-4. The overflow swale has been identified as requested. Refer to sheet DA-1. Three copies of the Final Drainage Study are enclosed as requested. Please contact me with any further comments or questions regarding this project. Thank you for your assistance. Sincerely, FARNSWORTH GROUP, INC. Eric W. Mo Engineer Intern EWM/srm Enclosure AVANTI / BENCHMARK / DORG�N / FARNSWORTH & POLK / FARNSWORTH & WYLIE / MASSMANN / NIETZ-AVANTI / WISCHMEYER 2UAI II N nV, SUIIF 200, SI. LOU IS, IA063119 2304 / 314-962-7900 (FAX) 314-962-1253 / www.f-w.com rdA PROJECT fww&�=901 COMMENT SHEET City of Fort Collins Engineering DATE: May 24, 2004 DEPT: Water & Wastewater PROJECT: Harmony School Shops 3rd Filing Rev. All comments :must be received by Sheri Wamhoff no later than: June 1, 2004 ➢ Maintain 10 feet minimum separation between proposed fire hydrant and electric vault. ➢ The City of Fort Collins Utilities does not install infrastructure for development. Please correct note 10 on the revised utility plans to read Contractor shall install fire hydrant. ➢ Include dimensions between water line taps (3 foot minimum separation between taps). ➢ Maintain 10 feet of separation between gas service and water/sewer services. ➢ See utility plan for other comments. Date: - Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS PLAT SITE _DRAINAGE REPORT OTDERJ'E X ur LI"rY _REDLINE UTILITY _LANDSCAPE: City of Fort Collins REVISION DATE: JUNE 3, 2004 DEPT: ENGINEERING PROJECT: Harmony School Shops, 3`d Filing ENGINEER: Sheri Wamhoff Comments: I . The revised sheet needs to be 24x36; we will not file larger or smaller sizes. 2. All of the notes for the Phasing need to be bubbled, most of this notes are changing. 3. Need to add the following note back onto the plans. V. New concrete entrance per City of Fort Collins standards. Refer to detail on sheet PDP-5. 4. Number 22 needs to be a part of Phase 1. All of the sidewalk along Milestone Drive needs to be built with Phase 1. This will provide your pedestrian connectivity that is required. 5. Number 18 needs to be deleted. Stormwater has told me that the entire pond needs to be built and certified with the first Phase that is built. 6. The electric transfbrmer locations. The transformers pads for what is now Phase 1 where never shown on the site and landscape: plans and thus were probably never reviewed by Light and Power. They were shown on the utility plans, but light and power rarely reviews the utility plans and they did not sign off on the utility plans approving the shown locations. Light and Power needs to review the transformer location. They will either do this when the minor amendment to the landscape plan is submitted or when I get revisions back I will route them a copy of the utility plan so that they can comment on the transformer pad location. I don't believe that you want the transformer in the middle of the pond (I believe it is too far away from a paved surface and the placement here would require the pond volume to be reevaluated.) My guess is that you will want to locate the transformer a; close to Milestone as you can to reduce the installation charges. The saw cut and patch for the services for Phase 1 will need to be the full width of the street. 8. Need to expand the bubbles to include any changes that have been made. 9. The fire hydrant adjacent to the driveway can be delayed until Phase 2, but would make more sense to put it in now as you would only need to cut and patch the street and pay the street cut fee in this location once. 10. See additional comments on the plans. H . Please return all redlined plans with resubmittal and provide 4 new/,blluleline copies for review. Date: June 3, 2004 Sign a:5- a-Mtt- PLEASE SEND COPIES OF MARKED REVISIONS 0 Plat ❑ SiteAUtility 0 Landscape 0 Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS SEP 06 '01 13:21 FP AER 3035263394 TO 9-19702216378 P.06i06 Page 5 Sheri Wamhoff September 6, 2001 The signature block for Western VII Investments, LLC is incorrect. Though you may want to consult Roberta to verify this, I believe it should read as follows: WESTERN V11INVESTMENT, LLC, A Delaware limited liability company ` By: Western Property Advisors, Inc., i A Colorado corporation, Its Attorney -in -Fact LE Stanley E. Whitaker, Jr. Vice President I look forward to discussing these changes with you as soon as you've had a chance to review them. If need be, I would be willing to visit with you and a representative of Western VII in your offices to discuss any matters about which you have questions to expedite the preparation of a final draft acceptable to the City and the Developers. Thanks for your assistance with respect to this and the DCP permitting process. 1 have passed all of the information you have sent me concerning the actual DCP permitting process along to John Finnemore in our construction den-rtm-r' f,r lh;c Ime. in applying for permits when he is prepared to do so. Sin ely, esli A. Armstrong National Director of Real Estate (303) 526-3381; FAX: (303) 526-3394 e-mail: armstrong-lcslic@aer.aramark.com cc: John Finnemore; Chris Bardwell Stanley E. Whitaker, Jr. (via facsimile) Mike Maxwell (via facsimile) Original sent via U.S. Mail ** TOTAL PAGE.06 ** PROJECT /-!c9m COMMENT SHEET City of Fort Collins Current Planning DATE: October 25, 2000 TO: Transfort PROJECT: #42-89H Hannony School Shops, 3rd Filing PDP - Type 1 (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 22, 2000 Note- Please identify your redlines for future reference Siq a afitYel CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat ✓.Site _Drainage Report Other Utility Redlille Ctility _Landscape Citv of Fort Collins PROJECT i..�� COMMENT SHEET City of Fort Callins Current Planning DATE: October 25, 2000 TO: Sheri Wamhoff PROJECT: #42-89H Harmony School Shops, 3rd Filing — PDP - Type 1 (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 22, 2000 pqe- Pll?pse identify �our redlines for future reference I ku nom Sc r s wps mg hdet 1 of _ Novembe 28, 2000 Site and landscape plan I . The sidewalk along the west edge of the parking lot - due to the fence and the parking overhang the effective width of this sidewalk is only 3 feet. Suggest that you widen the sidewalk out to 7 feet. 2. Provide concrete to the property line at the entrance drive not the cross -pan shown. 3. It appears that the east side of the driveway needs to move further east to align with the driveway across the street. d. It looks like the YA cerner of building A may extend slightly into the easement. No structure may be within an casement. And need to verify that the overhang extending into the easement does not exceed code requirements. Plat I. Need to include the statement of ownership and subdivision language. �. Providecertificate ofdedicationparagraph. _. Provide maintenance guarantee and repair guarantee language. d. Provide attornev certification paragraph. i. Provide notice of other documents paragraph. 6. Need to indicate that you are vacating the temporary 20' utility, drainage, slope and construction easement along Milestone Drive and the 50' temporary construction easement along Timberline Road with the filing of this plat. And the language in the dedication statement needs to reflect that not all easements are to remain. 7. The objectives for this project said that there would be an access easement across the parking and drive areas. I don't see anything shown. Y. It appears that the corner of Building A crosses into the easement. No structures are allowed within the easements. Should also look at the overhang for this building and make sure that it meets code criteria for allowable extension into an casement. 9. Remove the improvements from the plat. (Continued on next page) Sr,ttatury�C�c,-Z �-� CHECK HERE IF YOU WISH TO REC COPIES OF REVISIONS Plat Sitc _Drainage Report Other Utility linc Utility ;Landscape City of Fort Collins Harmony Scholl shops 3`a filing Sheet oft November 28, 2000 10_ The NE corner where the drainage pan is needs to be a drainage easement. A portion of this already is, but not all of it. I I _ What is the boundary of the US West easement and the other easement along the north property line? Do these overlap? US West will need to sign the plat. 12. See additional comments on the plat. Utility plans I_ Provide title on the first sheet of the utility plans - "Utility Plans for Harmony School Shops 3`a Filing". 2. Provide general notes (see attached) 3. Provide City signature block on each sheet of the utility plans. d. Don't show the vacated easements on the utility plans. �. It looks like the entrance driveways east edge needs to be moved east slightly so that it lines up better with the access drive across the street. 6. Show that the access drive is concrete to the property line. 7. Identify the driveway width and indicate its location based on a dimension from a property line. S. Will need to submit a variance request for the use of a radius drive. Variance request needs to include justification and be submitted and signed by a licensed engineer. Max radius that could be used is I S feet. (note: under proposed smndards this access point would not meet volume requirements for a radius entry) 9. Indicate the limits of curb removal and replacement and show the area to be patched. Also note that patch is to meet City requirements and standards for patching. 10_ Provide curb and gutter details (D-I I) for any curb, gutter or walk replacement that is needed. 1 1. Need drivewav detail. If the variance for the radius drivewav is approved then von will need to combine details for the driveway usin, details D-15 and D-17. 11 Also may need a detail for the pedestrian ramps at the driveway - this depends on the final design of the driveway 13. Can not drain the parking lot area out the driveway across the sidewalk. It doesn't appear that you are doing that, but wasn't sure. 14. The plat needs to be included in the utility plan set. The plat should still be numbered separately, but included in the lublc of contents for the utility plan set and a copy will be a part of the final filed set of utility plans. /001t h_ PROJECT City of Fort Collins COMMENT SHEET Current Planning DATE: October 25, 2000 DEPT: Water & Wastewater PROJECT: #49-82H Harmony School Shops, 3rd Filing PDP — Type I (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, November 22, 2000 Coordinate the landscape design with the civil design and provide the required landscape/utility separation distances. Y Maintain a 4 feet separation distance between the building envelopes and the outside wall of the meter pits. Place proposed meter pits and curb stops adjacent to mains. Show and label all curb stops and meter pits on the overall utility plan. Clearly define the sizes of all water and sewer mains and services. Separate water and sewer services are required for each building. Maintain 10 feet of separation between all thrust blocks and all other underground utilities. Fire hydrants must connect to the mains with a swivel tee. Show and label all fittings, tees, thrust blocks, valves, etc. Include all appropriate standard City of Fort Collins water and sewer details on the detail sheet. Include standard general notes pertaining to water line depth and polywrapping of D.I.P. i Will fire lines or irrigation taps be needed for this development? See site, landscape and utility plans for other c mments. Date: /(-Z%—OU Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES EPOR —ZIOINSHE X PL,A'I X ti ED UR,AIRAGE REPORT _OTHER6& S liIILI'IY Y Rfi I11 .I Ft_l'711.ITy V L,AA'DSCAPF, City of Fort Collins PROJECT (iu .� COMMENT SHEET City of Fort Collins. Current Planning DATE: October 25, 2000 TO: Technical Services PROJECT: #42-89H Harmony School Shops, 3rd Filing — PDP - Type 1 (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: November 22, 2000 Note- Please identify your redlines for future reference Signature CI IECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS VPlat Site Drainage Report Other Utility Redline Utility Landscape City of Fort Collins