Loading...
HomeMy WebLinkAboutWHITHAM PROPERTY NOVEMBER 2003 - Filed CS-COMMENT SHEETS - 2004-09-07/AMM PROJECT i.WA COMMENT SHEET City of Fort Collins Current Planning REC.,D DATE: July 11, 2003 TO: Engineering Pavement PROJECT: #24-02B WHITHAM PROPERTY ODP — TYPE II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: August 13, 2003 Note - PI EASE identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS �_- Plat _Site _Drainage Report _Other �t _Utility _Redline Utility Landscape City of Fort Collins Pro1'ect Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: August 13, 2003 Project: WHITHAM PROPERTY ODP - TYPE II (LUC) 924-02B All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: August 13, 2003 Note - Please identify your redlines for future reference Issue Contact: Dave Stringer Topic: General Number: 4 Created: 8/8/2003 Do not show local street connections in heavy line weight, these will be determined at time of specific project development plans. Please show these with a lighter line weights. Add note that final determination of local street connections will be made at time of Project Plan submital Number: 5 Created: 8/8/2003 Intersection of western most collector and Railroad tracks at Vine Drive needs to be labeled as possible future connection Number: 6 Created: 8/8/2003 Do not show right. -of -way widths of collector and arterial streets, these will be determined with specific project development plans Number: 7 Created: 8/8/2003 Show continuation of access from intersection of 2 lane arterial streets to the east at southern property boundary Number: 8 Created: 8/8/2003 At northeast corner of property show connection to Emutec property Number: 9 Signature Created: 8/8/2003 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page ] Remove buffer distance along railroad tracks, buffer will be determined by railroad at site specific development plan submittal Number: 10 Created: 8/8/2003 Remove reference to right-of-way dedication. Footage needs will be determined at time of specific project development plan Number: 11 Created: 8/8/2003 Okay with Engineering to schedule for hearing when requested changes are made Page 2