HomeMy WebLinkAboutWHITHAM PROPERTY NOVEMBER 2003 - Filed CS-COMMENT SHEETS - 2004-09-07/AMM
PROJECT
i.WA COMMENT SHEET
City of Fort Collins
Current Planning REC.,D
DATE: July 11, 2003 TO: Engineering Pavement
PROJECT: #24-02B WHITHAM PROPERTY ODP —
TYPE II (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
August 13, 2003
Note - PI EASE identify your redlines for future reference
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS �_-
Plat _Site _Drainage Report _Other �t
_Utility _Redline Utility Landscape City of Fort Collins
Pro1'ect Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: August 13, 2003
Project: WHITHAM PROPERTY ODP - TYPE II (LUC) 924-02B
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
August 13, 2003
Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: General
Number: 4 Created: 8/8/2003
Do not show local street connections in heavy line weight, these will be determined at
time of specific project development plans. Please show these with a lighter line
weights. Add note that final determination of local street connections will be made at
time of Project Plan submital
Number: 5 Created: 8/8/2003
Intersection of western most collector and Railroad tracks at Vine Drive needs to be
labeled as possible future connection
Number: 6 Created: 8/8/2003
Do not show right. -of -way widths of collector and arterial streets, these will be
determined with specific project development plans
Number: 7 Created: 8/8/2003
Show continuation of access from intersection of 2 lane arterial streets to the east at
southern property boundary
Number: 8 Created: 8/8/2003
At northeast corner of property show connection to Emutec property
Number: 9
Signature
Created: 8/8/2003
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page ]
Remove buffer distance along railroad tracks, buffer will be determined by railroad at
site specific development plan submittal
Number: 10 Created: 8/8/2003
Remove reference to right-of-way dedication. Footage needs will be determined at
time of specific project development plan
Number: 11 Created: 8/8/2003
Okay with Engineering to schedule for hearing when requested changes are made
Page 2