September 26, 1984
Mark Linder
Mitchell & Company
P.O. Box 1208
Fort Collins, Colorado
Re: Intra West Bank
Dear Mark:
I have received final inspection reports from the Water and Sewer
Department regarding the water and sewer mains at the Intra West
Bank development. The following items need to be corrected prior
to the City accepting these mains for perpetual maintenance.
Manholes Number 3 and 4 need to be lowered.
Two-inch valve box south of Manhole Number 3 is low and
needs to be raised.
Fire hydrant adjacent to JFK Parkway needs to be raised
twelve (12) inches.
Please contact: me prior to beginning this work and thank you in
advance for correcting these problems.
Sincerely,
David Stringer
Chief Construction Inspector
cc: Don Hahn
F A GINFEPIFJI .J HVIC F S :Y70 L Pr rte. A P I Box SUf ) Dorf. t ull ns, Cr,loi a�` i ��,0
SIN7ONs, I,l & ASSOCIATES, INC.
3555 STANFORD ROAD
POST OFFICE BOX 1816
FORT COIL I_INS . COLORADO 80522
February 14, 1983
TELEPHONE (303) 223-4100
CABLE CODE SIMONS[ I
Z
City of Fort Collins
Engineering Services Unit
PO Box 580
Fort Collins, CO 80522
Re: Marriott at Fort Collins (our project CO-RMV-03)
Dear Director of Engineering Services:
Enclosed is the revised Drainage Plan for the Marriott at Fort
Collins. We have incorporated your comments regarding our original
work into this report. Revisions include:
1. The existing 5' curb inlet that was originally designed by James
H. Stewart & Associates to overflow during the 10-year storm will
be left in place.
2. The pipe sizing in the original report was satisfactory. A mis-
labeled figure apparently caused confusion as to the contributing
flows for each pipe. The calculations have been modified and
times of concentration corrected to clarify the calculations.
3. The effect of the 100-year storm is addressed. Please note that
no ponding will occur. The flows will pass over E. Horsetooth
Road and into Warren Lake.
4. Regarding the detention requirements, please note that Mitchell &
Company has purchased detention rights in Warren Lake eliminating
the need for on -site detention.
Additionally, a question was raised regarding construction of the
storm drain under the proposed addition to the building. After dis-
cussing the problem with the structural engineer (Richard Weingart
Consultants, Denver, Colorado), we believe that our design should be
satisfactory since the building will be founded on caissons extending
to the hardpan underlying the site. The surcharge loading that might
affect the drain due to the building would be limited to approximately
150 psf at the underside of the floor slab. If the drain is con-
structed to the appropriate leakage standards, no problem will result.
DENVER OFFICE: 4105 EAST FLORIDA AVENUE SUITE 300_ DENVER. COLORADO 80222 (303) 692-0369
TUCSON OFFICE: 120 W BROADWAY SUITE 260. P.O. BOX 2712. TUCSON. ARIZONA 85702 (602)884-9594
CHEYENNE OFFICE: 1780 WETLAND ROAD CHEYENNE WYOMING 32001 I307) 634-2479
PITTSBURGH OFFICE: 7L I F IF! D Via. IIF ROAD. PITTSOUR(i I PENNSYI. VANIA 15TiH I41 )i 1153-071;
Director of Engineering
Services 2 February 14, 1933
If you have any further questions regarding this work, please feel
free to contact either Wen-Sheng Liang or Bob Mussetter.
Sincerely,
Ruh -Piing Li
Executive Vice President
APPROVED BY:
WEN-SHENG LI
RML/RAWBJG
Enclosure