Loading...
HomeMy WebLinkAboutSTRACHAN THIRD - Filed GC-GENERAL CORRESPONDENCE - 2004-08-26CITY OF FORT COLLINS ENGINEERING SERVICES September 26, 1984 Mark Linder Mitchell & Company P.O. Box 1208 Fort Collins, Colorado Re: Intra West Bank Dear Mark: I have received final inspection reports from the Water and Sewer Department regarding the water and sewer mains at the Intra West Bank development. The following items need to be corrected prior to the City accepting these mains for perpetual maintenance. Manholes Number 3 and 4 need to be lowered. Two-inch valve box south of Manhole Number 3 is low and needs to be raised. Fire hydrant adjacent to JFK Parkway needs to be raised twelve (12) inches. Please contact: me prior to beginning this work and thank you in advance for correcting these problems. Sincerely, David Stringer Chief Construction Inspector cc: Don Hahn F A GINFEPIFJI .J HVIC F S :Y70 L Pr rte. A P I Box SUf ) Dorf. t ull ns, Cr,loi a�` i ��,0 SIN7ONs, I,l & ASSOCIATES, INC. 3555 STANFORD ROAD POST OFFICE BOX 1816 FORT COIL I_INS . COLORADO 80522 February 14, 1983 TELEPHONE (303) 223-4100 CABLE CODE SIMONS[ I Z City of Fort Collins Engineering Services Unit PO Box 580 Fort Collins, CO 80522 Re: Marriott at Fort Collins (our project CO-RMV-03) Dear Director of Engineering Services: Enclosed is the revised Drainage Plan for the Marriott at Fort Collins. We have incorporated your comments regarding our original work into this report. Revisions include: 1. The existing 5' curb inlet that was originally designed by James H. Stewart & Associates to overflow during the 10-year storm will be left in place. 2. The pipe sizing in the original report was satisfactory. A mis- labeled figure apparently caused confusion as to the contributing flows for each pipe. The calculations have been modified and times of concentration corrected to clarify the calculations. 3. The effect of the 100-year storm is addressed. Please note that no ponding will occur. The flows will pass over E. Horsetooth Road and into Warren Lake. 4. Regarding the detention requirements, please note that Mitchell & Company has purchased detention rights in Warren Lake eliminating the need for on -site detention. Additionally, a question was raised regarding construction of the storm drain under the proposed addition to the building. After dis- cussing the problem with the structural engineer (Richard Weingart Consultants, Denver, Colorado), we believe that our design should be satisfactory since the building will be founded on caissons extending to the hardpan underlying the site. The surcharge loading that might affect the drain due to the building would be limited to approximately 150 psf at the underside of the floor slab. If the drain is con- structed to the appropriate leakage standards, no problem will result. DENVER OFFICE: 4105 EAST FLORIDA AVENUE SUITE 300_ DENVER. COLORADO 80222 (303) 692-0369 TUCSON OFFICE: 120 W BROADWAY SUITE 260. P.O. BOX 2712. TUCSON. ARIZONA 85702 (602)884-9594 CHEYENNE OFFICE: 1780 WETLAND ROAD CHEYENNE WYOMING 32001 I307) 634-2479 PITTSBURGH OFFICE: 7L I F IF! D Via. IIF ROAD. PITTSOUR(i I PENNSYI. VANIA 15TiH I41 )i 1153-071; Director of Engineering Services 2 February 14, 1933 If you have any further questions regarding this work, please feel free to contact either Wen-Sheng Liang or Bob Mussetter. Sincerely, Ruh -Piing Li Executive Vice President APPROVED BY: WEN-SHENG LI RML/RAWBJG Enclosure RD36/R331C'L1