October 17, 1967
The City of. Fort Collins
Department of Public Works
Municipal Building
Fort Collins, Colorado
Attention: Mr. Liquin
Dear Sir:
Pursuant to the conversation our attorney, Mr. Williams,
had with you on Monday, October 16, regarding the Emigh Street
approach to the paved portion of Prospect Street, this letter
is to confirm the arrangements discussed as follows:
It is our understanding that because Prospect Street paving
is according to county rather than city specifications, it will
in due time be paved to city specifications. In the meantime,
Highlander Heights is developing along five streets which inter-
sect Prospect Street as follows: Yount, Luke, Patton, Welch
,and Emigh, and suitable asphalt paved approaches to Prospect
Street must be constructed as each of these streets is put into
use, until Prospect Street is improved, as any attempt to pave
to the middle of Prospect Street would be unsatisfactory be-
cause grade and paving would ;iot match up.
We understand you have agreed to permit Highlander Heights,
Inc., to construct asphalt paving approaches to Prospect from
each of the above streets in consideration of which we agree to
pay our share of paving Prospect Street at such time as the en-
tire street can be paved which will be either at the time we
are ready to construct the fifth approach or at any time before
or after such time when the city is ready to pave Prospect Street
with asphalt. We agree to this proposal.
Very truly yours,
Highlander Heights, Inc.
By
Preside t
� /e
Te!eonone 303 48�-'2-9
3971
r .r
on East
y i _
300 West Lo Porte Avenue
Fort Collins, Colorado Telephone 303 484-4220
80521
January 20, 1972
Highlander Heights
C/o VIr. Lloyd Williams
Williams 6 Strahle Attorneys
303 United Bank Building
Fort Collins. Colorado 80521
Dear Mr. Williams:
On August 6, 1971, a letter was sent to you requesting installation of
the 12 inch stater main in Prospect to serve Highlander heights Subdivision.
This line is not yet installed.
Tile City Suidivision Ordinance requires a developer to install water
mains and hydrants prior to obtaining building permits. We must, therefore,
advise you that no futner building permits will be issued for highlander
Heights until this water main is installed.
Sincerely,
Roy A. Bingman
City Engineer
RAB/lms
cc: Gordon Clyde, Building Inspector
Paul Harder
TIME CENTER OF THE WORLD
LLOYD E. WILLIAMS
ATTORNEY AT LAW
UNITED BANK BUILDING
FORT COLLINS, COLORADO 80521
January 25, 1972
Mr. Roy A. Bingman
City Engineer
City of Fort Collins
Post Office Box 580
Fort Collins, Colorado
RE: Highlander Heights
Dear Mr. Bingman:
I have your letter dated January 20, 1972, concerning
the City's position that no building permits will be issued
until the Prospect Street water main is completed.
I refer you to your letter to us of December 8, 1970,
a copy of which is attached. We have been proceeding accord-
ing to this letter in every respect and consider it to be a
commitment by the City relating to the 12th Subdivision.
Miss Honstein has sought to get a contractor on this
water line For some time inasmuch as Highlander Heights
would benefit from it.
My notes on a phone conversation with Mr. Hilgenberg
on December 14, 1970, are "Mr. Hilgenberg assures me houses
will be connected when wanted but we are to complete water
line at or before completion of last house".
I ask from you only the same fair dealing you have always
gotten from us.
Sincerely,
Lloyd E: Williams
Enclosure
cf
Pont Off— So. 580
Fort Collins, Colo.ade, 80521
February 9, 1977
FA [loan
Van Schaack & Coilpany
2120 S. College Avenue
Fort Collins, Colorado 80521
Dear Di:
Telephone 303 484-4220
This letter is submi-tt(,d in response to your i_nriuiry concerning street improve-
ments on Montcon)ary Street between MCltu<rh and Pit kill street.
As I understau d the si-tuation, you have a cl ient olio dosi res to build on lots
at 1209 and 1213 iiontgoniory Street. T Lave r_liscussca the street improvements
with Roy Bin,m ni, Director of vi(e;, in 1 ilk, is in agreement that
it the devclolrr, inl)rnvcs a Vsectinn q! Pbmtqu" ; Arent from McHugh to Pitkin,
11r wi11 havo ❑ + his rTVjgations for ptdol is iniworim if and a certificate of
cAi,incy will he issued on the structures.
I have also talked wii--h t_he City's light and P ay-t tw nnrtnKmL concerning street
lights. They inform me that no street li(ht= arc r1,11litr�1 on this section of
Pknnttrlolrcry Street. However, they rroulr] I An to talk ".:i1-h the builder at an
early stagcn cencorning electrical _ _rvic" to the structures, particularly if
electric heat is to he utilized.
If I can he of further assistance in this matter, plonse contact me.
Sincerely,
L,1 oyd G. Mcl: nughl in
Civil Engineer II
Igm:cs
C
� tali
PAVING COMPANY
r
P. O. BOX 859 . FORT COLLIN S. C0LO RAD0 80521 • PHONE: (303) 484-3257
June 26, 1978
t,r. Roy Bingman
Fort Collins City Engineer
P. 0. Box 580
Fort Collins, Colorado 80522
Re: Paving Yount & Lake Streets
Highlander Heights Subdivision.
Dear lair. Bingman:
Please be advised that we have a contract for the asphalt paving
on the streets in Highlander He?ghts Subdivision. Lde anticipate
completion of the paving by July 7, 1978. t'e hope this information
can be of help to you in issuing a temporary C. 0. If you have
any questions, please don't hesitate to call.
\Flatiron Paving Company
James H. Short
JHS1psw