Loading...
HomeMy WebLinkAboutPARKWOOD FIFTH - Filed GC-GENERAL CORRESPONDENCE - 2004-08-24HARDEN, SCHMIDT, HASS & ZIER, P.C. ATTORNEYS AT LAW NINTH FLOOR, FIRST TOWER BUILDING, P.O. BOX 1606, FORT COLLINS, COLORADO 80522 TEIEPIIONE (303) 482-7777 October 28, 1987' Matt Baker City of Fort Collins Engineering Dept. Municipal Building 300 Laporte Ave. Fort Collins, CO HAND DELIVERED RE: Our Saviour's Lutheran Church Dear Mr. Baker: Ralph B. Harden H. Ted Schmidt, Jr. George H. Hass Richard F. Zler R. William Wowro Jeannine S. Haag Marla R. Helm Richard M. Stillwell 5�" 1 il� Le cti, y A< Thank you for meeting with myself, Bill Brown and Randy Pabst. By this letter, the church agrees to install either a detached five-foot or seven -foot sidewalk along the Lemay frontage, with a handicapped ramp at the Kirkwood intersection. The final decision to width is still being negotiated. This agreement to install the sidewalk is in lieu of all assessments or other fees assessed to the church for the City street oversizing fund. I understand that upon receipt of this letter you will authorize the issuance of a building permit. The issuance of a C.O. for the church addition will be contingent upon completion of the sidewalk. We believe this to be a satisfactory solution to our request to waive or reduce the street oversizing assessment. Thank you for your consideration and attention to our request. sincerel urs, ✓ eorge H. Hass FOR THE FIRM GHH/llh CC: William H. Brown Randy Pabst `,�QCGG7 J 7- 1.°t {- t'Z: //c,, I stes Park Office in Association with Hallberg & Brown. PO Box 3018, 201 1stNationnl Bank Bldg., Estes Park. CO80517 Telephone (303) 586d474 CITY OF FOR TCOLLINS P.O. BOX 580,FOR ICOLLINS, COLORADOB0522 (303)484-4220 DEVELOPMENT CENT ER EXT. 635 July 20, 1983 Mr. Jay Stoner 1918 Lemay Fort Collins, Colorado 80525 Dear Mr. Stoner:: Staff has reviewed the Kirkwood Condominiums PUD, preliminary and final, and has the following comments: 1. The number of parking spaces contained within the garages is to be indicated. Additional parking spaces should be designated, with stalls dimensioned. 2. The existing 3/4" water service is to be abandoned at the main. A revised site plan addressing comment #1, is to be submitted no later than Monday, August 8, 1983. An 8'z' x 11" reduction of the site plan and colored rendering are to be submitted by Monday, August 15, 1983. Sincerely, ,y n Cathy Chianese Senior City Planner CC:ro cc: Bonnie Tripoli, Utility Plans Examiner