Loading...
HomeMy WebLinkAboutMULBERRY AND LEMAY CROSSINGS FILING NO. 2 - Filed GC-GENERAL CORRESPONDENCE - 2004-08-23.,. ,ch,t.kt,n , d - • II &I'm Matthew Pridemore Architekton 398 S. Mill Ave. #301 Tempe, AZ 85281 (480)894-4637 July 17, 2001 Ted Sheppard Current Planning Department City of Fort Collins Dear Mr. Sheppard, I am writing in regards to a new KFC/Taco Bell project proposed at the southeast corner of South Lemay Avenue and East Magnolia Street, which is part of the Mulberry and Lemay Crossings Development. A portion of the aforementioned property is being leased by our client Harman Management Corporation, which will be maintaining both the building and landscaping within the leased area boundary. As one will see, our site and building have been designed to both meet and exceed the City's design principles. The site has been designed to include a considerable amount of open -space for landscaping. In addition, the landscaping on our site has been designed to blend in with the landscaping of the entire center in order to present a unified appearance. Large tree - lined landscape buffers have been provided along all street frontages. As part of this design a large "park -like" area as been incorporated to the north of the building. This area not only welcomes pedestrians onto the property, but it provides a nice area in which to relax and enjoy their meal. Pedestrian paths have been provided to create a promenade style entrance to the front of the store from all areas of the surrounding property. Per City requirements, landscape islands have also been provided in the parking lot to break up the rows of parking stalls. Great care has also been taken in the design of the vehicular (car and bicycle) and pedestrian circulation paths across the site. Safety is the most important design criteria. The building has been positioned on the site to maximize pedestrian access while limiting pedestrian/vehicular connections. For example, pedestrians at the comer of Lemay and Magnolia can reach the restaurant without having to cross a driveway or drive -aisle. 398 5 M 11 Ae, 301 T,, AZ BS281 1 480 894.4638 a different pattern dimension than that of the pedestrian crosswalks area that connects to the front field pedestrian accesses. This helps to differentiate a potential pedestrian - auto conflict area to the walking public. We believe that we have been very pedestrian friendly in our site design and provided a pedestrian scale that is augmented by the architecture of the store. We have reduced the "sea of parking" feeling to a reduced scaled and reduced pedestrian impact both on site and off. We have made access more direct and the site is easily maneuvered from multiple directions. Landscaping: We have provided multiple areas for landscaping within the parking areas. These individual havens of landscaping are not geometrically placed and provide a sense of non -repetitive nature. The islands within the front parking lot are of different sizes and shapes thus reducing the monotony of the site. The area of landscaping within the front parking area exceeds the City's 10% requirements by approximately 5%. The trees and bushes for the Home Depot site exceed the caliper and size requirements by the City. Ornamental trees have been specified at 2.0 inches and Canopy Shade trees are specified at 2.5 inches. Both of these trees have been oversize to pet -mote a more mature landscaping of the site. All evergreen trees have been size and specified to be 8 feet in height. Landscaping has been proposed for the site that provides visual integration of all wall and fencing for the site. Shade and Orimental trees have been used within tree grates to add to the visual depth to the store frontage and to give the front drive aisle more scalability and provides a more pedestrian friendly atmosphere within the confines of the plaza area in the front of the store. The pedestrian breeze way between the Home Depot and the proposed retail on the South is lined with sidewalk planters to provide a blend of architecture and landscaping thus providing a more friendly space to the individual. The landscaping of the site and the selection of the landscaping elements have been used to prevent erosion and meet the functional and visual purposes of defining spaces, direction of circulation within the site. The landscaping as designed manages visibility while attracting attention to the building entrances and other major focal points on the site. The site is completely visually integrated; both with the building and its pedestrian use areas as well as to each other. Wetlands: No wetlands exist onsite except for those that have been established due to the large site detention facility on the South end of the parcel. No work is planned for this area due to the completed, functioning storm system that is presently installed for this development. Page 3 of 5 Neighborhood Meetings: No neighborhood meetings have been completed as of this date. Meetings are being scheduled for the first two weeks of December, 2003. Our preliminary inquiry has led us to believe that we have the support of the local neighborhood and they would like to see the development completed. Minutes of neighborhood meetings will be provided to City planning staff for their review. Architecture: Character and Image: The building has been designed using features, colors, materials and activity areas consistent with and complimentary to the adjacent and surrounding development. The prototype has been significantly and substantially modified towards this goal. The character and image is one of warm earth tones and hues with careful attention to the detail and scale of the building as a whole and as it relates to the macro and micro scale of its surroundings. The image is one of a site - specific, community specific nature. Fagade Treatment and Details: The building has a distinct base, middle and top as expressed. by horizontal banding of materials interrupted by rhythmic vertical elements such as pilasters, steps in the fagade and special entry features. Pilasters are utilized to break up the body of the facade at approximately thirty-foot intervals. The various functional components and the architectural treatments thereof, serve to endow the building with multiple levels of transparency, layers, shade and shadow. A finer level of detail in the form of reveals, brick accents, decorative brackets, wall sconces, lintels, faux windows and cornice treatments further serve to add layers of interest such that the building, whether viewed from afar or up close, creates a sense of place. The garden center is defined and contained by architectural stone and masonry columns and decorative wrought iron fencing which is capped by a continuous architectural entablature on the front elevation that grows into the "rotunda" feature on the northwest comer of the garden center. Entrances: The entry features are clearly delineated and are joined by a covered pedestrian walkway, which serves to bring a pedestrian scale to the front fapade. A `rotunda" feature has been designed on the northwest comer of the garden center in order to serve as a visual landmark to orient and gather people for the progression into the side entry of the building. Two "tower" features have been incorporated on opposite corners of the building fagade to indicate points of entry into the covered pedestrian walkway and entry vestibules. A breezeway is planned between the south side of the building and the future pad to the south. A "portal' feature similar in design to the "rotunda" feature identifies entry to this breezeway. Multiple entry components offer inviting entry experiences into the facility whether arriving by car, bike or on foot. Page 4 of 5 Variation in Massing and Roof Forms: Combinations of architectural elements have been utilized to create a visually interesting and articulated structure. Changes in massing relate to entrances, pedestrian features, visual orientation features, landmarks and functional aspects of the building. The varieties of components utilized in creating a visually interesting building will be apparent from afar and the multiple layers and levels of detail in the building will reveal themselves as one approaches the project. Multiple roof forms have been incorporated into the design including parapets with detailed cornice treatments, sloped shed roofs over the covered pedestrian walkways and intersecting gabled roofs with exposed trusses over the towers. An open steel framework suggesting a domed structure has been designed over the "rotunda" feature. Materials and Colors: The Home Depot has been designed using a palette of medium to deep reddish -brown earth tones with minor accents of blonde brick and "Colorado Rust' colored roof forms. Stone is utilized as an accent material at the bases of pilasters, columns and on the entry tower columns. The building fagade is predominantly composed of brick masonry with E.LF.S. accents. The design elements and the color/material palette are in direct response to the architecture of the surrounding development and the Cities design guidelines. We have attached copies of the plans for the above mention Major amendment, PDP and Modification of Parking Standard. We have also included the applications and submittal fees for the three different submittals. We have combined the Major Amendment and the Modification of Parking Standard and S200 fee with the Major Amendment fee. We would like to be considered for the following, for that portion of the site that lies within Mulberry/Lemay Crossings, Filing Two, Lot Two, Final PUD as a Major Amendment with a Type Two review. And for that portion of Mulberry/Lemay Crossings Filing Two Lot Six we are asking for a review as a PDP. It is our understanding that this review will take approximately 12 weeks and could be heard by the Planning and Zoning Board in the month of February, 2004. If you need additional information or I have not fulfilled the submittal requirements, please let me know as soon as possible. We would be glad to furnish any missing items immediately. Sincerely, Blair B Warehime Site Development Coordinator Page 5 of 5 rI Galloway, Romero & Associates .l Design Engineenng Planning 5350 DTC Parkway Greenwood Village, Colorado 80111 (303) 770-8884 (303) 770-3636 fax E-mail: blair_warehime@graa.com November 26, 2003 Mr. Ted Shepard Chief Planner 281 North College Avenue Fort Collins, CO 80522-0580 (970) 221-6750 RE: Major Amendment - Filing 2 Lot 2, a PPD - Filing 2 Portion Lot 6 and Modification of Standard for Parking Distribution Dear Mr. Shepard, I am writing to you in response to your conceptual review letter dated August 12, 2003. Per our previous conversation we are also requesting a Major Amendment for that portion of the site that ties within Mulberry/Lemay Crossings, Filing Two, Lot Two and a Project Development Plan for that portion of the site within Mulberry/Lemay Crossings, Filing Two, Lot Six. This is per your review and letter dated June 4, 2002. I am also requesting a Modification of Standard to the City of Ft. Collins parking distribution standard. This is per the Conceptual Review of August 12, 2003 and your review letter dated June 4, 2002. Due to the store and its proposed layout we believe that the current distribution standard of the city does not provide the correct distribution for the required layout of our site. Distribution of parking on all sides of the building is possible but not to the level required by the standard. We request that the maximum of 50% parking in the front of the store be modified to allow for increased parking in the front field of our store. We have attached a copy of City staff's comments by the Conceptual Review Team of August 11, 2003 with our reply to each applicable comment for your review: 1. The project is zoned C, Commercial. This zone permits the proposed use, subject to review by the Planning and Zoning Board. (Noted) Page 1 of 7 2. Please be aware that the allowable parking is based on a maximum of five spaces per 1,000 square feet of gross leasable area. In addition, the parking lot is requiring that no more than 50% of the parking shall be located between the front door and the primary street. Also, the large parking lot must be divided into smaller sections by landscape areas and each section shall not exceed 200 spaces. In addition, 10% of the interior of the parking area shall be in landscaped areas and no more than 15 consecutive spaces are allowed without a landscape island. (We are requesting a "Modification to the Parking Standard as part of this development. We have addressed this issue in our planning objectives letter that has been provided for your review. The large parking lot is broken up into five separate sections with the smallest containing 30 spaces and the largest containing 112 spaces. The interior of the parking area contains pedestrian respites and shelter areas with landscaping that exceeds the City's requirement to a total of 14.6%. Please see Planning Objectives for further explanation) 3. Please be aware that outside areas that are used on a temporary basis for the sale of seasonal inventory only shall be defined by nonpermanent walls or fences. Such an enclosure shall not inhibit fire access to the building or pedestrian and bicycle access to the building entrance. If chain link fencing is used, it must be vinyl -clad or covered with a mesh material. Any such enclosure shall be removed upon the conclusion of the seasonal sale period. (All areas that will be used for seasonal sales and inventory are fenced with nonpermanent fences. These include the area northeast of the Garden Center and the Plaza Area North of the Garden Area. The fencing will be of structural tubular steel with black powder coating.) Areas in the rear of the store will be screened by 8 ft. masonry walls. 4. Three-phase electrical power can be extended to the site from 12th Street. The location of the transformer must be coordinated with Light and Power. Transformers must be within ten feet of hard surface for emergency change out and screened from public streets. Normal development charges will apply. Any modification to the existing system will be at the developer's expense. Street trees must be spaced 40-feet and ornamental trees 15-feet from streetlights. For further information, please contact Janet McTague, 221-6700. (The transformer will be place within a utility enclosure at the rear of the store. It will be screened with a masonry wall and a metal gate. Coordination with Light and Power during the construction document phase will occur. Access to the transformer will not be restricted and will be paved to the front of the transformer enclosure. No trees will be within the allowed clear zones for streetlights. It is noted that all modification to the existing system will be at Home Depot's expense.) 5. Interior parking lot lighting and security lighting will be private and must match the lighting already used within the center. This means that light poles, pole color, pole height, wall -mounted fixtures, lamps, wattage and decorative fixtures shall match Filing One (Wal-Mart). A Lighting Plan will be part of the submittal for P.D.P. (So noted, the Page 2 of 7 Lighting plan has been included within the review package.) 6. The site will be served water by the East Larimer County Water District and sanitary sewer by the Boxelder Sanitation District. There are four water stubs to the site, two potential service lines and two potential fire lines. Unused stubs shall be abandoned at the main. Normal tap fees will apply. In addition, there is a raw water requirement as well. For further information, please contact Mike Schied, civil engineer, 493-2044. (Coordination with the East Larimer County Water District will be part of the design review process. Of the four water service stubs to the property only two will be required. The two to be abandoned have been shown on the plan for abandonment. It is so noted for the normal tap fees and the addition of the raw water requirement for the district. We have included these into our project fees.) 7_ As mentioned, the sanitary sewer will be provided by Boxelder. The contact person is Ravi Srivastava, 498-0604. (So Noted.) 8. The site will be served by the Poudre Fire Authority. An automatic fire extinguishing system must be provided. Addresses must be visible from the street on which the buildings front. Internal fire lanes must be a minimum of 24 feet wide with inside and outside turning radii of 25 and 50 feet. A fire hydrant must be located within 300 ft. of the building and capable of delivering a minimum of 1,500 gallons per minute at 20 p.s.i. residual pressure. A Hazardous Material Impact Analysis must be provided. For further information, please contact Ron Gonzales, 221-6570. (We have had our Fire Consultant Contact Mr. Gonzales to fulfill this request and requirement.) 9. The site is located in the Poudre River drainage basin. There, are no development fees in this basin at this time. The standard drainage and erosion control reports are required and they must be prepared by a professional engineer registered in Colorado. The size of this site requires a SWMM analysis to design the drainage system. (So Noted, we have attached this report and analysis to the plan submittal for the City's review. It has been prepared by a professional engineer registered in Colorado.) 10. The overall Mulberry and Lemay Crossing drainage report addressed development of this site so the drainage patterns and imperviousness should be verified. If there are differences the drainage engineer will need to design improvements to address the differences. The design engineer needs to be a registered Professional Engineer in Colorado. (We have prepared a comprehensive drainage report that addresses the drainage patterns of the site. We have included any differences and addressed their resolution.) 11. Normally onsite extended detention is required to treat the runoff. That was not a requirement at the time the original development was approved. However the design engineers did address water quality with a wetland pond that does help with water quality, Page 3 of 7 it just isn't the same as extended detention. A variance to the requirement would need to be requested and justified by the existing water quality treatment. Another option would be to provide some water quality treatment within the new site. One suggestion would be to depress some parking lot medians to provide extended detention. For further information regarding the design of the stormwater system, please call Glen Schlueter, 221-6700.( 12. Although the site received a LOMR-Fill from FEMA the building will still have to meet the 18-inch elevation requirement for the Poudre River. Since the building layout will change from the approved LOMR-Fill, the design engineer will need to re -determine the highest BFE (Base Flood Elevation) against the building to determine the elevation requirement. Please contact Marsha Hitmes-Robinson for all the Floodplain requirements. 224-6036. (Per the FEMA map the Base Flood Elevation for this site is 4933 by contour. Finished Floor for the building has been established at elevation 4935. This is two feet above the BITE.) 13. The Street Oversizing Fee will apply, due at the time of building permit issuance. The fee is based on square footage and land use. In addition, the City collects the Larimer County Road Impact fee. Please note that these fees are adjusted annually based on the Denver -Boulder consumer price index. For an estimate of these fees, please contact Matt Baker, 221-6605. Information on the Street Oversizing Fee is available on the City's website. (We have contacted Mr. Baker and have included the fees in our project fee budget) 14. The existing Transportation Impact Study will have to be updated to reflect current conditions. Please discuss the scope of this study with Eric Bracke, Traffic Engineer, 221-6630. (Kathleen Krager of Bowers & Krager Inc. has contacted Mr. Bracke and discussed with him the scope of the study required for this project. The studv amendment is attached to this submittal.) 15. The P.D.P. may require the dedication of new utility easements. This can be done by separate legal instrument and coordinated by the Engineering Department. (It has been determined several easements will need to be abandoned and rededicated to the City and/or utility. It is our plan to do this by separate legal instruments and will coordinate with engineering.) 16. There may be a repay due to the original developer of the abutting public streets. (So Noted, and it will be worked out as part of our purchase agreement with the developer.) 17. A new set of Utility Plans will be required. This will be more efficient than amending the approved set on a sheet by sheet basis. Be sure the plans indicate very clearly both existing and proposed utilities. (So Noted, The new plans have been Page 4 of 7 included with this submittal. Existing and proposed utilities have been differentiated) 18. Utility Plans must include water and sewer design in both plan and profile. (Under the revised requirements, water and sewer has been shown in plan view only for review for the entitlement portion of this development. Plan and Profiles will be submitted during the construction document phase of the approvals.) 19. Be sure to get the latest layout of the building envelopes and parking lot layout for Buildings I and J. A Minor Amendment was approved in June of 2002 that revised the original plan. (A new ALTA was completed for this site and revised building layouts for Buildings I and J have been provided.) 20. If there are any encroachments by building envelopes into existing easements, then those affected portions of the easement must be properly vacated. The vacation procedure is by separate documents coordinated by the Engineering Department (Such encroachments do exist for Building J. The boundary line for the Detention tract overlaps the building. The developer through his consultant is modifying this boundary by separate legal documents and has been coordinating with the Engineering department.) 21. Check the turning radius by the contractor sales area (We have checked the area by the contractor sales area and applied an articulated bus turning template. We believe that this best represents the contractor truck and trailer that will frequent this site. Regular truck traffic is not allowed by Home Depot across the front of the store in the Front Drive Isle that is adjacent to the Store entrances.) 22. Please be aware that there is a platted sight distance easement along 12`h Street. This area is restricted to low -growing shrubs or low screen walls. Be sure to coordinate parking lot layout, landscaping and service yard screening so that there are no visible encroachments within the sight distance easement. (So Noted, we have modified our sight plan accordingly. We have moved the screen wall inside the sight line and have modified the landscaping.) 23. The City charges a Street cut fee. The fee is tripled if the street is less than five years old. For further information, please contact Rick Richter, 221-6605. (So noted, and we believe that we will be impacted by this fee. We will need to relocate an existing drive way off of Magnolia street and will have to remove up to two water service stubs to within the existing streets. We have tried not to do any street cutting but it is not possible at this time.) 24. Be sure to continue the east -west sidewalk all the way out to Lemay so that the main entrance is connected to a public walk. This will also provide pedestrian access to Page 5of7 and from the existing restaurant. (So Noted, This sidewalk has been added to our design and is part of our submittal) 25. The Development Agreement and Development Construction Permit will be needed. There is a fee associated with the Development Construction Permit. For further information, please contact Sheri Wamhoff, 221-6605. (So Noted, we have not contacted Ms Wamhoff but will do so during the Construction Document process.) 26. The Transportation Impact Study (T.I.S.) must also perform a Level of Service analysis for alternative modes. For further information, please contact Tom Reiff, 224- 2040. 27. Bicycle parking must be provided in a safe and secure location. Be sure that there is a clear continuous sidewalk system connecting the front entrance to the garden entrance and the seasonal sales area. (So Noted, Bicycle parking has been anticipated and is shown on the plan.) 28. Please note that Section 3.4.1(1) requires that elements of the site complement the visual context of the Poudre River. Careful placement of Cottonwood trees and river cobbles should be explored. For further information, please contact Doug Moore, 221- 6600. (So Noted, Mr. Moore will be contacted by our landscape architect during the review process.) 29. A Fugitive Dust Permit will be needed from the Larimer County Health Department during the construction phase. The trash collection system should include facilities for recyclable materials. Outside the buffer areas, native plants and grasses are encouraged over irrigated blue grass sod. For further information regarding these issues, please com.act Doug Moore, 221-6750. (Per the requirements of City a fugitive dust permit is required for a development larger than 25 acres. The Home Depot development will not exceed approximately 11.0 acres. It was our intent to follow the City's regulation and requirements.) 30. One of the key issues is to meet the standard regarding multiple entrances. As we have discussed, for this standard to be satisfied, the secondary entrance must be open during normal business hours and 12 months out of the year. (We have addressed a secondary access and have incorporated it within our submittal. We have modified our building elevations to provide for this entrance off of Magnolia Street and can be seen from the street.) 31. The Modification of Standard for the parking distribution standard may be taken to the Planning and Zoning Board as a "stand-alone" prior to the full P.D.P. The fee is $200 and a letter and supporting documentation may be submitted anytime. If granted, the Modification is valid for one year. Prior to expiration of one year, the P.D.P. must be Page 6 of 7 considered by the Board. (So Noted, we have considered and made separate application and withdrew the separate application in lieu of a combined application which is attached) 32. Please note that the first curb cut north of Mulberry on Lemay is not full motion but restricted to right-in/right-out only by the raised median. (So Noted, it is the intent of this development that entrance into the sight would be through the full movement intersection of Magnolia Street and /or 12"' street.) 33. A neighborhood information meeting is required as the site is adjacent to existing development and the plan represents a change in relationship to the approved plan. The Planning Department will create the notification map for the neighborhood meeting.(Per our discussion with Ted Shepard we are actively seeking neighborhood meetings with all surrounding neighborhoods. We believe we will be able to accomplish these meetings within the first two weeks of December, 2003.) We have attached copies of the plans for the above mentioned Major amendment, PDP and Modification of Parking Standard. We have also included the applications and submittal fees for the three different submittals. We have combined the Major Amendment and the Modification of Parking Standard and $200 fee with the Major Amendment fee. We would like to be considered for the following, for that portion of the site that lies within Mulberry/Lemay Crossings, Filing Two, Lot Two, Final PUD as a Major Amendment with a Type Two review. And for that portion Of Mulberry/Lemay Crossings Filing two Lot Six we are asking for a review as a PDP. It is our understanding that this review will take approximately 12 weeks and could be heard by the Planning and Zoning Board in the month of February, 2004. If you need additional information or I have not fulfilled the submittal requirement, please let me know as soon as possible. We would be glad to furnish any missing items immediately. Sincerely, Blair B Warehime Site Development Coordinator Page 7 of 7 We have also taken into consideration the building as an "island" in terms of the overall site design. Most fast-food restaurants have the drive -through lane wrapping back around the front of the building. However, we have turned the drive -through lane away from the building to link -up with the internal drive to the east, keeping the area in front of the building open for additional landscaping and pedestrian traffic. In order to present a unified architectural image across the site, we have taken numerous measures to match the architecture of the neighboring shopping center. First, we have incorporated both the center's color and material palettes. The KFC and Taco Bell colors are being used as accent colors. In addition, a masonry wainscot has been provided around the entire building. The masonry has then been extended up the faces of the KFC and Taco Bell tower elements. We have also included the gooseneck light fixtures and the Galvulume metal roofing found on the neighboring center. The proposed KFC/Taco Bell restaurant will be open Monday through Thursday from 10:00 AM to 10:00 PM, and Friday through Sunday 10:00 am to 12 midnight. At peak times there can be as many as eight employees, but during normal business hours there are four to five employees on duty. In terms of a development schedule, we anticipate receiving a building permit in the middle of October. It will then take approximately 75 days to complete the site work and restaurant. The project will be completed and open by late December. Hopefully, this letter along with the accompanying PDP submittal package have adequately addressed all of your and the City's requirements and concerns. If you have any questions please give me a call at (480) 894-4637. Thank you for your assistance. Sincerely, p Matthew Pridemore Architekton Sheri Wamhoff - Mulberry & Lemay Crossings Home Depot PDP/Major Amendment Page 1 From: Ginger Dodge To: Basil Hamdan; Dave Stringer; Doug Martine, Doug Moore; Eric Bracket Garold Smith, Gary Lopez, Glen Schlueter, J.R. Wilson, Jeff Hill, Jenny Nuckols, Kathleen Reavis, Katie Moore, Laurie D'Audney, Marc Virata; Mark Jackson, Matt Baker, Mike Gebo; Pete Wray, Rich Kopp, Rick Richter, Roger Buffington; Ron Mills, Sheri Wamhoff; Susan Joy, Tim Buchanan, Tom Reiff; Wes Lamarque Date: 12/4/03 1:11 PM Subject: Mulberry & Lemay Crossings, Home Depot PDP/Major Amendment The correct project numbers are as follows: Home Depot Major Amendment - #36-961 Home Depot PDP - #36-96J They will be listed in DMS with those numbers. Thanks! Ginger Sheri Wamhoff - Home Depot - Traffic Issues Page 1 From: Eric Bracke To: Ted Shepard Date: 2/19/04 9:34AM Subject: Home Depot - Traffic Issues Dear Ted, I will be unable to attend the Planning and Zoning Board meeting tonight due to another commitment. However, it is my understanding that some folks from the public may bring up issues regarding traffic, particularly at the intersection of Vine and Lemay. Vine and Lemay currently operates at LOS C, which is acceptable based on the City standards. When the Mulberry/Lemay Crossing project was first proposed, a comprehensive Transportation Impact Study was completed. Based on the impacts of the Center, roadway improvements were constructed in anticipation of the build -out of the project. The Home Depot phase of the project updated the TIS and is dated October 24, 2003. The TIS was prepared by Bowers & Krager, Inc. The results of the study clearly indicated that the original study was accurate and therefore the improvements made previously were appropriate for the development. The existing and proposed traffic from the development are being used in the calculations to determine the Adequate Public Facilities threshold for the intersection of Vine and Lemay. So, in other words, the Home Depot project is not going to push the intersection into the APF requirements. Another issue that continues to surface regards the interruption of traffic flow due to the rail crossing on Lemay This is not an issue from a City/Traffic Operations perspective. The City of Fort Collins has no standard that addresses transportation impacts due to trains. The BSNF disrupts traffic 8-10 times per day along the S. College Corridor, the Downtown Area, as well as Vine and Lemay. It is unfortunate, but it is a fact of life in Fort Collins and there is nothing we can do to improve the situation. I trust that this email will clarify any issues that arise at tonight's meeting. Regards, Eric L. Bracke, P.E., P.T.O.E. City Traffic Engineer (970)224-6062 ebracke@fcgov.com CC: Cameron Gloss; Dave Stringer; Ililey@lileyrogersmartel.com, Mark Jackson, Sheri Wamhoff; Tom Reiff, Ward Stanford MARCH, LILEY & OLIVE P.C. LUCIA A. LILEY ATTORNEYS AND COUNSELORS AT LAW J. BRADFORD MARCH 110 E. OAK STREET, SUITE 200 STEWARr W. OLIVE FORT COLLINS, COLORADO 80524-2880 19701 482.4322 fax (970) 482-5219 June 4, 2002 Sheri Wamhoff City Engineering Department VIA HAND DELIVERY 281 N. College Ave. Fort Collins, CO 80521 Re: Mulberry and Lemay Crossings Filing No. 2 Dear Sheri: ARTHUR E. MARCH 1908-1981 ARTHUR E MARCH. JR. R,w,r 2001 Enclosed for recording are the four original Deeds for Dedication of Easements in Lot 2 and Tract A Of the Mulberry and Lemay Crossings Filing No. 2, which have been executed by the grantors, Ft. Collins Partners I, L.L.C. and Wal-Mart Real Estate Business Trust, Also enclosed is a check in the amount of $145.00, which you requested from Goldberg Property Associates, Inc. to cover the recording fees for the casement vacations and dedications. Please provide uS with a copy of each of the recorded documents and a copy of the fully executed Amendment Agreement No. 1. Thank you. Sincerely, MARCH, LILEY & OLIVE P.C. BY Lucia A. Lilev i LAL/jpk Enclosures cc: Joyce Chiasson, Goldberg Property Associates, Inc. Kurt Prinslow, CLC Associates, Inc. 1': A W P('VI A[ AGOI DBI iRGAMulberry and Lemay Crossings Filing 2\Sheri W amhoff.ltr CLC l_, :. February 14, 2002 Ms. Sheri Wamhoff, P.E. Engineering Department Development Review Division 281 North College Avenue Fort Collins, CO 80522-0580 RE: Mulberry and Lemay Crossings, Lot 2 Retail I & J, Phase One Dear Ms. Wamhoff: Due to the modifications to Retail Buildings i & J and the impacts that has had on the site plan, we are submitting to you for your review copies of the revised On -Site Utility Plans. These sets are being provided to you for circulation to the city departments that will have eventually sign -off on mylar copies of the revised plan sheets. CLC Associates, Inc. will also forward copies to the affected utilities (Boxelder Sanitation and East Larimer County_ Water District) for their review and comments prior to asking them to sign the mylars. Due to the minor nature of these revisions, your prompt review and reply is appreciated. Should you or the representatives of the other departments have any questions, please contact me at (303) 770-5600. Sincerely, CLC Associates, Inc. Kurt D. Prinslow Director of Landscape Architecture Attachments: four (4) sets cc: David Ristau, Goldberg Property Associates (w/o attachments) Webster Jones, P.E. - ELCO (w/ attachments) Ravi Srivastava, Ph.D., P.E. - Boxelder Sanitation Districct (w/ attachments) ,:,r KDP/lkk dS:ia!BCi LiiS MARCH, LILEY & OLIVE, P.C. ARTHUR F. MARCH. JR. ATTORNEYS AND COUNSELORS AT LAW LUCIA A. L ILEY 110 E. OAK STREET J. BRADFORD MARCH FORT COLLINS. COLORADO 80524-2880 ARTHUR MARCH _1 STEWART W. OLIVE (970)482-4222 1908981 Fax (970) 482-5719 ---- September 14, 2001 Ms. Sheri Wamhoff Engineering Department City of Fort Collins 281 N. College Avenue Fort Collins, Colorado VIA HAND DELIVERY RE. Development Agreement for Mulberry and Lemay Crossings Filing No. 2 Dear Sheri: 1 have completed my review of the above -referenced document and suggest the following changes, which are shown in blacklining: I Page 2, first sentence in paragraph C under section 1. (General Conditions) should read as follows: ' E'xcei)t ati other♦ rse herein spegficnlly ergreed, Nno building permit for the construction...." 2. Page 5, second sentence in subparagraph A.1. under section R: (Special Conditions) should read as follows: "In addition, the City shall have the right to inspect the waterline installation, trenching, backfill and/or compaction within the Crty s right-ref--wa-V and to require- ..." 3. Page 5, second sentence in subparagraph B.1. under section II. (Special Conditions) should read as follows. "in addition, the City shall have the right to inspect the sanitary sewer installation, trenching, backfill and/or compaction within the Ci,tyls right-of-w(ty and to require... . Ms. Sheri Wamhoff September 14, 2001 Page 2 4, Page 5, second sentence in subparagraph C.2. under section 11. (Special Conditions), change the word "paragraphs" to "paragraph" and delete "and two (2)" since there is only one paragraph above. 5. Page 7, subparagraph D2. under section 11. (Special Conditions) should be deleted as the provisions in that subparagraph are covered in subparagraph D.3. The remaining subparagraphs should he renumbered accordingly. 6. Page 12, paragraph N_ under section Ill. (Miscellaneous) should be completed as follows: "If to the Developer Mark A. Goldberg bi. Collins l'artners1, 11C 1120 Lmcohx Street, Suite 1101 Denver, Co 80203-2136 With a copy to: Lucia A. bley March, Liley& 01ive, 7'.C. 1101,. Oak Street, Suite 200 1'orf Collins, CO 80524" Sheri, please call me if you have any questions. Sincerely, NlARC[ 1, LILEY & OLIVE, P.C. LAL/gh cc: Paul Eckman, Esq. Lou Delaney -ale aas6s' To: TSMEpARD@ft90V•Om" <shreakee/eqrrseM cc: Two esI s.Ajact: TTaw MIKFC OW I I JO1 02:49 1►M Ted • Cross Lag I have done some pro 'liaiaary traffic work oe the 1.me The origin proposal to add a fast food restaurant to the site. The original TIt assumed e future use of 26 kuf of high turn over. sit down rsetAurancs. The 2e kof sit down restaurants were estimated to produce 422 peak dour trips. The fastfood proposal of 3.6 ksf would produce an estimated 121 trips during the pH peak hour. This comes out to approximately 29a of the estimated restaurant trip geoaracion. At this time, I will be willing to let the now TIS •elides since Kr. Goldberg is still under to estimated trip generation_ however, keep in mind for future submittals that the 'rTS is now over two years old. once MalMart Is opened, I will be requiring updates to the existing 2-year old atady. The ADp issues with vine/Lemay are very real and we will be watching it closely. Let me know if you have any questions. Mind Regards, Writ L. Dracke. P.B. Traffic saginser City of port Collins abrack"fcgov.com Susan Joy - KFC Taco Bell Page 1 From: Ted Shepard To: Susan Joy Date: 2/4/03 9:34AM Subject: KFC Taco Bell Susan, while you were out on Friday, Highline Engineering called and they discovered an error in the Mulberry Lemay Crossings Flg Two plat. Wally and I went over it and it appears that CLC miscalculated a bearing distance from section corner to property corner. The result is that they need to do an Affidavit of Correction. Also, the forms have been built and the foundation will be 12 inches closer to the west p.l. and 6 inches closer to the south p.I. We don't see a need to re -build the forms. See the letter. You and Wally are copied on the letter, Ted City of Fort Collins Community Planning and Environmental Services Current Planning February 4, 2003 Mr Rusty Hall Highline Engineering Via Fax 303-889-0012 9101 East Kenyon Avenue, Suite 2500 Denver, CO 80237 Dear Mr. Hall: In your phone call to me on Friday, January 31, 2003, you explained that you discovered a surveying error on the Final Plat of Mulberry Lemay Crossings Filing Number Two. The result of this error is that the forms for the foundation have been constructed in such a manner as to cause the building (K.F.C./Taco Bell) to be located 12 inches closer to the west property line and six inches closer to the south property line. Your request was to allow the concrete to be poured so as to allow the forms to not have to be re -built. Your request is granted subject to the following: There shall be no loss of landscape area, turf, shrubs, trees or otherwise. Twelve inches shall be taken out of the west parking bay resulting in parking stalls that are 18 feet in length versus the original length of 19 feet. Similarly, the north -south error shall be compensated by decreasing the trash enclosure area by six inches. An Affidavit of Correction shall be filed with the City of Fort Collins. This Affidavit of Correction shall be submitted to the City of Fort Collins Engineering Department, in care of Susan Joy, in sufficient time for processing and review so that the Affidavit is filed and recorded with the Larimer County Clerk and Recorder prior the issuance of a either a Temporary or Final Certificate of Occupancy for the K.F.C./Taco Bell Building. If you have any questions, please feel free to call the City Engineering Department at 221-6605. e=hp,c Ted Shepard Chief Planner Xc: Susan Joy, Development Review Engineer Wally Muscott, Surveyor 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 Galloway, Romero &Associates Design Engineering Planning 5350 DTC Parkway Greenwood Village, CO 80111 (303)770-8884 FAX: (303) 770-3636 November 25, 2003 RE: Final Planned Unit Development — Major Amendment Mulberry and Lemay Crossings Final P.U.D. — Filing No. 2, Lot 2 The Home Depot - Drainage Compliance Letter This letter certifies that the Major Amendment to Mulberry and Lemay Crossings Final Planned Unit Development, Filing No. 2, Lot 2 for the proposed Home Depot building and Future Retail building is in compliance with the original Final Drainage Analysis by CLC Associates, Inc., approved 6/21/00. In the original CLC report, the area that makes up Lots 2 and 6 was comprised of eight full basins and three partial basins. The eight full basins included Basins B8, B9, B10, B6-1, Cl, C1-3, C2-1 and C4-1. The three partial basins included Basins C1-1, C1-2 and 0-2. All of these basins were designed with a 100-year runoff coefficient of 1.00. The composite 100- year runoff coefficient for the proposed Home Depot, Future Retail and existing retail on Lots 2 and 6 is 0.85. Therefore, the proposed development is well within the designed limits of the Final Drainage Analysis. The original report addressed water quality and included several enhancements to the design, which are currently in place. Most notable, the site features two "constructed" wetlands, which act to remove Total Suspended Solids (TSS). The ponds are also long and thin which allows the runoff longer contact time with the landscaped surface and tends to increase travel time of the runoff from one end to the other, further increasing the settlement of particles. Wetlands also enhance the biological activity associated with the breakdown of various constituents. These enhancements were installed and approved in lieu of extended detention as noted on page 4 of CLC's report which states that "additional enhancements, such as wetlands plantings, are intended to compensate for traditional water quality capture volume not accommodated in the Pond Bottoms." Erosion Control measures will be installed during Construction Activities to minimize erosion due to wind and runoff. Erosion control plans and notes have been included in the Major Amendment planning set. The Site will be permanently stabilized with paving, sod, mulch or landscape shrubs or trees. The first floor of the Home Depot and the Future Retail buildings were designed to elevation 4935, approximately 2 feet higher than the Base Flood Elevation (BFE) according to FEMA maps. The BFE has been shown on the Grading Plan included in the planning submittal. The proposed development falls within the original design parameters of the Final Drainage Analysis by CLC Associates, Inc. All storm sewer ponds have been constructed with previous development and are currently operational. The site also contains several water quality enhancements that were approved in lieu of extended detention. The proposed building exceeds the City requirement of 18 inches above the BFE by 6 inches (approximately 2 feet higher than the FEMA Base Flood Elevation). Therefore, additional analysis of the proposed Home Depot development is not required. Sincerely, Galloway, R/ lero & Associates J%N. Andresen Jr., P.E. \\FILESRVR\clients\HomeDepot\HDt49-HD249-HO449 - HO Store #NW0066 - Store Development - Ft. Collins, CO - NEC Mulberry and Lemay\Docs\Reports\HD249-jna-Drainage Compliance Letter.doc Galloway, Romero & Associates Design Engineering Planning 5350 DTC Parkway Greenwood Village, Colorado 80111 (303)770-8884 (303) 770-3636 fax E-mail: blair_warehime@graa.com November 26, 2003 Mr. Ted Shepard Chief Planner 281 North College Avenue Fort Collins, CO 80522-0580 (970) 221-6750 RE: Planning Objectives -Filing 2 Lot 2 Major Amendment, a PPD -Filing 2 Portion Lot 6 and Modification of Standard for Parking Distribution Dear Mr. Shepard, I am writing to you in response of the City's requirements for a statement of planning goals and objectives for our proposed development. The Home Depot proposed at the Mulberry/Lemay Crossings is a 102,540 S.F. of home improvement retail sales with a 19,079 S.F. Garden Center and two seasonal sale areas. The site is bounded by Magnolia Street on the North, Mulberry Street on the South, Lemay Avenue on the West and 12`h Street on the East. The project is zoned Commercial which permits this use. The Home Depot, when completed will employ approximately 150 to 200 people and will operate 24 hours, seven days a week. We have completed our design plans and submit to you the following A. City Plan Principles and Policies Achieved by the Proposed Development: Site Planning: The site is laid out in a design that achieves a well defined circulation route for all vehicles, bicycles and pedestrians. Traffic control devices have been used to direct traffic where necessary within the site. They provide for a safe atmosphere for the all forms of transportation. The front, main parking field has been divided, by landscape island and diagonal pedestrian walkways into small intimate parking fields that reduce the scale of the development. Each of the five smaller fields is readily Page 1 of 5 accessible by a pedestrian walkway system that provides for pedestrian respite and protection. Each pedestrian area is fully landscaped to promote a sense of security with a feel of Mini Park like setting. These pedestrian areas provide to the individual the ability to seek safety from surrounding automobile traffic as well as a place to rest. The landscaping serves also to break up the large surrounding areas into more scalable area that are more pedestrian friendly. The major parking field is broken up into individual areas of 30 spaces to up to 114 spaces. This larger parking is in the more remote portion of the front fields. All parking areas within the main parking field are within 250 L.F. of a main building entrance. These small localize parking areas with localize pedestrian areas and provide scale to the main parking field as well as to the building frontage. It is this intimate character that we endeavored to hold to in our design layout. The main access points off Magnolia Street serve to load the regionalized parking area and reduce the distance a car should travel to a parking space. With three entrances off this street it will permote better parking access and help reduce parking lot cruising. By reducing continuous parking circulation and providing a more direct route to parking the potential conflicts between automobile and pedestrian are reduced. Truck traffic will be routed directly to the rear of the store where loading and unloading will take place. Truck traffic will not be allowed along the front of the store drive aisle. Building service areas have been screened from all major street right of ways by the use of landscaping and 8 foot screen walls. The truck loading dock has been internalized into the site and an additional 12 foot screen wall has been proposed to screen the truck loading well and the trash compactor. This additional, multi -layer wall screening of the service area will serve to reduce sound from an area that is a high use area. This screening serves also to isolate the service area of the store from normal pedestrian impacts. We have screened seasonal sales areas that may be cluttered, i.e. the area at the rear of the garden center where large bulk items will be stored, displayed or sold. This area will be fenced during use and operation of the seasonal area. When not in use the fencing will be removed and parking will be allowed within that area of the site. Pedestrian Scale and Impacts: The site has been separated into mini areas that have landscaping and pedestrian refuge. The three sidewalks that divide the front parking areas are a full 8 ft. in width and provide for easy access from multiple directions to the stores main entries. A full plaza area is also provided along the front of the store to provide for pedestrian and retail activity. The main drive aisle has been decreased to 25 ft to allow for a more perspective and protective environment to the pedestrian. At this reduced width the crossing at the main store entrance does not appear as a large chasm to be cross by shopper but, provides easy connection access to all pedestrian walkways. The concrete within the plaza area in front of the store has been scored at Page 2 of 5