HomeMy WebLinkAboutMIDPOINT SELF STORAGE - Filed CS-COMMENT SHEETS - 2004-08-17PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannine
DATE: June 12, 2003 TO: Technical Services
PROJECT: #28-98D PROSPECT INDUSTRIAL PARK, MIDPOINT
SELF -STORAGE — TYPE I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
July 16, 2003
Note - Pl EASE identify your redlines for future reference
a r
! S - j2A cT A t
of X�;.= (:= l) ), S TTF- A,
Name (please print)
is / r h)c
L — (14
0C', j
ci
C MCK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site Drainage Report Other
_Utility _Redline Utility _Landscape
City of Fort Collins
Number:53 Created: 7/25/2003
Identify that the sidewalks are 5 foot and the parkways are 8 foot.
Number: 54 Created: 7/25/2003
Need to identify the emergency access location and identify what the interior striping would be
there. May also need to identify what happens to the area when the emergency access point on
Midpoint goes sway. A separate bubble for these may work best.
Number: 55 Created: 7/25/2003
Need to show where the curb gutter and sidewalk are going to end on Sharp Point. The trees
beyond this point will probably not be able to go in and will need to be escrowed for with the rest of
the street improvements.
Topic: Plot
Number: 31 Created: 7/25/2003
Correct the certificate of dedication
Number: 32 Created: 7/25/2003
Correct the City approval signature
Number: 33 Created: 7/25/2003
EAE easements are not listed in the legend
Number: 34 Created: 7/25/2003
They are to be emergency access easements not fire access easements.
Number: 35 Created; 7/25/2003
Need to identify what Tract A is. Is it row dedication?
Number: 36 Created: 7/25/2003
Need a radius at the NE corner of the property.
Number: 37 Created: 7/25/2003
Show the off -site easements that are needed with this project.
Page 3
C construction company, inc.
909 EAST SIXTY-SECOND AVENUE • DENVER, COLORADO 80216 • (303) 287-5525
September 3, 2003
Steve Olt, City Planner
Planning Department
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80522
Re: Prospect Industrial Park
Midpoint Self Storage — Phase II
Lot 33 - Type ( LUC #28-98D)
Dear Mr. Steve Olt:
Upon receipt and review of your comments provided to us via fax on July 30,
2003, we offer the following response. We have addressed these comments
from the various departments and offer the following response:
Current Planning -Building, General, Landscape, Site
Current Planning — Steve Olt
30
Standards have not been sent to us of this date.
62
Elevation references have been corrected on plans.
63
The two short wall sections have been changed to masonry as requested.
64
The Fire Lane has been identified on the plan accordingly.
29
So noted.
57
A wavier request similar to phase I has been attached and submitted to the
Director of Planning
65
The landscape plan has been revised to conform with the % of trees species.
56
The site! plan has been enhanced accordingly with additional information.
58
Refer to added statistic chart on sheet PDP — 2 for leasable area.
_69
Refer to added fence details on sheet PDP-2 and site plan for fence
locations.
60
The sewer easement across the site has been identified.
6_1
Refer to revised site plan for added information as requested.
27
(a) comment noted. Coordination is ongoing with Xcel. There appears to be
no issues due to the fact that the site is being filled.
(b) Comment noted. Coordination is ongoing with Xcel.
(c) Comment noted and added to Landscape Plan.
construction prollessionals since 1964
Engineering - Drainage Outfall, General, Landscape, Plat
Engineering — Sheri wamhoff
39
Storm _1A_is_being built now.
40
Easement process has been initiated with Natural Resources.
38
Two benchmarks have been provided.
41
A pan will be constructed across the width of the intersection; a riprap pad
has been added.
42
Spots have been added (see Grading Plan) and label has been updated.
43
So noted.
44
Mill and overlay hatch and note has been added to plans.
45
Spot elevations added to Grading Plan.
46
Curb & gutter and 2' pan will be built from existing end of curb to the 10'
cross pan.
47
Future ramp has been added.
48
A variance has been requested for the cross pan.
49
Utilities will still have access to the existing road.
50
We have had correspondence with JR Engineering and they will tie into our
design at the tracks.
51
JR Engineering does not have grades for flowline and only preliminary
centerline grades. It does not appear they have ground topo, as the elevation
of the tracks is different from ours. Also see response 50.
52
The title: has been revised as requested.
53
Refer to site plan for location and notes on sidewalk sizes.
54
Refer to site plan for added notes regarding the emergency access lane.
55
Comment noted. Refer to revised plan.
31
See revised.
32
See revised.
33
See Revised.
34
See revised.
35
See revised.
36
See revised.
37
See revised.
Light and Power — Doug Martine
1
Comment noted. Coordination with Light and Power has occurred.
2
There is an electric vault and a FO vault at the intersection. Both will need to
be relocated.
Police —Joseph Gerdom
11
Noted.
Stormwater Utility — Basil Harridan
21
1 The permanent outfall will be built now. There is now 1.5' of separation
-2-
between storm and sanitary lines.
20
20' easement has been provided. Process has been started with Natural
Resources for the easement.
25.
Noted.
24
Spots have been added.
23
Inlet protection has been called out on the erosion control plan.
22
The ground around the power poles in question will not be subject to cut. The
area around the north pole will remain at existing grade; approximately 1' of
fill will be; placed around the south pole. The easement in question is not an
exclusive easement. The power poles are in a Drainage and Utility
Easement. DCB is presently working with the electric company to coordinate
grading around the poles.
26
A table has been provided.
Transfort - Garold Smith
7
Noted.
Transportation Planning — Tom Reiff
8
A Striping Plan has been added to Sheet C13.
9
ROW has been noted on all plans.
10
The corrections have been made accordingly.
Water Wastewater — Roger Buffington
18
Fire hydrants have been updated.
19
Coordination has taken place with JR Engineering. A preliminary crossing
has been included on our plans.
Water Wastewater -Jeff Hill
12
Note has been added to the Landscape Plan.
13
Note has been included.
14
Water line has been upsized to 12" and profile added to Sharp Point Drive
centerline profile.
15
Swivel tee has been noted. 10' separation has been maintained.
16
Steel casing has been added.
17
10' separation has been maintained.
Zoning — Peter Barnes
3
A wavier request similar to phase I has been attached and submitted to the
Director of Planning
4
Refer to revised site plan with added information and site statistics.
5
Refer to PDP-2 for added fence details.
6
Refer to the site plan for the exact drive isle widths. The fire access lanes are
25'-0" as required.
-3-
Please note that the comments from the July 16rh meeting with the City Staff
have been incorporated within this re -submittal. Revisions to the appropriate
documents have been completed.
If you have any questions regarding our responses and re -submittal, please feel
free contact me directly at 303.287.5525.
Since y,
ar Sherman, Architect
ry
Vice resident of Design
dcb construction co. inc.
& J, J)C�,,
Micheal Oberlander, PE
Project Manager
North Star Design
Darren th en
Project Manager
dcb construction co. inc
u q
REi_,u �a.S^a
REVISION
COMMENT SHEET
DATE: September 8, 2003 TO: Technical Services
PROJECT: #28-98D PROSPECT INDUSTRIAL PARK (LOT
33), MIDPOINT SELF STORAGE PDP - TYPE I
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
September 24, 2003
No Comment
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE*"
r
�.41,c Ct v t< !+� ��s7.4NCe� �Lc%i
.-17 7 125
� c I
tVame (please print) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIO[VS
'Plat _Site _Drainage Report _Other City of Fort Collins
Utility Redline Utilitv _Landscape
P,EC.6 '93SEP
REVISION
COMMENT SHEET
DATE: September 8, 2003 TO: Technical Services
PROJECT: #28-98D PROSPECT INDUSTRIAL PARK (LOT
33), MIDPOINT SELF STORAGE PDP - TYPE I
(LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
September 24, 2003
ElNo Cornment
1-71 Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
(4
+ 1 2 L T
—ie i� AE �ee�l_> liesjo he 1�c-�aci�
Name (please print) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report _Other City of Fort Collins
Utilitv Redline Utility Landscape
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Transportation Planning
Date: September 24, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE I
(LUC) #28-98D
All comments must: be received by Steve Olt in Current Planning, no later than the
staff review meeting:
September 24, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 8 Created: 7/16/2003
Since both Midpoint and Sharp Point Drives are classified as collectors on the
Master Street Plan, a striping plan for both streets is needed. Please keep in mind
that Midpoint is a collector without on -street parking. (REPEAT COMMENT 9-23-03)
A striping plan was not submitted with the second submittal.
Number: 10 Created: 7/16/2003
There appears to be an inconsistency between the site and landscape plans and the
utility plan. On the utility plan the curb, parkway and sidewalk end prior to the edge
of the property on :Sharp Point Drive, while the landscape and site plans have these
improvements shown to the edge of the property? According to the Engineering
Dept. the curb and walk are to end prior to the edge of the property. Please make
the corrections to the site and landscape plans to reflect the utility plans. (REPEAT
COMMENT 9-23-03) The discrepancy between the plan sets has not been
corrected.
Signature
`? c�
Date
-CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report �4 Other
titility _ Redline Utility � Landscape / /61
Page 1
Project Comments Sheet
Selected Departments
Department: Stormwater Utility
Date: September 25, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE I
(LUC) #28-98D
All comments must: be received by Steve Olt in Current Planning, no later than the
staff review meeting:
September 24, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Hamdan
Topic: Easements
Number: 20 Created: 7/22/2003
9/23/03
Need to obtain a 20 foot temporary easement and a 20 foot permanent easement for the revised pipe outfall into the
pond. This will be needed prior to final plan approval.
Topic: Utility Plans
Number: 24
9/23/03
Created: 7/22/2003
The utility plans do not differentiate correctly between the existing, future and proposed lines, particularly for the
existing lines along Midpoint Drive and Sharp Point Drive. Please clarify and adhere to the symbols as shown in the
legend.
Topic: Water Line Separation
Number: 69 Created: 9/23/2003
The proposed separation between the future water line in Sharp Point Drive and the proposed 36"storm sewer is only
12". Is this from outside pipe diameter ? This is below the 18" minimum, and would leave only 3.5 feet of cover for the
future water line. It is suggested that an elliptical pipe be used or dual 30 inch pipes that would provide the water line
with a minimum 4 feet of cover. 12 " separation will then be approved as a variance by the utilities (stormwater and
water).
11`
Dare
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat __ � Site Brainage Report Other_
�lity _ _Redfine Utility Landscape
Page I
Project Comments Sheet
City of Fort Collins Selected Departments
Department: Engineering
Date: September 26, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE I
(LUC) #28-9813
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
September 24, 2003
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: Drainage outfall
Number: 40 Created: 7/25/2003
Need to obtain the off -site easements from utilites and natural resources for the drainage
pipes.
9/24/03 Still applicable.
Topic: General
Number: 45 Created: 7/25/2003
Need to provide spot elevations for the intersection of Sharp Point and Midpoint Drive.
9/26/03 Have provided existing elevations, please provide proposed elevations or will they be
the same.
Number: 74 Created: 9/26/2003
Need pan detail - don't think it will work as a 2 foot pan as the gutter is 2 foot wide.
Number:75 Created:9/26/2003
Add a type III barricade at the end of the cross pan.
Number:76 Created:9/26/2003
Final utility plans can not be signed off until the easement from Natural Resources is obtained.
Signature r
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
Utility �G Redline Utility �� Landscape
Page I
Project Comments Sheet
Selected Departments
Department: Transportation Planning
Date: July 17, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE I
(LUC) #28-918D
All comments muss: be received by Steve Olt in Current Planning, no later than the
staff review meeting:
No Review Date
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 8 Created: 7/16/2003
Since both Midpoint and Sharp Point Drives are classified as collectors on the
Master Street Plan, a striping plan for both streets is needed. Please keep in mind
that Midpoint is a collector without on -street parking.
Number: 9 Created: 7/16/2003
Please delineate and label the new right-of-way on all plan sets, including the site
plan for Midpoint and Sharpe Point Drives.
Number: 10 Created: 7/16/2003
There appears to be an inconsistency between the site and landscape plans and the
utility plan. On the utility plan the curb, parkway and sidewalk end prior to the edge
of the property on Sharp Point Drive, while the landscape and site plans have these
improvements shown to the edge of the property? According to the Engineering
Dept. the curb and walk are to end prior to the edge of the property. Please make
the corrections to the site and landscape plans to reflect the utility plans.
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _-'Z- Site Drainage Report Other
Utility _ Redline Utility Landscape
Page 1
Topic: Landscape
Number: 55
Created; 7/25/2003
Need to show where the curb gutter and sidewalk are going to end on Sharp Point. The trees
beyond this point will probably not be able to go in and will need to be escrowed for with the
rest of the street improvements.
9/26/03 Curb gutter and walk will not go all the way to the railroad tracks at this time and as
such that corner will not beat final grades. What is to be planted here? Maybe better to
escrow for the plantings that would not be in ultimate grade.
Topic: Plat
Number: 32
Created:7/25/2003
Correct the City approval signature
9/23/03 Corrected part of it, but also changed part of it. Approval is by the City Engineer.
Page 2
Project Comments Sheet
S
Citvul Fort Collins elected Departments
Department: Water Wastewater
Date: September 26, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE -TYPE I
(LUC) #28-98D
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
September 24, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: Utility
Number: 70 Created: 9/24/2003
An Air Relief Valve, (ARV) will be required on the 12-inch water main at the high
point adjacent to the railroad tracks. Provide the standard ARV detail on the detail
sheet.
Number: 71 Created: 9/24/2003
A minimum of 4.5 depth of bury over water mains is our standard. A variance to a
minimum depth of 4 feet could be granted if all other options have been explored an
ruled out. Perhaps using dual arched pipes at the proposed water main raising will
allow the necessary room to avoid this variance.
Number: 72 Created: 9/26/2003
Please provide a cost estimate for the construction of the 12-inch water main from
the proposed plug to the south side of the existing railroad tracks.
Topic: Landscape
Number: 73 Created: 9/26/2003
Provide the required landscape/utility separation distances on the landscape plans.
See site, landscape and utility plans for other comments.
Signature Date
U/
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat __ Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1
STAFF PROJECT REVIEW
DCB Construction Company, Inc.
c/o Darren Zethren
909 East 62nd Street
Denver, CO. 80216
Staff has reviewed your submittal
33), MIDPOINT SELF STORAGE - TYPE
following comments:
Date: 10/3/2003
for PROSPECT INDUSTRIAL PARK (LOT
I (LUC) #28-98D, and we offer the
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building
Number: 81 Created: 10/3/2003
Please see the red -lined Building Elevations sheets for some
corrections that need to be made to the building face directions.
Topic: Drainage outfall
Number: 82 Created: 10/3/2003
The most critical outstanding comment from staff is the need for the
off -site drainage easement that must go to the Natural Resources
Advisory Board and ultimately City Council (at 2 readings) for a
final decision. The PDP administrative (Type I) hearing can be
scheduled but no Final Compliance approval can be given until
Council has approved the off -site easement.
Topic: Landscape
Number: 78 Created: 10/3/2003
Please see the Water Conservation Standards for Landscapes COMMENT
SHEET and the Water Conservation Standards for LANDSCAPING and
IRRIGATION SYSTEMS General Information sheets from Laurie D'Audney
(Water Conservation Department) that are attached to this comment
letter.
Number: 79 Created: 10/3/2003
Please see the attached Administrative Interpretation #8-03, from
the Current Planning Director, regarding interior parking area
landscaping requirements. The last paragraph of the interpretation
clearly states that parking areas internal to a mini -storage
facility that are visible from adjacent streets and properties still
must be adequately screened.
Number: 80 Created: 10/3/2003
Please see the red -lined Landscape Plan for some additional shrub
plantings needed along the future Sharp Point Drive extension.
Page I
Topic: Light & Power
Number: 77 Created: 10/3/2003
A red -lined Landscape Plan, with comments from Doug Martine of Light
& Power, is being forwarded to the applicant with this comment
letter.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: Drainage outfall
Number: 40 Created: 7/25/2003
Need to obtain the off -site easements from utilities and natural
resources for the drainage pipes.
9/24/03 still applicable.
Topic: General
Number: 45 Created: 7/25/2003
Need to provide spot elevations for the intersection of Sharp Point
and Midpoint Drive.
9/26/03 Have provided existing eleva::ions, please provide proposed
elevations or will they be the same.
Number: 74 Created: 9/26/2003
Need pan detail - don't think it will ,cork as a 2 foot pan as the
gutter is 2 foot wide.
Number: 75 Created: 9/26/2003
Add a type III barricade at the end of the cross pan.
Number: 76 Created: 9/26/2003
Final utility plans can not be signed off until the easement from
Natural Resources is obtained.
Topic: Landscape
Number: 55 Created: 7/25/2003
Need to show w2ere the curb gutter and sidewalk are going to end on
Sharp Point. The trees beyond this point will probably not be able
to go in and will need to be escrowed for with the rest of the
street improvements.
9/26/03 Curb gutter and walk will not go all the way to the
railroad tracks at this time and as s:ch that corner will not be at
final grades. What is to be planted here? Maybe better to escrow
for the plantings that would not be '--n ultimate grade.
Topic: Plat
Number: 32 Created: 7/25/2003
Correct the City approval signature
9/23/03 Corrected part of it, but also changed part of it.
Approval is by the City Engineer.
Page 2
Department: Light & Power Issue Contact: Doug Martine
Topic: Landscape
Number: 66 Created: 9/11/2003
A landscape plan showing future streetlights on Sharp Point Dr. has
been sent to Steve Olt for forwarding to the applicant. The street
tree locations must be adjusted to provide 40 ft. minimum clearance
between the tree(s) and streetlight(s). If the tree is an
ornamental. the clearance can be reduced to 15 ft.
Department: P:FA Issue Contact: Michael
Chavez
Topic: General
Number: 67 Created: 9/18/2003
REQUIRED ACCESS:
A fire lane is required. The fire lane shall be visible by painting
and signage, and maintained unobstructed. 1997 9"1.2.2.1
Number: 68 Created: 9/18/2003
Knox Lock: The use of a Knox -Box or Knox -Padlock shall be required
for access onto the property in the event of an emergency.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Easements
Number: 20 Created: 7/22/2003
9/23/03
Need to obtain a 20 foot temporary easement and a 20 foot permanent
easement for the revised pipe outfall into the pcnd. This will be
needed prior to final plan approval.
Topic: Utility Plans
Number: 24 Created: 7/22/2003
9/23/03
The utility plans do not differentiate correctly between the
existing, future and proposed lines, particularly for the existing
lines along Midpoint Drive and Sharp Point Drive. Please clarify and
adhere to the ;symbols as shown in the legend.
Topic: Water Line Separation
Number: 69 Created: 9/23/2003
The proposed separation between the future water line in sharp Point
Drive and the proposed 36 " storm sewer is only 1.2". Is this from
outside pipe diameter ? This is below the 18" minimum, and would
leave only 3.5 feet of cover for the future water line. It is
suggested that an elliptical pipe be used or dual 30 inch pipes that
would provide the water line with a minimum 4 feet of cover. 12 "
separation will then be approved as a variance by the utilities
(stormwater and water).
Page 3
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 8 Created: 7/16/2003
Since both Midpoint and Sharp Point Drives are classified as
collectors on the Master Street Plan, a striping plan for both
streets is needed. Please keep in mind that Midpoint is a collector
without on -street parking. (REPEAT COMMENT 9-23-03) A striping plan
was not submitted with the second submittal.
Number: 10 Created: 7/16/2003
There appears to be an inconsistency between the site and landscape
plans and the utility plan. on the utility plan the curb, parkway
and sidewalk end prior to the edge of the property on Sharp Point
Drive, while the landscape and site plans have these improvements
shown to the edge of the property? According to the Engineering
Dept. the curb and walk are to end prior to the edge of the
property. Please make the corrections to the site and landscape
plans to reflect the utility plans. (REPEAT COMMENT 9-23-03) The
discrepancy between the plan sets has not been corrected.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Landscape
Number: 73 Created: 9/26/2003
Provide the required landscape/utility separation distances on the
landscape plans.
See site, landscape and utility plans for other comments.
Topic: Utility
Number: 70 Created:
An Air Relief Valve (ARV) will be recuired on the
at the high point adjacent to the railroad tracks
standard ARV detail on the detail sheet.
9/24/2003
12-inch water main
Provide the
Number: 71 Created: 9/24/2003
A minimum of 4.5 depth of bury over water mains is our standard. A
variance to a minimum depth of 4 feet could be granted if all other
options have been explored an ruled out. Perhaps using dual arched
pipes at the proposed water main raising will allow the necessary
room to avoid a variance.
Number: 72 Created: 9/26/2003
Please provide a cost estimate for the construction of the 12-inch
water main from the proposed plug to the south side of the existing
railroad tracks.
City staff has determined that the plans are in a condition that
enables the project to be scheduled for an administrative (Type I)
public hearing.. However, Final Compliance approval cannot be granted
until the necessary off -site easements are completed. The other
outstanding issues (from City staff) can be addressed prior to the
PDP public hearing or with the Final compliance submittal. Be sure
and return all red -lined plans when you re -submit any plans.
Page 4
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 8 Created: 7/16/2003
Since both Midpoint and Sharp Point Drives are classified as
collectors on the Master Street Plan, a striping plan for both
streets is needed. Please keep in mind that Midpoint is a collector
without on -street parking. (REPEAT COMMENT 9-23-03) A striping plan
was not submitted with the second submittal.
Number: 10 Created: 7/16/2003
There appears to be an inconsistency between the site and landscape
plans and the utility plan. On the utility plan the curb, parkway
and sidewalk end prior to the edge of the property on Sharp Point
Drive, while the landscape and site plans have these improvements
shown to the edge of the property? According to the Engineering
Dept. the curb and walk are to end prior to the edge of the
property. Please make the corrections to the site and landscape
plans to reflect the utility plans. (REPEAT COMMENT 9-23-03) The
discrepancy between the plan sets has not been corrected.
Department: Wester Wastewater Issue Contact: Jeff Hill
Topic: Landscape
Number: 73 Created: 9/26/2003
Provide the required landscape/utility separation distances on the
landscape plans.
See site, landscape and utility plans for other comments.
Topic: Utilit},
Number: 70 Created: 9/24/2003
An Air Relief Valve (ARV) will be required on the 12-inch water main
at the high point adjacent to the railroad tracks. Provide the
standard ARV detail on the detail sheet.
Number: 71 Created: 9/24/2003
A minimum of 4.5 depth of bury over water mains is our standard. A
variance to a minimum depth of 4 feet could be granted if all other
options have been explored an ruled out. Perhaps using dual arched
pipes at the proposed water main raising will allow the necessary
room to avoid a variance.
Number: 72 Created: 9/26/2003
Please provide a cost estimate for the construction of the 12-inch
water main from the proposed plug to the south side of the existing
railroad tracks.
City staff has determined that the plans are in a condition that
enables the project to be scheduled for an administrative (Type I)
public hearing. However, Final Compliance approval cannot be granted
until the necessary off -site easements are completed. The other
outstanding issues (from City staff) can be addressed prior to the
PDP public hearing or with the Final compliance submittal. Be sure
and return all of your redlined plans when you re -submit any plans.
Page 4
If you have any questions regarding these issues or any other issues
related to this; project, please feel free to call me at (970)221-
6341.
You'fr�s�pTruly,
/ru l yy,,
e//�Yo^i�.lyc/�ru
Steve Olt
City Planner
cc: Sheri Wamhoff
Michael Oberlander
Project File #28-98D
Page 5
4C% construction company, inc.
909 EAST SIXTY-SECOND AVENUE • DENVER, COLORADO 80216 • (303) 287-5525
November 24, 2003
Steve Olt, City Planner
Planning Department
City of Fort Collins
281 North College Avenue
Fort Collins, Colorado 80522
Re: Prospect Industrial Park
Midpoint Self Storage — Phase II
Lot 33 - Type ( LUC #28-98D)
(Comments from 10.3.03)
Dear Mr. Steve Olt:
Upon receipt and review of your comments provided to us via fax on October 10,
2003, we offer the following response. We have addressed these comments
from the various departments and offer the following response:
Current Planning -Building, General, Landscape, Site
f
Current Planning — Steve Olt
81 1 Elevation references have been corrected on the plans.
82
The NR board has approved this easement and has sent it to City Council for
final approval. The scheduled City Council meetings are 12.16.03 and
1.6.04.
78
1 Comment noted. These standards have been review.
79 We are in receipt of the interpretation from the Planning Director. We
appreciate the clarification. There has not been any interior landscaping
added to the plan per the clarification
80 1
Additional landscaping has been added where indicated to provide screening !,
from the street.
77
he relined comments from Doug Martine has been picked up. Trees and
shrubs have been moved away from fire hydrant line.
4u _ ! l,Omment nosed. Refer To comment response bz.
construction proiessionals since 1964
Engineering - Drainage Outfall, General, Landscape, Plat
I
Engineering — Sheri wamhoff
45 Note has been added relating existing elevations to proposed elevations.
74 Using 4' pan and added detail
_
75 Type III barricade has been added
76 _ omment noted. Refer to response to item 82 above for clarification.
55 I The plans have been modified per your directions and suggestions to reduce
the length of the curb and gutter and sidewalk. We would recommend and
ask for direction on the escrowing of the landscaped area at the area.
32
The City approval signature nas been corrected as noted.
Light and Power — Doug Martine
66
Comment noted. The street light has been added to both the site and
landscape plan. Trees and shrubs have been moved to accommodate these
lights.
67
Comment Noted.
68 Knox boxes will be provided accordingly..
Stormwater Utility — Basil Harridan
1 20
1 20' easement has been provided. Process has been completed with Natural
Resources for the easement. These easements have been shown on the
plans
24.
Comment noted. Line types have been coordinated between plan and
legend.
69 ' A 24" X 38" horizontal elliptical storm pipe is now being proposed. With this
configuration, 4.25' of cover has been established with 12" separation
between water line and storm sewer (outside to outside). A variance is being
requested to reduce the min. coverage over the water line.
Transportation Planning Tom Reiff
i P—
8 _ A Striping Plan has been added to Sheet C13 of plan set.
10 I The corrections have been made accordingly.
'
Wastewater Wastewater —Roger Buffington I
73 Fire hydrants have been updated.
70 A future air relief valve has been shown on plans and detail added.
72 71 I See 69 above. _
A cost estimate has been provided with this submittal.
construction prof6ssionols since 1964
Sheri Wamhoff - comments on Sharp poin Page 1
From: Sheri Wamhoff
To: Tim Blandford
Date: Fri, Jul 21, 2000 3:10 PM
Subject: comments on Sharp poin
Tim
Here are some notes on the sharp point extension.
At transportation coordination it was agreed that the road could have an angle point at the intersection. It
would be a three way controlled access so that the extension of the road would not have to follow our min
curve requirements.
Therefore it appears that the road should go through Tract A.
The extension should be designed as a collector with parking. This will allow for greater flexibility and the
ability to install islands for the railroad crossing devices if/as needed. The street will need to cross the
railroad tracks perpendicularly. May want to check with Mike Herzig on how close to 90 degrees this
needs to be.
In conjunction with the development of the adjacent property the road will need to be designed (including
the 500 feet off site) and built or it may be possible to delay the construction by the escrow of funds for the
construction of the street if they do not take access from it.
As a collector the applicant would receive street oversizing reimbursement for the oversized portion and
they can file for reimbursement from the property on the other side of the street. Odds are pretty slim that
they would get reimbursed for the portion adjacent to the natural area. But it appears that there is a
developable lot adjacent a portion of the roadway.
Sheri
If you have any questions regarding our responses and re -submittal, please feel
free contact me directly at 303.287.5525.
Sincer
arry Sherman,, Architect
Vice resident of Design
dcb construction co. inc.
Micheal Oberlander, PE
Project Manager
North Star Design
construction prof¢ssionols since 1964
REM 7f'3DEc:
REVISION
COMMENT SHEET
DATE: December 11 2003 TO: Technical Services
PROJECT: #28-98D PROSPECT INDUSTRIAL PARK
(LOT 33), MIDPOINT SELF STORAGE —
TYPE I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
S�
December 17, 2003
No Comment
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
Z Te TMp, C--iRAntktG E1mr LoCAWIdd 1 S CONE✓S iNf
�q Livev -ryPE � ►-leap, W/-1cti DO&S
SUGGEST �VUTPi�"/t- 6,e ,fyGaA/
-rM t s (E�-14-s&-,n ex7— exp t2e- ? Doej ,7- tiOF" ra
Nance (please privet) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report _Other City of Fort Collins
Utility Redline Utility Landscape
�.H
REVISION
COMMENT SHEET
DATE: December 1, 2003 TO: Water/Wastewater
PROJECT: #28-98D PROSPECT INDUSTRIAL PARK
(LOT 33), MIDPOINT SELF STORAGE —
TYPE I (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
December 17, 2003
10 No Continent
ElProblems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
Name
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
L�Kat 4<te _Drainage Report _Other
-Utility _l edline Utility -L-11-ndscape
L —
Date
City of Fort Collins
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Transportation Planning
Date: December 16, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE I
(LUC) #28-98D
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: General
Number: 85
No further comments.
Created: 12/16/2003
�)
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page 1
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: December 17, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE I
(LUC) #28-98D
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: Drainage outfall
Number: 40 Created: 7/25/2003
[121121031 The NRB approved this proposal. We will not actually issue an easement, but the decision has been made that an
excavation permit will be issued by Engineering for the work within the City Utilities property. The fees associated with this
permit are $70 ($25 for thepermit administration and $45 for the inspection fees). There is no Pavement impact fee with this
permit as the street is not paved for the area for which this permit is for. The contractor doing this work must be licensed with
Engineering to work in the City right-ef-way. This excavation permit will be processed and issued with the Development
Construction Permit (DCP) for this site (there are additional fees and such associated with the DCP).
9/24/03 Still applicable.
7/25/03 Need to obtain the off -site easements from utilizes and natural resources for the drainage pipes.
Topic: Landscape
Number: 55 Created: 7/25/2003
112/ 17/031 Per the discussions at staff review only the two street trees that will not be able to be installed will need to be
escrowed for. Steve will work with you on the other landacaping to be installed. The amount for the two trees
will be a part of the cash escrow that will be given to the city with the money for the local street improvement
costs on Sharp Point.
9/26/03 Curb gutter and walk will not go all the way to the railroad tracks at this time and as such that corner will not be
at final grades. What is to be planted here? Maybe better to escrow for the plantings that would not be in ultimate grade.
7/25/03 Need to show where the curb gutter and sidewalk are going to end on Sharp Point. The trees beyond this point
will probably not be able to go in and will need to be escrowed for with the rest of the street improvements.
r;
§1gnature
i
CHECK HERE IF YOU
Plat Site
Utility Redline Utility
Date
TO RECEIVE COPIES OF REVISIONS
Drainage Report_ Other�`�
Landscape
Page I
Project Comments Sheet
Selected Departments
Department: Stormwater Utility
Date: December 19, 2003
Pre j ect:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE I
(LUC) #28-9813
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Hamdan
Topic: Drainage Reports
Number: 83 Created: 12/16/2003
[12/16/03] Please provide 3 signed and stamped copies of the drainage reports with any future submittal for approval.
Topic: Easements
Number: 20
[12/16/031
Created: 7/22/2003
Instead of a regular easement process, an excavation permit through the City's Engineering Department would be
allowed in order to drain flows into the utility owned skunk pond and do the construction work necessary for
installing the pipe off of Sharp Point Drive.
9/23/03
Need to obtain a 20 foot temporary easement and a 20 foot permanent easement for the revised pipe outfall into the
pond. This will be needed prior to final plan approval.
Topic: Grading Plan
Number: 84 Created: 12/16/2003
[12/16/031 Please document on the grading plans which trees are to remain and which are to be removed. Provide a
note for trees to remain to have a construction fence around them for protection.
-1
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
f Plat _ /site Drainage Report Other —
Utility Redline Utility Landscape
Page I
STAFF PROJECT REVIEW
Citvof Port Coll
DCB Construction Company, Inc. Date: 12/23/2003
c/o Barry Sherman
909 East Sixty -Second Avenue
Denver, CO. 80216
Staff has reviewed your submittal for PROSPECT INDUSTRIAL PARK, MIDPOINT
SELF STORAGE (EXPANSION) - TYPE I (LUC) #28-981), and we offer the following
comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Genera/
Number: 87 Created: 12/23/2003
[12/23/03] Current Planning is ready for the Final Plan mylars to be submitted. The
only concern is regarding the planned streetlight locations on the future Sharp Point
Drive, as provided by Light & Power. There are 2 Redmond Linden trees that are too
close to the planned streetlights. Please contact Doug Martine, at (970)224-6152, to
work out the final tree locations before revising and submitting the Landscape Plan.
Department: Engineering Issue Contact: Sheri Wamhoff
Topic: Drainage outfall
Number: 40 Created: 7/25/2003
[12/12/03] The NRB approved this proposal. We will not actually issue an easement,
but the decision has been made that an excavation permit will be issued by Engineering
for the work within the City Utilities property. The fees associated with this permit
are $70 ($25 for the permit administration and $45 for the inspection fees). There is
no Pavement impact fee with this permit as the street is not paved for the area for
which this permit is for. The contractor doing this work must be licensed with
Engineering to work in the City right-of-way. This excavation permit will be processed
and issued with the Development Construction Permit (DCP) for this site (there are
additional fees and such associated with the DCP).
[9/24/03] Still applicable.
(7/25/03] Need to obtain the off -site easements from utilities and natural resources
for the drainage pipes.
Page 1
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 85 Created: 12/16/2003
No further comments.
Please be sure and return all red -lined plans when you submit the mylars
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970)221-6341.
Yours Truly, Q
� "
Steve Olt,
City Planner
cc: Sheri Wamhoff, Engineering
Basil Hamdan, 5tormwater
North Star Design, Inc.
Page 3
Project Comments Sheet
Selected Departments
wwnftmmmw�_
Department: Water Wastewater
Date: July 21, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE -TYPE I
(LUC) #28-98D
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
No Review Date
Note - Please identify your redlines for future reference
Issue Contact: Roger Buffington
Topic: Utility
Number: 18 Created: 7/21 /2003
As a result of a meeting with PFA, delete two fire hydrants and move one as noted
on the utility plans.
Number: 19 Created: 7/21 /2003
Coordinate with JR Engineering on alignment of water main in the future Sharp Point
Drive. The cost of the boring and railroad crossing will be the responsibility of this
development and the Sidehill development. A meeting is suggested to facilitate this
coordination and determine which plans will include the crossing.
Issue Contact: Jeff Hill
Topic: Utility
Number: 12 Created: 7/17/2003
Include the standaird general note pertaining to the utility/landscape separation
distances. Show all existing/proposed water and sewer lines the site/landscape
plans and maintain the required landscape/utility separation distances.
Number: 13
Created: 7/17/2003
Include a note on the utility plans to coordinate abandonment of existing water and
sewer service with the city of Fort Collins Utilities. _
Date
I
CHECK 13ERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X Plat _ X Site Drainage Report Other.
Utility _ Redline Utility , Landscape
Page L
Number: 14 Created: 7/17/2003
Water line within the Sharp Point Drive extension must be 12-inch. Provide a profile
of the 12-inch water line and complete the design for the tossing at the rail road
tracks (Include a steel casing at the rail road crossing).
Number: 15 Created: 7/17/2003
Fire hydrants which connect to a proposed water main must be connected with a
swivel tee. Maintain a 10 foot separation between buildings and fire hydrants.
Number: 16 Created: 7/17/2003
Provide a steel casing on the 12-inch water main at the dual storm sewer crossing.
Include the steel casing detail on the detail sheet. Include all information for the
construction of the steel casing (i.e. wall thickness, length, diameter, etc.).
Number: 17 Created: 7/17/2003
Maintain 10 feet minimum separation between thrust blocks and all other
underground utilities.
See site landscape; and utility plans for other comments.
Page 2
Project Comments Sheet
Selected Departments
City of Porl Collins
��.�■ a
Department: Stormwater Utility
Date: July 22, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE 1
(LUC) #28-98D
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 16 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Drainage outfall
Number: 21 Created: 7/22/2003
The proposed temporary drainage outfall from Pond 2 and from the rear swale should be redesigned such that the
permanent outfall is built now rather then with the construction of Sharp Point Drive. There is no need for an interim
outfall situation since the permanent facilities can be built at this stage.
Storm sewer 1 A profile shows a 1.2 foot separation from the existing 42 in sanitary sewer main. Please provide a 1.5
foot separation from that main if possible in order to maintain propoer clearances, otherwise provide support to prevent
the 42 in line from weighing on the sanitary sewer main.
Topic: easements
Number: 20 Created: 7/22/2003
Please provide a 20 foot wide drainage easement for all proposed storm sewers.
A permanent drainage easement from the City of Fort Collins Utilities who owns the ponds where this site drains to will
be required prior to hearing. Please contact the City Right Of Way office to start the process of obtaining such
easements.
Topic: Erosion Control
Number: 25
Plan is OK.
Created: 7/22/2003
Topic: Grading
Number: 24 Created: 7/22/2003
Please call out the elevations for the proposed fill along the future Sharp Point Drive Right Of way.
Signature
7ll"27(o3
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X Plat " Site X Drainage Report Other_
Utility _ C Redline Utility X Landscape
Page 1
Topic: Inlet on Sharp Point Drive
Number: 23 Created: 7/22/2003
How will the inlet on Sharp Point Drive be protected in the interim situation to prevent dirt from eroding and draining
freely into the existing pond.
Topic: Pond 2 Grading
Number. 22 Created: 7/22/2003
It seems that some of the grading for Pond 2 will involve excavating around an existing power pole. Please obtain the
approval from the owner of the electric line for sharing in their easement and for excavating around their power pole.
Topic: Water Quality Outlet Details
Number: 26 Created: 7/22/2003
Please provide a water quality outlet elevation table for Pond 2 similar to the one provided for Pond 1.
Page 2
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: July 25, 2003
Project:
PROSPECT INDUSTRIAL PARK, MIDPOINT SELF STORAGE - TYPE I
(LUC) #28-98D
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
No Review Date
Mote - Please identify your redlines for future reference
Issue Contact: Sheri Wamhoff
Topic: Drainage outfall
Number:39 Created: 7/25/2003
Storm line lA needs to be built now, not in the future. This will save the developers the cost of one
pipe.
Number: 40
Created: 7/25/2003
Need to obtain the off -site easements from utilites and natural resources for the drainage pipes.
Topic: General
Number: 38 Created: 7/25/2003
Please provide two benchmarks.
Number: 41 Created: 7/25/2003
Need to address how the drainage will work at the intersection of Sharp Point and Midpoint Drive
with the removal of the curb and gutter. It might be a good idea to meet with Engineering,
Stormwater and Natural Resources regarding this design. It might be worth looking at adding some
inlets and tying into and upsizing the 24 inch pipe to drain the intersection.
Number: 42
Created; 7/25/2003
Please provide some elevations at the access drive off of Sharp Point so can determine how the
drainage at this drive is going to work. Also please label as future emergency access.
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
x Plat Site Drainage Report Other —
utility
X Utility Redline Utility � Landscape
Page I
Number:43 Created: 7/25/2003
Note on the plans that the curb height at the emergency access drive off of Midpoint Drive is to
transition to a 0 inch height at the sidewalk.
Number: 44 Created: 7/25/2003
Midpoint Drive will need to be fully milled and overlayed from the west side of the first cut to the
intersection with Sharp Point. This street will be milled and overlayed in mid September. As your
work will occur after this you will need to do a full mill and overlay when your work is done. This
needs to be noted and shown on the utility plan.
Number:45
Created: 7/25/2003
Need to provide spot elevations for the intersection of Sharp Point and Midpoint Drive.
Number: 46
Created: 7/25/2003
A portion of the new curb you are showing on the east side of Sharp Point may need to be built in
order to get the intersection to drain.
Number: 47 Created: 7/25/2003
Show that there will be a future ramp on the east side of the intersection if one does not already
exist.
Number: 48
Created: 7/25/2003
A crosspan is not allowed across collectors. We would like to look at other options before we agree
to the use of a crosspan. If a crosspan is used need to provide information showing that it is
meeting min grades.
Number:49
Created; 7/25/2003
Need to work with utilities to make sure that the driveway as you are showing still works for them
(that any changes to it are acceptable).
Number: 50
Created: 7/25/2003
Your note on the street plans. This is true we are not requiring the off -site design if we have a
design from sidehill that this ties into. Not sure that what we have seen from SideHill ties in at
this location. The grade going down to the railroad tracks seems to comply with what they have
shown, although from what we have seen from them the grade break between the two designs is
greater than allowed.
Number:51 Created: 7/25/2003
Please show 20 - 50 feet of the centerline grade proposed by sidehill. I have shown what the plans
we have said, but don't think that is the most current design.
Topic: Landscape
Number: 52
Created: 7/25/2003
Do not title the plans addition to midpoint self storage. They should be'Midpoint Self Storage' with
what ever you want at the end.
Page 2