Loading...
HomeMy WebLinkAboutMEADOWS AT REDWOOD PUD REPLAT - Filed GC-GENERAL CORRESPONDENCE - 2004-08-17July 3, 1986 Mr. Tom Gathmann City of Fort Collins Storm Drainage Utility 300 LaPorte Avenue P.O. Box 580 Fort Collins, CO 80522 Re: Replat of The Meadows at Redwood P.U.D.!rkAV- Project No.: 206.19 Dear Tom: The Replat of The Meadows at Redwood P.U.D. is being submitted to the City of Fort Collins as a Preliminary Plat. This subdivision was originally platted, designed and approved as Redwood Villages P.U.D. in 1982 and 1983. All proposed improvements as per the plans by Parsons and Associates (project 82.22 Fly:D, sheets 1-5) have been constructed and approved by the City. The proposed plan calls for an overall reduction in the number of dwelling units to be built and will be designed in a "typical" single family configuraiton as opposed to the modular housing approach of the original plan for Redwood Village P.U.U. Although the runoff coefficient of 0.45 used for the original plan seems a bit, unrealistic for that particular plan, we feel that it will be appropriate for the current design. We see no significant change in the amount or the pattern of the storm water runoff for the proposed plan over the original Redwood Village P.U.D. plan. Although the storm drainage improvements for Redwood Village P.U.D. have been installed and accepted by the City per letter to Jay K. Jackson (Jacobson) from David Stringer dated August 26, 1985, since these improvements are to be maintained privately by a Homeowne,s Association, further inspection should occur after build -out of the proposed Replat to confirm that the improvements ENGINEERING PROFESSIONALS INC. are still in -place, undamaged and essentially in conformance with the improvements previously referred to as designed by Parsons and Associates. A,l, In addition, all subsequent phases of The Replat of The Meadows at Redwood P.U.D. will also conform to the overall drainage scheme and the proposed improvements for Redwood Village P.U.D., Phases II and III, as well as the "Evergreen Park Basin Major Storm Drainage Study" as prepared by Engineering Professionals, Inc. Sincerely, ENGINEERING PROFESSIONALS, INC. j i fenneth L. Rabbers KLR:psri 8epterber 4, 1986 Mr. Torn Gathmann City of Fort Collins Storm Drainage Utility 300 LaPorte Avenue P.O. Box 580 Fo:t Cel1ins, Colorado 80522 Re: Replat of The Meadows at- Redwood P.U.D. Dear Tom: Project No.: 522.2 The Replat of The Meadows at Redwood P.U.D. is being submitted to the City of Fcrt Collins as a Final Plat. This subdivision was or=ginally platted, designed and approved as Rcslwood Villages P.U.D. in 1982 and 1983. All proposed improvements as per the plans by Parsons and Associatos (project 82.22 RED, sheets 1-5) have been constructed and approved by the City. The propo> ed plan calls for an overall reduction in the mn,bcr of dwell ing units to be bui l t and will be designed in a "typical" single family configuration as opposed to the modular housing apFroach of the original plan for Redwood Village P.U.D. Although tiic runoff coefficient of 0.45 used for the original plan sccm� a bit unrealistic for that particular plan, we feel that it will be appropriate for the current design. We see no significant change in the amount or the pattern of the storm water runoff fcr the proposed pla.n over the original Redwood Village P.D.D. plan. Although the storm drainage improvements for Redwood Village P.U.D. have been installed and accepted by the City per letter to Jay K. Jackson (Jacobson) from Davis& Stringer dated August 26, 1985, Wircc the e "sl=GUGnlI �.0 o, 1? R.41Vz..k1Si[ z_.px.lVa�eLy_1bX a further inspection should occur after bur'd out cf�L nolose Re_�lat to confirm Chat the improvements ENGINEERING PROFESSIONALS INC. 2000 Vermont Dr, For- Cnllins, CO 80525 (303) 226-3852 are nt l]_ in -place, undamaged and essentially in conformance with the imprcvements previously referred to as designed by Parsons and Associates. In addition, all subsequent phases of The, Replat of The Meadows at Redwood P.U.D. will also conform to the overall drainage scheme and the proposed improvements for Redwood Village P.U.D., Phases II and III, as well as the "Evergreen Park Basin Major Storm Drainage Study" as prepared by Engineering Professionals, Inc. Sincerely, ENGINEERING PROFESSIONALS, INC. Steven L. Kraushaar, P.E. SLK:kf CITY OF FORT COLLINS COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION October 15, 1986 Walt Barclay United Bank of Fort Collins P.O. Box 565 Fort Collins, Colorado 80522 Dear Walt: Enclosed is a copy of the street oversi zing reimbursement made for Redwood Village. This statement satisfied all previous oversiz- ing obligations between the City and Redwood Venture. Due to the fact that all street improvements are in for the replat, the statement in the development agreement saying no oversizing repays are due with the replat is correct. If you have any questions about this, feel free to call me (221-6750). S'nceob 4 Jim Newel 1 OFFICE OF COMMUNITY • DEVELOPMENT, PLANNING DIVISION 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6750