The Replat of The Meadows at Redwood P.U.D. is being
submitted to the City of Fort Collins as a Preliminary Plat.
This subdivision was originally platted, designed and approved as
Redwood Villages P.U.D. in 1982 and 1983. All proposed
improvements as per the plans by Parsons and Associates (project
82.22 Fly:D, sheets 1-5) have been constructed and approved by the
City.
The proposed plan calls for an overall reduction in the
number of dwelling units to be built and will be designed in a
"typical" single family configuraiton as opposed to the modular
housing approach of the original plan for Redwood Village P.U.U.
Although the runoff coefficient of 0.45 used for the original
plan seems a bit, unrealistic for that particular plan, we feel
that it will be appropriate for the current design. We see no
significant change in the amount or the pattern of the storm
water runoff for the proposed plan over the original Redwood
Village P.U.D. plan.
Although the storm drainage improvements for Redwood Village
P.U.D. have been installed and accepted by the City per letter to
Jay K. Jackson (Jacobson) from David Stringer dated August 26,
1985, since these improvements are to be maintained privately by
a Homeowne,s Association, further inspection should occur after
build -out of the proposed Replat to confirm that the improvements
ENGINEERING PROFESSIONALS INC.
are still in -place, undamaged and essentially in conformance with
the improvements previously referred to as designed by Parsons
and Associates. A,l,
In addition, all subsequent phases of The Replat of The
Meadows at Redwood P.U.D. will also conform to the overall
drainage scheme and the proposed improvements for Redwood Village
P.U.D., Phases II and III, as well as the "Evergreen Park Basin
Major Storm Drainage Study" as prepared by Engineering
Professionals, Inc.
Sincerely,
ENGINEERING PROFESSIONALS, INC.
j
i
fenneth L. Rabbers
KLR:psri
8epterber 4, 1986
Mr. Torn Gathmann
City of Fort Collins
Storm Drainage Utility
300 LaPorte Avenue
P.O. Box 580
Fo:t Cel1ins, Colorado 80522
Re: Replat of The Meadows
at- Redwood P.U.D.
Dear Tom:
Project No.: 522.2
The Replat of The Meadows at Redwood P.U.D. is being
submitted to the City of Fcrt Collins as a Final Plat. This
subdivision was or=ginally platted, designed and approved as
Rcslwood Villages P.U.D. in 1982 and 1983. All proposed
improvements as per the plans by Parsons and Associatos (project
82.22 RED, sheets 1-5) have been constructed and approved by the
City.
The propo> ed plan calls for an overall reduction in the
mn,bcr of dwell ing units to be bui l t and will be designed in a
"typical" single family configuration as opposed to the modular
housing apFroach of the original plan for Redwood Village P.U.D.
Although tiic runoff coefficient of 0.45 used for the original
plan sccm� a bit unrealistic for that particular plan, we feel
that it will be appropriate for the current design. We see no
significant change in the amount or the pattern of the storm
water runoff fcr the proposed pla.n over the original Redwood
Village P.D.D. plan.
Although the storm drainage improvements for Redwood Village
P.U.D. have been installed and accepted by the City per letter to
Jay K. Jackson (Jacobson) from Davis& Stringer dated August 26,
1985, Wircc the e "sl=GUGnlI �.0 o, 1? R.41Vz..k1Si[ z_.px.lVa�eLy_1bX
a further inspection should occur after
bur'd out cf�L nolose Re_�lat to confirm Chat the improvements
ENGINEERING PROFESSIONALS INC.
2000 Vermont Dr, For- Cnllins, CO 80525 (303) 226-3852
are nt l]_ in -place, undamaged and essentially in conformance with
the imprcvements previously referred to as designed by Parsons
and Associates.
In addition, all subsequent phases of The, Replat of The
Meadows at Redwood P.U.D. will also conform to the overall
drainage scheme and the proposed improvements for Redwood Village
P.U.D., Phases II and III, as well as the "Evergreen Park Basin
Major Storm Drainage Study" as prepared by Engineering
Professionals, Inc.
Sincerely,
ENGINEERING PROFESSIONALS, INC.
Steven L. Kraushaar, P.E.
SLK:kf
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
October 15, 1986
Walt Barclay
United Bank of Fort Collins
P.O. Box 565
Fort Collins, Colorado 80522
Dear Walt:
Enclosed is a copy of the street oversi zing reimbursement made for
Redwood Village. This statement satisfied all previous oversiz-
ing obligations between the City and Redwood Venture.
Due to the fact that all street improvements are in for the
replat, the statement in the development agreement saying no
oversizing repays are due with the replat is correct. If you have
any questions about this, feel free to call me (221-6750).
S'nceob
4
Jim
Newel 1
OFFICE OF COMMUNITY •
DEVELOPMENT, PLANNING DIVISION