April 7, 1987
Mr. Mike Hertzig, PE
Development- Coordinator
City of Fort Collins
300 LaPorte Avenue
Furl- Collins, Co 80521
RE: Revised Preliminary Site, Utility &
Drainage Plan for Williamsburg PUD
Dear Mike:
I have reviewed the proposed revised preliminary site, utility,
and drainage plan for Williamsburg PUD. The revised preliminary
plan is substantially the same in terms of drainage impact as the
previously approved preliminary PUD and drainage study.
We, therefore, do not believe it is necessary to modify the
previously approved preliminary drainage plan at this time.
If you have any questions, please give me a call.
a�ncerely,
John Barnet -t, ASLA
Vice -President
cc: 7.VFK
Debbie Tamlin
JC/jk
CITY OF FORT COLLINS
DEVELOPMENT SERVICES — ENGINEERING
June 19th, 1987
Mike Beasecker
c/o Circle K Corporation
1127 S. Tejon Street
Denver, CO 80223
Dear Mike;
The City of Fort Collins Engineering Services will release the Footing and
Foundation Permit for the proposed convenient store on the northwest corner
of Shields Street and Horsetooth Road without the completion of all the
utilities, provided the Developer has met the three conditions as specified
in the Development Agreement for The Market at Horsetooth Commons P.U.D.,
and is restated below:
E. Footing and 'Foundation permit.
Prior to the issuance of the footing and foundation permit for
any buildings within this Development, the Developer agrees to
the following:
(i) No combustible material will be allowed on the site until
the water system is installed by the Developer and approved
by the City.
(ii)To provide and maintain an adequate all-weather roadway
access to any building under construction, to handle any
emergency vehicles or equipment. Such access shall be at a
minimum, 20 feet wide roadway of 4" base course material
compacted according to City Standards, with a 40' radius
turnaround at each building and dead end.
(iii)The issuance of said footing and foundation permit is
solely at the Developer's own risk and the Developer shall
hold the City harmless in the event of any damages result-
ing from the issuance of said permit prior to the comple-
tion of the requirements in accordance with the Code of the
300 LaPcrte Ave. • PO. Box 580 • Fort Collins, Colorado 80522 • 003) 221 6605
Page 2
Engineering services agrees to release the building permit for said build-
ing provided all required utilities have been completed by the Developer
and accepted by Engineering Services. The required utilities are all util-
ities as specified in Chapter 99-6. B. in the City Code serving such build-
ing which is the subject of the Building Permit, and are shown on the
approved utilities plans.
If you have any questions concerning this matter please contact me at the
Planning Department (303) 221-6750.
S ncer ly;
1/ I
mNewell
/ Civil Engineer
cc: Dave Stringer, Chief Inspector
Ted Shepard, Project Planner.