TO: Bob Smith, Assistant City Engineer - Drainage
ur/e rV PGfFNS Ex,4.111,V,-4,
FM: Bonnie Tripoli, -Development-En(_T r eHnq-Ana4yxt-
RE: Subdivision Utility Plans
DATE �-3
Submitted for your review and comment are utility plans for
X_
% �-6 Z.41yl—) /./6 .7 J
Please respond by
Pie
r
�U
fl
ii
���� a JiJ
M
CITY OF FOR FCOLLINS P.0. BOX 580,1`ORTCOI LINS, COLORADO80522 (103)484-4220
DEVELOPMENT CENTER EXT.655
July 20, 1983
Mr. Frank Vaught
ZVFK ARCHITECTS/PLANNERS
218 West Mountain Avenue
Fort Collins, Colorado 80521
Dear Frank:
Staff has reviewed the Landings 5th Filing, preliminary and final and has
the following comments:
0
1. The design of Spring Canyon Court is not acceptable and must be
redesigned.
2. Eight foot easements are to be provided along the front lot lines.
3. Building envelopes cannot encroach on easements.
4. The 5' walk will not be oversized by the City.
5. Square footage of lots should be indicated on the site plan.
6. Provide parking information for this phase and delete data on Tract
"B" and "C".
7. What -is the status of the property between this project and the
Landings 3rd Filing?
A revised site plan, addressing the above comments, is to be submitted no later
than Monday, August 8, 1983. An 81z" x 11" reduction of the site plan and
colored rendering are to be submitted by Monday, August 15, 1983.
Sincerely,
Cathy Chianese
Senior City Planner
CC:ro
cc: Bonnie Tripoli, Utility Plans Examiner
June 7, 1984
Re: Storm Water Drainage
Report Revisions
Job No. 83-269-010
City of Fort Collins
Storm Water Drainage Department
300 LaPorte Avenue
Fort Collins, Cclorado 80522
AUn: Mr. Phil Waite
Dear Phil:
We have addressed your three comm-mts received on June 6, 1984 regarding
the Landinqs 5th Filing P.U.D.
1) The calculations for basin B are included for your. review.
2). In reviewing the grading on the project that it is complete
and by examining, the 100-wear developed discharge from basin B
equal to approximately 0.40 cfs, I do not see a reason to install
a curb chase drain. Due to the small amount of change resulting
j' in the develoT-d condition, the difference between the historic
and developed runoff is minimal. As discussed with you or. June 7,
10,04, 1. think that we are in agreeance that this curb chase should
Pet be installed.
3) We will revise Exhibit C of the Storm Water Drainage Report to
reflect: revision #2 on the sign -off area. I believe this was an
error in Mr. Smith's sigr:ature and therefore should be readily
changeable.
Should you have any questions regarding the Storm Water Drainage Report for
the Landings 5th Filing, please do not hesitate to call.
Sincerely yours,
a
Rick R. Pickard„ P.E.
TARANTO, STANTON & TAGGF.
CONSULTING ENGINEERS
RRP:ses
TARANTO, STANTON & TAGGE
Consulting Engineers
748 Whalers Way • Building D • Fort Collins. CO 80525
1303) 226 0557 • Metro Denver Number (303) 595 9103