Loading...
HomeMy WebLinkAboutKENSINGTON SOUTH - Filed GC-GENERAL CORRESPONDENCE - 2004-08-12Asphalt Paving • Contracting • Sand & Gravel October 12, 1977 PCX Miller, 3833 Spruce lane, Port Collins, Colo. 80521. Gentlemen: P. 0. Box 2187 1800 North Taft Hill Road Fort Collins, Colorado 80522 (303) 482-7854 I his is to inform you that your asphalt paving on streets Canterbury, glen Haven and West Drake in Kensington South Subdivision will be completed by November 1), 1977, weather permitting. cc: file 11 you have any ether questions, ptease feel free to contact me. Yours 'I ruts, STERLING PAVING CO. J By: Bob Gardner We Are An Equal Employment Opportunity Employer ENGINEERING DIVISION August 29, 1980 Mr. Rex s• Miller Rex Miller Construction, Inc. P.O. Sox 1417 Fort Collins, Colorado 80522 Dear Rex: we are presently preparing an inventory of detention ponds in the City to determine whether or not they have been properly constructed and have been accepted for maintenance by the City. In doing so, we have noted that the detention pond for Kensington South, First Filing has not been. constructed in accordance with the approved utility drawings. The headwall at the outlet structure and the trickle channels have not been installed. Also, the overall grading of the pond is not in accordance with the utility plan. if you wish to go over these items before you correct them, please contact Dave Stringer at our office. If you have any questions regarding this matter, please call me. Sincerely, Marc Engemoen Civil Engineer IS cc: Dave Stringer m REX S. s gg L�1 I l'� S `O"v'STRUC,TIC►N INC;. „� ` , 9-9-80 Marc I,;ngco�oen city of Fer_t Collins Engincering Division P.O. Rox 580 T't. Collins, rn 80522 UcarMarc; We are in receipt of your letter dated August 29, 1980 regarding the detention pond for Kensington South, First Filing. Rex asked me to notify you to the effect that the headwall and trickle channels will he installed by the summer of 1,981. At this time t_h(, grading will also meet the utility plan specifications. If you do not find this reply satisfactory, please contact our office at. 482-4743. ;Sinccr� ly, rl( rrri_ l— Celka Sccrclary b;nclo:;urc MILLER CCMPANIES Cit-y of Port Collins I,,'no Ii nc(ring fk1,parti[K nL P.O. Box 580 Dort Collins, CO 80522 AtLr: Ronnie Trfpolie To whom it may concern; Miller Properties Inc PBox 2272 July 2, 1�81 This letter is to inform you of our intent to repair Lhe sect -ion of sidewalk d�u,gcd in Front of the property located at 1343 Glen Haven Drive, Lot 38, Kensington South Subdivision. We will repair the damage within thirty (30) day cf the of the certificate of occupancy. At this time we ask that you give clearance on this property . Thank you for your cooperation. sincerely, Bruce E. Miller t 3ty/ t: l Cl MILLER l'h CCMNiES City of Fort Collins I�ngineorrinq Depart-mcnt P.O. 1Sox 580 Fort Collins, CO 80522 Dear Sirs; Miller Properties Inc ,trc(t N. ") Sox 2272 oct_oi-,--r b, 1981 'Tbe intent of thi:; letter is to request that Fngineerinq Clearance be given for the property located at 1430 (;len Haven (hot 12, Kensington South, 1st Piling). Tlir,r(, is scxnc, repair work to I)r done in the concrete sidewalk along the street. The -,se repairs will be made within a thirty day period. We are asking that cleararco Ix, given from your department so as to obtain a Certificate of Occupancy from the Miildinq Tnspection Department. Your cooperation in this matter will ix, greatly appreciated. Sincerely, Bruce F. Miller I3f 7,l/tl CIIV (Jf KJKI LVLLWO ... e: a .. BUILDING INSPECTION December 9, 1981 - f .ffisi._. .b..c Sv.•X. _J 4: ..r�.r S.1 hC ....-°sr.-.r; Mr. Bruce Miller Miller Properties, Inc. P. 0. Box 2272 re Fort Collins, CO 80522 Dear Bruce: 1430 Glen Haven Drive Sidewalk Repair It has come to my attention that a 30-day, Temporary Certificate of Occupancy was issued for the above residence on October 19, 1981 conditional upon the adjacent public sidewalk and surrounding pavement being repaired. As of this date, our office has not received clearance from the Engineering Division in- dicating that the necessary repair has been done. I understand furl 'her that your office has been apprised of this matter by a phone call from our office on two separate occasions with no corrective action taken. City subdivision regulations specifically require that all such public im- provements be completed prior to issuance of a Certificate of Occupancy. Because the Temporary Certificate has expired, the occupants of the above residence are no longer authorized to remain there. Therefore, if the required sidewalk repairs are not completed within five days of this notice, proceedings to vacate the above residence will be initiated as agreed to by your firm when the Temporary Certificate was issued. Sincerely, - Felix C; Lee Deputy Chief Building Official FCL/dlh cc: Dave Stringer, Chief Construction Inspector Residents of 1430 Glen Haven Drive P.O. Box 580. Fort Collins. Colorado 80522 ENGINEERING DIVISION April 13, 1982 Rex S. Miller Construction, Inc. 3833 Spruce Drive Fort Collins, Colorado 80526 Ph Dear Mr. Miller: I am sure you are aware that the detention pond, for Kensington South, First Filing has still not been constructed in accordance with the approved utility drawings. The headwall at the outlet structure and the trickle channels have not been installed, and the overall grading is not in accordance with the utility plan. I brought this matter to your attention in a letter dated August 29, 1980, a copy of which is attached. You advised me in a letter dated September 9, 1980, also attached, that the necessary work would be completed by the summer of 1981. As we are now approaching the 1982 construction season, I wonder if you are planning to bring this matter to a conclusion. 484-4220 Ext. 728 I realize that the present slump in the building industry has affected your construction schedule, and that is difficult to estimate when construction will pick up again. But I am sure you can appreciate the concern of the homeowners in Kensington South who have endured the nui- sance the pond creates:in its present condition for the past three years. Please advise me at your earliest convenience when we can anticipate the completion of this pond. Your cooperation in this matter would be greatly appreciated. If you have any questions, please do not hesitate to call me. Sincerely, 4"7 5Wle/f-1— Marc Engemoen Civil Engineer IT Attachments FLATIRON CONCRETE CONSTRUCTION CO. 941 RIVERSIDE DRIVE, FORT COLLIN S, COLORADO 80524 • PHONE (303)484-9262 Reply to: P. O. Box 504, Fort Collins. Colorado 80522 August 3, 1983 City of Fort Collins P.O. Box 580 Fort Collins CO 80522 P,ttn: Dave Stringer Re: Detention Pond Swale & Headwall @ Kensington South Dear Dave: Flatiron Concrete Construction has been contracted with Rex Miller to build the concrete swale and headwall at the Kensington South Detention Pond. Work will begin immediately. SKW/jd Sincerely, Steven K. Wood, Superintendent Flatiron Concrete Construction Co. FOUNDATIONS & FLATWORK CURBIGUTTER CITY OF FORT COI TINS ENGINEERING SERVICES July 7, 1983 Mr. Rex S. Miller Rex Miller Construction, Inc. P.O. Box 1417 Fort Collins, Colorado 80522 Re: Kensington South Subdivisions Dear Rex: Some weeks ago you met with Marc Engemoen and myself to discuss the detention system in the Kensington South lst Filing as it relates to building permits. In our meeting you indicated the remaining improvements to the detention system would be completed as soon as possible. In turn, the City agreed not to withhold building permits in the Kensington South Subdivisions because of the drainage system. To date the City has released building permits for homes on Hastings, Canterbury and Knottingham streets. However, work towards completing the drainage system has not yet started. The City has operated in good faith towards its portion of the agreement and now requests the drainage system be completed. In addition, after the pond's completion a letter from your engineer to the Storm Drainage Utility, certifying the drainage system has been constructed to the lines and grades shown on the Kensington South 1st Filing Utility Plans as approved by the City Engineer must be submitted. If the drainage system is not completed by July 31, 1983, the City Engineer's office will withhold all building permits in the Kensington South Subdivisions. All permits requested from now to the July 31st date will be handled on an individual basis. I regret the :inconvenience this may cause you, but the Kensington developments have expam.ed to the point where completion of the pond is necessary. 0 A ��` y vG I David Stringer'� Chief Construction Inspector cc: Mick Mercer Tom Bays James H. Stewart and Associates, Inc. Consulting Engineers and Surveyors 214 North Howes Street P.O. Box 429 Fort Collins, Colorado 80522 (303) 482 9331 March 28, 1984 Mr. David Stringer City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Dave: Laboratory: 301 Lincoln Court P.O. Box 429 Fort Collins, Colorado 80522 (303)484-6309 This is to inform you that we have examined the detention pond on Tract "A", Kensington South, First Filing. The concrete pan was straightened and has been completed. Some finish grading was required to ensure the bottom of the pond drains to the pan. The volume of the pond was not significantly decreased; however, its actual volume was much greater than the volume re- quired at the time the pond was designed. The pond appears to be built as designed and will function as it is supposed to. If you have any questions regarding the pond, please call. Sincerely, JAMES H. STEWART AND ASSOCIATES, INC. Richard A. Rutherford, P.E. & L.S. Secretary/Treasurer ME cc: Rex Miller CITY OF FORT COLLINS STORM WATER LIT ILI TY April 2, 1984 Mr. Rex Miller 3833 Spruce Lane Fort Collins, Colorado Re: Detention Pond in Tract A, Kensington South, lst Dear Mr. Miller, I have received a letter from Dick Rutherford of James H. Stewart & Associates, Inc. dated March 28, 1984. This letter was addressed to Dave Stringer, Chief Construction Inspector, and indicates that certain work has been completed on the detention pond in Tract A. From what I understand this work was necessary prior to final acceptance of the pond by the City. Please be informed that before the City can accept the pond for perpetual maintenance an "as built" survey showing detailed cross sections of the pond will be necessary. These cross sections are needed to verify pond volume and check bottom elevations to see if there is adequate slope to insure the bottom of the pond drains to the pan. After these cross sections are received, reviewed and approved, a final site inspection will be completed prior to final acceptance. If, after the site inspection we are satisfied with the construction of the pond, you will be notified in writing of the City's acceptance for perpetual maintenance. Please call me if you have any questions. Sincerely, v(�kC' 6. LJazrQ- Philip G. Waite, Civil Engineer II Storm Drainage Division`/ cc: Dave Stringer " Chief Construction Inspector REX S. CONSTRUCTION, INC. P.O. BOX 1417, PORT COLLINS, COLO. 80522 November 22, 1977 City of Fort Collins Engineering Department 300 Laporte Avenue Fort Collins, CO 80521 Gentlemen: Re: Paving of Drake Road Following is a list of charges to the City of Fort Collins for the above paving. r,. 4130 cu„ yds. of 6" sub base at $1.18 $4,873.40 2710 cu.-yds. of 2" asphalt overlay 4,742.50 342.95 tons of road base (north side) at $3.60 1,234.62 Sub grade prep 692.15 Total charge to City of Fort Collins: $11,542.67 Sincerely, R.S.M. DEVELOPMENT COMPANY By: Presidentk cd CITY OF FURT COLLINS STORM WAFFR UTILITY April 5, 1984 Mr. Rex Miller 3833 Spruce Lane Fort Collins, CO 80526 Re: Kensington South 1st Filing Dear Mr. Miller, As you requested I am sending you this letter to verify the Tract A, Kensington South 1st Filing has been in the past and will be in the future used for a detention facility for this development. During our discussion at the site this afternoon I indicated that once the Storm Drainage Division receives, reviews and approves the "as built" cross section information a final site inspection will be completed. If after the site inspection, the Storm Drainage Division is satisfied with the work, a letter of acceptance will be sent to you and the City will assume responsibility for perpetual maintenance. As we agreed upon, the area to be included in the cross sections is that portion of the pond east and approximately 10 feet west of the new concrete trickle pan installed from the south inlet to the pond. Also that portion of the north end of the pond from the top of sidewalk on Drake to the toe of the slope along all of the area that was filled. As I indicated, the Storm Drainage Division requires that all new detention ponds to be maintained by the City must have at least a 20 bottom slope. However, based on your indication that there is not enough fill material to satisfy this requirement, a 1.5% bottom slope for that portion of the pond that is being regraded to drain to the pan will be acceptable. Please call if you require additional information or have any further questions. Sincerely, 4P, -4 6. 6,,Jbz�l Philip G. Waite Civil Engineer II,. Storm Drainage Division cc: Subdivision file / Construction Inspection ✓ ,' (J1} I,A IJ(. f I H U 17 I Y rJU l ., F',, r, l,,,, CITY OF FORT COLLINS ENGINEERING SERVICES Date: April 11, 1985 Allision Construction 1000 Driftwood Drive Fort Collins, CO 80525 Dear Sir: We have on file in our office a letter of guarantee for 2720 Nottingham in the Kensington South subdivision. In this letter you agreed to make necessary repairs for Engineering clearance. To date, these repairs have not been completed. Please notify this office when these repairs are being made. If I can be of any assistance to you, please contact me at 221-6605. Si rely, Dave Stringer Chief Construction Inspector f h1GWFERINL SF.. R�/Ir;F v �'Ylr) I ipnrle Avr (l Doy SH(I . {nii tIs. (:t,' _ do r- RE i S. LIM CONSTRUCTION, INC. P.O. IIOX 1417, POIt'I' ( 0IA,INS, COLO. 90522 November 30, 1977 Mr. Tom Jones Traffic Engineer City of Fort Collins 300 Laporte Ave. Fort Collins, CO 80521 Dear Mr. Jones: We would like to order street signs for the first filing of Kensington South Subdivision. The following signs will be necessary in the immediate future. 1. W. Drake Road & Dunbar Avenue 2. Dunbar Avenue & Glen Haven Drive 3. Hastings Drive & Dunbar Avenue 4. W. Drake Road & Canterbury Drive 5. Canterbury Drive & Glen Haven Drive Enclosed is a copy of the first filing plat showing the intersections indicated above. If I can be of any further assistance, please call me at 221-4002. Sincerely, REX S. MILLER CONSTRUCTION, INC. By: ". President cd Enclosure Post Office So. 580 Fort Collins, Colotodo 80521 January 9, 1978 Rex Miller Po Box 1417 Fort Collins, Colorado To Whom It May Concern: Tal.phons 303 484.4220 It is standard policy for the City of Fort Collins to accept for perpetual maintenance those public right-of-way constructions which have been approved by the City and which have passed all required guarantee periods. This includes the water mains, sanitary sewer mains, storm sewer mains, street pavements, street lights, and street signs in the Kensington South lst Subdivision DMP: cs Sincerely, Donald M. Parso City Engineer TIME CENTER OF THE WORLD Asphalt Paving • Contracting • Sand & Gravel inlay li. 1978 Rex Willer 300 C;lenhaVon Drive Dort Collins, Colo80521 )cer Sir, (III, ISIIII I: P. 0. Box 2187 1800 North Taft Hill Road Fort CnIhns, Colorado 30522 (303) 482-7854 These are the 1978 asphall pnxino nrico, for Ken�lnpton South Snh- Soil steritant, 6" base & 2" asphalt mat $3.35,Y(l Soil sterilant, 3" subbase, 6" base & 2" mat $4.10/yd 'Thank you for giving us the opportunity to install your asphalt paving, we look forward to being of service to you in 1978. if you have any further questions, please feet free to contact me. Sincerely Yours, STLP1,1W PAVING CO. By: Bob Garfncr We Are An Equal Employment Opportunity Employer Asphalt Paving • Contrartiny • Sand & Gravel July Zl, 1978 Bob Zackley, City of For( Collins, r.0. liox 580, Fort Collins, Colo 80522. Dear, Bob, P_ 0- Box 2187 1800 North Taft Hill Road Fort Collins, Colorado 80522 (303) 482 7854 I his is to inform you that Sterling Paving Co. does have a contract for asphalt paving Dunbar, Hastings and Sutton Court in Kensington Subdivision, with kex Miller Construction Co. of Port Collins, Colorado. cc: file these streets are to be completed by November 1, 1978. Sincerely Yours, S"IFRLING PAVING CO. By: Bob Gardner We Are An Equal Employment Opportunity Employer CITY OF FORT COI, I.INS P,O. BOX 580 FORM COLLINS, COLORADO 80522 PH (303) 484-4220 EXT. 305 ENGINEERING SERVICES DEPARTMENT October 17, 1978 Rex Miller Construction Company 1300 Glen Haven Drive P.O. Box 1417 Ft. Collins, CO 80522 Re 7.0' Concrete Walk & Bikeway, Drake Road Kensington South Subdivision Dear Sir: on June 9, 1978 the 7.0' concrete walk and bikepath was constructed on the south side of Drake Road between Dunbar Avenue and Canterbury Drive. It has since been noted that the landscaping has not been completed per plan as shown on Section A -A, Sheet 15 of 15 of Kensington South Utility Plans. It has been observed that the drainage Swale between the vertical curb and gutter and the 7.0' walk has not been graded to meet the top of walk or the back of curb, thus allowing undermining of the north edge of the walk in numerous areas. This landscaping should be completed as soon as possible to prevent any further erosion in these areas and to minimize the structural damage taking place on the north edge of the walk. The 7.0' walk and bikeway will not be accepted by the City until the landscaping is completed. very truly yours, Rodney 1R. Albers Constriction Inspector PA/cm 100% Recycled Bond CIlY(M IMAI (UIIINS f.0. lioX 5so, f A U)I_II N b COLOR,1 DO50�_2 I'llpO3) IS1-422O I NGINI. I_IM(, DIVISION November 2, 1979 Mr. Pat walker F&F Concrete Construction 941 Riverside Fort Collins, Colorado Dear Pat: A survey of the Cedar Village and Kensington South subdivisions indicates several areas of concrete curb and gutter installed by your company which retain water because of improper construction. These areas are listed on the attached sheet. As you know, you are 1-C'SpOnsitl0 for poor workmanship and materials for a period of two years from the date you install new concrete. Please be advised that you should make all necessary repairs to the listed areas within the next 30 days. Failure to do so could result in action being taken on your cement contractor's bond to have necessary corrections made. Sincerely, G� Bob Zakely Chief Construction Inspector LXT. 728 REX ' se Y FEE CONSTRUCTION, INC. P.O. BOX 1417, FORT COLLINS, COLO. 80522 9-9-80 Marc Engemoen _ City of Fort Collins Engineering Division P.O. Box 580 Ft. Collins, CO 80522 Dear Marc; We are in receipt of your letter dated August 29, 1980 regarding the detention pond for Kensington South, First Filing. Rex asked me to notify you to the effect that the headwall and trickle channels will be installed by the summer of 1981. At this time the grading will also meet the utility plan specifications. If you do not find this reply satisfactory, please contact our office at 482-4743. Sincerely, 1 .. I MCI C. Terri L. Delka Secretary Enclosure