ENGINEERING DIVISION
September 28, 1983
Bernie Cain
Poudre Corporation
P.O. Box 7
Fort Collins, Colorado 8OS22
Re: Indian Hills West, 2nd Phase
Dear Bernie:
It is standard policy for the City of Fort Collins to accept
for perpetual maintenance those public right-of-way constructions
which have been approved by the City and which have passed all
required guarantee periods. This includes the water mains,
sanitary sewer mains, storm sewer lines and facilities, street
pavements, street lights and street signs. The water and sewer
lines have been installed; have been approved and accepted.
.( Jerely,
David Stringer
Chief Construction Inspector
DATE 5 April 64 DE f A;i TMEN
ITEN #43-79B
REPLAT Of INDIAN HILLS WEST PUD, Phase One - Preliminary and final
DATE5 April 84 3.. EPA �TMIT .l 3'� ¢ µ
ITEM#43-79B REPLAT OF INOIAN HILLS 14EST PUD, Phase One - Preliminary and Final
EANT
A water and sewer tap has been installed for Building 14 & 15, a water and sewer
tap for Building 16 & 17 has also been installed.
urn
DATE 5 April 84 DEPRT]ME7
ITE^; ; k43-798 REPLAT OF INDIAN HILLS WEST PUD, Phase One - Preliminary and Final
CITY OF FORT COLLiNS
OFFICE OF PLP; INT O DEVE1_OPMENT
April 19, 1984
Mr. Bernie Cain
POUDRE CORPORATIN
Post Office Box 7
Fort Collins, Colorado 80522
Dear Bernie:
Staff has reviewed the application for preliminary and final PUD and subdivi-
sion plat approval of Lots 14, 15, 16, and 17 of Indian Hills West Phase
1, and offers the following comments:
1. A revised drainage report should be submitted for staff review and
approval which addresses the impact of runoff as a result of the plan
changes.
2. All modifications to existing utilities as a result of the amendment
will be paid by the developer. All existing utility easements should
be shown on the site plan.
3. The site plan should be drawn at an engineers, rather than architects,
scale. Also, the plan should be revised to include the following informa-
tion:
a. Maximum building height
b. A note that each lot is a single residential unit
c. Surrounding 150 foot information
d. Vicinity map
e. Total bedrooms and number of bedrooms per unit
f. Total floor area and floor area per unit
g. Owners certification signature block; attorneys certification signa-
ture block; and Planning and Zoning Board signature block
h. Legal description of PUD
v �
. .,_., b,.. ..,...._n.. _.._,,,... ........�...,,.,. ...... �v........-
[ if q;f U` f'I ffJNlNi l ?rJ�l C.i F',r: Any i'rJ :'iux 'SH❑ f m, L Collins. [allnl ado H? j52,� (9❑3: 221-6750
Af�iU I]f-VELUI'M[M
Mr. Bernie Cain
From: Joe Frank
April 19, 1984
Page Two
4. The title of the plan should be "Indian Hills West PUD - Lots 14, 15,
and 16 - Amended Final Site Plan".
5. The plan should include a note that "all notes as indicated on the site
plan for the overall Indian Hills West PUD shall apply".
6. Will the building coverage exceed 90% as indicated in note #5 of the
Indian Hills West PUD site plan? Does the plan meet the other notes?
Please verify.
7. On May 21, 1984, 83"xll" reductions and colored renderings of all plans
should be submitted. Also on that date, signed mylars of the site plan
and subdivision plat should be provided, including a signed "Site and
Landscape Covenants" document. Ten copies of the site plan should be
provided on that date.
8. Please note the Planning and Zoning Board hearing in May will be on
Wednesday, May 30 rather than Monday, May 28.
Revisions to the plans reflecting the above comments should be delivered
to this office by Wednesday, May 9. If you have any questions, please do
not hesitate to contact me.
'ncerely,
Joe ank
Seni City Planner
JF:ro
cc: Mauri Rupel, Development Center Director
Bonnie Tripoli, Development Coordinator
I'.O. 13OX 580, I OKI ( 01
1 INS, (01 OR ADO 50�22
II] (703) 484 1-i-
I X F. 728
e
U1 Y OIL I OKT (OI 1_INS
1_NGINL1 KING DIVISION
September 13, 1979
Mr. Dan Bailey
Hansen Realty
First National Tower Building
Fort Collins, Colorado
Re: Indian Hills West P.U.D.
Dear Sir:
Continuing site inspections on your Indian Hills West P.U.D. indicate
that the roadway subgrade throughout the area, although compacted, is
still wet enough that it will not adequately support asphalt paving.
For this reason I would recommend strongly that any plans you have to
pave the streets be delayed until sometime next spring. During the
interim period the sub(Tade will be subjected to heavy traffic and should
stabilize in most locations. Those that don't, can be repaired prior to
paving, resulting in a much more acceptable finished street.
Naturally, since this request is made by the City we would not hold
certificates of occupancy because the streets were not paved as long
as each request for a certificate was accompanied by a letter from the
future owners stating that they were aware streets were not to be paved
until a later date.
Your cooperation on this matter is greatly appreciated.
Sincerely,
David Stringer
Engineering Construction Inspector
cc: Bob Zakely
le_�}q'�'
oi".r
FO..,...o"�.w.e;'
CIIY OF RT COLLINS P.O. i3OX 580, FOGY COLLINS, COLOkADO 30322 PII (303) 4S-1-4220
ENGINEERING DIVISION EXL. 728
September 19, 1979
Mr. George Weitzel
225 S. Taft Hill Road
Fort Collins, Colorado
Re: Indian Hills West P.U.D.
Dear George:
On Tuesdav, September 11, the City water department made water
service taps on Cheyenne Drive in Indian Hills west P.U.D.
I was present for approximately one hour while these taps were
in the process of being made. During that time I noted your
excavator was digging the service trenches as staked, and the
wat r department tapping crew was measuring the correct set
back as staked by the developer's engineer..
Because of. the narrowness of this street, .1 appreciate your
workmen taking the necessary time to make sure that all of
the water services were installed as staked, in hopes of
avoiding any, conflict with remaining street construction.
Sincerely,
Dave Stringer
Construction Inspector
cc: Bob Zakely
Dan Bailey
3°!
00�00-
e. r
( HY OI f ORI COLLINS P.O. Box 580, Fort Collins, Colorado 80522 Ph(303) 484-4220 Ext. 728
ENGINEERING DIVISION
February 10, 1983
Bernie Cain
Poudre Corporation
P.O. Box 7
Ft. Collins, Colorado
Dear Bernie:
On Tuesday of this week, George Weitzel contacted me concerning
the raising of an existing manhole to the street surface at
636 Cheyenne Drive.
I asked George to raise the manhole to the proper height but
not to install the final asphalt surface at this time, due to the
lack of hot asphaltic concrete. George expressed his concern regarding
the release of Certificates of Occupancies for the remaining units
if this manhole was not completed. I assured George that Engineering
would not withhold any C.O.'s because of the manhole. However,
the asphalt pavement is to be installed as soon as possible this Spring
when the asphalt plants start producing.
This letter is to reaffirm to George and you concerning future
C.O.'s at this address.
Sincerely,
David Stringer
Chief Constriction Inspector
cc: George Weitzel