Loading...
HomeMy WebLinkAboutHORSETOOTH COMMONS PUD - Filed GC-GENERAL CORRESPONDENCE - 2004-08-10t (a WestGas-N July 14, 1987 City of Ft. Collins Community Development Dept. 300 La Porte Avenue Ft. Collins, CC 80521 Re: Tract A, Horsetooth Commons P.U.D. Gentlemen: Western Gas Supply Company 500 Prudential P.aza 1050 17tn Street Denver- CO '0205-0501 (303) 534-1261 I have reviewed the information you sent to Western Gas Supply Company (WestGas), formerly known as Western Slope Gas Company regarding the above referenced development. I find no immediate conflict between this proposal and WestGas' existing facilities, however; please note that WestGas has an 8" high pressure natural gas pipeline which runs east -west in Horsetooth Road (Larimer County Road No. 62) and turns south on Shields Street (Larimer County Road No. 17). WestGas must be given 48 hours notice of any proposed activity in the vicinity of our facilities. All crossings which might involve our pipeline, must be coordinated with WestGas, well in advance of construction. Thank you for your cooperation in this matter. I can be reached on (303) 572-'4135 if you require any additional information. Sincerely, WESTERN GAS SUPPLY COMPANY Richard Chamberlain Associate Right of Way Agent RC:mmo Develc lent Services Engineering Department August 27, 1992 RE: Sidewalks in the Horsetooth Commons P.U.D. To Whom It May Concern: Having looked at a plat of the aforementioned area, it is my opinion that under current City requirements, TRACT "B" of that certain Planned Unit Development would not be required to install sidewalks unless the owner would apply for a change of use and or intensify the use by rebuilding or redevelopment of TRACT B Please be informed that this letter does not override or amend those conditions as stated in the covenants for the Horsetooth Commons Planned Unit Development. If you have any questions regarding this matter, please feel free to call me. Sincerely, Dave Stringer � Chief Construction Inspector DS/ltg EMI forth (AIe,"c Arenue • P.O. Bov �80 • Fort Collins, CCU 80522-07;"' 80 • 003)'1-t,bU� I I WAI C SSOCIATES Consulting Engineers and Surveyors August 18, 1988 Mr. Robert Smith Storm Drainage Utility City of Fort Collins P 0 Box 580 Fort Collins, Co. 80522 Dear Bob: This is to certify to you that on August 16, 1988, I checked the detention pond and the drainage systems at the new Grease Monkey located on Tract "A", Horsetooth Commons P.U.D., Fort Collins, Colorado. The pond was built substantially in accordance with the plans prepared by our firm and approved November 17, 1987. A sepia showing the ",As Built" elevations is enclosed for your records. The been meets or exceeds the planned elevation and the size and elevation of the pond are basically the same as approved. The area inlet was constructed basically as planned. The orifice plate was being installed the day we surveyed the pond. If you have any questions concerning the grading or drainage system for this project, please call. Sincerely, Richard A. Rutherford, P.E. President Ikm James H. Stowari and Associates, Inc. 214 N. Howes Street P0, Box 429 Ft. Collins, CO B0522 3031482-9331 Develc lent Services Engineering Department August 27, 1992 RE: Sidewalks in the Horsetooth Commons P.U.D. To Whom It May Concern: Having looked at a plat of the aforementioned area, it is my opinion that under current City requirements, TRACT "B" of that certain Planned Unit Development would not be required to install sidewalks unless the owner would apply for a change of use and or intensify the use by rebuilding or redevelopment of TRACT 11 B., Please be informed that this letter does not override or amend those conditions as stated in the covenants for the Horsetooth Commons Planned Unit Development. If you have any questions regarding this matter, please feel free to call me. Sincerely, Dave Stringer Chief Construction Inspector DS/ltg 'S ISnith Collc,i;c A�anue • I'.O. Boy :;80 • Fort Collins, CO 80�;22.0580 • (303) 21-noW; P.O. Box 566 • Windsor, cU uu »u February 26, 1987 Mr. Mike Herzig, P.E. Development Coordinator City of Fort Collins 301 West Laporte Avenue Ft. Collins, CO 80521 RE: Request for vacation of pre-existing rights -of -way within Horsetooth Commons P.U.D. Dear Mike: I am requesting that certain existing public rights -of -way within the recently approved Horsetooth Commons P.U.D. be vacated. These rights -of -way are no longer necessary and are in conflict with the recently approved plat. They are as follows: Jane Street (see attached deed of dedication) Legal Description: A tract of land in Sec. 27, Twp. 7 N. Range 69, W. 6th P.M.: Considering the East line of the SE 1/4 as bearing North and with all bearings herein relative thereto, contained within the boundary lines described as: commencing in the Southeast corner of Section 27, Township 7 North, Range 69 West of the 6th P.M., and run thence N. 563.25 feet; thence N. 89°44'16" W. 30 feet to the true point of beginning; thence N. 89°44'16" W. 790.01 feet; thence S. 50 feet; thence S. 89°44'16" E. 790.01 feet; thence N. 50 feet to the true point of beginning. 2. Two pieces of street right-of-way at the intersections of Shields and Richmond Drive, and Horsetooth and Richmond which lie outside the platted right-of-way of these streets. These areas consist of approximately 14.45 sq. ft. Legal Descriptions: A tract of land located in the Southeast quarter of Section 27, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado being more particularly described as follows: Commencing at the Southeast corner of said Section 27 and considering the South line of the Southeast quarter to bear North 89' 45' 30" West with all Mike Herzig February 26, 1987 Page Two bearings contained herein relative thereto; thence along said South line of Southeast quarter North 89' 45' 30" West, 1020.00 feet; thence North 00' 00' 00" East, 50.00 feet to the North right-of-way line of Horsetooth Road; thence along North right-of-way line South 89° 45' 30" East, 296.21 feet to the beginning of a curve concave to the Northwest having a central angle of 47' 08' 36" with a radius of 15.00 feet whose long chord bears North 66' 40' 12" East, 12.00 feet to the true point of beginning; thence continuing along the arc of said curve 6.12 feet with a central angle of 23' 23' 08" whose long chord bears North 31° 24' 20", 6.08 feet; thence North 89' 45' 30" West, 3.15 feet; thence South 00' 14'30" West, 5.20 feet to the true point of beginning. Said tract of land contains 9.45 square feet. A tract of land located in the Southeast quarter of Section 27, Township 7 North Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado being more particularly described as follows: Commencing at the Southeast corner of said Section 27 and considering the East line of the Southeast quarter of said Section 27 to North 00' 00' 00" East with all bearings contained herein relative thereto; thence along said line North 00' 00' 00" East, 663.25 feet; thence South 89' 44' 16" East, 50.00 feet; thence South 00° 00' 00" East, 103.93 feet to the beginning of a curve concave to the Northwest having a central angle of 90' 15' 44" whose radius is 16.00 feet, whose long chord bears South 450 07152" West, 22.68 feet; thence South 00' 07' 15" East, 68.00 feet to the true point of beginning; thence 25.06 feet along the arc of a nontangent curve concave to the Southwest whose central angle is 89' 44' 16" and whose long chord bears South 44' 52' 28" East, 22.58 feet; thence South 00' 00' 00" West, 0.30 feet; thence 25.06 feet along the arc of a curve concave to the Southwest whose central angle is 89' 44' 16" and whose long chord bears North 44' 52' 28" West, 22.58 feet; thence North 00' 07' 15" West, 0.30 feet to the true point of beginning. We are requesting that this vacation be placed on the March 17 meeting of the City Council so we can complete the City approval process and begin construction of our project. Sincerely, • 't /.John L. Barnett ASLA Vice President JB/jk Connell Resources March 24, 1988 Page 2 These items shall be completed prior to final acceptance of the right-of-way construction. The completion of these items are guaranteed by Bond No. 19 S 100130393. If you have any questions, please feel free to call. Sincerely, J � ,Rick Richter Engineering construction Inspector cc: Don Smith J J W Z a U REBOURCEB INC April 12, 1988 Connell Resources, Inc. Divisions - Loveland Excavating Co. Windsor Aggregates, Inc. Taft Hill Aggregates, Inc. Mr. Rick Richter City of Fort Collins Development Services - Engineering P.O. Box 580 Fort Collins, CO 80522 Regarding: Horsetooth C rmons P.U.D. Dear Sir: On March 24, 1988 you addressed a letter to our firm regarding items not completed at Horsetooth Commons. Of the four items listed, we feel only two are our responsibility. These are: 1. To adjust the four valve boxes on Richmond Drive. 2. To regrout manhole adjustment rings on Manhole S-5. We feel the cracked asphalt pavement at Station 3150 on Richmond Drive is due to trench settlement around the valve boxes. The utility work was not done by our firm. We also feel the damaged curb and gutter was not caused by our forces. Other contractors were working in the area also. We hope to complete the two items I previously mentioned in the near future. If you have any questions, feel free to call or write. Sincerely, CSJ,MID_L RESQRCF.SI, INC. Robert J. Q6ihn Project NVbnager RJQ/jw • 1425 South Lincoln, Loveland, Colorado 80537 • Loveland 667-1238 Fort Collins 224-2604 Denver 623-3151 TEV\/A4�r SS( I rE Consulting Engineers and Surveyors August 18, 1988 Mr. Robert Smith Storm Drainage Utility City of Fort Collins P 0 Box 580 Fort Collins, Co. 80522 Dear Bob: This is to certify to you that on August 16, 1988, I checked the detention pond and the drainage systems at the new Grease Monkey located on Tract "A", Horsetooth Commons P.U.D., Fort Collins, Colorado. The pond was built substantially in accordance with the plans prepared by our firm and approved November 17, 1987. A sepia showing the ".As Built" elevations is enclosed for your records. The berm meets or exceeds the planned elevation and the size and elevation of the pond are basically the same as approved. The area inlet was constructed basically as planned. The orifice plate was being installed the day we surveyed the pond. If you have any questions concerning the grading or drainage system for this project, please call. Sincerely, Richard A. Rutherford, P.E. President Ikm James H. Stewart and Associates, Inc 214 N. Howes Street PO Box 429 Ft. Collins. CO80522 303/482-9331 �111I11/I,�'' ♦I `I. - L' January 26, 1992 Project No: 1200-01-90 Dottie Bensen Bensen Classics Route H1 Sterling, Colorado 80751 Re. Lot 2, Market at Horsetooth Commons; Ft. Collins, Colorado Dear Mrs. Bensen, We have completed our as -built survey for the above referenced site in order to complete certification requirements of the City of Fort Collins Storm Water Utility. The attached plan indicates the existing contours that we picked up in the field. There is a low area which would potentially fill with runoff prior to overflowing at the current apparent overflow elevation of 19.71. The ultimate overflow design elevation is 80.20 which would also be the detention pond high water elevation. The detention pond outlet shown on the approved design drawings was not constructed. The outlet would consist of an inlet at the pond low point and an B" pipe to convey water to the existing 36" storm sewer located along Shields Street. The pontential pending of water without a release is called stormwater retention. I contacted Susan Hayes of the City of Fort Collins Storm Water Utility regarding the current situation. Susan indicated that unless there was a development agreement specifying project phases and indicating that the outlet did not need to be installed with Phase 1, then a stormwater outlet must be installed according to the design plans approved and on record with the City of Fort Collins. Retention, the holding of runoff without an outlet, is not allowed in the City of Fort Collins according to Susan Hayes. We have not been able to locate a development agreement. We had asked Kent Goodman to get us a copy of the development agreement if there was one. Kerrie Ashbeck at the City Planning Department indicated that there was not a development agreement for this particular project. Susan Hayes indicated that if an outlet was provided, we could provide an interim certification for the Phase which has been completed. I feel that in order to resolve this issue, you may want to call Susan Hayes at the City of Fort Collins Storm Water Utility and discuss her requirements with her directly. We may all want to sit down and discuss a course of action to resolve this. I cannot certify what was constructed at this time since construction has not met the requirements of the approved storm drainage design. The City Storm Water Utility would not accept it. Please call me at 226-5334, so we can further discuss an appropriate plan of action. Sincerely Shear Engineering Corpor'at-ion Brian W. Shear, P.E. cc: Susan Hayes; City of Fort Collins Storm Water Utility Kent Goodman Don Smith 4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334