Loading...
HomeMy WebLinkAboutHARMONY SCHOOL SHOPS FOURTH - Filed CS-COMMENT SHEETS - 2004-08-10PROJECT =I COMMENT SHEET City of Fort Collins Current Planning DATE: July 24, 2002 TO: Engineering PROJECT: 442-89J Harmony School Shops — Modification of Standards All comments must be received by Ted Shepard no later than the staff review meeting: August 7, 2002 Note - PLEASE identify your redlines for future reference �kz�s,i c�e�-ice J �, �-u 4(.D CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Utility _Site _Drainage Report _Other _Redline Utility _Landscape 1 City of Fort � \� pY c� � �, G c-� e^ / die M � I � ��-.. /�'� /'e G Cc I N � i.0 v L! P V d 1 P � 4 I }1'Pe�S � `�Y���-�• ,�, s�w,e ��,,���,P��s �l� �o�- 1����ea�l�. Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: June 5, 2003 Project: TIMBERLINE VILLAGE PDP -TYPE 11 (LUC) #10-03 All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: June 04, 2003 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 45 Created: 3/31/2003 The internal parking lot and building layout design will likely be altered due to additional right-of-way width required on Harmony and Timberline Roads. Harmony Road requires an additional through lane per the City's Master Street Plan. Timberline Road also requires additional lanes and per the TIS, also requires additional right-of-way for the channelized-T intersection design with Milestone Drive. Interim/uldmate street designs are needed (which will also require CDOT approval) this will help estaialish right-of-way, utility, at Harmony Corridor setback requirements. [6/4/03] mnc Vt/ /YtC'i.«� The plat appears to reflect che�addRlona i -o -way require on Harmony koad correct � However, this change in property line is not reflected once horizontal control plans. sing the City's horizontal control plan for the Harmony Road alignment, it then appears as a result that the building placements fall short of the 80' setback from the future edge of pavement. Because the channelized-T design along Timberline has not been completed, there may be right-of-way impacts of the design which in turn may affect the building placement along Timberline. Number: 47 Created: 3/31/2003 Ensure 9' utility easement is provided on Milestone Drive, 15' utility easements are provided on both Harmony and Timberline Road behind the ultimate right-of-way for each, and 80' of setback for the Harmony Corridor plan behind the future edge of pavement (6 lane section) for Harmony Road. [6/4/031 15' of utility easement along Harmony Road is not evident on the plat. In addition, 80' of setback from the future edge of pavement is also not evident on the plat. Number: 51 Created: 4/1/2003 Utility, access, and landscape permits are likely to be required by CDOT as the project continues. [6/4/031 Dale CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Ulat __✓Site Drainage Report Other_ tility _ ✓ Redline Utility _I % Landscape Page I It should be verified who will be working on the permit for CDOT to underground the overhead line within the development. Because I believe the line is Xcel's, they likely need to be working with the Developer for that portion of the utility permit. Number: 52 Created: 4/1/2003 The tree protection/mitigation plan shows landscaping to be removed/relocated outside of the property boundaries. Because this is off -site, the off -site easement required should also include a provision for tree removal/relocation. Another option is for the off -site property owner to sign off on the tree mitigation plan. (it appears that the offshe and onsite entities are one In the same, so this shouldn't be an Issue). [6/4/03] Prior to a hearing, the landowner to the north should Indicate if any issues exist on the proposal. Number: 53 Created: 4/1/2003 Show the installation of a Type III barricade along the eastern boundary of this site at the termination of the private drive, as well as the internal sidewalk system. [6/4/03] With the need to construct a sidewalk to Snow Mesa to meet LOS requirements, the Type III barricade is no loner needed Number: 54 Created: 4/2/2003 Letters of Intent are required for all offsite easements prior to the scheduling of a hearing. This appears required for the property to the northeast as well as southwest. [6/4/03] The owner of the mobile home park also needs to sign a letter of Intent for the sidewalk connection. Number: 58 Created: 4/2/2003 The existing cross access easement shown on the plat, which would facilitate connectivity to the east, does not line up with the driveway connection shown on the plans, which has been moved north. A cross access easement will need to be maintained at the finalized location for the driveway connection to the east. [6/4/03] Please ensure that cross access is maintained to the east by showing an access easement on the plat starting from the access point off Harmony north then proceeding east along the driveway which is meant to continue east Into the future developable area. In addition, the site plan should make reference to the driveway continuing east upon development of the neighboring property. Number: 68 Created: 5/16/2003 It was not noted Initially that Timberline Village is an existing name of a recorded plat in the City; the documents cannot have Timberline Village as the name associated with the City. The name on all the documents should be changed to Harmony School Shops 4th Filing. This also allows for this project to be filed in the same physical location as the previous filings of Harmony School Shops. Number: 73 Created: 5/21/2003 Both the site plan and the utility plan needs to show a design for the 6' asphalt walk indicated on the site plan to connect to Snow Mesa Road. Number: 75 Created: 5/22/2003 Based upon discussion among City Transportation on 6/5, it was concluded that additional right-of-way along Harmony Road adjacent to this site is not required. This is a result of the determination that the right-of-way in place today will "work" in the ultimate 6 lane configuration of Harmony Road. Future edge of pavement to determine the 80' setback should still be verified. Number: 76 Created: 5/22/2003 Based upon discussion among City Transportation on 6/5, the horizontal alignment of the channelized-T design is satisfactory- The following items related to this design though, downeed to be addressed. Page 2 1. Cross sections along the channelized-T at 50' intervals (as well as critical point such as median noses) are needed to verify drainage patterns and vertical "ride". Also provide spot elevations on any plan view. 2. Indicate curb type along the medians for the channelized-T proposed and provide a detail. 3. Turning movements for large vehicles (WB-50) need to be verified on this design, especially because of commercial trucks using this to serve the site and it allows them to head east on Harmony Road. 3. The proposed design is considered safe from a Traffic Operations standpoint, provided that the work north of Timberline (as being designed by North Star Design) is completed concurrently. The channelized-T without these improvements is a safety issue. It is required that this offsite design is approved concurrently with these plans if not already approved with the Caribou Apartments project. This may involve needing to place the plans from North Star into this submittal or getting North Star to separate this plan set out from the Caribou Apartments design to be approved independently. In addition, this offsite construction will need to be done prior to or concurrent with the channelized-T construction. As Caribou Apartments is under final compliance review, this may not be a concern, but if that project does not move forward, the construction would need to fall upon this development; there would be reimbursement available from Street Oversizing for this. Number: 88 Created: 6/2/2003 Based on CDOT requirements (given the existing posted speed limit), when Harmony Road Is widened to 6 lanes, the required stacking for the dual -left turn lanes might eliminate the 3/4 turning movement into the site, reducing the driveway out to Harmony Road as a right -in, right -out movement. Topic: Plat Number: 70 Created: 5/21/2003 There are numerous areas defined internal to the plat that are not locatable. Number: 74 Created: 5/22/2003 Note 1 on the plat is a potential concern. The blanket easement being created by the note technically results in all buildings being built on this easement (and perhaps legally prevents the buildings from being built) because building envelopes aren't defined on the plat. Number: 90 Created: 6/5/2003 Technical Services offered the following comments: 1. Boundary & legal closes 2. Plat does not meet requirements of Sections 1.2.2 and 1.2.4 in Appendix E-6 of the Larimer County Urban Area Street Standards. 3. Comments from March 26, 2003 Sheet have not been addressed. (#2 & #6) 4. If lot lines to be vacated were removed the plat would be cleaner. 5. Drainage/detention area at NEC of plat needs a Tract #. 6. Some easements are not locateable. Topic: Site Plan Number: 71 Created: 5/21/2003 Please add a note on the site plan indicating that: "Buildings 3, 4, 5, and 6 are approved with regards to land use only. Subsequent development of each building will require City approval of site specific utility plans (prepared by a licensed engineer in the State of Colorado) for the area surrounding each building currently noted as "Future Phase" on the Harmony School Shops 4th Filing utility plans. Said approval shall be in conjunction with an associated minor or major amendment (as applicable). Drainage reports, erosion control deposits, and inspection fees may also be required with the development of each building." A similar note will be required on the development agreement for the project. Topic: Transportation Number: 85 Page 3 Created: 6/2/2003 The TIS notes approach speeds on Harmony as 45 mph Instead of 50 westbound, 55 eastbound. The TIS should correct this information and if any of the numbers generated in the report are dependent on posted speed, those results should likewise be amended. Number: 86 Created: 6/2/2003 The TIS shows a drop in total peak hour traffic on some movements In the Harmony/Timberline Intersection when compared to the 2015 numbers In the PVHS study. The TIS should explain why this change occurs. Number: 87 Created: 6/2/2003 The TIS shows EB Harmony to NB Timberline turning movements at 8 (AM) U 6 (PM) while the same turning movement Into the site off the 3/4 access directly east Is at 61 (AM) at 123 (PM). The TIS should explain how this distribution split was determined. Page 4 1,t,,,Ze__ Vta-MI-a July 11, 2003 Mr. Ted Shepard City of Fort Collins 281 North College Avenue Fort Collins, Colorado 80522 Re: Harmony School Shops 41h Filing Dear Ted: J-R ENGINEERING We have revised the construction drawings and drainage report per your comments dated June 11, 2003. The following numbers correspond to the comments: Current Planning 1. See comment response by CityScape. 2. See comment response by CityScape. 3. See comment response by CityScape. 4. See comment response by CityScape. 5. See comment response by CityScape. 6. See comment response by CityScape. 7. See comment response by CityScape. 8. See comment response by CityScape. 9. See comment response by CityScape. 10. See comment response by CityScape. 11. See comment response by CityScape. 12. See comment response by Vaught -Frye. 13. See comment response by Vaught -Frye. 14_ See comment response by Vaught -Frye. 15. See comment response by Vaught -Frye. 16. See comment response by Vaught -Frye. 17. See comment response by CityScape. 18. See comment response by Vaught -Frye. Engineering 45. Additional Right-of-way will not be required for Timberline and Harmony Roads as discussed with City of Fort Collins and CDOT. The City of Fort Collins and CDOT will not require additional pavement widening along Harmony Road as discussed at the meeting on 6/2.5/03. X: 934700 / Corresp / Letters / commentresponseletter 2620 Hass Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970-491-9984 • w .imngineeringsom 4T A 15' wide utility easement was added to drawings along the north side of Harmony Road. A note on the plat clearly indicates all road setbacks. 51. A note is shown on sheet 9 "Utility Plan" indicating that the overhead electric line shall be placed underground with this development. 52. The City of Fort Collins owns and maintains the tract between this development and the development to the north "Sunstone Village PUD". The city has agreed to sign off on whatever documentation is required as discussed in city meeting on Monday 4/7/03. 53. The Type 111 barricade was removed due to the extension of the temporary asphalt path to Snow Mesa. 54. Offsite easements exhibits will be included with this submittal. 58. A blanket cross access easement will be provided for the entire development as noted on the plat and will also be covered in the Developer's Agreement. 68. The name on the plan set have been updated to Harmony School Shops 41h Filing. 73. All necessary plans have been updated to show the extension of the temporary asphalt path. 75. Additional Right-of-way will not be required for Timberline and Harmony Roads as discussed with City of Fort Collins and CDOT. The City of Fort Collins and CDOT will not require additional pavement widening along Harmony Road as discussed at the meeting on 6/25/03. 76. Noted. • Cross sections have been added and are shown at the critical points to verify drainage patterns and vertical ride. • Curb types have been noted and the necessary details are shown. • JR Engineering has provided an exhibit showing the WB-50 truck turning movement through the "T". • Noted. 88. Noted. 70. All defined areas on the plat, are now locatable. 74. Building envelopes are now defined on the plat. 90. Noted. 1. Boundary and legal close. 2. Plat now meets aforesaid requirements. 3. Comments from March 26, 2003, have now been addressed. 4. Lot lines are legal lines that need to be shown on the plat when they are being vacated. 5. Drainage/detention area at northeast comer of site cannot be made into a tract, due the lot size requirements of the developer. 6. All easements are now locatable. 71. See comment response by Cityscape. 85. See comment response by Matt Delich. 86. See comment response by Matt Delich. 87. See comment response by Matt Delich. Light and Power 77. Transformer was moved to provide access by electric line truck. 78. See comment response by CityScape. 79. See comment response by CityScape. X: 934700 / Corresp / L.etters / commentresponseletter 80. See comment response by Vaught -Frye. 81. Noted. 82. A blanket easement has been provided on the Plat. 83. See comment response by Vaught -Frye. 84. Noted. Stormwater Utility 67. A concrete reinforcement detail for the water quality outlet box is provided on the 65. 62. drainage detail sheet. • This comment has been previously addressed on the last submittal as acknowledged by Basil Hamdan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Hamdan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Hamdan on 7/8/03. • A different line type has been used to try and differentiate between existing and proposed storm sewer. • This comment has been previously addressed on the last submittal as acknowledged by Basil Hamdan on 7/8/03. • The grading and erosion control notes have been revised to the current notes being used by the City of Fort Collins. • This comment has been previously addressed on the last submittal as acknowledged by Basil Hamdan on 7/8/03. • Spillway and berm elevations are shown on the grading plans. • Grading Plan has been revised to show detailed spot elevations. • A different line type has been used to try and differentiate between building footprints, contours, and property lines • Pan elevations have been labeled along with the slope at which the pan is to be constructed. • This comment has been previously addressed on the last submittal as acknowledged by Basil Hamdan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Hamdan on 7/8/03. 63. Western VIl Investment will contract with JR Engineering to complete drainage certification. 60. Through our research we concluded that there was never a recorded easement for the existing detention pond located due East of the existing gas station. 66. • A note was added to cover sheet clarifying the maintenance responsibility of storm sewers. Storm sewer labeling was revised. JR Engineering designed the proposed utilities to achieve the largest separation possible. X: 934700 / Corresp / Letters / commentresponseletter 61. • JR Engineering revised our storm drain to keep the 10-year HGL within the drainage pipe. • This comment has been previously addressed on the last submittal as acknowledged by Basil Harridan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Harridan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Harridan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Harridan on 7/8/03. • Utilities located between buildings 8 & 9 have been revised per the City of Fort Collins direction. • This comment has been previously addressed on the last submittal as acknowledged by Basil Harridan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Harridan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Harridan on 7/8/03. • This comment has been previously addressed on the last submittal as acknowledged by Basil Harridan on 7/8/03. Traffic Operations 69. A "Channelized T-Intersection" design for the Timberline Road/Milestone Drive intersection has been incorporated with this submittal. Transportation Planning 27. See comment response by Cityscape. 28. See comment response by Cityscape. 32. Directional ramps have been added to the driveway entrance at Milestone Drive. 89. harmony striping plan will be submitted next week to CDOT pending Tom Reiff's review. Water/Wastewater 35. See comment response by Cityscape. 34. Easements have been provided for all curb stops and fire hydrants. 37. This comment has been previously addressed on the last submittal as acknowledged by Jeff Hill on 7/8/03. 39. This comment has been previously addressed on the last submittal as acknowledged by Jeff Hill on 7/8103. 91. The utility plan now labels all curb stops (existing & proposed). 92. This comment has been previously addressed on the last submittal as acknowledged by Jeff Hill on 7/8/03. 93. JR Engineering has provided a copy of the design specifications to Jeff Hill for the Geoweb being used to gain access to the sanitary sewer manhole behind building #I . 94. The plans have been updated to reflect the min. 10' separation between utilities and proposed structures. X: 934700 / Corresp / utters / commentresponseletter Zoning 72. See comment response by Cityscape. The submittal package for CDOT will be sent out next week (which includes the Harmony Road striping plan, design waiver modifications, and CDOT access permit). It is our understanding from our last meeting with CDOT and City of Fort Collins on 6/25/03 that the Harmony Road portion of this project would not hold the Harmony Schools Shops Fourth Filing from getting scheduled for a public hearing. Therefore due to time constraints we will have to submit this portion next week. If you have any questions or need additional information, please contact me at 970.491.9888. Sincerely, >� y Adam Vail Designer II cc: Rob Beery, Miller -Weingarten Joe Carter, Cityscape Matt Rankin, Vaught -Frye Architects Randall Provencio, JR Engineering X: 934700 / Corresp / Letters / commentresponseletter January 17, 2003 Miller Weingarten 850 Englewood Parkway — Ste 200 Englewood, Colorado 80110 Attn: Mr. Rob Beery /1T Albertson's, Incorporated P.O. Box 20 Boise, Idaho 83724 Attn: Todd J. Poirer Irerracon 301 North Howes • P.O. Box 503 Fort Collins, Colorado 80521-0503 (970) 484-0359 Fax. (970) 484-0454 Re: Responses/Clarifications to Geotechnical Engineering Report Proposed Albertson's Supermarket and Retail Buildings Northeast of Timberline Road and Harmony Road Fort Collins, Colorado Terracon Project Number 20025218 Dear Mr. Beery, We are pleased to respond to the review comments made by the Albertson's review team. Terracon discusses the incomplete/deficient items on the Geotechnical Investigation Checklist below. GENERAL REQUIREMENTS 1) Albertson's Review Comment A box designated as incomplete is checked regarding "Is the expected differential movement of slabs vs. foundations stated to be within the acceptable limits of ''/2" within 30' and V across the length of the building?" Terracon's Response This information is found on page 7, 4th paragraph, and applies to the Albertson's Supermarket. EARTHWORK 1) Albertson's Review Comment A box designated as incomplete is checked regarding "Special recommendations for construction methods for inclement weather?" Terracon's Response Terracon does not anticipate construction methods will vary due to inclement weather. It is conceivable however, that the site could be difficult to negotiate with construction equipment if heavy periods of precipitation were to occur. Also, if construction were performed in the winter months, special attention would be necessary for cold weather precautions regarding placement of soil fill and backfill, concrete, masonry, etc. Arizona ■ Arkansas ■ California ■ Colorado ■ Georgia ■ Idaho ■ Illinois ■ Iowa E Kansas 0 Kentucky ■ Minnesota ■ Missouri Montana 0 Nebraska ■ Nevada ■ New Mexico ■ North Carolina ■ Oklahoma 0 Tennessee 0 Texas ■ Utah ■ Wisconsin ■ Wyoming Consulting Engineers & Scientists Since 1965 www.terracon.com REVISION COMMENT SHEET DATE: July 11, 2003 TO: Technical Services PROJECT: #10-03 TIMBERLINE VILLAGE PDP — TYPE II (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: July 23, 2003 M ❑ No Comment ElProblems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** i 't T�jL- C- r c t-tc & i /j c l u r= 0 4-" , D Z, -- z i Ti 1. c (S V i3 1 / T-C U) (i�C__7//,./ .'�' �c p(_,; T C '' Lc` T/ <i /S %/ftK� w4 / 7a /�Ei�'.'/%/ C if l 4 S Y/"1r3C L ,�) — L//✓ Y LC i-/4 /2,� Z /�/ST//✓6c, Jtf Name (please print) Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS =Plat _Site _Drainage Report _Other 6a _Utility _Redline Utility _Landscape Cty of Fod cott;ns July 11, 2003 Ted Shepard City of Fort Collins Community Planning and Environmental Services P.O. Box 580 Fort Collins, CO 80522 RE: Timberline Village PDP Dear Ted, urban design, inc. 3555 stanford road, suite 105 fort coffins, Colorado 80525 (970) 226-4074 fax (970) 226-4196 e@cityscapeud.com Included below are the comments received from City Staff regarding the first round of Project Development Plans for Timberline Village (Harmony School Shops). An explanation (in italics) of how issues have been addressed follows each comment. These comments were initially received on June 12, 2003 With the response to these comments and this re -submittal, the consultant team considers the Project Development Plan review complete and requests that a hearing be scheduled. ISSUES: Department: Current Planning Issue Contact: Ted Shepard Topic: Cover Sheet Created:5/27/2003 Number 1 Please correct the spelling of Compliment in comment number 10 and comment number 26 in the General Notes. The spelling of the word "compliment" has been corrected. Topic: Overall Site Plan Number Please change the 6' asphalt sidewalk to 8' wide as required by code. Show the alignment and the connection to Snow Mesa Drive. The 6' asphalt walk has been changed to an 8' walk. The alignment of walk has been extended to Snow Mesa Drive and is shown on Sheet 2 of 14 of the planning set of drawings. Number 3 Please add the information provided on Sheet 21 of JR Engineering set of drawings to the Overall Site Plan. The information from Sheet 21 in JR Engineering's plan set has been added to the Overall Site Plan Topic: Building 6 Area Plan Number 4 Please add an additional tree to the bank parking lot as shown on the landscape plan The additional tree in the bank parking has been added as requested. Number 5 Please add a hedge along the Timberline ROW to block headlight beams from the bank parking lot. Landscaping has been added to the building 6 area to screen headlights from casting light upon Timberline Road. Page 1 Number 6 Add pedestrian scaled fixtures to each plaza. Provide a detail and spec sheets for ped lights. Pedestrian scaled fixtures have been added to each plaza. Detail sheets and specs of these pedestrian lights have been included in this submittal set. Topic: Site Plan Number Please remove the Lot Line label that points to nothing or move label to proper location. This label has been moved. Number 8 Please remove the utility layer and the topo layers from the Site Plan to make it more legible. The utility and topo layers have been removed from the Site Plan. Number 9 Please provide a connecting walkway between buildings 3 and 4. The walk can be as narrow as 4' in width. Planter diamonds for trees are acceptable. After further discussions with Transportation Planning on June 30, 2003 it was determined that pedestrian connection was required within the landscape island between buildings 3 and 4. Number10 Make sure that the 8' connecting walkway is shown on one of the two site plans and has positive drainage. The connecting walkway is shown on the Overall Site Plan. Topic: Landscape Plan Number 11 As per the Large Retail Establishment section of the LUC, a 6' wide landscape bed is required along the west fagade of Building One (Albertsons) where arcades are not present. Please refer to Code Section 3.5.4. Per discussions with the City of Fort Collins Current Planning Department on June 25, 2003 staff stated that the proposed trees in tree pits would be sufficient. Topic: Architecture Sheets 8, 11 and 12 Number 12 Please change the term Metal Halogen to Metal Halide. This change has been made. Topic: Architecture Sheet 10 Number 13 Please let us know what the Pre -Finished Standing Seam Metal Roofing colors will be prior to approval. So noted. Thank you Page 2 Topic: Lighting Plan Number 14 Please lighten up the landscape and utility layers or freeze layers for this plan. Plan is difficult to read. Original submittal was much easier to read. The utility layers have been frozen on the lighting plan and the background of the plan has been lightened to emphasize the pole locations and the foot candle numbers. Topic: Lighting Schedules and Details Number 15 Please amend the Luminaire Schedule regarding the height of the wall -mounted lights. Are they proposed a 30' height? The luminaire schedule has been amended and the wall -mounted lights have been placed at a height of 22 feet. Number 16 The Dark Bronze color fixture and pole are the most preferable of the color proposed. Please specify this color in the Luminaire Schedule. The Dark Bronze colored fixture and pole will be used in the construction of this project. The pedestrian fixtures and poles will be Dark Bronze or Black in color. This information was inadvertently left off of the plans but will be included on the Final Compliance Set. Number 17 Provide an elevation and section of the proposed wall adjacent to the mobile home park. Please see Sheet 3 of 14 for an elevation and section of the proposed wall behind the supermarket building. The wall is proposed to match the color of the structures on site. Fractured face block with a capstone will be used to provide more visual interest and a shadow line. Number 18 Please provide pedestrian scaled lighting at all plazas. Pedestrian scaled lighting has been provided at all of the plazas. Please see the specification sheets for more information. Department: Engineering Issue Contact: Marc Virata Topic: General Number: 45 Created: 3/31/2003 The internal parking lot and building layout design will likely be altered due to additional right-of-way width required on Harmony and Timberline Roads. Harmony Road requires an additional through lane per the City's Master Street Plan. Timberline Road also requires additional lanes and per the TIS, also requires additional right-of-way for the channelized-T intersection design with Milestone Drive. Interim/ultimate street designs are needed (which will also require CDOT approval) this will help establish right-of-way, utility, & Harmony Corridor setback requirements. [6/4/03] The plat appears to reflect the additional right-of-way required on Harmony Road correctly. However, this change in property line is not reflected on the horizontal control plans. Using the City's horizontal control plan for the Harmony Road alignment, it then appears as a result that the building placements fall short of the 80' setback from the future edge of pavement. Because the channelized-T design along Timberline has not been completed, there may be right-of-way impacts of the design, which in turn may affect the building placement along Timberline. Page 3 ROW issues have been resolved on both Timberline Road and Harmony Road. No additional dedication of ROW is necessary on either frontage per discussions between JR Engineering and the City of Fort Collins. At a June 25, 2003 meeting with City Staff and CDOT staff it was agreed upon that the 80-foot setback from the existing edge of pavement would be sufficient. Any future widening of Harmony Road will encroach into the 80-foot setback. It was agreed that there was no way to precisely determine the future location of the Harmony Road ultimate edge of pavement. Number: 47 Created: 3/31 /2003 Ensure 9' utility easement is provided on Milestone Drive, 15' utility easements are provided on both Harmony and Timberline Road behind the ultimate right-of-way for each, and 80' of setback for the Harmony Corridor plan behind the future edge of pavement (6 lane section) for Harmony Road. Utility easements have been shown on the landscape plans. [6/4/03] 15' of utility easement along Harmony Road is not evident on the plat. In addition, 80' of setback from the future edge of pavement is also not evident on the plat. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 51 Created: 4/1 /2003 Utility, access, and landscape permits are likely to be required by CDOT as the project continues. So noted. Thank you. [6/4/03] It should be verified who will be working on the permit for CDOT to underground the overhead line within the development. Because I believe the line is Excel's, they likely need to be working with the Developer for that portion of the utility permit. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 52 Created: 4/1 /2003 The tree protection/mitigation plan shows landscaping to be removed/relocated outside of the property boundaries. Because this is off -site, the off -site easement required should also include a provision for tree removal/relocation. Another option is for the off -site property owner to sign off on the tree mitigation plan. (It appears that the offsite and onsite entities are one in the same, so this shouldn't be an issue). [6/4/03] Prior to a hearing, the landowner to the north should indicate if any issues exist on the proposal. The applicant has requested that the City Forrester, Tim Buchanan, email City of Fort Collins Engineering Staff a note of approval or denial of the mitigation plan as proposed in this plan set. Please contact me directly if additional action on this item is necessary. Number: 53 Created: 4/1/2003 Show the installation of a Type III barricade along the eastern boundary of this site at the termination of the private drive, as well as the internal sidewalk system. [6/4/03] With the need to construct a sidewalk to Snow Mesa to meet LOS requirements, the Type III barricade is no loner needed. So noted. Thank you Page 4 Number: 54 Created: 4/2/2003 Letters of intent are required for all offsite easements prior to the scheduling of a hearing. This appears required for the property to the northeast as well as southwest. It has been noted that letters of intent for all offsite easements will be given to staff prior to the scheduling of a hearing. [6/4/03] The owner of the mobile home park also needs to sign a letter of intent for the sidewalk connection. It has been noted that letters of intent for all offsite easements will be given to staff prior to the scheduling of a hearing. Number: 58 Created: 4/2/2003 The existing cross access easement shown on the plat, which would facilitate connectivity to the east, does not line up with the driveway connection shown on the plans, which has been moved north. A cross access easement will need to be maintained at the finalized location for the driveway connection to the east. [6/4/03] Please ensure that cross access is maintained to the east by showing an access easement on the plat starting from the access point off Harmony north then proceeding east along the driveway which is meant to continue east into the future developable area. In addition, the site plan should make reference to the driveway continuing east upon development of the neighboring property. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 68 Created: 5/16/2003 It was not noted initially that Timberline Village is an existing name of a recorded plat in the City; the documents cannot have Timberline Village as the name associated with the City. The name on all the documents should be changed to Harmony School Shops 4th Filing. This also allows for this project to be filed in the same physical location as the previous filings of Harmony School Shops. The name of the project has been changed to Harmony School Shops, 4'" Filing for purposes of recordation only. The project will continue to be referred to as Timberline Village for marketing and signage. Number: 73 Created: 5/21 /2003 Both the site plan and the utility plan needs to show a design for the 6' asphalt walk indicated on the site plan to connect to Snow Mesa Road. The proposed walk has been shown on the Overall Site Plan to connect to Snow Mesa Road. Number: 75 Created: 5/22/2003 Based upon discussion among City Transportation on 6/5, it was concluded that additional right-of- way along Harmony Road adjacent to this site is not required. This is a result of the determination that the right-of-way in place today will "work" in the ultimate 6-lane configuration of Harmony Road. Future edge of pavement to determine the 80' setback should still be verified. At a June 25, 2003 meeting with City Staff and CDOT staff it was agreed upon that the 80-foot setback from the existing edge of pavement would be sufficient. Any future widening of Harmony Road will encroach into the 80-foot setback. It was agreed that there was no way to precisely determine the future location of the Harmony Road ultimate edge of pavement. Page 5 Number: 76 Created: 5/22/2003 Based upon discussion among City Transportation on 6/5, the horizontal alignment of the channelized-T design is satisfactory. The following items related to this design though, does need to be addressed. 1. Cross sections along the channelized-T at 50' intervals (as well as critical point such as median noses) are needed to verify drainage patterns and vertical "ride". Also provide spot elevations on any plan view. 2. Indicate curb type along the medians for the channelized-T proposed and provide a detail. 3. Turning movements for large vehicles (WB-50) need to be verified on this design, especially because of commercial trucks using this to serve the site and it allows them to head east on Harmony Road. 3. The proposed design is considered safe from a Traffic Operations standpoint, provided that the work north of Timberline (as being designed by North Star Design) is completed concurrently. The channelized-T without these improvements is a safety issue. It is required that this offsite design is approved concurrently with these plans if not already approved with the Caribou Apartments project. This may involve needing to place the plans from North Star into this submittal or getting North Star to separate this plan set out from the Caribou Apartments design to be approved independently. In addition, this offsite construction will need to be done prior to or concurrent with the channelized-T construction. As Caribou Apartments is under final compliance review, this may not be a concern, but if that project does riot move forward, the construction would need to fall upon this development; there would be reimbursement available from Street Oversizing for this. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 88 Created: 6/2/2003 Based on CDOT requirements (given the existing posted speed limit), when Harmony Road is widened to 6 lanes, the required stacking for the dual -left turn lanes might eliminate the 3/4 turning movement into the site, reducing the driveway out to Harmony Road as a right -in, right -out movement. So noted. Thank you. Topic: Plat Number, 70 Created: 5/21 /2003 There are numerous areas defined internal to the plat that are not locatable. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 74 Created: 5/22/2003 Note 1 on the plat is a potential concern. The blanket easement being created by the note technically results in all buildings being built on this easement (and perhaps legally prevents the buildings from being built) because building envelopes aren't defined on the plat. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 90 Created: 6/5/2003 Technical Services offered the following comments: 1. Boundary & legal closes 2. Plat does not meet requirements of Sections 1.2.2 and 1.2.4 in Appendix E-6 of the Larimer County Urban Area Street Standards. 3. Comments from March 26, 2003 Sheet have not been addressed. (#2 & #6) 4. If lot lines to be vacated were removed the plat would be cleaner. Page 6 5. Drainage/detention area at NEC of plat needs a Tract #. 6. Some easements are not locatable. Please refer to the response letter provided by JR Engineering that addresses this comment. Topic: Site Plan Number: 71 Created: 5/21 /2003 Please add a note on the site plan indicating that: "Buildings 3, 4, 5, and 6 are approved with regards to land use only. Subsequent development of each building will require City approval of site specific utility plans (prepared by a licensed engineer in the State of Colorado) for the area surrounding each building currently noted as "Future Phase" on the Harmony School Shops 4th Filing utility plans. Said approval shall be in conjunction with an associated minor or major amendment (as applicable). Drainage reports, erosion control deposits, and inspection fees may also be required with the development of each building." A similar note will be required on the development agreement for the project. Said note has been added to the Site Plan. Please see JR Engineering's response to comments regarding the Development Agreement. Topic: Transportation Number: 85 Created: 6/2/2003 The TIS notes approach speeds on Harmony as 45 mph instead of 50 westbound, 55 eastbound. The TIS should correct this information and if any of the numbers generated in the report are dependent on posted speed, those results should likewise be amended. A TIS amendment in letterform has been included in this submittal addressing this comment. Number: 86 Created: 6/2/2003 The TIS shows a drop in total peak hour traffic on some movements in the Harmony/Timberline intersection when compared to the 2015 numbers in the PVHS study. The TIS should explain why this change occurs. A TIS amendment in letterform has been included in this submittal addressing this comment. Number: 87 Created: 6/2/2003 The TIS shows EB Harmony to NB Timberline turning movements at 8 (AM) & 6 (PM) while the same turning movement into the site off the 3/4 access directly east is at 61 (AM) & 123 (PM). The TIS should explain how this distribution split was determined. A TIS amendment in letterform has been included in this submittal addressing this comment. Department: Light & Power Issue Contact: Alan Rutz Topic: General Number: 77 Created: 5/29/2003 Transformer behind Building 1 must be accessible by an electric line truck. Provide a detail of the proposed transformer enclosure. Please see enclosure detail on Sheet 7 of 14 Number: 78 Created: 5/29/2003 Remove shrubs at the electric vault located 120' NE of Building 5. (See Overall Utility Plan 10 of 20 and Landscape Plan 5 of 14) The requested shrubs have been removed Page 7 Number: 79 Created: 5/29/2003 Use caution when installing trees over primary electric lines. See Utility and Landscape Plans. So noted. Thank you. Number: 80 Created: 5/29/2003 Buildings 7 and 8 use a shared transformer. Will need to know the electric load for both buildings to determine final transformer size. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 81 Created: 5/29/2003 State Highway Permits will be needed for installation of electric system along Harmony. Developer is responsible for obtaining all required construction permits. So noted. Thank you. Number: 82 Created: 5/29/2003 Electric lines will need to be in an easement. Show electric/utility easements or a blanket easement on the plat. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 83 Created: 5/29/2003 Transformer for Building 6 is next to the north of building wall. A window or door will not be allowed next to the transformer. So noted. Thank you. Number: 84 Created: 5/29/2003 Contact Xcel Energy to underground the overhead electric line on Harmony. Due to adjacent water lines this line may need to be installed joint trench with the Cities new electric line. Please refer to the response letter provided by JR Engineering that addresses this comment Department: Stormwater Utility Issue Contact: Basil Harridan Topic: Details Number: 67 Created: 4/7/2003 6/4/03 Please provide a concrete reinforcement detail for the water quality outlet box Please refer to the response letter provided by JR Engineering that addresses this comment. Topic: Drainage plan Number: 65 Created: 4/7/2003 6/4/ 03 Provide Legend. Use one sheet if possible. Please call out inlet sizes, pipe sizes etc... on utility plans rather than on drainage plan. Show existing lines in a different line type than proposed ones. Please refer to the response letter provided by JR Engineering that addresses this comment. Page 8 Topic: Erosion Control Number: 64 Second Review June 3, 2003 Created: 4/7/2003 The plan is still incomplete and difficult to follow, please correct. March 7, 2003 Delete the grading and erosion control notes (Larimer County Urban Street Standards) from the note sheet #2 of 20. The erosion control plan is very incomplete. Among other things missing are the notes, schedule, BMP legend, etc. Please complete your plan properly and resubmit. Please refer to the response letter provided by JR Engineering that addresses this comment. Topic: Grading Plans Number: 62 6/4/03 Created: 4/7/2003 Show spillway location. Call out berm and spillway elevations. Provide a spillway detail. Provide spot elevations, call out all high points and low points. Use different line thicknesses for proposed contours, building footprints and property lines. Please call out the pan elevations in the pond. Why does it end suddenly end where it does??? clarify grades. Specify which existing trees in the detention pond will be affected by regrading operations. Please provide mitigation since these trees provided a buffer for the residences to the north. Please tie in contours to neighboring properties. Label existing contours. Please refer to the response letter provided by JR Engineering that addresses this comment. Topic: OH -site Drainage improvements Number: 63 Created: 4/7/2003 6/4/03 The off -site storm sewer improvements that were built previously by the developer were not certified to the City, please provide one. During a site visit it was observed that the areas disturbed during the installation process were not adequately vegetated/seeded. This should be done prior to the approval of this project. The City of Fort Collins has agreed to wait until the improvements associated with this project, Harmony School Shops, 4" Filing, are made. The City requested that this pond certification be identified as a separate item on the Development Agreement. Page 9 Geotechnical Engineering Review Comments Fort Collins, Colorado Terracon Project Number 20025218 Page 2 2) Albertson's Review Comment A box designated as incomplete is checked regarding "Groundwater encountered? Depth? Recommendations for mitigation?" Terracon's Response Groundwater was encountered in Test Boring nos. 2, 5, 6, 10, 11, and 13 at approximate depths of 18 to 22-1/2 feet below existing site grades as shown on the boring logs. No mitigation of groundwater is anticipated unless any excavation at the site is expected to exceed 18 feet in depth from present grade during construction. 3) Albertson's Review Comment A box designated as incomplete is checked regarding "Maximum slope on sides of excavations recommended?" Terracon's Response The maximum permanent slope in cut or fill areas should not be steeper than 3:1 (horizonta1:vertical). Temporary slopes should follow OSHA regulations. DESIGN VALUES 1) Albertson's Review Comment A box designated as incomplete is checked regarding "Coefficient of friction?" Terracon's Response The coefficient of friction for use in footing design in conjunction with the on -site soils shall be 0.30. FOUNDATION RECOMMENDATIONS 1) Albertson's Review Comment A box designated as incomplete is checked regarding "Minimum footing depth provided (frost depth, minimum coverage)?" Terracon's Response The frost depth and minimum depth is discussed on page 7, paragraph 3. 2) Albertson's Review Comment A box designated as incomplete is checked regarding "Minimum size on foundation system (spread footings, piles, piers)?" Topic: Plat Number: 60 Created: 4/4/2003 6/4/03 Does the area where the existing detention pond from the previous filing is located have a drainage easement on it. If yeas, then you need to vacate any existing drainage easement no longer needed on the plat. Please refer to the response letter provided by JR Engineering that addresses this comment. Topic: Storm sewer profiles Number: 66 Created: 4/7/2003 6/3/03 Specify maintenance responsibility for all storm sewers. City will only maintain lines in the public ROW. Number or name different storm lines. Call out clearance from proposed sanitary sewer and water lines. Some clearances, i.e the sanitary sewer clearance by STMH-1 seem to be very small. Please keep 10 year HGL within the pipe. Please refer to the response letter provided by JR Engineering that addresses this comment. Topic: Utility Plans Number: 61 6/4/03 Created: 4/4/2003 Provide a legend. Identify what DP stands for (Drainage Pipe). Please call out existing storm sewers. Reference detail sheet for facilities. Call out all inlet sizes and types on the overall utility plan. Call out types of pipe used for drainage. Please specify if these DP (Drainage Pipes) will be RCP Class III, ADS etc... ?? There are still many areas that are unreadable on the plans. The overall utility plan is too busy with text notations. Please reroute the storm sewer to the southeast of building 8 in a manner that would minimize the amount of crossings over the proposed water line. Please maintain a minimum 18" vertical clearance between sanitary lines and storm lines whenever possible. The overall utility plan has many unreadable/overlapped labeling. Please clarify and correct. Legend is missing on some of the plans. Please provide a phasing plan. Clarify what will be built with first phase, how will future phases be dealt with in the interim, will they be overlot graded and stabilized ?? Please refer to the response letter provided by JR Engineering that addresses this comment. Page 10 Department: Traffic Operations Issue Contact: Eric Bracke Topic: Transportation Number: 69 Created: 5/20/2003 There have been discussions and preliminary designs for a channelized "T" intersection at Timberline/Milestone. The new set of plans shows a full movement intersection without the benefit of the channelizing medians. Why? If the developer has decided not to go with the channelized "T", then a full median will be constructed resulting in a right-in/right-out access at Timberline/Milestone The connection to the east has not changed. It still appears circuitous and meanders through the parking lot rather thar, functioning as a true cross access. The channelized T has been added to the site plan. The design of the Channelized "T" was not completed at the time of the last re -submittal hence it was not included in the plans. An agreement has been made between the applicant and the Transportation Planning Department allowing the connection to exist as proposed within this plan set. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 27 Created: 3/28/2003 Harmony corridor is identified as a future 'Enhanced Travel Corridor' and Timberline will be a high frequency corridor on the City's Long Range Transit Plan. According to the LUC (4.19 (E.1c) neighborhood commercial centers are major stages for the transit network (existing or future). Integration of a transit stop needs to be included in future submittals. A meeting with Transportation Planning and Transfort is requested to discuss the stop locations. (FOLLOW UP COMMENT 6-2-03) The proposed right turn lane into the site from Timberline will suffice as the future transit stop on the Timberline corridor. However, the Harmony stop needs to be located as close as possible to the primary driveway and walkway system into the site (see red lines). Even though no concrete pads will be required at this time, please show on the site plan the walkway connection, landing area, and shelter pad. (see redlines for stop locations) A follow-up meeting with Tom Reiff was held on June 30, 2003 and the new transit location was determined. This "new" location is expressed on the site plan. Number: 28 Created: 3/28/2003 The proposed private drives that provide cross access to the eastern property need to be realigned and more direct. (Follow Up Comment 5-29-03) Since the City is not requiring a public street connection to the east, the primary east -west drive aisle should be designed to function similar to a street. Furthermore, this drive access may become very important for this development if the 3/4 turn movement from EB Harmony Road is closed at some future date, which according to CDOT is very likely. Please see the provided sketches for the reconfigured drive aisle and intersection. A meeting with the City Transportation Planning Department on June 30 resulted in the agreed upon layout and alignment. An additional walk was added from the northeast of building 3 to the eastern most property line providing the desired connectivity without sacrificing desired parking stalls and beneficial landscape screening and shade. Number: 32 Created: 3/28/2003 Directional access ramps are required within the public Right of Way. Please install directional ramps at the two drive aisle entrances off of Milestone Drive (see red lines). An additional ramp on the north side of Milestone Drive is required to align with the ramp directed to the north. Also change the radial style ramps shown at the Harmony Road access to east to west directional ramps only. (Repeat Comment 5-29-03) Please show directional access ramps at the driveway intersections with Milestone Dr. in accordance with the LCUASS (see red lines). The requested directional ramps have been shown on the plan per the City of Fort Collins Redlines Page 11 Number: 89 Created: 6/2/2003 The bike lanes shown on Harmony Road need to be located along the outer edge of the road and transition between the through lane and right turn lane at Timberline closer to the intersection. Please refer to the response letter provided by JR Engineering that addresses this comment. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Landscape Number: 35 Created: 3/31 /2003 As previously indicated, Show all existing and proposed water/sewer lines on the landscape plans and provide the required landscape/utility separation distances. Maintain 10 feet of separation between light poles and water sewer lines. All existing and proposed utilities are shown on the landscape plans. A 10-foot separation distance between light poles and water/sewer lines has been met. Topic: Plat Number: 34 Created: 3/31/2003 As previously indicated, Provide utility easements for all curb stops and fire hydrants. Please refer to the response letter provided by JR Engineering that addresses this comment. Topic: Utility Plans Number: 37 Created: 3/31/2003 As previously indicated, Remove all unnecessary text from the overall utility plans to provide more clarity. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 39 Created: 3/31 /2003 As previously indicated, Include standard general notes on the overall utility plan pertaining to poly wrapping D.I.P. Remove the general note to joint deflect water mains vertically to avoid utility crossing. Clearly define all locations of conflict of water mains and other utilities. Provide all information necessary for water main lowerings. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 91 Created: 6/6/2003 Show and label all location of proposed as well as existing curb stops. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 92 Created: 6/6/2003 Reconfigure storm sewer and water main layout between bldg 8 and 9 to avoid multiple utility crossings as well as several unnecessary fittings on the water main. Please refer to the response letter provided by JR Engineering that addresses this comment. Number: 93 Created: 6/6/2003 Provide the design specification for our review for the geoweb proposed for the access road on the sanitary sewer main. The sewer cleaning trucks are approximately 40 to 45 tons. A "grasscrete" type system may be needed to carry loads in this range. Please refer to the response letter provided by JR Engineering that addresses this comment Page 12 Number: 94 Created: 6/6/2003 Maintain 10 feet of separation between the fire hydrant adjacent to bldg 3 and the trash enclosure for bldg 3. See site, landscape and utility plans for more comments. So noted. Thank you. Department: Zoning Issue Contact: Peter Barnes Topic: zoning Number: 72 Created: 5/21 /2003 Near the northeast corner of the Albertsons building on the site plan there's a note that says "Lot Line (typ)" with an arrow that points to nothing. The arrow needs to point to a lot line, so the note needs to be moved, or a lot line needs to be drawn. As requested, the note has been relocated. This concludes the written comment response portion of this response letter. The following responses specifically address the supermarket architecture/big box comments from City Planning staff. Please find the City of Fort Collins redlines attached. Please find the following responses for the comments sent from the City of Fort Collins, CO dated 6/26/03. 1. The materials and colors have been changed to correspond to adjacent retail building. a. Brick color field brick interstate brick "baja brown". Accent brick: interstate brick color "tumbleweed". b. EIFS colors will correspond to adjoining building. Main field color: Senergy #421 oatmeal. Accent band: Senergy #3052 Cardamom. c. Storefront: All aluminum storefront will be clear anodized aluminum to match automatic entry and exit doors used by Albertsons. d. Glazing will be 1" insulated clear glass, except at the 2-story glass section "evergreen" color glass will be used to reduce the heat gain into the building. e. The canopy material will be corrugated pre -finished metal color: forest green. The frame and decorative turnbuckles for the canopy will be black. f. The block wainscot will be a architectural split -face integral color masonry to correspond to adjoining building. Color: #924 clalite g. No lights will be used on the front of the building only at the rear per photometric plan. 2. Brick / Block Detailing a. The columns at the entries will be articulated with the tulip band design defined with cast -stone cap and row -lock brick bank below. b. The entry canopies header will be defined with a brick soldier course on front and sides. Color: Tumbleweed to correspond to adjoining building. Page 13 3. Coping a. The coping at the west elevation above the split -face masonry band will be cast -stone. The coping above the main sign panel with the EIFS finish will be metal coping: Sherwood green to correspond to adjoining building. b. The remaining 3 sides will have pre -finished metal coping, except at the brick pilasters. These will have cast -stone coping. the metal coping will be metal "bone white" with mortar reveal to suggest a stone look. 4. Lights on east elevation wall pack fixtures will be provided per photometric plan. 5. A canopy will be provided over the main door on south elevation of same design and color as west elevation. 6. Integral colored masonry will be used. 7. Four (4) trees and tree grates will be provided in walk on west elevation. 8. If a seasonal sale is planned it will comply with all applicable codes. For more informajidn regarding any these comments please contact me. fkk �---.. be Carter Cityscape Urban Design Page 14 Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: July 30, 2003 Project: TIMBERLINE VILLAGE PDP -TYPE 11 (LUC) #10-03 All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: July 23, 2003 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 54 Created: 4/2/2003 Letters of intent are required for all offsite easements prior to the scheduling of a hearing. This appears required for theproperty to the northeast as well as southwest. / [6/4/03] The owner of thp mobile home park also needs to sign a letter of intent for the sidewalk connection. /�"�'� U^/� S✓��� [7/23/031 A letter of Intent from ARC was not received with the submittal, only a legal description of the area. ���u /�r�i , i/ ��K., s/Sj � 61AO-z Number: 58 Created: 4/2/2003 The existing cross access easement shown on the plat, which would facilitate connectivity to the east, does not line up with the driveway connection shown on the plans, which has been moved north. A cross access easement will need to be maintainedo at the finalized location for the driveway connection to the east. A :�x P4ek— '1/A�'� [6/4/03] Please ensure that cross access is maintained to the east by showing an access easement on the plat starting from the access point off Harmony north then proceeding east along the driveway which is meant to continue east into the future developable area. In addition, the site plan should make reference to the driveway continuing east upon development of the neighboring property. [7/23103] The site plan does make this reference, but the plat does not appear to do so. I would suggest amend -'in Note on the plat to read as follows: Sienarure / Date HECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat ✓ Site Ae D image Report Other_ = Utility /' Redline Utility Landscape Page 1 "Cross Access & Parking Easement - The owners of the property being subdivided, their successors and assigns do hereby covenant and agree that cross access and parking is allowed between the lots and tracts of this subdivision and that cross access is allowed for vehicular connectivity to the parcel directly east. This provision shall be subject to current zoning regulations, applicable laws and ordinances." Number: 113 Created: 7/30/2003 Please add a note on the landscaping and utility plan set indicating that prior to the construction of the channelized-T intersection, the relocation of the existing landscaping affected by the proposed construction shall be coordinated with the City Forrestor. /I Topic: Plat Number: 90 Created: 6/5/2003 Technical Services offered the following comments: 1. Boundary & legal closes 2. Plat does not meet requirements of Sections 1.2.2 and 1.2.4 in Appendix E-6 of the Larimer County Urban Area Street Standards. 3. Comments from March 26, 2003 Sheet have not been addressed. (#2 & #6) 4. If lot lines to be vacated were removed the plat would be cleaner. 5. Drainage/detention area at NEC of plat needs a Tract #.n/edc 6. Some easements are not locateable. 1—Ce 4- T' f5T�7-' [7/281031 Technical Services offered the following comments: 1. Plat needs sheet No. 1 of 2 and 2 of 2. 2. Some easements are not locatable. 3. The title (subtitle) of the plat is wrong - ("being a replat of lots 2 & 3 Harmony School Shops 1st...) 4. Is there a way to identify the lot comers (new) with a symbol? Lot lines are hard to distinguish. 40A 5-/Izv� 7*rl Number: 110 Created: 7/28/2003 In general, it is difficult to follow the information on the plat. The lot lines within the platted boundaried are hard to follow. The plat labels a 20' utility, drainage, access easement (Reception# 97028752) which seems to point at a hatched area designated as an emergency access easement and there are other labels which are difficult to place where they are defined. - x� Topic: Utility Plans Number: 76 Created: 5/22/2003 Based upon discussion among City Transportation on 6/5, the horizontal alignment of the channelized-T design is satisfactory. The following items related to this design though, does need to be addressed. 1. Cross sections along the channelized-T at 50' intervals (as well as critical point such as median noses) are needed to verify drainage patterns and vertical "ride". Also provide spot elevations on any plan view. 2. Indicate curb type along the medians for the channelized-T proposed and provide a detail. Page 2 3. Turning movements for large vehicles (WB-50) need to be verified on this design, especially because of commercial truckspsing his to serve the site and it allows t/he�Jy�]'', to head east on Harmony Road. ��r /�i 10 leefl C- �as�- ,./!�L ', r 4. The proposed design is considered safe from a Traffic Operations standpoint, provided that the work north of Timberline (as being designed by North Star Design) is completed concurrently. The channelized-T without these improvements is a safety issue. It is required that this offsite design is approved concurrently with these plans if not already approved with the Caribou Apartments project. This may involve needing to place the plans from North Star into this submittal or getting North Star to separate this plan set out from the Caribou Apartments design to be approved independently. In addition, this offsite construction will need to be done prior to or concurrent with the channelized-T construction. As Caribou Apartments is under final compliance review, this may not be a concern, but if that project does not move forward, the construction would need to fall upon this development; there would be reimbursement available from Street Oversizing for this. [7/23/03] After review of the submitted turning movements for a WB-50 and futher analysis of turning movements using the provided CAD drawings, please "shave ofP' portions of the medians as redlined. This would appe r to make the turning movements easier for these larger vehicles. Number: 103 Created: 7/28/2003 Please add a signature block for CDOT in the cover sheet. In addition, please provide CDOT General Notes on the plans (the notes to be used were emailed to Adam Vail). Number: 104 Created: 7/28/2003 Please replace Sheet 17 with the striping plan worked out with Adam, City Engineering & Transportation, & CDOT. Traffic Engineering indicated that the striping plan was acceptable. t i/ IA71c� Number: 105 Created: 7/28/2003 There is some concern on the amount of cross slope from the crown to the east side of Timberline directly in front of Milestone Drive, it appears relatively flat. Please explore raising the east side of this median to achieve greater fall across Timberline. It seems ou enntw iv at the elevation noted at STA 15+97.25 is higher than the spot elevations on ei er si e. lease :see redlines on plan view and cross section sheets. Number: 106 Created: 7/28/2003 Please give an indication on the existing cross slopes across Timberline in order to see how the cross slope across the new median opening ties into the existing cross slopes. Number: 107 Created: 7/28/2003 Please specify a transition length/area from where the outfall curb and gutter transitions to the inflow. A length of transition should be specified to ensure that a smooth riding section is obtained. Otherwise if possible, it is preferred that the use of catch curb is discouraged along the medians when spill curb is predominantly used. Page 3 August 25, 2003 Mr. Ted Shepard City of Fort Collins 281 North ColleLc Avenue Fort Collins, Colorado S0522 Re: Harmony School Shops 4tn Filing Dear Ted: U J R ENGINEERING We have revised the construction drawings and drainage report per your comments dated July 23, 2003. The tollowing numbers correspond to the comments: Engineering 54. Letter of intent will be submitted by the developer. 58. Note no. 2 will be deleted on the plat and replaced with a note that references the "Restrictions and Covenant" document to be recorded concurrently with the Plat. This document specifically details the rights. responsibilities, restrictions and obligations of the parties involved. The change was not yet made because we are waiting on specific language from the attorney. 113. A note was added to Canalized "T" Demo Plan stating "CONTRACTOR SHALL REFER TO LANDSCAPE PLANS BY CITYSCAPE FOR REMOVAL AND REPLACEMENT OF EXISTING LANDSCAPING ALONG MEDIAN. RELOCATION OF EXISTING LANDSCAPING ALONG MEDIAN SHALL BE COORDINATED WITH CITY FORRESTOR.". Topic plat: 90. • Sheet numbers of the Plat were revised unfortunately: an error still exists on sheet one since it is shown as sheet 2 of 2. This will be corrected for the final product. • Plat is undergoing a major overhaul to help clarify easement locations and geometry. This revision will include a third page but not completed in time for this submission. All easements will be clearly shown and will be locatable upon completion. • Subtitle has been revised. • Same response as item no. 2 110. Same comment as to item 902 above.. Utility Plans: 76.Raiscd medians are revised to accommodate WB-50 turning movement. X: 934700 / Corresp / Letters / commentresponseletter 26!O I Rind, Sulr 190, Iron Collnm, (() 80925 970 191 ISSN • 1'., . 970 -i91 19 I • —w.jrt q,n ,r ing.u.nl 103. Signature block for CDOT was added to bottom right corner of cover sheet. Sheet 2B was added for placement of CDOT General notes. 104. Latest approved Striping Plan was added to drawings. 105. Revisions were made accordingly. 106. Existing cross slopes have been added to cross -sections. 107. Transition lengths have been specified on drawings. Light and Power 96. Vaught Frye Architects has provided this information to Alan Rutz. 97. Blanket easement is being used for this development as specified on notes at bottom of sheet. Due to developers concern blanket easements will be revised and individual easements will he shown on Plat prior to Mylar submittal. Stormwater 109. • The owner of the telephone easement does not have exclusive use of the land encumbered by his easement. There is no requirement that he sign the Plat. • Note has been revised. • Note has been revised. 64. A meeting with Bob Zakely has been scheduled. 108. • Note was added on sheets L 1 & 12 of 27 stating -ALL FUTURE PHASE AREAS (BLDGS 3, 4. 5. 6) SHALL BE OVERLOT GRADED WITH POSITIVE DRAINAGE. ALL FUTURE AREAS SHALL. BE SEEDED AND MULCHED PER LANDSCAPE PLANS:' • Detail of 2' trickle pan was added to sheet 26 of 27 L I L The proposed area inlet is outside of CDOT R.O.W. 112. • Type of pipe used for roof drains is stated on the Cover Sheet (1 of 27) in note #17 in lower left corner. Clean outs have been added at bends. Transportation Planning 98. The walk width has been revised to 8'. Water/Wastewater 35. See comment response by Cityscape. 91. Note was added on sheets 9 & 10 of 27 stating "WATER METER PITS AND CURB STOPS FOR BUILDINGS 3, 4,5 AND 6 SHALL BE INSTALLED WITH FURTHER PHASES". 93. Placing Geoweb specification on drawings will place liability on J-R Engineering by referencing specification will limit the liability in J-R Engineering which is our preference. X: 934700 / Corresp / Letters / commentresponseletter Geotechnical Engineering Review Comments Fort Collins, Colorado Terracon Project Number 20025218 Page 3 Terracon's Response Footings should be sized based on the bearing capacity recommendations outlined in the geotechnical engineering report, however, recommended minimum widths of column and wall footings are 36 inches and 18 inches, respectively, assuming the minimum dead load pressure of 750 psf can be achieved. When considering the anticipated maximum wall and column loads of 6 kips per linear foot and 120 kips, respectively, outlined in the Albertson's Inc. Geotechnical Design Standards, larger footings will be required. PAVEMENT RECOMMENDATIONS 1) Albertson's Review Comment A box designated as incomplete is checked regarding "Recommended pavement sections (including compacted native soils, base coarse and wear coarse) included?" Terracon's Response The pavement section is displayed in a table on page 10 of the geotechnical report. The compacted subgrade thickness requirement is 8 inches, as shown on page 13 of the report. SEISMIC CONSIDERATIONS 1) Albertson's Review Comments Three boxes designated as incomplete are checked regarding "Maximum probable event (MPE) calculation, Maximum credible event (MCE) calculation, and seismic response spectrum analysis". Terracon's Response According to the Albertson's Inc. Geotechnical Investigation Standards, these items are only required if the site falls within a Seismic Risk Zone 3 or 4. Terracon discusses the site is in a Risk Zone I area on page 12 of the geotechnical report. Please contact us if you have any questions or need additional information. ely, " ACON as Jobe,(y/{. E. Manager cc Addressee (1) Albertson's (1) 101. Note was added on sheets 9 & 10 of 27 stating "ALL UTILITIES SHALL BE INSTALLED WITH PHASE I UNLESS OTHERWISE SPECIFIED 101. Water line was added. Fire hydrant is now in landscaped island and is stubbed out for future development. 102. Comments were checked and revisions were made. If you have any questions or need additional information, please contact me at 970.491.9888. Sincerely, —�:2 Trina Colvin Design Technician II cc: Rob Beery, Miller -Weingarten, Joe Carter, Cityscape Matt Rankin, Vaught -Frye Architects Randall Provencio, JR Engineering X; 934700 / Corresp / Letters / commentresponseletter f� aEc. a i.■.. FINAL COMPLIANCE City of Fort Collin, COMMENT SHEET Current Plannine DATE: August 27, 2003 TO: Technical Services PROJECT: #10-03A Timberline Village PDP — Final Compliance — Type II (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: September 10, 2003 Note - Please identify your redlines for future reference ). 3�PLFQ`j j "&A-L CLOSs- . n /� • � � .SJ Z OL'-� L. k-c=b 2 c� r/tJc7 Tc �t���, ) A/.,� d TN L (Z Y� ✓+r Sint t �rtT�_-7 (s (��' �� ��v =t. At--T _7-FiA _T_( I\JL ;�; — G�,� (_ 0� / -1 �-� Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort COMM i August 27, 2003 Ted Shepard City of Fort Collins Community Planning and Environmental Services P.O. Box 580 Fort Collins, CO 80522 RE: Timberline Village PDP Dear Ted, urban design. inc. 3555 stanford road, suite 105 fort collins, colorado 80525 (970) 226-4074 tax (970) 226-4196 e@cityscapeud.com Included below are the comments received from City Staff regarding the third round of Project Development Plans for Timberline Village (Harmony School Shops). An explanation (in italics) of how issues have been addressed follows each comment. These comments were initially received on July 25, 2003. The City of Fort Collins comments have been addressed on this set of Final Compliance Plans. The City of Fort Collins redlines have been included in this submittal. The P.D.P. is eligible for the August 21, 2003 Planning and Zoning Board meeting. The item will be on the discussion portion of the agenda. So noted. Thank you. 2. It is imperative that in order to remain on the August 21s' agenda, a Letter of Intent be provided from ARC to the City of Fort Collins Engineering Department for the construction of the eight -foot wide asphalt sidewalk. So noted. Thank you. The applicant and staff agreed that a condition of approval would be issued with the decision of the Planning and Zoning Board. The condition would allow the walk to be constructed within the Harmony Road right-of-way if no reasonable solution could be met with the walk were currently proposed. 3. Harmony Road is planned for future transit service by Transfort. Therefore, in accordance with City of Fort Collins Transit Design Standards and Guidelines, a bus shelter needs to be secured with a financial escrow. The escrow amount is $3,500.00. The applicant will provide a financial escrow for the future construction of a transit stop in the amount of $3,500, 4. The parapet walls for the Albertson's supermarket must feature a three-dimensional cornice. As we have discussed, the cornice does not have to be a masonry material. Camburas and Theodore Architects have provided the Albertsons parapet wall detail at the request of staff. 5. The existing shrubs in the median in Timberline that will be reconstructed for the channelized tee must be relocated or replaced. A note has been added to sheet 2 of 14 directing the contractor to work directly with the City Forrester on relocation and/or replacement of plant material within the Timberline median. 6. A power point graphic of a channelized tee will be very helpful for the Planning and Zoning Board work session. So noted. Thank you. Be sure that the eight -foot walk is specified on the site plan to match the utility plan east of Building Two. This requested change has been brought to the attention of the consulting engineers. 8. Sheet 7 of 14 should be reduced to a 24" x 36" format. Be sure to include the plan view section per elevation as was done on the May submittal. So noted. Thank you. 9. Please revise note number 31 in the following manner: "Per Section 3.5.1(J)(6) of the Land Use Code, this P.D.P. is specifically conditioned such that the placement of outdoor vending machines shall be prohibited unless screened from view from the private drives, parking lots, public streets and residential areas by a screen wall." Note number 31 has been revised to read as requested. 10. Please ncte the following deadlines for the August 215' P & Z hearing: One set of 81/2 x 11 reductions of the sheets 1 — 14 are due on Monday, Aug. 4'". Nine sets of full-size sheets 1 — 14 are due on Monday, Aug. 111". Electronic images and graphics for the Board are due on Wednesday, Aug.13'". The P & Z work session is scheduled for Friday. Aug. 15". So noted. Thank you. Number 35 Jeff Hill As previously indicated, provide the required landscape and utility separation distances. Correct standard general note on the landscape plans pertaining to landscape utility separation requirements. Maintain 10 feet of separation between trees and water/sewer lines and 4 feet of separation shrubs and water/sewer lines. The Fort Collins Land use code no longer specifies that a separation distance of 10 feet be maintained between trees and water/sewer lines. Only a 6-foot separation is required. The plans meet this standard. Shrubs have been kept a minimum of 4 feet away from meters but not from the water/sewer lines. The applicant's representative is not aware of a code section that specifies such separation requirements. Number 102 See site, landscape and utility plans for other comments So noted. Thank you. Number 113 Please add a note on the landscaping and utility plan set indicating that prior to the construction of the Channelized T intersection, the relocation of the existing landscaping affected by the proposed construction shall be coordinated with the City Forrester. A note expressing the staff comment was added to the landscape plan within the Final Compliance set and the construction set. This concludes the response to the City of Fort Collins Planning Department comments. Engineering and Utility response to comments have been provided under separate cover. Sincerely: Joe Carter Cityscape Urban Design Project Comments Sheet Selected Departments Department: Engineering Date: September 17, 2003 Project: TIMBERLINE VILLAGE PDP - TYPE II (LUC) & FINAL COMPLIANCE#10- 03 All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: September 10, 2003 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 51 Created: 4/1/2003 Utility, access, and landscape permits are likely to be required by CDOT as the project continues. [6/4/031 It should be verified who will be working on the permit for CDOT to underground the overhead line within the development. Because I believe the line is Xcel's, they likely need to be working with the Developer for that portion of the utility permit. [9/ 16/031 This comment is left as unresolved just as a heads -up for the applicant. Number: 54 Created: 4/2/2003 Letters of intent are required for all offsite easements prior to the scheduling of a hearing. This appears required for the property to the northeast as well as southwest. [6/4/031 The owner of the mobile home park also needs to sign a letter of intent for the sidewalk connection. [7/23/031 A letter of intent from ARC was not received with the submittal, only a legal description of the area. [9/9/031 As neither a letter of intent or the actual easement has been provided for the proposed design, final compliance has not been met and the drawings cannot be finalized for approval and signature. It is my understanding that an alternative design for the trail is being looked at, this needs to be provided on the construction plan set. uurel Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other _ Utility _ Redline Utility Landscape Page I Topic: Plat Number: 90 Created: 6/5/2003 Technical Services offered the following comments: 1. Boundary & legal closes 2. Plat does not meet requirements of Sections 1.2.2 and 1.2.4 in Appendix E-6 of the Larimer County Urban Area Street Standards. 3. Comments from March 26, 2003 Sheet have not been addressed. (#2 & #6) 4. If lot lines to be vacated were removed the plat would be cleaner. 5. Drainage/detention area at NEC of plat needs a Tract #. 6. Some easements are not locateable. [7/28/031 Technical Services offered the following comments: 1. Plat needs sheet No. 1 of 2 and 2 of 2. 2. Some easements are not locatable. 3. The title (subtitle) of the plat is wrong - ("being a replat of lots 2 & 3 Harmony School Shops 1st...) 4. Is there a way to identify the lot corners (new) with a symbol? Lot lines are hard to distinguish. [9/16/03] These comments are left as unresolved because of the plat being revised by the applicant. Number: 110 Created: 7/28/2003 In general, it is difficult to follow the information on the plat. The lot lines within the platted boundaried are hard to follow. The plat labels a 20' utility, drainage, access easement (Reception# 97028752) which seems to point at a hatched area designated as an emergency access easement and there are other labels which are difficult to place where they are defined. [9/10/031 This comment is left as unresolved as the applicant has indicated an updated plat is still forthcoming Topic: Utility Plans Number: 76 Created: 5/22/2003 Based upon discussion among City Transportation on 6/5, the horizontal alignment of the channelized-T design is satisfactory. The followirg items related to this design though, does need to be addressed. 1. Cross sections along the channelized-T at 50' intervals (as well as critical point such as median noses) are needed to verify drainage patterns and vertical "ride". Also provide spot elevations on any plan view. 2. Indicate curb type along the medians for the channelized-T proposed and provide a detail. 3. Turning movements for large vehicles (WB-50) need to be verified on this design, especially because of commercial trucks using this to serve the site and it allows them to head east on Harmony Road. 3. The proposed design i:s considered safe from a Traffic Operations standpoint, provided that the work north of Timberline (as being designed by North Star Design) is completed concurrently. The channelized-T without these improvements is a safety issue. It is required that this offsite design is approved concurrently with these plans if not already approved with the Caribou Apartments project. This may involve needing to place the plans from North Star into this submittal or getting North Star to separate this plan set out from the Caribou Apartments design to be approved independently. In addition, this offsite construction will need to be done prior to or concurrent with the channelized-T construction. As Caribou Apartments is under final compliance review, this may not be a concern, but if that project does not move forwardtie construction would need to fall upon this development, there would be reimbursement available from Street Oversizing for this. [7/23/031 After review of the submitted turning movements for a WB-50 and futher analysis of turning movements using the provided CAD drawings, please "shave off' portions of the medians as redlined. This would appear to make the turning movements easier for these larger vehicles. [9/16/03] Please be aware that Caribou Apartments has not completed final compliance review. As such, the development agreement will need to obligate the developer of both design and construction of the offsite improvements north of the channelized-F should Caribou Apartments not have these respective items completed relative to the desired schedule of Harmony School Shops 4th. Page 2 Number: 105 Created: 7/28/2003 There is some concern on the amount of cross slope from the crown to the east side of Timberline directly in front of Milestone Drive. it appears relatively flat. Please explore raising the east side of this median to achieve greater fall across Timberline. It seems counterintuitive that the elevation noted at STA 15+9725 is higher than the spot elevations on either side. Please see redlines on plan view and cross section sheets. [9/16/031 Please look at further raising the east side of the median from STA 17+50 to 18+50 to provide more of a cross fall, it would be preferred if the slopes can at least match existing slopes. Also. please show street patching as shown on the redlines with the typical street patching note. In addition, please show patching limits of 6' past (half the lane width) where curb and gutter is to be added and add the same note regarding limits of repair that is shown on Sheet 5. Number: 115 Created: 9/10/2003 Based on conversations with CDOT in processing their access permit, please address the following items: -Add a note to Sheet 8 indicating that the access opening onto Harmony Road is to be centered upon the 35' opening in the deeded access control line. -Please create an existing and proposed striping plan for Harmony Road. The proposed striping plan sheet should label/indicate striping to remain and proposed striping areas. In addition, indicate "existing bikelane striping from taper to intersection to be refreshed". On the existing striping plan, show with cross -hatching areas of striping which are to be removed. -Please provide what the building square footages are for the existing gas station and school uses that would use this development for circulation. This will be filled in item I 1 of the access permit. -As a "heads -up", at the time the plans are approved and signed off, 5 copies (signed and stamped for the construction plan) of the following sheets will need to be provided for CDOT's purposes: > Cover Sheet >General Notes > Horizontal Control Plan > Grading Plan > Existing and Proposed Harmony Road Striping Plan > Details Sheets > Cityscape's Site ai Landscape Plan (also, 3 additional copies of the proposed and existing striping plan for CDOT is needed) Page 3 November 1^_. _2003 Mr. Ted Shepard CITY PLANNER —CITY OF FORT COLLINS Current Planning 281 N. College Avenue P.O. Box 580 Fort Collins. CO 80522-0580 J R ENGINEERING RE: TIMBERLINE VILLAGE PDP -TYPE II (LUC) & FINAL COMPLIANCE#10-03 Dear Mr. Shepard: ISSUES Department: Engineering Issue Contact: Marc Virata Topic: General Number: 51 Created: 4/ l /2003 Utility, access, and landscape permits are likely to be required by CDOT as the project continues. 16/4/031 It should be verified who will be working on the permit for CDOT to underground the overhead line within the development Because I believe the line is Xcel's, they likely need to be working with the Developer for that Portion of the utility permit. 19/16/031 " This comment is left as unresolved just as a heads -up for the applicant. Response: Noted Number: 54 Created: 4/U2003 Letters of intent are required for all offsite easements prior to the scheduling of a hearing. This appears required for the property to the northeast as well as southwest. 6/4/03 1 The owner of the mobile home park also needs to sign a letter of intent for the sidewalk connection. 7/2 3/031 .� letter of intent from ARC was not received with the submittal, only a legal description of the area. 1 9/9/O3I ,As neither a letter of mentor the actual easement has heen provided for the proposed design. final compliance has not heen met and Ill,- drtwim_s cannot he finalized for approval and signature. It is my understanding thut an ullcrnaure dcsi�,n for the trail is heimL, looked m. this needs Io be provided on the construction plan set. Response: ,Voted Topic: Plat N u ni hcr: 90 C'rrated: 6/5/2003 IcdoucId Scn ices tfered the Iollowmg comments: i. I3uun(I LIT c & legal clr.ses Pasc I k1 491-)888 L.•x1-w94 a�L 1', ngmrcrin,'.unn 2. Plat does not meet requirements of Sections L22 and 1 2.4 in Appendix E-6 of the Larimer County urban Area Street Standards. 3. Comments from March 26. 2003 Sheet have not been addressed. (#2 & #6) 4. If lot lines to be vacated were removed the plat would be cleaner. 5. Drainage/detention area at NEC of plat needs a Tract #. 6. Some easements are riot locatable. 17/28/031 Technical Services offered the following comments: 1. Plat needs sheet No. 1 of 2 and 2 of 2. 2. Some easements are not locatable. The title (subtitle) of the plat is wrong - ("being a replat of lots 2 & 3 Harmony School Shops I st_.) Is there a way to identify the lot corners (new) with a symbol? Lot lines are hard to distinguish. [ 9/ 16/031 These comments are left as unresolved because of the plat being revised by the applicant. Response: Comments dated 7128103 were partially addressed in the August 25, 2003 response but the plat was in the process of being re formatted and so several issues remained outstanding. The issues should be addressed with the current submittal. .Specific responses follow: 1. Flat needs .sheet No. I of 2 and 2 of 2. This comment was because both sheets were labeled `I of 2'. The plat has been reformatted to have a total of three sheets and all are now labeled correctly. 2. Some easements are not locatable. I believe all easement lines have been labeled and tied down by offset or bearing and distance so all easements should now be locatable 3. The title (subtitle) of the plat is wrong — ("being a replat of lots 2 & 3 Harmony School Shops ist... ) I didn't understand what was wrong with the subtitle as written however; it has been revised and hopefully addresses the concern. 4. Is there a way to identify the lot corners (new) with a symbol? Lot lines are hard to distinguish. The interior lot corners have been identified with a solid dot. Found corners are identified with an open circle, and set monuments are identified with a smaller dot and two concentric rings as shown on the legend. I thing the format revision of breaking into 3 sheets has helped a lot in clarifying lot lines, lot corners, and monuments. Number: 110 Created: 7/28/2003 In general, it is difficult 7o follow the information on the plat. The lot lines within the platted boundaried are hard to follow. The plat labels a 20' utility, drainage, access easement (Reception# 97028752) which seems to point at a hatched area designated as an emergency access easement and there are other labels which are difficult to place where they are defined. 19/10/031 This comment is left as unresolved as the applicant has indicated an updated plat is still forthcoming. Response: Similar comment as item 90. Concerns are addressed in the above comments Topic: Utility Flans Number 76 Created: 5/22/2003 Based upon discussion among City Transportation on 0/5. the horizontal alignment of the channelized-T design is sausfactory. The fbllowin" items related to this design though, does need to be addressed. I . Cross sections along the channelized-T at 50' intervals tas well as critical point such as median noses) are needed to verify drainage patterns and vertical "ride' Also provide spot elevations on anv plan view. Page 2 PROJECT (Ew;&"M COMMENT SHEET City of FDA Callins Current Planning DATE: February 26, 2003 TO: Engineering Pavement PROJECT: #10-03 TIMBERLINE VILLAGE PDP — TYPE II (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: March 26, 2003 Note - PLEASE identify your redlines for future reference Lt) , l l A,`j vi've Ti1,, 412 n- /, e no i/AT— Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS � _Plat Site _Drainage Report _Other `— _Utility _Redline Utility _Landscane City of Fort Conine 2. Indicate curb type along the medians for the channelized-T proposed and provide a detail 3. Turning movements for large vehicles (WB-50) need to be verified on this design, especially because of commercial trucks urine this to serve the site and it allows them to head east on Harmony Road. 3. The proposed design is considered safe from a'Traffic Operations standpoint, provided that the work north of Timberline (as being designed by North Star Design) is completed concurrently. The channelized-T without these improvements is a safety issue. It is required that this offsite design is approved concurrently with these plans if not already approved with the Caribou Apartments project. This may involve needing to place the plans Isom North Star into this submittal or getting North Star to separate this plan set out from the Caribou Apartments design to be approved independently. In addition, this offsite construction will need to be done prior to or concurrent with the channelized T construction. As Caribou Apartments is under final compliance review, this may not he a concern, but if that project does not move forward, the construction would need to fall upon this development; there would be reimbursement available from Street Oversizing for this. (7/23/031 After review of the submitted turning movements for a WB-50 and further analysis of turning movements using the provided CAD drawings, please "shave off' portions of the medians as redlined. This would appear to make the turning movements easier for these larger vehicles. 19/16/03] Please be aware that Caribou Apartments has not completed final compliance review. As such, the development agreement will need to obligate the developer of both design and construction of the offsite improvements north of the channelized-T should Caribou Apartments not have these respective items completed relative to the desired schedule of Harmony School Shops 4th. Response: A southbound approach taper design has been provided that will provide a safe transition to the channelized-T intersection. Number: 105 Created: 7/28/2003 There is some concern on the amount of cross slope from the crown to the east side of Timberline directly in front of Milestone Drive. it appears relatively flat. Please explore raising the east side of this median to achieve greater fall across Timberline. It seems counterintuitive that the elevation noted at STA 15+97+25 is higher than the spot elevations on either side. Please see redlines on plan view and cross section sheets. 1 9/ 16/03 Please look at further raising the east side of the median from STA 17+50 to 18+50 to provide more of a cross fall, it would be preferred if the slopes can at least match existing slopes. Also, please show street patching as shown on the redlines with the typical street patching note. In addition, please show patching limits of 6' past (half the lane width) where curb and gutter is to be added and add the same note regarding limits of repair that is shown on Sheet 5. Response: The cross slopes for Stations 17+50 through 18+50 have been increased to match the existing cross slope. The minimum proposed cross .slope is 1.5% where the existing crov:s slope is less than 1.5%. The limits oJ'street paving, shown on .sheet 20, have been revised per the redlines and the requested note has been added. Number: 1 15 Created: 9/ I0/2003 Based on conversations with CDOT in processing their access permit, please address the following items: -Add a note to Sheet S indicating that the access opening onto Harmonv Road is to be centered upon the 35' opening in the deeded access control line. Response: The requested note has been added. page i -Please create an existing and proposed striping plan for Harmony Road. The proposed striping plan sheet Should label/indicate striping to remain and proposed striping areas. In addition, indicate "existing bike lane striping from caper to intersection to be refreshed". On the existing striping plan, show with cross -hatching areas of striping which are to be removed. Response:.4 demolition plan, sheet 17b, has been added for 1larmony Road showing the limits of striping removal. The existing bike lane striping has been shown to be "refreshed". -Please provide what the building square footages are for the existing gas station and school uses that would use this development for circulation. This will be tilled in item I of the access permit. Response: The square footages have been calculated based on the survey information. The gas station is 1,900 SF and the school is 12,810 SF. -As a "heads -up", at the time the plans are approved and signed off, 5 copies (signed and stamped for the construction plan) of the following sheets will need to be provided for CDOT's purposes: >Cover Sheet >General Notes >Horizontal Control Plan >Grading Plan >Existing and Proposed Harmony Road Striping Plan >Details Sheets >Cityscape's Site & Landscape Plan (also, 3 additional copies of the proposed and existing striping plan for CDOT is needed) Response: Noted Department: Stormwater Utility Issue Contact: Basil Harridan Topic: Erosion Control Number: 64 Created: 4/7/2003 Please provide an erosion control escrow calculation in the text of the report. Response: The erosion control cost estimate has been added to Appendix E of the drainage report. Fourth Review September 8, 2003 Same comment as last time. Third Review July 23, 2003 Please schedule a meeting with Bob Zakely to discuss this plan. Response: Randall provencio met with Bob Z,akely and Bob's comments were resolved. Second Review .tune 3, 2003 The plan is still incomplete and difficult to follow, please correct. Response: Randall Provencio of JR Engineering met with Bob Zakelv and Bob's comments were resolved. Page 4 Topic: Plat Number: 119 Created: 9111/'003 The maintenance note on the plat seems to indicate that the City will be responsible of maintaining all facilities within a drainage easement on the site, while the City has only agreed to maintain the pond and the storm sewer from Harmony to the detention. Please modify the note, to that effect and add that the City would only maintain the detention pond after certification and acceptance of that pond, and after the two-year warranty period. Response: Topic: Utility Plans Number: 112 Created: 7/28/2003 Please add the abbreviation labeling of Roof Drain, R.D. to the abbreviation list as well as that of Domestic Service, D.S. Please specify what type of pipe will be used for the drainage coming off the roof of Building 1. Provide a cleanoutatthe bend. Response: The requested abbreviations have been added. See note #17 on the cover sheet regarding roof drains. Cleanouts have been provided. Number: 121 Created: 9/11/2003 Please clearly call out that the inlet and storm sewer along Harmony Rd. will be built with Phase 1. Add note to storm sewer profiles that all storm sewers to use watertight joints. Storm sewer installation to be inspected by City of Fort Collins. Pipe B only to be maintained by City of Fort Collins. all other pipe to be maintained by property owner. Response: This is called out in note 4 on the utility plans. Additionally we have added phase I labels to certain utilities for clarification. The requested notes have been added. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 116 Created: 9/10/2003 No further comments. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Landscape Number: 35 Created: 3/31/2003 9/10/03 As previously indicated, provide the required landscape/utility separation distances. Correct standard general note on the landscape plans pertaining to landscape utility separation requirements. Maintain 10 feet of separation between trees and water/sewer lines and a feet of separation shrubs and water/sewer lines. Response: Joe Carter of Cityscape and Jeff Paulsen of JR Engineering met with Jeff Hill and Jeff's concerns have been addressed. 'topic: Utility Plans Number: 91 Created: 0/6/2003 9/10/03 As previously indicated, show and label all location of proposed as well as existing curb stops and meter pits. All existing water services most have a curb stop attached to them or there is no way to control the water. Response: All meter pits and curb stops have been labeled. Parse 5 Number: 100 Created: 7/24/2003 If meter pits, curb stops and fire hydrants for phase one are constructed within phase two then provide bollards to protect them from traffic. Include a bollard detail on the detail sheet. Response: Guard posts have been shown the Overall Utility Plan and a detail has been provided on sheet 24. Number- 102 Created:7/24/2003 See site, landscape and utility plans for other comments Response: The comments on the utility plan redlines have been addressed. Please refer to Cityscape's response letter for the site and landscape plan comments. Number: 117 Created: 9/ 11/2003 Water services must remain the same size from the main to a point 5 feet downstream of the meter pit. Correct all water services to reflect this. Response: Water services have been corrected as requested. Number: 118 Created: 9/ 11/2003 Provide utility easements for all water services up to and including the curb stop as well as fire hydrants. Response: Utility easements have been provided as requested. Number: 120 Created: 9/11/2003 Include 1 1/2"- 2" meter pit detail, concrete encasement detail and bollard detail on the detail sheet with the next submittal. Response: Details have been added as requested. Department: Zoning Topic: Zoning Number: 114 No comments. Issue Contact: Peter Barnes Created: 9/4/2003 If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 491-9888. Sincerely, f�sen 1R Engineering JP/sdr Paee 6 Minor Amendment IL apt?. Emma COMMENT SHEET City of Fort Collins 11 ZONING DEPT. Minor Amendment Revisions MA - 0700002 DATE: March 21, 2007 TO: - fywyL PROJECT: 2120 E Harmony Rd, Harmony School Shops Lot 8 See attached copy of comments from previous rounds All comments must be returned to Jennifer Nuckols in Zoning by March 30, 2007. PLEASE ENTER YOUR COMMENTS IN ACCELLA Note - PLEASE identify your redlines for future reference Name (please print) PROJECT (0=9669�3`01 COMMENT SHEET City of Fort Collins Current Planning DATE: February 26, 2003 TO: Technical Services PROJECT: #10-03 TIMBERLINE VILLAGE PDP — TYPE II (LUC) V J All comments must be received by Ted Shepard no later than the staff review meeting: -Tim SVLC.. MA to March 26, 2003-,n43✓LG9./uA Note - PLEASE identify your redlines for future reference %. (EGAD r!GO E�� GGg7 Pia�(A)P1i12y DoE5A),or eGoSEOK MfiTCf/ 7A/i5GEGA& Z. a,'6 Tirc.0 3/CO (�uLTTS %&IN,� S (✓( L� it—IZUv�D TZf� t a)w T 67��'nli N �2i /o l0/LgTao ����C- I (-�s Tom Cs SNa:,i r elk/ i�� LcJCAy�i3c �F o 7z) 147 t,R 7'1 Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape r� n City of Fort Collin Project Comments Sheet Selected Departments City of Fort Colluns Department: Engineering Date: April 7, 2003 Project: TIMBERLINE VILLAGE PDP -TYPE II (LUC) #10-03 All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: March 26. 2003 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 45 Created: 3/31/2003 The internal parking lot and building layout design will likely be altered due to additional right-of-way width required on Harmony and Timberline Roads. Harmony Road requires an additional through lane per the City's Master Street Plan. Timberline Road also requires additional lanes and per the TIS, also requires additional right-of-way for the channelized-T intersection design with Milestone Drive. Interim/ultimate street designs are needed (which will also require CDOT approval) this will help establish right-of-way, utility, at Harmony Corridor setback requirements. Number: 46 Created: 3/31/2003 Per LUC Secdon 3.6.3(F), a street connection stub is required to the property to the east. Because a private drive stub is currently proposed, alternative compliance to this section of code is required. Transportation Staff is in support of granting alternative compliance provided revising of the private drive to appear less circuitous towards the eastern end of the site. Number: 47 Created: 3/31/2003 Ensure 9' utility easement is provided on Milestone Drive, 15' utility easements are provided on both Harmony and Timberline Road behind the ultimate right-of-way for each, and 80' of setback for the Harmony Corridor plan behind the future edge of pavement (6 lane section) for Harmony Road. Number: 51 Created: 4/1/2003 Utility, access, and landscape permits are likely to be required by CDOT as the project continues. Number: 52 Created: 4/1/2003 The tree protection/mitigation plan shows landscaping to be removed/relocated outside of the property boundaries. Because this Is off -site, the off -site easement required should also include a provision for tree removal/relocation. Another option is for the off -site property owner to sign off on the tree mitigation plan. (It appears that the offsite and onsite entitles are one in the same, so this shouldn't be an issue). Number: 53 Created: 4/1/2003 Show the installation of a Type III barricade along the eastern boundary of this site at the termination of the private drive, as well as the Internal sidewalk system. Signature Z G 7 Dat ,CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility _ Redline Utility .—Landscape Page l Number: 54 Created: 4/2/2003 Letters of Intent are required for all offsite easements prior to the scheduling of a hearing. This appears required for the property to the northeast as well as southwest. Number: 58 Created: 4/2/2003 The existing cross access easement shown on the plat, which would facilitate connectivity to the east, does not line up with the driveway connection shown on the plans, which has been moved north. A cross access easement will need to be maintained at the Finalized location for the driveway connection to the east. Topic: Plat Number: 43 Created: 3/31/2003 Move the repair guarantee provision to appear before the owner signature blocks. Number: 44 Created: 3/31/2003 Show the full -width existing rights -of -way for the surrounding public streets. Number: 59 Created: 4/2/2003 An emergency access easement dedication is required internal to the site for areas PFA designated as fire lanes. Topic: Utility Number: 48 Created: 3/31/2003 Show existing features for 150' beyond the project limits (need to see the full -width of existing Timberline/Harmony/Milestone). Number: 49 Created: 4/1/2003 The utility plans show the main area of development as Phase I with the outlying pad sites making up the remainder as Phase 2. There are a few suggestions regarding showing of phases, which may make future development of the pad sites easier: I. Rather than have the remaining pad sites outside of Phase 1 all as Phase 2, show each pad site as a separate phase. Having these all shown as Phase 2 implies that the development of one pad site requires all the facilities needing to be installed in Phase 2; separate phases for each pad site resolves this. Also, there is no requirement that phases after Phase 1 need to be developed in sequential order (provided they are phased in such a way that each phase is independent of every other phase when shown), this allows more independency with future pad development. 2. Instead of showing phasing on each of the grading, utility, and horizontal control sheets, remove the indications of phasing on these Individual sheets and instead create a phase plan sheet(s) showing this same information. In this manner, any potential need to revise phasing boundaries will result in only needing to revise the phase plan sheet(s) instead of the individual grading, utility, and horizontal control sheets. Number: 50 Created: 4/1/2003 Why aren't the areas currently shown as Phase 2 displaying any information on the horizontal control plan portion of the plan set? This information should be shown if intended to be built off of. Number: 55 Created: 4/2/2003 The new proposed driveway out to Milestone is required to be constructed as a "pan" style driveway approach in accordance with LCUASS Drawing 706. The proposed radius style ("high volume") driveway would be allowed if evidence is submitted Indicating driveway volumes greater than 350 trips/day. Number: 56 Created: 4/2/2003 Assuming a high -volume driveway is appropriate for the aforementioned driveway, 15' radii are the maximum allowed, Instead of the 20' radii proposed. Number: 57 Created: 4/2/2003 Provide additional Information on the apparent drainage Flows carried from Harmony Road to on -site. There appears to be a concrete pan extending north -south on the southeast corner of the site, but it is apparently not labeled, nor could a detail be found. The sidewalk culvert should be labeled with the type/width and include a detail (a concrete culvert is required). How much Flow is anticipated along the pan? Page 2 REVISION COMMENT S DATE: May 14, 2003 TO: Technical Services PROJECT: #10-03 TIMBERLINE VILLAGE PDP - TYPE II (LUC) M� All comments must be received by Ted Shepard no later than the staff review meeting: June 4, 2003 No Comment 13- Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** I , 3kVA)12jCJ IR'l � LtGRL �o5E5. L .� �lC,T v �j0t Y17}�FC I'" CA lfr v.l1P ✓7 lS Cl LIYI ArCc, PPt �G YI� YWS. 3. GoM�-nr„1 A. �ssr �i. (a 2: - for tl YteS E P Name OI SC,& ,5' 1'_L_�•2 " , j 'i _�•L' UI 5)LfC - �)q�,- Ytof beNh 1-e ")CLJ t)te Plat Lvl ,lj L �_ CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS L =Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape Date City of Fort Collins