HomeMy WebLinkAboutHARMONY MARKET PUD - Filed CS-COMMENT SHEETS - 2004-08-10Do wment Serti'ices
City of tort Coilins
TO:
PUBLIC SERVICE
" r .M 0 R A N D U 11
FROM: Mike Herzig, Deveiccment Coorcinator
DATE: March 7, 1989
P,E: Subd'.visicn Utility Plans
Submitt= for your revieai and comment are :!tility Mans `or:
HARMONY MARKET P.U.D.
Please respond by:
Friday, March 17, 1989
ram+ 64' s W4 i0~ NAfUPAt, bAs L._iaiL
P6, w
R •p •W. L��E v� le>ev+A� . Pt�a�pds� s�� L,-N� w� a�-
Gcosc
300 LaPorte Avenue • P.O. BUY • Fort Cullins, CO 80522-0580 • (303) 221-6750
Page 5
the buildings on Harmony must not be considered the service area and
demonstrate design excellence.
40. Since the treatment of the buildings along Harmony are so important, Staff
encourages the P.U.D. document to specify strict architectural standards in
advance of future tenants. As so often happens, these pads are leased by
franchise outlets intent on constructing the standard, national, corporate
architecture. While Staff recognizes the need for identity, and has and will
continue to work with national tenants, it must be made clear that the center
will promote a consistent architectural theme, emphasizing quality materials.
SITE PLANNING
41. Staff is concerned about the proliferation of perimeter building pads. This
does not promote a pedestrian type center. Staff, therefore, suggests the pad
buildings be clustered into groups rather than having each tenant on each
individual pad. Perhaps this would reduce the fear that each pad will
develop in its own style rather than in a uniform design.
42. Staff prefers the old original alignment of Oak Ridge Drive. The current
alignment does not provide as much buffering to the south. How is the
reduced setback compensated?
43. The preliminary site plan should list the anticipated allowable uses.
NOISE
44. It will be important to analyze the potential noise impact associated with this
development. Staff strongly suggests a noise analysis be conducted to quantify
the impacts of truck delivery, the trash compactor, etc.
SIGNAGE
45. Since the Pace lot has no legal frontage on Harmony, a free standing sign will
not be allowed on Harmony Road. Similarly, only one free standing sign will
be allowed per lot per frontage. Therefore, only one sign will be allowed on
Boardwalk.
46. Staff is concerned about the potential lack of graphic consistency throughout
the center. As a result, a signage and graphic program is suggested. At the
least, modify mote number 12 to read:
"At minimum, all signs must comply with the City of Fort Collins Sign Code.
Final signage allowance and location shall be granted after P.U.D. review by
the Planning and Zoning Board. Signage throughout the P.U.D. shall
demonstrate sensitivity to surrounding properties, particularity along Harmony
Road. Individual tenant signage shall also demonstrate a graphic consistency
within the center. The use of common design elements within the signage
shall be encouraged."
Page 6
TRANSPORTATION
47. Staff strongly believes that Oak Ridge Drive should be constructed from
Boardwalk to Lcmay. This would relieve the traffic on Boardwalk and
provide recirculation to Lemay. This would also allow trucks to use Lemay as
an option rather than having to rely solely on Boardwalk.
MISCELLANEOUS
48. Please be aware that a Master Plan comment includes the future consideration
of a Transfort bus stop with bench and shelter at the corner of Oak Ridge
Drive and Boardwalk.
This concludes staff comments at this time. In order to remain on schedule for
the April 24, 1989 P & Z hearing, please note the following deadlines:
Plan revisions are due April 5, 1989
PMT's, 10 prints, colored renderings are due April 17, 1989.
Final documents are due April 20, 1989.
Please call at your earliest convenience to discuss these comments.
Sincerely,
Ted Shepard
City Planner
cc: Joe Frank, Assistant Planning Director
Mike Hcrzig, Development Engineer
Project Comments Sheet
® Selected Departments
('il}- of burl (nliuis
Department: Engineering
Date: November 28, 2003
Project:
HARMONY MARKET P.U.D. SAM'S CLUB EXPANSION - MAJOR
AMENDMENT - TYPE II
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
December 03, 2003
Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: Civil Plans
Number: 13 Created: 11/28/2003
[11/28/03] The intersection improvements as shown on the Bank One plans are not
acceptable to the City. In discussions with City Transportation, the stripping
proposed by the development (which would eliminate separate through and right
turn movements on both legs of Boardwalk) is not acceptable. Separate through
and right turn lanes must be maintained due to the high numbers of turning
movements. As a result, the TIS will need to be amended based upon single left
turning movements instead of the double lefts as assumed in the study.
Number: 14
Created: 11/28/2003
[11/28/03] The TIS indicates that all curbs at the Harmony and Boardwalk
intersection are at "finished" locations. The current street width needs to change in
order to allow for future double lefts; the Bank One project dedicated additional right-
of-way to allow for future widening. Please ensure 56 feet of right-of-way is provided
from the existing street Centerline of Boardwalk Drive. Approximately 12 additional
feet from existing right-of-way.
Number: 15 Created: 11/28/2003
[11/28/03] Amended TIS may show that north entrance from Boardwalk into
Harmony Market 'Ist Filing may need to move because of stacking problems for
through and left turning movements.
Signature
Du e
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other.
Utility _ Redline Utility Landscape
Page 1
Number: 16 Created: 11/28/2003
[11/28/03] General Comment: All excavations within public rights -of -way and
easements need an excavation permit from City Engineer's office. Contact Lance
Newlin at 221-6605
Number: 17 Created: 11/28/2003
[11/28/03] Show limits of excavation in rights -of -way. Also add note stating that
final limits of asphalt repair will be determined in the field by the City Engineering
Inspector
Number: 18 Created: 11/28/2003
[11/28/03] General Comment: City Traffic Engineer will approve all traffic
(pedestrian and vehicle detours/closures with an approved Traffic Contral Plan
prepared by a qualified Traffic Control Supervisor
Topic: Plat
Number: 19 Created: 11/28/2003
[11/28/03] All existing sanitary sewer easements that are not being used will need to
be vacated. New easements will need to be dedicated. Existing drainage and
access easements that are being encroached on by proposed building addition will
need to be vacated. Additional rights -of -way at Boardwalk/Harmony will need to be
dedicated as discussed in comments 13 - 15. See attachment for easement
vacation/dedication process if this property is not being replated. See copy of
enclosed plat attached
Page 2
6zSTAFF PROJECT REVIEW
KIMLEY-HORN & ASSOC. Date: 12/9/2003
KEVIN ROBERSON
950 SEVENTEENTH ST. #1050
DENVER, CO 80202
Staff has reviewed your submittal for HARMONY MARKET P.U.D. SAM'S CLUB
EXPANSION - MAJOR AMENDMENT - TYPE II, and we offer the following
comments:
ISSUES: /
Department: Engineering Issue Contact: Dave Stringe
Topic: Civil Plans
Number: 13 Created: 11 /28/2003
[11/28/03] The intersection improvements as shown on the Bank One plans are not
acceptable to the City. In discussions with City Transportation, the stripping
proposed by the dlevelopment (which would eliminate separate through and right
turn movements on both legs of Boardwalk) is not acceptable. Separate through
and right turn lanes must be maintained due to the high numbers of turning
movements. As a result, the TIS will need to be amended based upon single left
turning movements instead of the double lefts as assumed in the study.
Number: 14 Created: 11 /28/2003
[11/28/031 The TIS indicates that all curbs at the Harmony and Boardwalk
intersection are at "finished" locations. The current street width needs to change in
order to allow for future double lefts; the Bank One project dedicated additional right-
of-way to allow for future widening. Please ensure 56 feet of right-of-way is provided
from the existing street Centerline of Boardwalk Drive, approximately 12 additional
feet from existing right-of-way.
Number: 15 Created: 11 /28/2003
[11/28/03] Amended TIS may show that north entrance from Boardwalk into
Harmony Market 1 st Filing may need to move because of stacking problems for
through and left turning movements.
,Number: 16 Created: 11 /28/2003
[11/28/031 General Comment: All excavations within public rights -of -way and
easements need an excavation permit from City Engineer's office. Contact Lance
Newlin at 221-6605
• Number: 17 Created: 11/28/2003
[11/28/03] Show limits of excavation in rights -of -way. Also add note stating that
final limits of asphialt repair will be determined in the field by the City Engineering
Inspector NO 6-�r c,4 vgTl "� w i , L 12E °o-?'&- "V
Page I
Number: 18 Created: 11 /28/2003
[11/28/03] General Comment: City Traffic Engineer will approve all traffic
(pedestrian and vehicle detours/closures with an approved Traffic Control Plan
prepared by a qualified Traffic Control Supervisor
Topic: Plat
Number:19 txN'Qir Created:11/28/2003
[11/28/03] All existing sanitary sewer easements that are not being used will need to
be vacated. New easements will need to be dedicated. Existing drainage and
access easements that are being encroached on by proposed building addition will
need to be vacated. Additional rights -of -way at Boardwalk/Harmony will need to be
dedicated as discussed in comments 13 - 15. See attachment for easement
vacation/dedication process if this property is not being re -platted. See copy of
enclosed plat attached
Department: Stormwater Utility Issue Contact: Wes Lamarquet
Topic: Drainage
Number: 20 Created: 12/2/2003
Please provide drainage calculations for the new basins created due to the re-
grading for the storm sewer. These calculations are needed in order to size the
proposed inlets and storm sewer for the 100-year storm. If the storm sewer is not
intended to carry the entire 100-year storm and surface drainage is to be used, City
criteria only allows 1-foot of ponding in parking lots.
Number: 21 Created: 12/2/2003
Please provide storm sewer profiles showing the HGL.
• Number: 22 Created: 12/2/2003
Please provide details for the area inlet and the storm sewer outfall into the pond.
Department: Natural Resources Issue Contact: Doug Moor
Topic: General
Number: 28 Created: 12/3/2003
[12/3/03] Drawing need to be relabeled. Wetlands should be labeled as wetlands
not cattails. Provide accurate wetland delineation report with next submittal prior to
the scheduling of a public hearing.
Department: Zoning Issue Contact: Jenny Nuckols�
Topic: Zoning
Number: 1 Created: 11 /13/2003
[11/13/031 Please label all signage on the elevations as "illustrative only and subject
to the Sign Code." Sign Permits are reviewed separately.
Page 2
❑ ❑ n-Horn
and
A
� ns;;ociates. Inc.
January 9, 2004
■
Ted Shepard
Suite 1050
City of Fort Collins
050 Seventeenth Street
Denver, Colorado
Current Planning Department
80202
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522-0580
Re: Review of Harmony Market P.U.D. Sam's Club Expansion —Major Amendment —Type II
Dear Mr. Shepard:
Thank you for your comments on the above -mentioned project. In an effort to address your comments concisely and
simplify your next review we have summarized your comments and our responses below.
ISSUES:
Department: Current Planning Issue Contact: Ted Shepard
1 . The site plan, landscape plans, architectural elevations and lighting plan will constitute a five sheet "planning set" of
documents that is distinct and different from the Utility Plans. These five sheets will be the "Major Amendment" that is
fom arcled to the Planning and Zoning Board. The site plan, therefore, needs to be simplified to contain less construction
detail information. Please delete the information where indicated and re -number the legend accordingly. Please place the
title in the lower right comer and refer to it as a "Major Amendment" Also, all but note number 25 should be deleted and
replaced with our standard notes. The sheet can remain as is (sheet 2 of 15) for inclusion in the Utility Plans but the set
should re -numbered as a five sheet set for planning purposes.
Response: Acknowledged'. The requested planning set is included. Tine notes have been changed per your request
for the site plan included in this planning set.
2. Please add the ownership and notary and approval signature blocks as per the enclosed example.
Response. Acknowledged. The ownership and notary approval blocks have been added per the example.
3. In general, the plans are hard to read. It is difficult to distinguish that which is being proposed and that which is existing.
Please take a look at the enclosed plans for a recent Home Depot amendment. Note the use of redline imposed upon the
existing plans so that the proposed improvements are very clear. If this kind of document can be produced, it would be
very helpful.
Response: Acknowledged. The planning site plan has been simplified to make it less confusing and easier to read.
We have removed a lot of the notes from the plan view which helps simplify the plan. The landscape plans have also
been revised to make it more clear and ease' to read. The adjoining property that is screened (graved) is not under
construction.
TEL 303 228 2300
FAX 303 44E 6678 - I -
C—� Kimley-Horn
and Associates, Inc.
4. The Landscape Plan is difficult to read in that the trees to be removed are ghosted too lightly. 1 suggest that you take an
approved Landscape Plan and redline out the trees that you are proposing to remove. Or, provide a separate Landscape
Plan where the trees to be removed are color -coded.
Response: Please reference the Landscape Consultant's plans and response to this item
Now, having made that comment, there are an excessive number of trees that [are] proposed to be removed. The
fundamental concept of the new parking lot design is flawed in that too many trees are sacrificed in order to gain a
marginal number of spaces. For the City of Fort Collins, trees within the large parking lot represent ten years of maturity
and do a magnificent job of mitigating the heat gain of the immense asphalt surface area. Please carefully evaluate as to
whether all of the trees that define the south edge of the parking and the north elevation of the building need to be
removed. Instead of prioritizing the needs of the new parking lot, the value of the trees should be given priority and the
new parking lot designed around them. The value of the trees vastly outweighs the few parking stalls that would be gained
by the removal of these trees. Please refer to the redline sheets for the trees that should be preserved.
Response: Acknowledged. Please reference the Landscape plans far revised removal and transplanting counts. The
landscape islands have been modiFed to preserve some of the trees along the front drive aisle.
6. The Landscape Plan simply states that there will be "New and Transplanted" trees. It is the City's desire that as much plant
maturity be preserved as possible. The Plan should state that all trees to be removed will be transplanted back on site. If a
transplanted tree is lost in the transplanting process, only then will be new tree be allowed. Where a new tree is provided,
the caliper size shall be upgraded from the required minimum of two inches to 2.5 inches in caliper. I suggest a meeting
with the landscape contractor, City Forester, Kimley Hom and myself to make sure that we embark on a workable course
of action that meets the needs of all parties.
Response. Please reference the Landscape Consultant's plans and response to this item
In general, the Lighting Plan is excessive. The 1,000-watt fixtures should be replaced by 400-watt fixtures. There are
several readings where the foot-candle measurements exceed ten which is in violation of Section 3.2.4(0) (7). 1 have
compared the proposed Lighting Plan with the existing Super Wal-Mart, and the proposed new Home Depot and the Sam's
Club illumination levels significantly exceed these other retail stores. Illumination levels should be reduced accordingly
and the 1,000 watt fixtures deleted.
Response- Acknowledged. The lightingplan has been revised to accommodate these requests and to meet the city
standards.
S. Since I do not have a Hubbell catalog, I do not know whether a "MSV A" is metal halide or high pressure sodium or some
other type of lamp source. I will need specification sheets for each of the fixtures listed in the table. Staff recommends
High Pressure Sodium since it is far more energy conserving than Metal Halide.
Response: Acknowledged. The lamp type has been revised to use ffigh Pressure Sodium. We have provided the
specification sheets for the Irnnps referenced on the lighting plan.
2-
G—" Kimley-Horn
IIIIIIIIIIIIIIIIIIINand Associates. Inc.
9. The 35-foot poles should be reduced to 30 feet to match the original approval the balance of the center. Staff is concemed
that pole height, style and color may not be as consistent across the 50-acre center as possible. While there are some
differences due to pad sites developing later than the anchors, introducing yet another new pole (style, height, color, lamp
source) v,'ill detract from this consistency.
Response: Acknowledged. The light pole heights have been reduced to 30 feet as requested to match the Harmony
Market Center. The color and style of the poles will also be ordered to match the center.
10. Please note on the Lighting Plan that wall -mounted light fixtures (which are not shown) must also be sharp cut-off and
down -directional. We have found that this detail is often overlooked resulting in the Planning Department rejecting the
electrical contractor's installation and the client failing to receive a Certificate of Occupancy in a timely manner. This
consternation can be avoided by specifying on the plans, supported by the manufacturer's specification sheet, a wall -
mounted light fixture that meets our Code.
Response: Acknowledged. A note has been added to the lighting plan regarding this request. The building plans
will also reflect this request.
11. Please see the other redline comments on the Lighting Plan for further comments.
Response: Acknowledged. Please reference the lighting plan to verify compliance with all other comments.
12. Comments on the architectural elevations are made on the plan sheet. Be sure to provide a "plan view" that matches the
elevation for the north and west elevations. This is needed to review the extent of the facade projections and articulations.
Response: Acknowledged. The Architectural floor plan has been provided.
13. Please add some benches near both the north and west entrances.
Response: Acknowledged'. A total of three benches have been added, two along the north side of the building
adjacent to the main entrance and one adjacent to the Tire Mounting Area entrance. Refer to the site plan.
Department: Zoning Contact: Jennv Nuckols
Topic: Zoning
Number: 1 Created: 11/13/2003
[11 /13/031 Elevations shouldn't show signage. Please remove. Signs will be reviewed separately by zoning at the time sign
permits are applied for.
Response: We understand the signage will be reviewed separately. The Architect felt it necessary to show the
signage which they thought would be approved by zoning. The signage shown is only to convey the appearance of
some sort of signage that will eventually be installed.
Number: 2 Created: I 1 / 13/2003
[1 1 /13/03] The parking lot as shown doesn't comply with the LUC standards 3.2.1 (E) (5) P, No more than 15 parking spaces
3-
PP1`=Fj Kimley-Horn
hhh, M and Associates, Inc.
in a row, without an intervenin, landscaped island.
Response: Understood. The new parking area has been revised to meet the LUC standards
Number Created: 11/13/2003
[11/13/03] Site Data - sheet 2 of 15 - Zoning Classification shouldjustbe Harmony Corridor -remove "commercial"
Response: Understood. "Commercial" has been removed from the zoning classification.
Number: 4 Created: 11/13/2003
[1 1 /13/03] FYI - cart corral can only have directional -type signage, no advertising, logos etc, only a message to the effect of
cart storage, returning carts etc. Signs can be no larger than 4 sq ft.
Response This information has been provided to the Architect Please reference the Architectural plans, when
submitted, to assure this conformance.
Number: S Created: 11/13/2003
[11 /13,'03] 1 don't see bike racks noted anywhere. Please locate them close to main entrances
Response: Bicycle racks .have been provided at the west side of the main entrance.
Number Created: 11/13/2003
[11113103] Note the dimensions of the expansion on the site plan
Response: Understood. These have been provided.
Number: 7 Created: 11/13/2003
[11/13/03] Suggestion - as a frequent shopper to Sam's, I'd like to note that the shrubs at the end of the aisles create a huge site
obstruction. Unless you are driving a full size SUV, the placement of the shrubs makes it nearly impossible to see oncoming
vehicles in the drive aisle. I've witnessed numerous near -accidents. I'd like to suggest that those shrubs be replaced with low -
growing evergreens.
Response. Noted. Please reference the Landscape Consultant's response to this item.
Number: 8 Created: 11/13/2003
[11/13/03) Landscape plan - Note #12. Add to "installation of materials........ "and installation".
Response: Please reference the Landscape Consultant's response to this item.
Number: 9 Created: 11/13/2003
[11/13/03] For the new proposed landscaping, need to know count and types of items being planted
Response: Please reference the revised landscape plans and consultant's response to this item.
Number:10 Created: 11/13/2003
[11/13/03] Another suggestion - in the 2 medians where grass is being shown, I'd suggest removing the grass and replacing it
with rockmulch and low to no -water xeriscape plants. The trees are already established, the grass areas generally are not kept -
up well and water conservation always needs to be considered.
Response: Please reference the Landscape Consultant's response to this item
-4-
D A T F. 7 March 89 D F- P/ 1 R Y I 'I I F 9 VT. N
ITEM:
54--87A HARMONY MARKET - Preliminary & Final
No Problems
Problems or Concerns (see below)
tea- iTa,Z�co-�`-�G �Ro eP,
Date Signature
G Kimley-Horn
and Associates, Inc.
rtment: Light S Power Topic: General Issue Contact: Doug Martine
Number 11
[11/14/03] No Comments Created: 11/14/2003
No response necessan'.
Department: Transfort Issue Contact: Garold Smith
Number: 12
[ 1 1 /24/03] No Comments Created: 11 /24/2003
No response necessary.
Department: Engineering Issue Contact: Dave Stringer
Topic: Civil Plans
Number: 13 Created: 11/28/2003
[11/28/03] The intersection improvements as shown on the Bank One plans are not acceptable to the City. In discussions with
City Transportation, the striping proposed by the development (which would eliminate separate through and right tum
movements on both legs of Boardwalk) is not acceptable. Separate through and right turn lanes must be maintained due to the
hieh numbers of turning movements. As a result, the TIS will need to be amended based upon single left turning movements
instead of the double lefts as assumed in the study.
Response: The traffic study has been revised with single left turn lanes on the northbound and southbound
approaches to the Harmony RoadToardwalk Drive intersection. Also refer to the Boardwalk Drive striping plans
which show a new lane confrguration which maintains separate through right turn lanes. The bicycle lanes have
been reduced to 6'to accommodate this.
Number: 14 Created: 11/28/2003
[1 1/28/031 The TIS indicates that all curbs at the Harmony and Boardwalk intersection are at "finished" locations. The current
street width needs to change in order to allow for future double lefts; the Bank One project dedicated additional right-of-way
to allow for future widening. Please ensure 56 feet of right-of-way is provided from the existing street Centerline of
Boardwalk Drive. Approximately 12 additional feet from existing right-of-way.
Responce: This additional right-o%wav requested along Boardwalk Drive is not adjacent to the Sam's Club project
.site, and therefore not owned by this property owner. Anv dedication of right-af-way tit this location would need to
be acquired from the current property owner of the overall Harmony Market site. In addition, we have been told that
the City no longer wants double lefts.
Number: 15 Created: 11/28/2003
[11 /28,103] Amended TIS may show that north entrance from Boardwalk into Harmony Market 1st Filing may need to move
because of stacking problems for through and left turning movements.
Response: The traffic impact study has determined that the location of the north driveway may be acceptable to the
City given the proposed striping improvements along Boardwalk Drive.
Number: 16 Created: 11/28/2003
[11/28/03] General Comment: All excavations within public rights -of -way and easements need an excavation permit from
City Engineer's office. Contact Lance Newlin at 221-6605
Response : Understood. The revised plats have eliminated the excavations within public rights -of -way. Should there
he a need to excavate within public rights -of -way, the contractor shall obtain the appropriate permits.
5-
pP� Kimley-Horn
F1 and Associates; Inc.
Number: 17 Created: 11/28/2003
[ 1 1 /28/03] Show limits of excavation in rights -of -way. Also add note stating that final limits of asphalt repair will be
determined in the field by the City Engineering Inspector
Response: Understood. The revised plans have eliminated the excavations within public rights-of-way.
Number: 18 Created: 11/28/2003
[ 11 /28103] General Comment: City Traffic Engineer will approve all traffic (pedestrian and vehicle detours/closures with an
approved Traffic Control Plan prepared by a qualified Traffic Control Supervisor
Response: Understood. The plan sheet this comment references was a construction phasing/sequencing plan. The
drive in question must be closed in order to be relocated. After further discussion with Mr. Stringer on this topic, the
contractor will coordinate all closures with the city, traffic engineer.
Topic: Plat
Number: 19 Created: 11/28/2003
[ 1 1 /28/03] All existing sanitary sewer easements that are not being used will need to be vacated. New easements will need to
be dedicated. Existing drainage and access easements that are being encroached on by proposed building addition will need to
be vacated. Additional rights -of -way at Boardwalk/Harmony will need to be dedicated as discussed in comments 13 - 15. See
attachment for casement vacation/dedication process if this property is not being replatted. See copy of enclosed plat attached
Response: Acknowledged. Please see the attached easement vacation exhibits which address this item. We are
herekt, requesting the dedication and vacation of these easements as shown. Upon your initial approval, we will
provide legal descriptions far each.
Department: Storinwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 20 Created: 12/2/2003
Please provide drainage calculations for the new basins created due to the regrading for the storm sewer. These calculations
are needed in order to size the proposed inlets and storm sewer for the 100-year storm. If the storm sewer is not intended to
carry the entire 100-year storm and surface drainage is to be used, City criteria only allows 1-foot of ponding in parking lots.
Response Drainage calculations are enclosed which show that less than 7 foot ofponding will occur in the parking
lots. This analysis was only performed on the revised basin areas, those in the north parking area will remain
unchanged.
Number: 21 Created: 12/2/2003
Please provide storm sewer profiles showing the HGL.
Response: Acknowledged. See storm sewer profiles for HGL.
Number: 22 Created: 12/2/2003
Please provide details for the area inlet and the storm sewer outfall into the pond.
Response: Acknowledged. See storm sewer details.
-6-
C,_F1 Kimley-Horn
and Associates, Inc.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 23 Created: 12/3/2003
[ 1213/03] Locate and label bike racks near the building's main entrance in a visible and secure location. [LUC 3.2.2 (C.4.a, b,
c)]
Response: Acknowledged. Bike racks have been provided as requested at the northwest corner of the building.
Number: 24
Created: 12/3/2003
[ 12/3/031 According to the City standards walkways through parking lots with parking stalls on both sides need to be a
minimum 8 feet in width. The walkway through the handicap parking stalls in front of the entrance appears to be only 6 feet
in width. Please increase to a minimum 8 feet. (Figure 5, Article 3, page 39)
Response: Acknowledged. The island width has been increased to accommodate the 8 foot walkway.
Number: 25
Created: 12/3/2003
[12/3/03] Transportation staff highly recommends that a new walkway from the NW comer of the addition be constructed out
to the Boardwalk sidewalk instead of the proposed walkway shown on the driveway entrance on the NW comer of the lot.
(See redlines) This will not only provide a more direct connection to entrance of Sam's Club, but also the other stores within
the shopping center and create a physical separation for shoppers pushing carts to cars.
Response: Acknowledged. The proposed walkway has been modified to match your request. Refer to site plan.
Number: 26
Created: 12/3/2003
[12/3/03] Transportation staff also recommends that the shrubs along the center drive aisle be trimmed or replaced. They area
site obstruction and create an unsafe driving condition.
Response. Please reference the Landscape Consultant's response to this item.
Number: 27
Created: 12/3/2003
[ 12/3/03] The submitted T1S did not include any analysis of transit, bicycle or pedestrian level of service. However, since the
majority of this infrastructure already exists a complete analysis is not necessary. A memorandum stating how the required
LOS for these modes is being met would be sufficient.
Response. A letter is enclosed providing an evaluation of the transit, bicycle, and pedestrian modes of travel to the
Sam's Club.
Natural Resources
Topic. General
Number: 28
Issue Contact: Doug Moore
Created: 12/3/2003
[12/3/03] Drawing needs to be relabeled. Wetlands should be labeled as wetlands not cattails. Provide accurate wetland
delineation report with next submittal prior to the scheduling of a public hearing.
- 7 -
G _ Kimley-Horn
and Associates. lnc.
Response: A natural resources assessment report will be sent under separate cover from Walsh Environmental
Sciences Inc. The areas within the detention area have been renamed non jurisdictional wetlands, which is
consistent with the report.
Department: Stormvater Utility Issue Contact: Wes Lamarque
Topic: Erosion/Sediment Control
Number: 30
Please provide an erosion control plan and calculations per City requirements. If you have any questions, please call Bob
Zakely at (970) 221-6700.
Response: Acknowledged. Erosion Control plans and calculations have been provided.
Water Wastewater
Topic: Civil Plans
Number: 31
Issue Contact: Jeff Hill
Created: 12/8/2003
[12/8/03] Clearly define all connection and abandonment procedures to the existing sanitary sewer main. Provide a profile of
the relocated sanitary sewer main. Show all information needed as well as all underground utility crossing in the profile (Le.
Lengths of pipe between manholes, Slope of pipe, Inverts at manholes, Stationing of services, etc.).
Response. Acknowledged. A plan and profile sheet has been provided.
Number: 32
Created: 12/8/2003
Building 3] Provide a copy of the utility easement dedication for the realigned sanitary sewer main for our review. Building
envelop may not project into the sanitary sewer easement.
Response. Acknowledged. Please see attached exhibit for the easement vacation and dedication. The sanitary line
has been moved to ensure that the easement will not prajeet into the building envelop.
Number: 33 Created: 12/8/2003
[12/8/031 Maintain 5 feet minimum separation between the realigned sanitary sewer and the proposed curb and gutter.
Response. Acknowledged) The new alignment of the sanitary line is now 5 feet off of the proposed flow line.
Number: 34
Created: 12/8/2003
[12/8/031 Eliminate the sanitary sewer crossing of the existing landscape island and fire hydrant lateral. Manholes may not be
located in landscape islands.
Response. Acknowledged. The revised alignment of the sanitary line has eliminated the fire hydrant lateral crossing.
The sanitary manhole has been removed from the landscape island as requested. However, to eliminate the need to
make roadwgv cuts in Oukridge drive, the connection of the proposed sanitary line to the existing line at the south
side of the building is adjacent to the sidewalk in the open space area.
Number: 35 Created: 12/8/2003
[12/8/03] Show and label the locations of the existing fire line, water service, and grease trap on the civil plan. Is the existing
fire line and water service to be abandoned? Provide all detail necessary.
Kimley-Horn
and Associates, Inc.
Response Acknowledged. The existing fire line and water service is labeled and will be removed beyond the point of
connection to the new line. No information has been provided to us on the location oFthe existing grease trap.
Number: M Created: 12/8/2003
[12/8,031 Water service may not be connected to the fire line. Show and label all appurtenances associated with the proposed
fire line and water service (Le. valves, thrust blocks, meter pits, etc.). Fire lines are to be Ductile Iron Pipe (D.I.P.) and water
services are to be Copper to a point 5 feet downstream of the meter pit. Include the standard general notes pertaining to water
line depth of bury and polywrapping D.I.P. Utility plans indicate a 3-inch water service is to be installed, yet the detail sheets
have the 1 .5"-2" meter pit detail. Which is it?
Response: Acknowledged. The water service and fire line are now separated. A water plan sheet has been provided
to show the new water litres, thrust blocks, and valves. The domestic waterline will be upsized to a 3"copper line at
the connection to the existing 2" water line.
Number: 37 Created: 12/8/2003
[12/8/03] Provide a profile of the storm sewer showing all water and sanitary sewer crossings.
Response: Acknowledged. A storm sewer plan and profile sheet has been provided.
Topic: Landscape
Number: 38
Created: 12/8/2003
[12/8/03] Show all existing and proposed water and sewer lines on the landscape plans. Maintain the required landscape/utility
separation distances on the landscape plans.
See site, landscape and utility plans for other comments.
Response: Please reference the Utility Plans and Landscape Consultant's Plans and responses to these items.
We hope the above assists in your review Harmony Market P.U.D. Sam's Club Expansion — Major Amendment— Type
11 Comments. Should you have any further questions or comments please contact me at 303-228-2300.
Sincerely,
AKiIMM Y-HORN AND SSOCIATES, INC.
Kevin M. Roberson, P.E.
Project Manager
TE/kntr
G:\Land Dev\G7811007 SAM'!. Fort Collins\Admin\Correspondence\2004_0105_Response Letter.doc
a
1. 1°
^f+M1 3
Citv of Port Collins
TO:
Deve, anent Services
Planning Departrnent
GAR}• .:.... _.
PUBLIC SERVICE
MEMORANDUM
FROM: Mike Herzig, Development Coordinator
DATE: March 13, 1989
RE: Subdivision Utility Plans
Submitted for your review and comment are utility plans for:
Harmony Market PUD
Please respond by:
Monday March 20, 1989_
14f
300 LaPorte Avenue • P.O. Bus 580 • Ivrt Collins, CO 80522-0580 • (303) 221-6750
,.L�x®ad
Citv of Fort Collins
March 27, 1989
,:,'el, -rent -semces
i'ldI'm vn', I)C na rf!11se Fa
Mr. Eldon Ward
Cityscape Urban Design
3030 South College Avenue
Fort Collins, CO. 80525
Dear Mr. Ward:
Staff has reviewed the request for an amendment to the Oak -Cottonwood Farm
Master Plan. Staff offers the following comments:
Stnlf is very concerned about preserving the integrity of the land use
designations on Parcels IH, IG, and IF. Given the current application for a
1'.1J.1). on Parcel IB, it becomes a critical land planning objective to provide an
effective transition of uses in order to buffer the existing single family homes
in Fairway Estates. Successful shopping centers in Fort Collins have relied upon
transitional land uses to mitigate impacts on the neighborhoods in which the
centers are located. Staff, therefore, recommends that two measures be taken to
Cnsnre the proposed land use designations on Parcels 1H, IG, and IF remain as
proposed and not be diluted in the future to commercial uses.
A. The owner of the property is encouraged to file deed restrictions with the
Latimer County Clerk and Recorder establishing, for public record, the
allowable land use designations on Parcels IH, IG, and IF. Such restrictions
would allow prospective purchasers or leasees to examine the public record and
he I'orc%varned of the land use limitations in a prudent manner. Similarly, title
companies v;ould be alerted to the use restrictions and only commit to insure
accordingly.
B. The Master Plan document should contain a strong note indicating that
Parcels 111, IG, and IF are specifically reserved for certain uses expressly
designed to act as a transitional buffer between Parcel IB and the Fairway
Estates Subdivision. Such a note will act as an advisement to future Planning
and Zoning Boards that the land use designation is an important design element
for the overall effectiveness of the Mastcr Plan. Please draft a note that is
clear, concise, and unequivocal. The note will be reviewed by the City
Attorney.
2. Child care centers have effectively been used as transitional land uses between
commercial centers and residential areas. Have child care centers been
investigated for possible uses on Parcels IH and IF? Despite the existing child
care center north of Harmony, trends indicate a future need for such a facility,
especially in the southeast portion of the City.
,Oo I.al'nrte Al cnuc • P0, Iiuy S'IO • Dort (olhns, C1 60522-0h00 • (303) 221-0750
Page 2
3. Transfort is interested future service in the area. It is anticipated that there
would be a need for several bus stops and passenger waiting shelters at strategic
locations. Ppssfble locations include the corners of Boardwalk and OakRidgc,
Boardwalk and Steele, Steele and Fossil Creek Pkwy, Please indicate on the
document that these points are being considered for Transfort facilities.
4. The document should indicate that the direct access off Harmony Road will be
restricted to a right-in/right-out turn movement.
5. The Public Service Company cautions that future development will require clos_
coordination between the installation of buried gas line and the planting of
street trees.
6. The City of Fort
Collins
Water and Sewer Department
cautions that the area of
the Master Plan
contains
the service area of both the
City and the Special
Districts. At the
time
of development, and to avoid
potential conflicts, it is
suggested that a
Master
Utility Plan be submitted for
review and comment by
the effected water
and sewer
providers.
This concludes staff comments at this time. The schedule of deadlines for the April
24, 1989 Planning and Zoning Board meeting is as -follows:
Plan revisions are due April 5, 1989.
PyIT's, 10 prints, colored renderings are due April 17, 1989.
Final documents are due April 20, 1989.
As always, please call at your convenience to discuss these comments.
Sincerely,
�\ �' Div �� •-4.-/l.�
Ted Shepard,
City Planner
cc: Joe Frank, Assistant Planning Director
Mike Herzig, Development Engineer
1)"�veIol ant Services
i'lanniuti Department
� r
CitV of Fort Collins
March 28, 1989
Mr. Frank Vaught
Vaught -Frye Architects and Planners
2900 South College Avenue
Fort Collins, CO. 80525
Dear Mr. Vaught:
Staff has
reviewed) the
request for P.U.D. approval for the
Harmony Market.
please be
aware that the
comments pertaining to the amended
Master Plan have
been sent
to Cityscape
Urban Design under separate cover.
The following
comments
for the P.U.D. are
offered:
UTILITY INFORMATION
1. A 16 inch water main must be constructed in Boardwalk, and connected to an
existing 12 inch main in Boardwalk north of Harmony Road. The City Water
and Sewer Dept. will pay for the oversizing. A 20 inch water main is
existing in Lemay Avenue. Both mains will be used to provide service to
the shopping area.
2. A sanitary sewer main is existing at the intersection of Oak Ridge Drive and
Lemay. This main will have to be extended to Boardwalk, and will be used
to provide sewer service.
3. Mountain Bell requests a 10 foot wide easement on the east side of Boardwalk
Drive to continue north to Harmony Road.
d. The First Filing of Harmony Market P.U.D. will not affect existing Public
Service Company easements. However, future filings will need to indicate one
and possibly two recorded PSCo. easements. Public Service cautions that trees
or fences will not be allowed in these easements. Street streets should not
interfere with underground gas lines.
5. Oak Ridge Drive will need to be extended east to Lemay with the First Filing
or additional costs must be paid to the City Light and Power Department to
install temporary overhead electric power lines from the west side of Lemay
to the east side of the First Filing. The estimated cost for this temporary
overhead line is $10,000. However, if the Light and Power Department is
able to complete a bore under Harmony Road, then the extension of Oak
Ridge Drive, or the temporary overhead line will not be required.
',11) 1 .ill etc \ cmw I'.t�. Boy =�0 • Fort Collins, CO 80;22-t) • (303) 2 -67�0
Page 2
6. Light and Power advises that street trees should be setback 7.5 feet from the
curb to avoid conflicts with buried conduit.
7. 'fhc State Division of Highways will require a submittal request to allow the
right-in/right-out on Harmony Road (State Highway 68).
8. The water lint; connection across Harmony (which may require a bore) will
need a permit from the State Division of Highways.
9. Please check all landscape materials at the intersections for possible conflicts
with vehicular sight distances.
10. The sidewalk on Harmony Road should be adjusted according to the details
provided on the red -lined utility plans.
11. All buildings must be constructed in accordance with the City Building Code
with regard to the requirements relating to fire sprinklers and fire
containment areas.
12. An engineer's fire flow report must be submitted showing water supply
capability of the water supply system.
13. All areas throughout the project where undesignated parking may obstruct fire
access must be posted: "No Parking - Fire Lane". Approved signage must be
used. Areas where this would apply are at the main frontages to the
buildings and the rear service areas.
14. All parking lot drive aisles and service drive areas must be designated as
access casements.
15. Please indicate the building envelope dimensions for Pad 2 on the First Filing
final site plan.
16. Permission must be obtained from the owners of the irrigation ditches before
abandonment.
17. The Drainage Report should address water quality aspects as well as the
attempts made to prevent degradation of the quality of the runoff.
18. The First Filing landscape plan needs to be revised to show the newly aligned
detention pond.
PARKING AND CIRCULATION
19. Minimizing air pollution at the site requires the best practical traffic flow,
especially when parking exceeds 75% of capacity. Is the design of the
parking lot entrances consistent with the best traffic engineering practice? Has
internal circulation been designed to reduce traffic conflicts? Safe, efficient
internal traffic flow helps air quality.
Page 3
20. Have you considered shifting the parking lot access drive on Boardwalk
further to the south to directly line up with the internal "loop road". This
would avoid a "T" intersection as it is shown now.
21. As stated above, the loop road should be prioritized to reduce unnecessary
conflicts and excess turning movements. Staff suggests that the loop road in
front of the anchor tenants not provide a 'curb cut" for every parking aisle.
Rather elongated landscaped islands should define one cut to serve two or
three aisles. This would define a series of separate lots with perimeter
landscaping. Recirculation could occur on the north loop road so there arc no
dead -ends. An illustration is available to demonstrate this idea.
22. The parking lot design does not provide sufficient pedestrian amenities.
Pedestrian paths (6 foot minimum), flanked by landscaping should be provided
to allow shoppers to move safely and freely throughout the entire center. This
path could be placed in the landscaped area that would separate the
individual parking lots as defined above. Each path could serve two lots.
This concept has been used successfully in the Pavilion Shopping Center on
South College (T.J. Max).
23. Perimeter stall lengths may be reduced to 17 feet where there is a two foot
landscaped overhang.
24. All parking lot islands should include shrub beds. Staff suggests that parking
lot islands be treated with slight berms. Such berms should match the height
of perimeter parking lot berming. This creates a positive perspective from the
street as the view would not include headlights, grills, tires, etc. but rather
landscaping and just a partial view of the car. To a limited extent, this has
also been done at the Pavilion Shopping Center. To a larger extent, the
effect could be dramatic.
25. The employee parking lot needs further definition as to stall locations,
landscaping, etc.
26. All interior parking lot landscaping should not be less than 6%.
27. All interior parking lot sidewalks should be a minimum of 6 feet.
28. The loading area on the
east side of
Pace should
be temporarily
screened until
the adjacent building is
constructed.
Also, it was not made
clear whether
trash compactor will be
located in
such a way
as to screen
the view and
buffer the noise. These
details should
be made
more clear on
the final site
plan.
LANDSCAPING
29. Staff feels strongly that the 80 foot buffer along Harmony should be
constructed with the First Filing. Since the Pace is the largest building
envelope, it is necessary to establish the landscape buffer now. The buffer
should consistently be 80 feet.
Page 4
30. Berms along Harmony should be undulating to provide interest. Shrub beds
designed to cover the mulched area in 3 to 5 years should be included.
Berms should be wide enough to adequately water and maintain.
31. The west side of Boardwalk should be landscaped with street trees to create a
quality strcetscape and to begin to provide buffering to the west.
32. The landscaping plan should employ large caliper trees (4 inch) around the
Pace building. Similarly, the conifers in this area should be 10 to 12 feet in
height. These larger materials would be necessary to establish the appropriate
buffering.
33. The landscape plan should specify which pine and spruce will be 6 foot, 7
foot. or 8 foot. There should be a mix of one third of each.
34. The City Forester has inspected the site and requests that the 3 mature spruce
trees in the area of the farmhouse, be preserved. Also in this area, please
preserve the large honeylocust and the large diameter elm. The old willows
and small diameter elms are not, in themselves, valuable. However, as a
cluster, the old trees provide a visual interest. While you are encouraged to
preserve these older trees, it will not become a requirement.
35. Offsitc landscaping north of Harmony Road, in the area south of the homes
on Seaway Circle, is strongly encouraged. These homes were built before the
Gateway concept and do not benefit from the new buffering requirements.
36. Berms along the cast side of Boardwalk are strongly encouraged. Again, the
width and height should be sufficient to screen headlights.
37. The final landscape plan does not indicate any shrubs or berming along the
south and west elevations of the Pace building. Adding these elements will
help soften the effect of such a large structure.
ARCHITECTURE
38. One of the major issues identified is the use of quality exterior building
materials. Staff encourages the use face brick and other materials to create a
quality appearance for the Pace building. Since Pace will be the first user,
the quality materials will set a standard for others to follow. Staff expects
the Pace architecture will be substantially improved over the elevations that
were submitted on March 6, 1989.
39. The buildings along Harmony must demonstrate quality to made compatible
with the surrounding area. Staff suggests the north elevations of these
buildings to be brick. Also, the north elevation must screen such items as
service entries, dumpsters, pad mounted mechanical equipment, and gas and
electric meters. Roofs should screen rooftop mechanical equipment. Blank
walls should be broken up with treatments such as "false shutters" to lend a
residential character. Roof material should be sensitive. Flat roofs are
discouraged and sloped roofs are preferred. In general, the north elevation of