Loading...
HomeMy WebLinkAboutHARMONY EAST COMMERCIAL PUD - Filed GC-GENERAL CORRESPONDENCE - 2004-08-10Gefroh Associates Inc. James A. Getroh, R. Arch. UA Architects/ Planners Kurt D. Reed Fredric J. Hattman November 29, 1979 Mr. John Pedas Planning Director; Larimer County Larimer County Building 200 West Oak Ft. Collins, Colorado 80521 RE: East Harmony Commercial P.U.D. Concept Plan Dear Mr. Pedas: This letter accompanies the submission of the East Harmony Commercial P.U.D. Concept Plan. Please make note of the following items in the Concept Plan: 1. Conceptual plan has been developed with respect to City of Ft. Collins P.U.D. specifications. 2. We are requesting consideration for a parking ratio variance as notecl on the plans. A. Restaurant space: one parking space per 150 sq.ft. of gross building area B. Office space: one parking space per 300 sq.ft. of gross building area. 3. We are requesting consideration for a variance on building heights. Preliminary office building designs may require 36 feet of building heighth to gable roof peaks. I have included 14 copies of the Conceptual Plans. Conceptual review is tentatively scheduled for December 27, 1979• Respectfully, Kurt D. Reed Corporate Secretary Fort C(1W�(office — One Drake Park, Suite 23, 333 West Drake, Fort Collins, Colorado-13031223.7474 Steamboat Office — P.O. Box 5114, Steamboat Square, Steamboat Springs, Colorado-13O31879.4545 RKHARD D. LAMM GOVERNOR 3 ?* ? A O �0 07 COLORADO GEOLOGICAL SURVEY DEPARTMENT OF NATURAL RESOURCES 715 STATE CENTENNIAL PUILDING — 1313 SHERMAN STREET DENV ER, COLORADO 60203 PHONE (303) 639 2611 January 21, 1980 Ms. Sherry Albertson Current Planning Section Larimer County Planning Department Fort Collins, CO 80522 Dear Ms. Albertson: RE: HARMONY EAST COMMERCIAL P.U.D. JOHN W. SOLD Director We have received and reviewed this subdivision application, and if the recommendations of the c:nyineuring geologist end the U.S. Soil Conservation Service are carefully follu:ed, then we have no geology -related objection to approval of this project. JMS/ba cc: Land Use Conmlission Si cerely, roes M. Soule ngineering Geologist GEOLOGY STORY OF THE PAST .. . KEY TO THE FUTURE Rir'rnRDD LAMM DIVISION OF WATER RESOURCES Department of Natural Resources 1313 Sherman Street- Room 818 Denver, Colorado 80203 Adminis!ration (303) 839-3581 Ground Water (303)839-3587 January 23, 1980 Ms. Sherry Albertson Current planning Section Larimer County Planning Dept- P. O. Box 1190 Fort Collins, CO 80522 Re: I1an1-Iony East Commercial J. A c�SCN sts".e Fnymear Dear Ms. Albertson: This is to acknowledge receipt of preliminary plan material for the above refcienced subdivision. The South Fort Collins Water District no letter of commit - has been designated as the source of water; however, en submitted. Information available in our files ment for service has be indicates that the District may have sufficient water available to serve Com ncrcial devclopn entotontingent upon therdevelopereobtaiming cast written commitment for service from the District. Very truly yours, Hal D. Simpson, Chief Water Management Branch H DS/GDV: mvf cc: Jim Clark, Div. Eng. Land Use Comm. rig POUD- 4LLEY FIRE PFOTECTION DISTRICT i Y f.� jY R-,�(O e���j,,,,� -I{ r i -'�• 4 � � �� �i _ l/\ ,,,� '� 46:5 HO ;AN DR. FORT COLLINS, COLORADO 20521 • C.A. WILLIS. CHIEF PHONE (303)226 0204 January 23, 1980 Jerry 'white Larimer County Planning Office P.O. Box 1458 Fort Collins, Co. 80522 Jerry: RE: Harmony East Commercial P.U.D. A,t the Conceotual Review stage, we 'required a fire hydrant at each entrance to this complex. The hydrant at the east entrance is shown and an additional hydrant should be shown at the west entrance. This additional hydrant should riot be obstructed by the sign but be in the general vicinity of that entrance. Both fire hydrants should be Installed and operational prior to any building construction. Cf there are any questions, please conatet me. sincerely, Ay' Gilbert Fisher, Fire Prevention Bureau cc: Harmony Group 2200 E. Lincoln - P.O. Box 403 Phone: 482-7853 January 28, 19BO Current Planning Section Larimer County Planning Dept. Larimer County Courthouse Fort Collins, CO 80522 RE: I?arinony East Commercial PUD Dear Sirs: the Inrrnony East Cuimnercial PUD is located just east of the Country Store and Hanuony Dance Studio on terrace soils of Nunn Clay Loam and Altvan-Satanta Loam. These soils would be prime if irrigated, and the Nunn Clay Loam would have severe shrink - swell limitation for cu�ranercial building sites. The site is next to the Mail Creek; but, as the construc- tion is planned and with proper design, this site would present no problem in erosion or flooding. IIwaver, as the site is next to Mail Creek, special effort should be taken not to damage the vegetation on the strc;anbaak; and, if areas under construction are to be left bare for long periods of time, a plan should be developed to reduce erosion that would flow into the dams just down the creek. The plan should include shaping of disturbed areas and cover crops. Sincerely, �c Roy E. Swanson president cc: Glenn M. McCarty, Dist. Consvt., SCS, Ft. Collins THE LARIMER COUNTY CANAL NO. 2 IRRIGATING COMPANY P. O. sox 523 Fort Collins, Colorado 80522 January 29, 1980 Ms. Sherry Albertson Larimer County Planning Commission P. O. Box 1190 Fort Collins, Colorado 80522 RE: H:arrnony East Co:,•mercial P.U.D. Dear Ms. Albertson: Plans for the above -mentioned P.U.D. have been reviewed by this company; and after discussion and agreements with the developer, Mr. Gregory A. Hurst, we find all of our objections have been addressed and corrected. we anticipate drawing an agreement setting forth our several understr.ndi_ngs and agreements before the end of this week. After the the agreement has been executed, we will have no objection to this P.U.D. For your guidance, please find enclosed copies of two letters which suuTmirize our discussions. Very truly yours, Glen A. Johnson, President GAJ:sl Fnclosures cc: Board of Directors Mr. Gregory A. Hurst