November 29, 1979
Mr. John Pedas
Planning Director; Larimer County
Larimer County Building
200 West Oak
Ft. Collins, Colorado 80521
RE: East Harmony Commercial P.U.D.
Concept Plan
Dear Mr. Pedas:
This letter accompanies the submission of the East Harmony Commercial
P.U.D. Concept Plan.
Please make note of the following items in the Concept Plan:
1. Conceptual plan has been developed with respect to City of Ft.
Collins P.U.D. specifications.
2. We are requesting consideration for a parking ratio variance as
notecl on the plans.
A. Restaurant space: one parking space per 150 sq.ft. of gross
building area
B. Office space: one parking space per 300 sq.ft. of gross
building area.
3. We are requesting consideration for a variance on building heights.
Preliminary office building designs may require 36 feet of building
heighth to gable roof peaks.
I have included 14 copies of the Conceptual Plans. Conceptual review is
tentatively scheduled for December 27, 1979•
Respectfully,
Kurt D. Reed
Corporate Secretary
Fort C(1W�(office — One Drake Park, Suite 23, 333 West Drake, Fort Collins, Colorado-13031223.7474
Steamboat Office — P.O. Box 5114, Steamboat Square, Steamboat Springs, Colorado-13O31879.4545
RKHARD D. LAMM
GOVERNOR
3 ?*
? A
O
�0
07
COLORADO GEOLOGICAL SURVEY
DEPARTMENT OF NATURAL RESOURCES
715 STATE CENTENNIAL PUILDING — 1313 SHERMAN STREET
DENV ER, COLORADO 60203 PHONE (303) 639 2611
January 21, 1980
Ms. Sherry Albertson
Current Planning Section
Larimer County Planning Department
Fort Collins, CO 80522
Dear Ms. Albertson:
RE: HARMONY EAST COMMERCIAL P.U.D.
JOHN W. SOLD
Director
We have received and reviewed this subdivision application, and if the recommendations
of the c:nyineuring geologist end the U.S. Soil Conservation Service are carefully
follu:ed, then we have no geology -related objection to approval of this project.
JMS/ba
cc: Land Use Conmlission
Si cerely,
roes M. Soule
ngineering Geologist
GEOLOGY
STORY OF THE PAST .. . KEY TO THE FUTURE
Rir'rnRDD LAMM
DIVISION OF WATER RESOURCES
Department of Natural Resources
1313 Sherman Street- Room 818
Denver, Colorado 80203
Adminis!ration (303) 839-3581
Ground Water (303)839-3587
January 23, 1980
Ms. Sherry Albertson
Current planning Section
Larimer County Planning Dept-
P. O. Box 1190
Fort Collins, CO 80522
Re: I1an1-Iony East Commercial
J. A c�SCN
sts".e Fnymear
Dear Ms. Albertson:
This is to acknowledge receipt of preliminary plan material for
the above refcienced subdivision. The South Fort Collins Water District
no letter of commit -
has been designated as the source of water; however, en submitted. Information available in our files
ment for service has be
indicates that the District may have sufficient water available to serve
Com ncrcial devclopn entotontingent upon therdevelopereobtaiming cast
written commitment for service from the District.
Very truly yours,
Hal D. Simpson, Chief
Water Management Branch
H DS/GDV: mvf
cc: Jim Clark, Div. Eng.
Land Use Comm.
rig POUD- 4LLEY FIRE PFOTECTION DISTRICT
i Y f.� jY R-,�(O e���j,,,,� -I{ r i -'�• 4 � � �� �i _ l/\ ,,,� '�
46:5 HO ;AN DR. FORT COLLINS, COLORADO 20521 • C.A. WILLIS. CHIEF PHONE (303)226 0204
January 23, 1980
Jerry 'white
Larimer County Planning Office
P.O. Box 1458
Fort Collins, Co. 80522
Jerry:
RE: Harmony East Commercial P.U.D.
A,t the Conceotual Review stage, we 'required a
fire hydrant at each entrance to this complex.
The hydrant at the east entrance is shown and
an additional hydrant should be shown at the
west entrance. This additional hydrant should
riot be obstructed by the sign but be in the
general vicinity of that entrance.
Both fire hydrants should be Installed and
operational prior to any building construction.
Cf there are any questions, please conatet me.
sincerely,
Ay'
Gilbert Fisher,
Fire
Prevention
Bureau
cc: Harmony Group
2200 E. Lincoln - P.O. Box 403 Phone: 482-7853
January 28, 19BO
Current Planning Section
Larimer County Planning Dept.
Larimer County Courthouse
Fort Collins, CO 80522
RE: I?arinony East Commercial PUD
Dear Sirs:
the Inrrnony East Cuimnercial PUD is located just east of the
Country Store and Hanuony Dance Studio on terrace soils of Nunn
Clay Loam and Altvan-Satanta Loam. These soils would be prime
if irrigated, and the Nunn Clay Loam would have severe shrink -
swell limitation for cu�ranercial building sites.
The site is next to the Mail Creek; but, as the construc-
tion is planned and with proper design, this site would present
no problem in erosion or flooding. IIwaver, as the site is next
to Mail Creek, special effort should be taken not to damage the
vegetation on the strc;anbaak; and, if areas under construction
are to be left bare for long periods of time, a plan should be
developed to reduce erosion that would flow into the dams just
down the creek. The plan should include shaping of disturbed
areas and cover crops.
Sincerely,
�c
Roy E. Swanson
president
cc: Glenn M. McCarty, Dist. Consvt., SCS, Ft. Collins
THE LARIMER COUNTY CANAL NO. 2 IRRIGATING COMPANY
P. O. sox 523
Fort Collins, Colorado 80522
January 29, 1980
Ms. Sherry Albertson
Larimer County Planning Commission
P. O. Box 1190
Fort Collins, Colorado 80522
RE: H:arrnony East Co:,•mercial P.U.D.
Dear Ms. Albertson:
Plans for the above -mentioned P.U.D. have been reviewed by
this company; and after discussion and agreements with the
developer, Mr. Gregory A. Hurst, we find all of our objections
have been addressed and corrected.
we anticipate drawing an agreement setting forth our several
understr.ndi_ngs and agreements before the end of this week.
After the the agreement has been executed, we will have no
objection to this P.U.D.
For your guidance, please find enclosed copies of two letters
which suuTmirize our discussions.
Very truly yours,
Glen A. Johnson, President
GAJ:sl
Fnclosures
cc: Board of Directors
Mr. Gregory A. Hurst