HomeMy WebLinkAboutHARMONY CENTRE PUD CIRCUIT CITY STORE - Filed OA-OTHER AGREEMENTS - 2004-08-10.lion Services
Engineering Department
City of Fort Collins
July 18, 1997
Ms. Tess Jones
State of Colorado Department of Transportation
1420 2nd Street
Greeley, Colorado 80632-0850
RE: Access permit for Pavilion Lane
Dear Tess:
Attached is the application and State Highway Access Permit for Pavilion Lane serving the Harmony
Centre P.U.D., Circuit City Store. This is an existing street that is located on State Highway (SH) 287
approximately 896 feet North of SH 68 (Harmony Road) on the Fast side. This development is
providing an upgrade for this access point since it currently provides access to a retail shopping center.
It will continue to do this as well as provide access to a retail electronics store. The proposed upgrades
considered and accounted for the increase in traffic once the connection of Pavilion Lane to JFK
Parkway is made in the future. Please note that this connection is not a part of the required
improvements of this development.
This access is being improved as shown on the approved utility plans (Exhibit `B"). A right turn lane is
being provided on northbound SH 287 (South College Avenue) onto Pavilion Lane. The improvements
at the intersection of Pavilion Lane and SH 287 will consist of the reconfiguration of the curb, gutter, and
sidewalk in order for the right turn lane to line up with the existing right turn lane to the north of Pavilion
Lane. A 6' concrete crosspan will also be constructed at the intersection of Pavilion Lane and SH 287 for
drainage purposes (refer to Exhibit "B"). Please note that this right turn lane will not meet the
requirements of the State Highway Access Code at this time or in the future when the right deceleration
lane serves as an accelleration lane for the future proposed access point south of this site. Striping for the
right turn lane will allow for a 10' lane and 2' of gutter pan.
Curb and gutter with a 20' radius will also be placed at the southern end of the property for a future curb -
cut. For interim purposes, the existing curb and gutter on SH 287 will reamin to prevent any vehicular
access and the proposed right turn lane will be striped as shown on Exhibit "B" but will be modified in
the future by others. Once the proposed development south of this project (Harmony Centre P.U.D.) has
been completed, the above mentioned right turn lane will be modified to serve as a combination
accel/decellane.
If you have any questions regarding this, please contact me at (970) 221-6750.
PimBlandQford
Z--
Development Engineer
281 North College Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
COLORADO DEPARTMENT OF TRAN— ORTATION
Issuing authority applicat on
STATE HIGHWAY ACCESS PERMIT APPLICATION
acceptance date:
Instructions: - contact the Department of Transportation or your local government to determine your issuing authority.
- contact the issuing authority to determine what plans and other documents are required to be submitted
with your application.
- complete this form (some questions may not apply to you) and attach all necessary documents and
submit it to the issuing authority. Submit an application for each access requested.
- if you have any questions contact the issuing authority. Please print or type
1) Property owner (Permittee)
2) Applicant
Circuit City
DSP Builders, Inc.
street address, city
street address, city
9950 Mayland Drive Richmond
6075 Parkway Dr. #201
state & zip phone ff
state & zip
phone #,
VA 23233 804/527-4000
CO 80022
303 289-0666
3) Address of propety to be served by permit (if known)
S. College & Pavillio:n Lane
4) Legal description of property:
county subd'vision blod lot section tovnnhp rangm
Iarimer Np �,_ ,Tc;, 1 36 7N L9W
5) What state highway are you requesting access from?
6) What side of the highway ❑ N ❑ S $: E ❑ W
287 — S. College .Ave.
7) How many feet is the proposed access from the nearest mile post?
How many feet is the proposed access from the nearest cross street?
feet (circle: N S E IN )from:
fi9(n feet (circle: N S E W ) from: t+T`
8) Check here if you are requesting a
❑ new access ❑ temporary access SK improvement to existing access )(Change in access use ❑ removal of access
9) What is the approximate date you intend to begin construction?
8/15/97
10) Do you have knowledge of any State Highway access permits serving this property, or adjacent properties in which you have a property interest.
0 no ❑ yes, if yes - what are the permit number(s)?: and/or, permit date:
11) Does the property owner own or have any interests in any adjacent property?
CO no ❑ yes, if yes - please describe:
12) Are there other existing or dedicated public streets, roads, highways or access easements bordering or within the property?
0 no ❑ yes, if yes - list them on your plans and indicate the proposed and existing access points.
13) If you are requesting commercial or industrial access please indicate the types and _number of businesses and provide the floor area square footage of each.
business square footage business square footage
Circuit City - RZ-MfL lt- TRH tc iE D `
2
N49MCwC,-+-AlRG RE17ML. '�
E)eT ize-rAu- Cof-41—e= IZt--.TAIL
14) If you are requesting agricultural field access - how many acres will the access serve?
15) If you are requesting residential developement access, what is the type (single family, apartment, townhouse) and number of units?
type number of units type number of units
16) rovide the following vehicle count esti� a4tes for vehicles that will use the access. Leaving the property then returning is two counts. Indicate if your counts are
umes peak hour volor �c average daily volumes. WOK pH / S i1lRp NWN1
e of passenger cars and light trucks
a of multi unit trucks
a of other vehicles
i30 If Z50
N6H / NOM
NpH NO
a of single unit vehicles in excess of W If
a of farm vehicles (field sQupment)
Total count of all vehicles
5 Noti
(D
135 / Z50
17) Checkwith the issuing authority to determine which of the following documents are required to complete the review of your application.
(plans should be no larger than 24" x 36")
- Ia) Property map indicating other access, bordering roads and streets.
a) Highway and driveway plan profile. f) Proposed access design
b) ) Drainage plan showing impact to the highway right-of-way. 9J Parcel and ownership maps including easements.
c) Map and letters detailing utility locations before and after h) lSigning and striping plans.
development in and along the right-of-way. i) Traffic control plan.
d) Subdivisjon, zoning, or development plan. j) Proof of liability insurance.
If an access permit is issued to you it will state the terms and conditions for its use. Any changes in the use of the permitted
access not consistent with the terms and conditions listed on the permit may be considered a violation of the permit.
The applicant declares under penalty of perjury in the second degree, and any other applicable state or federal
laws, that all Information provided on this form and submitted attachments are to the best of their knowledge true
and complete.
Applicants signature
Data
— b-S)' &,-Ue,s
7 - 9- 97
If the applicant is not the owner of the property, we require this application also to be signed by the property owner or their
legally authorized representative (or other acceptable written evidence). This signature shall constitute agreement with this
application by all owners -of -interest unless stated in writing. If a permit is authorized, the property owner will be listed as
the permittee.
Property owner signature 'Z/Pd
°E/1e{'RL�ro+z N OhN o��rt{ �i�[lr]J f�,+,,
2-rr �h
Date
G ri� Deu, _ofic Bty,� �.4 'f1
-, Previous editions may be used until supplies are exhausted wvr rv,n,eia, —,
No/MP/Side:
COLORADO DEPARTMEN 1 OF TRANSPORTATION Local Jurisdiction Fort Collins
STATE HIGHWAY ACCESS PERMIT Dist/Section/Patrol: 49n54
DOT Permit No.:
Permit Fee: $0.00
Date of Transmittal: 08/27/97
THE PERMITTEE; APPLMA
Circuit Citv DSP Builders, Inc.
9950 Mavland Drive 6075 Parkway Drive #201
Richmond, VA 23233 Commerce City, CO 80022
11hone:(804)527-4000 Phone: (303) 289-0666
is hereby granted permission to construct and use an access to the state highway at the location noted below.
The access shall be constructed, maintained and used in accordance with the terms and conditions of this permit,
including the State Highway ,Access Code and listed attachments. This permit may be revoked by the issuing
authority if at any time the permitted access and its use violate any of the terms and conditions of this permit. The use
of advance warning and construction signs, flashers, barricades and flaggers are required at all times during access
constrlraion within State right-of-way in conformance with the MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES, Part VI. The issuing authority, the Department and their duly appointed agents and employees shall be held
harmless against any action for personal injury or property damage sustained by reason of the exercise of the permit.
LOCATION:
Access is located on SII 287, also known as Pavilion Lane, a distance of 896 feet North of SH 68 (Harmony Road) on the East
side- (4414 South College Avenue, Fort Collins, CO 8052.5)
ACCESS TO PROVIDE SERVICE TO:
A number of retail establishments including the futwe dcvclapmart of 1-larnumy Centre P.U.U. This access has been
evaluated for the future connection of Pavilion Lane to JFK Parkway.
OTHER TERMS AND CONDITIONS:
*****� "** SEE EXHIBIT A - TERMS AND CONDITIONS **********
MUNICIPALITY OR COUNTY APPROVAL
Required only when the a�ropriate local authority retains issuing authority.
By _) -Date _- �—Till C 4 GaL
Upon the signing of this permit the perm 'tee agrees to the terms and conditions and referenced attachments c ntained
herein. All construction shall be completed in an expeditious and safe manner and shall be finished within 45 days from
initiation T he permitted access shall be completed in accordance with the terms and conditions of the permit prior to
being used. The permittee shall notify City of Forl Collins 6nLinecrine - Inspections Division
wBb the Colorado Department of Transportation in _ Rick liici lel' __ at _L9701 2.21-6605
at least 48 hours prior to commencing construction within the State Highway right-of-way.
The person signing as the permittee must be the owner or legal representative of the property served by the permitted
access and have full authority to accept the permit and all it's terms and conditions. 1
Permiilee (X)
Date 7`�_.\q�
i
— -- -- _ _ —-
This permit is not valid until signed by a duly authorized representative of the Department.
DEPARTMENT OF`T7A1N,,PORTATION, STATE OF COLORADO l
By (X) �Z S!� IG" __ Date ��1 Title �«4S_re o t Q rn�4—
VVV (Date of issue)
COPY DISTRIBUTION: Required: Make copies as necessary for, Previous Editions are Obsolete and will not be used
I. Dls, , - !Or 9inaq I n6fll Authority Inspector CDOT Forrn #101
,' Apl ant GE Patrol rratllr f - 7 al
SHEET 1OF-,,2—
CO!_ORADC A`EPARTMENT OF TRA 'ORTATION
VARIANCE FROM THE STATE HIGHWAY ACCESS CODE
287/342.33/East Furt Collins
oq�
WHEN USED, THIS FORM SHALL BE ACCOMPANIED BY AN ACCESS PERMIT APPLICATION
1. State specific reasons for this variance request. Documents verifying statements may be requested or should be provided with request.
State specific sections of the State Highway Access Code from which this request seeks relief. (Additional sheets may be attached). If
variance is temporary, state conditions which will change allowing the access to conform to the access code. If date is known when
conformance can be achieved, provide that date.
SEE ATTACHED SHEET 2 OF 2
VARIANCE REQUEST FOR A REDUCED DECELERATION
LANE LENGTH AND REDUCED TAPER RATIO
NOTICE: Providing false information to a government agency is punishable as perjury in the second degree, as well as being punishable
under any other applicable state or federal laws,
his form submitted by .. n
(X)
b - - -f r..dlX
ITEMS BELOW THIS LINE ARE E=OR OFFICE USE ONLY,
Y-//-q
2. Recommendation of local government authority. When local government has issuing authority, this recommendation must be signed by
an authorized off ical.
THE CITY AGREES WITH THE CONDITONS STATED IN THE VARIANCE REQUEST.
l (X) �-9it-a., � � � Date
3. Recommendation of the Region Traffic /n Safety Engineer:
Wb�'n .<eTf t.�y, rraf'Y1.IYtC.tU. ci0Ctuf�'
Date
'e•�r.e.�•m:•en. a��.•o'•rr: n:v't n•ao♦1 '-•
The future street (shown on Sht, 4-ofVariance) to the south ali_8ns w_5.th existin Xonsin;ton
Drive to the west of SH 287. The South College Access Control Plan of 1989 recognizes that
street locat>>_on; therefore, fixing the distance available for the right deceleration lane into
the exi.stin� Pavil_i_on Lane.
I recommend anprovaT since rr_quest meets the ult.mate configuration conforms to the Access Control Plan. Th
rectu_rements of the Variance Procedure.
t I
INAL ACTION T,
BY THE REGION TRANSPORTATION DIRECTOR:
Having reviewed this variance request and all materials attached, I
stand#s, of jF,e State Highway Access Code.
X)
COPY - Region permit rips/ Canary copy.
approve, 'J deny, this request for variance from the
DateQ
U C OT Form t112 6/94
Sheet 2 of Yz{
Variance Request for a Reduced Deceleration Lane Length
Harmony Centre P.U.D. - Circuit City Store
I larmony Centre P.U.D. - Circuit City Stores is requesting a variance to State Highway Access Code
4.8. I .b. that requires a minimum deceleration lane length of 295 feet for a posted speed limit of 40
mph. "they are proposing a temporary deceleration lane length of 180 feet. The purpose of the
deceleration lane is to direct vehicles traveling northbound on College Avenue onto eastbound
Pavilion Lane safety and effectively. Currently vehicles have to enter Pavilion Lane from the
northbound travel lane on College Avenue. The proposed construction will enhance the turning
movements onto Pavilion Lane and provide a safer environment.
Circuit City expects that this temporary design will remain until Harmony Centre is developed. This
project is expected to begin construction in approximately four months. Once the construction
begins, the contractors for Harmony Centre will remove the striping for the taper and modify the
striping for the deceleration lane. This will provide a continuous right -turn lane on College Avenue
between Kensington Avenue and Pavilion Lane. The length of this new deceleration lane will be
approximately 278 feet long if measured from the PCR of Pavilion Lane to the PCR of Kensington
Avenue. This is still less than the minimum requirements that the State recommends, which is 295
feet.
Please refer to the traffic study prepared by Matthew J. Delich, P.E. on October 11, 1996 titled
Circuit Citv Traffic Study for his professional recommendations. Also included (with the Access
Penmit Application) are five sets of utility plans showing the appropriate information related to this
variance.
At this time the City of Fort Collins agrees with Mr. Delich. Although the deceleration lane does
not and will not meet the State of Colorado's minimum requirements expressed in the State Highway
Access Code, Section 4.8. Lb., the City feels that the proposed temporary deceleration lane and the
future continuous deceleration lane provide a safe and efficient environment for vehicles traveling
northbound on College Avenue and entering Pavilion Lane.