This letter is to address the Development Agreement
submitted regarding the above -mentioned PUD.
It is my understanding that an additional provision to
the Standard City Development Agreement was added by the
attorneys' for the owners and that the City is now requesting
indication that the Purchaser, Osprey, Inc., consents to the
additional provision. I can, on behalf of the applicant
Osprey, Inc., state that the applicant does so consent to the
addition of that provision and will, upon presentation,
indicate its acceptance by initialing the additional
provision.
If you have any questions regarding this matter, please
contact me.
Thank you for your continued cooperation.
Yours 1-very truly,
Robert L. Hiller
RLH/lw
CITY OF FORT COLLINS
ENGINEERING SERVICES
July 9, 1986
Tom Livingston
Osprey Homes, Inc.
155 Boardwalk Drive
Fort Collins, CO 80525
RE: Harbor Walk P.U.D.
Dear Tom:
It has come to my attention that during construction of the sanitary
sewer by Loveland Excavating the sidewalk, which is part of the South
Lemay Improvement District, was damaged by heavy equipment traffic.
This area is at the northwest corner of the intersection of South Lemay
Avenue and Harbor Walk Drive.
We feel that this repair should be made as soon as possible in order
not to delay final acceptance.
If you have any questions, please contact me at 221-6605.
Sincerely,
David S. Melberg
Construction Inspector
rim
FNGINFFPING SERVICES
300 LaPorte Ave- P.O. Box 580 Fort Collins, Colorado 80522 (303) 221-6605
CITY OF FORT COLLINS
DEVELOPMENT SERVICES — ENGINEERING
March 2, 1987
Mr. Dave Simpson
Loveland Excavating
1425 S. Lincoln Avenue
Loveland, Colorado 80537
Re: Waterline - Harbor Walk P.U.D.
Dear Dave:
This is to inform you that after the City's request back in August 1986
to raise the fire hydrant at Lemay Avenue and Harbor Walk Drive, please
be advised this work has been completed by your company and has been
tested and accepted by the City.
Sincerely,
Craig Farver
Construction Inspector
Mir ti
� 1 ati
OF✓:1 OPMFNT SERVICES -- 300 LaPorte Ave • PO Box 580 • Fort Collins. Colorado 80SL2 (303) 2216605
El1GINi-FRING
June 19, 1987
Re: Harborwalk Estates
Grading Check
Project No. 10-554-003
United Ban}: of Fort Collins
3665 J. F. Kennedy Parkway
Fort Collins, Colorado 80525
Attn: Mr. Walt Barclay
Dear Wait:
Per your request, vie have reviewed the elevations of the existing overlot
grading at Harborwalk Estates. It is our opinion that the completed
overlot grading is generally in accordance with the approved grading plan.
Confirmation was based on 31 spot elevations surveyed on June 19, 1967.
The results of this check are as follows:
Locations where current elevations are equal to = 3
design elevations.
Locations where current elevations are greater = 19
than design elevations, ie. more fill than
required; variance = 0.1' - 2.1'
Locations where current elevations are less = 9
than design elevations, ie. less filled
than required; variance = 0.1' - 1.4'
The areas, where fill is less than required, are minimal for the most part
and in the lower range of t1Te variance. A map showing locations and
elevations is available for ,your review.
It is noteo that the
grading plah
is an overlot
grading plan and is not
intended to reflect
exact finish
grading after
building constriction.
Material from building excavation is to be used in
canpletion of the finish
lot- grading. T'_ds .is dependent on
the size of home on each lot, and the
type of house design
incorporated.
The completed
hares on the project are
reprr,sentative of the
actual finish
grading of the
lots.
TARANTO, STANTON 3 TAGGE
('.on :ulDnq I nrp..... !
71H Wh;duu Way • Hutlrliny D • Forl CoIW s, CO 80525
1.ma3 P"G 0557 • Metro Denver Number (303) 595-9103
12 lJUN �r�lR
19
Page Two
Mr. Walt Barclay
United Bank of Fort Collins
June 19, 19II7
Should you have any questions, please do not hesitate to contact me.
Very truly yours,
Larry E. Stanton, P.E.
1''1Ijn,7W, STANTON & TAGGE
CONSULTING ENGINEERS
LES : kinc
CITY OF FORT COLLINS
DEVELOPMENT SERVICES — ENGINEERING
August 27, 1987
Mr. Walt Barclay
United Bank
Asset Quality Control
401 South College Avenue
Fort Collins, Colorado 80524
Re: Harbor Walk Estates
Dear Mr. Barclay:
Harbor Walk Estates, a Planned United Development, has been inspected and
initially accepted by the City pending the normal contractor one-year
warranty period.
Please be informed that this acceptance does not relieve the developer or
builder of his responsibility to repair any damage which may occur as a
result of home-building activity.
Sincerely,
David Stringer
Chief Construction Inspector