April 30, 1992
Rick Ensdorff
Transportation Administrator
City of Fort Collins
235 Mathews Street
Fort Collins, CO 80524
RE: Hampshire Square II
Dear Rick:
Please accept this letter as a follow-up to our recent
conversation.
The proposed 18 single-family lot subdivision is located at the
northwest corner of Drake and Hampshire. It is estimated that
approximately 180 trips per day will be generated from this area
directly onto the collector, Hampshire, and the arterial, Drake.
Thank you for your review of this project, and please let me know
if any further information will be of assistance.
Sincerely,
STORCK DEVELOPMENT COMPANY
RICHARD RR
RRS:mam
POST OFFICE BOX 8368 FORT COLLINS, COLORADO 80524 (303) 223-7555
STEWARr&ASSOC[ATES
Consulting Engineers and Surveyors
July 23, 1992
Mr. Michael R. Herzig, P. E.
Development Coordinator
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Mike:
I am writing to request a variance from the Street Design Criteria that
streets intersect at right angles. This request is for the intersection
of Hampshire Court and Hampshire Road. The angle of intersection is 83039',
which is within the allowable variance limit. Also, the centerline of
Hampshire Court lines up with, and is on the same bearing as, the existing
driveway into Drake Crossing on the east side of Hampshire Road.
Thank you for your consideration of this request.
Sincerely,
-k Gti ' tvZ
Phillip I. Robinson, P.E. & L.S.
Vice President
jrr
James H Stewart
and Associates, Inc.
214 IN Howes Street
PO. Box 429
Ft. Collins, C080522
303'482-9331
comm, ty Planning and Environmental
Engineering Department
City of Fort Collins
March 19. 199:1
Stork Development
2507 Hampshire Road
Fort Collins, CO 80526
RE: Hampshire Court
Dear Mr. Stork:
�rvices
This letter is to inform you that the utilities to include
sanitary sewer, water and storm sewer as well as the asphalt
paving and sidewalks, curbs and gutters have been inspected and
initially accepted by the City of Fort Collins pending the normal
contractors warranty period.
Please be informed that this letter of acceptance does not
relieve the developers, contractors, lot owners, or their
contractors of their responsibilities for the repair of any
damage which may occur as a result of the building contruction.
Sincerely,
� � r
Lance Newlin
Engineering Construction Inspector
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6005
STEWART&O SSOCIATES
Consulting Engineers and Surveyors
May 17, 1993
Ms. Kate Malers
Storm Water Utility
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Kate:
Re: Hampshire Court Subdivision
This is to certify that I have inspected the drainage facilities which
serve the Hampshire Court Subdivision and found them to be constructed in
conformance with the approved plans.
On May 15, 1993, I surveyed the as —constructed dimensions and elevations
of the detention pond and have calculated the volume to be 22,263 cubic feet,
which is more than required. The restriction plate with 82—inch diameter
opening is installed over the outlet pipe.
The attached red —lined print shows the surveyed elevations at various
locations, and the attached calculation sheet shows the as —built pond volume
calculation. Please call if you have questions.
Sincerely,
Phillip I. Robinson, P.E. & L.S.
Vice President