HomeMy WebLinkAboutGREENSTONE PUD PHASE 1 - Filed CS-COMMENT SHEETS - 2004-08-09PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 6 Jan 1993 DEPARTMENT: 'V-bb SVC--'
ITEM: 54-92C GREENSTONE PUD
Please respond to this project by Wednesday, January 15,1993
Planner: Kirsten Whetstone
NOTE: These are revised preliminary site, landscape, and ODP'plans
.for review at the January 25 Planning and Zoning Board Meeting
No Problems
_ Problems or Concerns (see.below)
of e-.'r•3:i: 07-iLi Jy 41ivarS wi eL
'tws
No.*T /viT�� �NgjJoif+M� T i111�1y iAN6S IV'k. ���I�iD.
NJ31v" V AA3 1-#WL'5
trjl��s �O.ue► ijl f�:� , �fX.�cs %pe JPa1o� ��vr'St INM-+
0#40S1 Ar A MiAr.7wa/w1 f%� 8 �fR/M� R1TseR a%��
'fi0lf�!/►t It p .4rOX C La1Tr JPC. �i4sSNCwf�
!PC ' Cua-tiE-S�ou (y�'�2o.w) vriu.4s�ME�vTS
Date: Signature:
1h1f z2o���
CHECK IF REVISIONS REQUIRED: J$ PLAT
❑ SITE
❑ LANDSCAPE
❑ UTILrrY
DEVELOPMENT SERVICES.—
w. o. 1�u'r. . oTvr..T 291 NORTH COLLEGE P.O.DOX 530 FORT COLLINS, COLORADO 90522-0580 (303)221-6750
7. The developer should be aware of the City Ordinance requiring
the undergrounding of certain existing overhead electric
lines. Please contact Alan Rutz at Light and Power (221-6700)
for more specific information.
8. Control monumentation is missing on the plat. There are many
bearings and distances missing for the various easements.
9. Sheet 2 of 19 does not belong on the plat, it is a stand alone
document and should be labeled 1 of 2 and 2 of 2.
10. The area with the irrigation pond must be a Lot or a Tract,
with designated usage on the plat and site plan. Include a
note regarding maintenance and ownership as well.
11. outer boundary monumentation is missing.
12. There is no dedication statement on the plat.
13. Vicinity map does not match the plat.
14. What does the 37.1775 acre near lot 11 refer to?
15. There should be a statement on the plat that "off -site
easements" are dedicated with this plat.
16. Pleased submit a revised plat.
17. Please refer to the two attached comment sheets from the
Stormwater Utility.
18. I have attached a letter from Platte River Power Authority
concerning the 100' powerline easement and information on the
magnetic fields generated from the transmission lines which
run through the Greenstone PUD area.
19. Do you have something in writing from PRPA giving you
permission to use the access road along the powerline easement
for an emergency access? Include this on the plans.
20. The temporary emergency access road should be shown and
labeled on the plans. Include a note regarding the timing and
construction of this temporary access road and the option of
constructing streets for phase 2 instead.
21. The temporary cul-de-sac on Greenstone Trail is not in the
same place on the site plan and plat.
22. Please label County Road 32 as a "Future 6 Lane Highway" or
"Master Planned 6 Lane Highway".
23. Include a note on the site plan about ownership and
maintenance of the landscape easement. Label the
equestrian/powerline easement on the site plan and include a
note about ownership and maintenance.
24. Parkland fees of $625.00 per acre are payable at the time of
building permit issuance.
25. Please provide additional fencing details and guidelines on
the site plan. Do you have any cut -sheets, photos, or
information about the three rail fence? What kind of fencing
will be allowed along lot lines, easement lines, along open
space tracts, etc.? Will solid privacy fencing be allowed
closer to the homes?
26. How much of the large lots will be buildable? Will you have
building envelopes or other "areas of disturbance" noted on
the site plan? Will there be restrictions on the amount of
lawn area. that can be planted in non-native grasses? These
issues should be addressed on the plans.
27. Under "KEY" please make a reference to note 410 to make it
clear that 0.5 acre of pasture is required per horse.
28. Could you provide
along County Road
see the detail at
plans, as; was done
a "blown -up" version
32 at a larger scale.
1" = 100'. Include a
on the preliminary.
of the landscaping
It is difficult to
cross-section on the
This concludes staff comments at this time. In order to stay on
schedule for the March 22, 1993 Planning and Zoning Board hearing,
please note the following deadlines:
Plan revisions are due March 3, 1993 by 12:00 noon.
PMT's, colored renderings, and 10 prints are due March 15.
Final myl.ars and other documents are due March 18th by 12:00.
Please be aware that the development agreement and utility
plans must be signed prior to the Planning and Zoning Board
Hearing. If not, a condition will be placed on the project
giving you 30 days to finalize the plans and agreement, after
which time, you must submit a request for an extension from
the Planning and Zoning Board. Please complete the attached
ownership information sheet for the Development Agreement and
return to Mike Herzig.
If you have any questions about these comments or would like to
schedule a time to meet to discuss them, please contact me at 221-
6750.
Sincerely,
rely,�4
Kirsten Whetstone
Project Planner
cc Gary Odehnal, Parsons and Associates
Kerrie Ashbeck, Engineering Department
Lim/3 wig n mew !o 14W.4b6 "-C
-lb 7'7yf� ,ap'Ditio /°t'°,v714�JS efc 774r-e� 11167WII; v
tea. -$Ab6& ,oa u4s ! ,f o -W • �► s (Spaea +•
v46X, ,oy �til 4p6a AA L•t,Ni-f +�` �� i�`3neuaa �c
„.es�ti�jltir. PROJECT
,lint>srr, ..gilt.
�itiv y
COMMENT
Citv of Foft Collins
DATE: 1 Feb 1993 DEPARTMENT: U i', �rf�
ITEM: 54-92D GREENSTONE PUD PHASE 1
Please respond to this project by Friday, February 12,1993
Planner: Kirsten Whetstone
No Problems
X Problems or Concerns (see below)
Review of these plans should not be construed as a commitment
that telephone facilities sufficient to serve this project are
presently available. U S WEST will provide telephone service in
accordance with the rates and tariffs on file with the Colorado
Public Utilities Commission.
Telephone facilities generally occupy rear lot utility easements,
which must be located on terrain which permits trenching
operations. These plans show relocation of an irrigation ditch
into the 12' "slope & utility easement” beginning at Station
69+50. We question whether this allows the developer sufficient
space for utility trenches in the same easement. The use of this
easement for "slope (as great as 4:1)" may cause the developer
difficulties in providing the required trench for telephone
facilities. The County Road 32 Plan also shows a proposed box
culvert at Station 56+16. We would need to see details on this
culvert to determine its impact on existing telephone cables.
The developer is responsible for provision of all trench and
street crossings for telephone facilities within the project, and
the developer pays up front construction costs for facilities
within the development.
Any relocation. of existing telephone facilities required by these
plans will be paid for by the developer.
Date: Signature! /J�e —
02_ 8.-q� .�—.
CHECK IF REVISIONS REQUIRED: PLAT
❑ SITE
❑ LANDSCAPE
►S 1
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.DOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221fi750
PLANNING DEPARTMENT
PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 1 Feb 1993 DEPARTMENT: U f,
ITEM: 54-92D GREENSTONE PUD PHASE 1
Please respond to this project by Friday, February 12,1993
Planner: Kirsten Whetstone
No Problems
X Problems or Concerns (see below)
Review of these plans should not be construed as a commitment
that telephone facilities sufficient to serve this project are
presently available. U S WEST will provide telephone service in
accordance with the rates and tariffs on file with the Colorado
Public Utilities Commission.
Telephone facilities generally occupy rear lot utility easements,
which must be :Located on terrain which permits trenching
operations. These plans show relocation of an irrigation ditch
into the 12' "slope & utility easement" beginning at Station
69+50. We question whether this allows the developer sufficient
space for utility trenches in the same easement. The use of this
easement for "slope (as great as 4:1)" may cause the developer
difficulties in providing the required trench for telephone
facilities. The County Road 32 Plan also shows a proposed box
culvert at Station 56+16. We would need to see details on this
culvert to determine its impact on existing telephone cables.
The developer is responsible for provision of all trench and
street crossings for telephone facilities within the project, and
the developer pays up front construction costs for facilities
within the development.
Any relocation of existing telephone facilities required by these
plans will be paid for by the developer.
Date:
Signature:
CHECK IF REVISIONS REQUIRED: PLAT
❑ SITE
❑ LANDSCAPE
j� UTILITY
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.OMOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
0
PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 1 Feb 1993 DEPARTMENT:��'
ITEM: E54-92D GREENSTONE PUD PHASE 1
Please respond to this project by Friday, February 12, 1993
Planner: IS:irsten Whetstone
No Problems
l� Problems or Concerns (see below)
4f0Aira0(- M OW LI M 6h/T47-lo+.) /S m/SSIA/<,,
MANY 2fSF112/ivG j AND D,,d7-.4 Awc60-f V1C--
I'Y) /SS/niC� �%Z/►'1 TNcs 1��9i?�o��
T-H �S / T iS A
boGume
AJa r-
ST�AN. O
Date: Signature:
CHECK IF REVISIONS REQUIRED: ❑
EA S Frnt Nrs ,
�G d NLr
aVert -�
PLAT
SITE
LANDSCAPE
UTILITY
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
THc: A RE=/} w/r#4 -rtrc !RR IG,4T/0NO
YYl us T Q,_= A L a r a 2 .4 7/2,4c-T'j
cSrGNATC-D UJ'45v
jE Ou--erg. SovNOARy MoNvm t/VTA4 rtd'.') ! i
M I ssS / Nfi ,
clti�►ry Map Does /va-r- 5C,,E?PK 7-b rn.aTL64
�E
V//f.4r rues
rt�cT
Ac rtc ,A-le4k
LoT /l
/ Fen 7Z03 ?
�t
JIJ&&O A
S7-ArG ► tq j-- YHAT OFF
/q rZe 'MC ATtYo uj irH
T/*IJ O.+J-
i
lee-1212
/fir C D 72) 4B&F'o/L e-
Re cdlz OIAJ f
GU�
City of Fort Collins
PROJECT
COMMENT SHEET
DATE: I Feb 1993 DEPARTMENT: ��A
ITEM: 54-92D GREENSTONE PUD PHASE 1
Please respond to this project by Friday, February 12, 1993
Planner: Kirsten Whetstone
Y- No Problems
Problems or Concerns (see below)
Date: a , g - 9a Signature: CfG(/. 7l�e
CHECK IF REVISIONS REQUIRED: ❑ PLAT
❑ SITE
❑ LANDSCAPE
❑ UTILITY
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.DO%580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
coyyLNS -L pG�
t
c x
c
DI
M E M O
FORT CO
Sanitation District
TO: Ms. Kirsten Wetstone, City of Fort Collins, Planning
PO Box 580,FFort Collins, CO /
FROM: Terry Farrill, Systems Engineer �"�
THRU: Michael DiTullio, District Manager
DATE: February 2, 1993
SUBJECT: 54-92C Greenstone PUD
The Fort Collins -Loveland Water District and the South Fort Collins
Sanitation District has reviewed the above mentioned project and
submits the following comments:
Exclusive easements are to be provided for the water and
sanitary sewer facilities that are not located in the
street right-of-way. The easements are to be provided on
standard District easement forms.
Adequate access is to be provided to the sanitary sewer
line located along the Union Pacific Railroad.
If you have any, questions, please do not hesitate to contact me at
226-3104.
4700 South College Avenue
Fort Collins, Colorado 60525
Telephone 226-3104-669-4321
FAX (303) 226-0186
Co:rnmur ' , Planning and Environmental ' -vices
Planning Department
City of Fort Collins
February 19, 1.993
Ed Hyatt
Jim Sell Design
117 E. Mountain Ave.
Fort Collins, CO 80524
Dear Mr. Hyatt:,
City Staff has reviewed your submittal for Greenstone PUD Phase I -
Final, and offers the following written comments:
1. The temporary access road may be used for Phase One as shown
on the Preliminary PUD plat, or concurrent construction of
Phase 2 streets will be necessary to provide a looped street
network and adequate emergency access.
2. Utility lines for Public Service will need to occupy the 26'
equestrian, landscape and utility easement adjoining the north
line of County Road 32. Coordination of development of this
easement with installation of utility lines will be required.
No trees will be allowed within 4' of any buried natural gas
lines.
3. Where common utility/sidewalk easements exist (along
Greenstone Trail, Creekside Road, Silver Moon Lane... the 54'
wide right-of-way) there must be a minimum of 8' from the rear
of the walk to the rear of the easement.
4. Cul-de-sac (46' right of way) utility easements need to be a
minimum of 13' wide rather than 10' wide due to the proposed
planting of street trees between the rear of the sidewalks and
the ROW :Lines. This space is normally used by Fort Collins
Light and Power for installation of buried electrical
facilities.
5. Please see attached comment sheet from US WEST.
6. The Fort: Collins -Loveland Water District and South Fort
Collins Sanitation District has the following comments:
Exclusive easements are to be provided for the water and
sanitary sewer facilities that are not located in the street
ROW. The easements are to be provided on standard District
easement forms.
Adequate access is to be provided to the sanitary sewer line
located along the UPRR tracks.
^4I \ nth � 011 =c Ac"Iluc • I' (). !3r\ _-411 • I 'It � "1111, � 0 110-'-_)_•)0 • I'0'1 -1 i,7'1